This is a request for proposal for a design-bid-build construction project at Marine Corps Air Station Beaufort in South Carolina. The project involves constructing a new cryogenics facility including administration and liquid oxygen/nitrogen production sections, as well as demolishing existing Buildings 898 and 702. Additional site work includes earthwork, fill, paving, landscaping, and installing oxygen/nitrogen filling stations and storm water piping. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command as a small business set-aside. Proposals are due on July 16, 2020 with a projected award date of 806 calendar days after notice to proceed. Pricing will be evaluated for the base requirements and all option items on a firm-fixed-price basis.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. N40085-19-R-9020 CON- DBB P457 CRYOGENICS FACILITY MCAS BEAUFORT
PROPOSALS ARE DUE ON 16 JULY 2020, AT 2:00 PM EDT. REFER TO SECTION 00 21 16 FOR PROPOSAL DELIVERY INFORMATION.
PRE-PROPOSAL INQUIRIES (PPI) SUBMISSION AND CUT-OFF IS AS DIRECTED IN THE SOLICITATION.
MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $5,000,000 AND $10,000,000 IN ACCORDANCE WITH DFARS 236.204.
NAICS CODE IS 236220 -Commercial and Institutional Building Construction, AND THE SMALL BUSINESS SIZE STANDARD IS $36,500,000.
THIS ACQUISITION IS BEING SOLICITED AS A SMALL BUSINESS SET-ASIDE.
WAGE DETERMINATION GENERAL DECISION NUMBER: SC20200008 01/03/2020
KRISTY L. WRIGHT 757-341-1644
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
15-Jun-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________806 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________21 Jul 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4008519R9020 44
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008519R9020
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Base Price
FFP
FOB: Destination
NET AMT
Option Item 1
FFP
Demolition Site 898
Option Item 2
FFP
Demolition Site 702
Option Item 3
FFP
Dumpster Enclosure
Planned Modification 1 FF&E
FFP
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0005 N/A N/A N/A N/A
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFEORS
INSTRUCTIONS TO OFFERORS
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2 GENERAL OVERVIEW OF CONTRACT
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT (PHASE II)
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPIs)
4.4 BETA.SAM.GOV (BETASAM)
5. INCORPORATION OF TECHNICAL PROPOSAL
6. ATTACHMENTS: LOCATED ON BETA SAM
6.1 ATTACHMENT A - PRE-PROPOSAL INQUIRY LOG
6.2 ATTACHMENT B - CONSTRUCTION EXPERIENCE AND PROJECT DATA SHEET
6.3 ATTACHMENT C - PAST PERFORMANCE QUESTIONAIRE
6.4 ATTACHMENT D – PRICE PROPOSAL FORM
1. GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.1.1 This solicitation is being issued as A Small Business Set-Aside.
1.1.2 The NAICS code for this procurement is 236220 and the size standard is $36,500,000
1.1.3 This acquisition will be advertised utilizing FAR Part 36, Design Bid Build Source Selection Procedures and 15 – Contracting by Negotiations resulting in a Firm Fixed Price (FFP) contract for construction services.
1.1.4 Magnitude of Construction: Between $5,000,000 and $10,000,000.
1.2 GENERAL OVERVIEW OF CONTRACT
The project is to construct a new, low-rise cryogenics facility. Construction of the cryogenics facility is generally described as reinforced concrete masonry unit (CMU) wall system with an exterior split-faced CMU veneer, concrete pile foundations, interior walls of CMU and a standing seam metal roof system. The cryogenics facility includes an administration / maintenance section and a liquid oxygen/ nitrogen production section. Project also constructs a covered storage area for gas cylinder storage. Built-In Equipment includes lockers, display cases and shelving. The AT/FP includes standard force protection measures such as mass notification systems, emergency shutoffs for ventilation systems, laminated windows, blast resistant construction including windows, doors and frames, emergency lighting and signage. Site Preparations include removal of contaminated earth, earthwork, site fill, site demolition at Bldg 898 and Bldg 702, and cryogenic tanks removal. Paving and Site Improvements include concrete pavement, asphalt parking, landscaping, storm water management, equipment shelter and a dumpster pad. Oxygen/nitrogen filling stations, and storm water piping. The filling stations provide cover for the pipe works and storage for cylinders.
2. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest priced, technically acceptable offer.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a).
The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.
4. In order to permit efficient competition, the Navy will utilize the following methodology.
Proposals will initially be screened for price and placed in order (lowest price to highest price).
The Navy will then evaluate the technical factors of the lowest priced proposal. In the event the proposal is deemed Unacceptable, the process described will be conducted again as many times as necessary, until such time as the Government identifies a technical acceptable proposal. The Navy will make award to the lowest priced technically acceptable proposal from among the lowest priced proposals. However, the Navy, at its sole discretion, reserves the right to increase the number of proposals it will review under this methodology. Accordingly, under this methodology, the technical factors of some proposals may not be evaluated by the Navy. If discussions are deemed necessary by the Contracting Officer, all proposals will be evaluated (both technical and price) for the purpose of establishing a competitive range.
5. An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions, if held. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.
3. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Past Performance
The distinction between Corporate Experience and Past Performance is Corporate Experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price:
(1) Solicitation Submittal Requirements:
Price Binder: Price shall be submitted on the Price Proposal Form included in the solicitation.
The offeror shall submit one (1) original electronically, marked “Original” in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. Additionally, the offeror shall submit one (1) hard copy, marked “Copy” and one
(1) CD‐ROM, in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. All hard copies shall be in separate 3-ring binders. All submissions shall including the following:
� Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, DUNS, cage code, point of contact (POC), POC phone number, and POC email address;
� Completed SF 1442 signed with all amendments acknowledged;
� Price Proposal Form;
� Copy of Representation and Certifications and proof of registration in System for Award Management (SAM);
� Confirmation of filing of Veterans' Employment and Training (VETS) VETS-4212 for the 2017 filing cycle.
� Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not to exceed $3 million;
� Responsibility Determination information (see below)
The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line item numbers (CLINs). Failure to complete all CLINs may result in the proposal being rejected or otherwise not considered.
In the event of a discrepancy between the original and copies, the original electronic copy marked “original” of the proposal will govern. Furthermore, any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/nonprice information within the price proposal will not be considered.
ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL
PACKAGE:
RESPONSIBILITY DETERMINATION INFORMATION – In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:
1. One (1) signed bank reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Description of offeror’s facilities and equipment.
4. Other offeror’s work presently under contract.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements, all option items and the planned modification (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section 00700 of the solicitation. In accordance with FAR 52.217-5, Evaluation of Options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Technical Factors:
Non-price binder: The offeror shall submit one (1) original electronically, marked “Original” in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. Additionally, the offeror shall submit one (1) hard copy, marked “Copy” and one (1) CD‐ROM, in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. All hard copies shall be in separate 3-ring binders. All submissions shall including the following:
� Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Phone Number, and Email Address;
� 8 ½ x 11 paper, 12-point font;
� Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated;
� Additionally, include an electronic version of the price and non-price proposals on one CD-ROM.
In the event of a discrepancy between the original and copies, the original electronic copy marked “original” of the proposal will govern. Furthermore, any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/nonprice information within the price proposal will not be considered.
(b) Non-cost/price Factors:
Factor 1 – Corporate Experience:
(i) Solicitation Submittal Requirements:
The offeror shall submit the following information:
Submit a minimum of two (2) up to a maximum of five (5) relevant construction projects that best demonstrates experience as a prime contractor on relevant projects that are similar in size, scope and complexity to the RFP. For the purposes of this evaluation, a relevant project is further defined as:
Size: A single building with a cumulative square footage of 5,000 SF or greater.
Scope/Complexity: New construction projects of an industrial facility or warehouse structure.
Renovations and additions will not be considered.
Projects submitted for the offeror shall be completed within the past seven (7) years of the date of issuance of this RFP. Projects must clearly state the construction completion date or may be considered Not Relevant. Also, projects completed outside of this window will be considered “Not Relevant.”
Ensure that the project description clearly describes whether the project is new construction, addresses how the project meets the Size and Scope/Complexity requirements as delineated above, and provides the final construction cost.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project. Projects which are not complete as of the date of issuance of this RFP shall not be considered by the SSEB.
The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). The Government will not consider information beyond this page limit.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). Projects that are not sufficiently described so as to clearly demonstrate compliance with the above Size and Scope/Complexity requirements may be deemed Not Relevant.
If the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture partners. Experience submitted for one of the Offeror’s Joint Venture partners in which the Joint Venture partner was a partner in a different Joint Venture entity may be submitted to demonstrate relevant project experience. Offerors who fail to submit experience for all Joint Venture members may be rated lower. Offerors are still limited to a total of five (5) projects combined.
If the Offeror is proposing as a single corporate entity (i.e. not as a Joint Venture), the Offeror may submit relevant project experience it performed as a partner in a previous Joint Venture.
Offerors are still limited to a total of five (5) projects.
Experience of proposed subcontractors will not be considered. Likewise, the Government will not consider the offeror’s experience as a subcontractor.
(ii) Basis of Evaluation:
The basis of evaluation will include the offeror’s demonstrated experience and depth of experience in performing relevant construction as defined above in the solicitation submittal requirements. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects total. Any projects submitted in excess of the first five (5) will not be considered. An offeror that does not submit a minimum of two (2) relevant projects as defined above will receive a rating of “Unacceptable” and will not be eligible for award unless corrected through discussions, if held.
Factor 2 – Safety
(i) Solicitation Submittal Requirements:
The offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)
Experience Modification Rate (EMR): Include three previous complete calendar years’ (2017, 2018, 2019) worth of data. This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, the offeror must affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends must be addressed as part of the factor submission.
OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: Submit three previous complete calendar years’ (2017, 2018, 2019) worth of data. If an offeror cannot submit an OSHA DART, for any year, the offeror must affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA and DART data negatively must be addressed as part of this factor submission.
Total Recordable Case (TRC) Rate: Submit three previous complete calendar years’ (2017, 2018, 2019) worth of data. If an offeror cannot submit TRC rates, for any year, the offeror must affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the TRC rate data negatively must be addressed as part of this factor submission.
Technical Approach for Safety: The technical approach to safety narrative shall be limited to one
(1) double-sided page (or two (2) single-sided pages), and must address all items below.
� The offeror shall describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.
� The offeror shall fully describe the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work.
� The offeror shall describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.
� The offeror shall describe their methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
(ii) Basis of Evaluation: The evaluation will collectively consider the following:
Experience Modification Rate (EMR) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Total Recordable Case (TRC) Rates Offeror Technical Approach to Safety Other sources of information available to the Government
Experience Modification Rate (EMR): For the three previous complete calendar years (2017, 2018, 2019), the offeror will submit EMR. If no EMR exists, the offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance companyDesign-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends should be addressed as part of this selection factor. The board will evaluate the EMR to determine if the offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rates: For the three previous complete calendar years (2017, 2018, 2019), the offeror will submit their OSHA DART, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA DART rates, the offeror must affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART data and negative trends should be addressed as part of this element. The board will evaluate the OSHA DART rates to determine if the offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
Total Recordable Case (TRC) Rates: For the three previous complete calendar years (2017, 2018, 2019), the offeror will submit their TRC, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit TRC rates, the offeror must affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the TRC rate data and negative trends should be addressed as part of this element. The board will evaluate the TRC rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
Technical Approach to Safety: The offeror will describe their plan to evaluate their safety performance and that of potential subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two pages. The Government will not consider information beyond this page limit. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. Those offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases.
Factor 3, Past Performance:
(i) Solicitation Submittal Requirements:
FOR EACH PROJECT SUBMITTED WITH ITS PROPOSAL FOR FACTOR 1 –
CORPORATE EXPERIENCE, IF A COMPLETED CPARS EVALUATION IS AVAILABLE,
IT SHALL BE SUBMITTED WITH THE PROPOSAL. IF THERE IS NOT A COMPLETED
CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 – Corporate Experience. AN OFFEROR SHALL NOT
SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.
IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror must complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Kristy Wright, via email at kristy.l.wright1@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror. It is the responsibility of the offeror to provide accurate points of contact for each identified contract and current telephone numbers and/or email addresses.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Offerors are strongly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Corporate Experience. Offerors are also strongly encouraged to address any adverse past performance issues. Such explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
Performance award or additional information submitted will not be considered.
(ii) Basis of Evaluation:
This evaluation focuses on how well the offeror performed on the relevant projects submitted under Factor 1 – Corporate Experience and past performance on other relevant projects currently documented in known sources.
The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance including, but not limited to:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and
- Recency of tasks performed that are identical to, similar to, or related to the task at hand
- A respect for stewardship of Government funds
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination.
The assessment of the offeror’s past performance will be used as a means of evaluating the offeror’s probability to successfully meet the requirements of the RFP.
4. PROPOSAL REQUIREMENTS
4.1. PRE-PROPOSAL CONFERENCE AND SITE VISIT: There will be NO Site Visit or Pre- Proposal Conference for this solicitation.
4.2. In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non-Price Factors Proposal, submitted in accordance with the Evaluation Factors for Award and other requirements as set forth in this solicitation:
i. The Price Proposal and the Non-Price Proposal shall be submitted in separate 3-ring binders. All pages shall be numbered and binders shall be appropriately tabbed, conforming to the proposal submittal requirements’ structure for each evaluation factor.
Price and Non-Price Proposals must be submitted SEPARATELY in sealed envelopes/boxes. Any pricing information included in the Non-Cost/Price Proposal will not be considered. Similarly, any Non- Price information included in the Price Proposal will not be considered.
“PRICE PROPOSAL OR NON-COST/PRICE PROPOSAL FOR RFP N40085-19-R-9020,
ATTN: KRISTY WRIGHT; DO NOT OPEN IN MAIL ROOM”.
Price and Non-Price Proposal submissions will be accepted via email to kristy.l.wright1@navy.mil or via DoD SAFE (Secure Access File Exchange) only.
Electronic submissions could be separated so as not to overload e-mail/DOD SAFE during transmission.
Information from DoD SAFE https://safe.apps.mil/ website: “DoD SAFE (Secure Access File
Exchange) is a service to make it easy for you to exchange unclassified files up to 8.0 GB that can't be sent through email. The recipient will receive an automated email and instructions for uploading the file(s).”
A DOD Safe submission must be requested by the offeror no later than 4 calendar days before the proposal due date and time. To request a DOD SAFE generated link to submit your proposal, send an email to Contract Specialist Kristy Wright at kristy.l.wright1@navy.mil stating the name and email of the recipient.
In addition to an electronic version of the bid guarantee, a paper copy must be provided.
Mailing address:
NAVFAC MIDLANT, ACQ21
9324 Virginia Avenue Bldg. Z140, Room 225 Norfolk, VA 23511 Attn: Kristy Wright, Contract Specialist
Note: Offerors will NOT be penalized for deadline submission of paper copies as long as an electronic version is received by the proposal due date and time and the mailed item(s) postmark is at least 1 day prior to the proposal due date.
ii. The offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated herein, for non-conformance may result in an unfavorable proposal evaluation.
Proposals MUST be sent via express mail carriers. Hand-delivery is NOT an option. Please mail to the following address:
NAVFAC MIDLANT
9324 Virginia Avenue, Bldg., Z140, Room 225 Norfolk, VA 23511 Attn: Kristy Wright, Contract Specialist - ACQ21
4.3. PRE-PROPOSAL INQUIRIES (PPIs): All inquiries must be submitted in writing and received by the Contract Specialist by 10 calendars days prior to proposal due date in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI’s submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to kristy.l.wright1@navy.mil. Use of the PPI Log template is REQUIRED. The PPI Log Template (Attachment A) can be found on the BETASAM website under the Additional Documents section.
4.4. Amendments will be posted directly to beta.sam.gov. The drawings and specifications will be posted on beta.sam.gov under the Additional Documents section of this RFP. Additionally, other postings will be made to beta.sam.gov, such as the pre-proposal inquires (PPI) log, revised drawings, etc., under the Additional Documents section of the RFP. It is recommended contractors check the beta.sam.gov Additional Documents section of the RFP periodically to see if additional postings have been made. It is the contractor’s responsibility to check beta.sam.gov for all postings.
Section 00600 - Representations & Certifications
CLAUSES INCORPORATED BY REFERENCE
52.203-2 Certificate Of Independent Price Determination APR 1985 52.203-11 Certification And Disclosure Regarding Payments To
Influence Certain Federal Transactions
SEP 2007
52.204-8 Annual Representations and Certifications MAR 2020 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law
FEB 2016
52.215-6 Place of Performance OCT 1997 52.215-22 Limitations on Pass-Through Charges--Identification of
Subcontract Effort
OCT 2009
52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-3 Alt I Protest After Award (Aug 1996) - Alternate I JUN 1985 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-28 Preparation of Proposals--Construction OCT 1997 52.244-6 Subcontracts for Commercial Items AUG 2019 52.251-1 Government Supply Sources APR 2012 252.236-7001 Contract Drawings, and Specifications AUG 2000
CLAUSES INCORPORATED BY FULL TEXT
52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS--
REPRESENTATION (NOV 2015)
(a) Definitions. Inverted domestic corporation and subsidiary have the meaning given in the clause of this contract entitled Prohibition on Contracting with Inverted Domestic Corporations (52.209-10).
(b) Government agencies are not permitted to use appropriated (or otherwise made available) funds for contracts with either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation, unless the exception at 9.108-2(b) applies or the requirement is waived in accordance with the procedures at 9.108-4.
(c) Representation. The Offeror represents that--
(1) It [ ___ ] is, [ ___ ] is not an inverted domestic corporation; and
(2) It [ ___ ] is, [ ___ ] is not a subsidiary of an inverted domestic corporation.
(End of provision)
52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)
(a)(1) The Offeror certifies, to the best of its knowledge and belief, that-
(i) The Offeror and/or any of its Principals-
(A) Are ( ) are not ( ) presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;
(B) Have ( ) have not ( ), within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property (if offeror checks “have”, the offeror shall also see 52.209-7, if included in this solicitation); and
(C) Are ( ) are not ( ) presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in paragraph (a)(1)(i)(B) of this provision.;
and
(D) Have , have not , within a three-year period preceding this offer, been notified of any delinquent Federal taxes in an amount that exceeds $3,500 for which the liability remains unsatisfied.
(1) Federal taxes are considered delinquent if both of the following criteria apply:
(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.
(ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
(2) Examples. (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. Sec. 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. Sec. 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. Sec. 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.
(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code).
(ii) The Offeror has ( ) has not ( ), within a three-year period preceding this offer, had one or more contracts terminated for default by any Federal agency.
(2) Principal, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager;
head of a division or business segment; and similar positions).
(b) The Offeror shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Offeror learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
(c) A certification that any of the items in paragraph (a) of this provision exists will not necessarily result in withholding of an award under this solicitation. However, the certification will be considered in connection with a determination of the Offeror's responsibility. Failure of the Offeror to furnish a certification or provide such additional information as requested by the Contracting Officer may render the Offeror nonresponsible.
(d) Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (a) of this provision. The knowledge and information of an Offeror is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
(e) The certification in paragraph (a) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this solicitation for default.
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other…
This is the start of the file's text. The full file is on GovTribe.