This document contains an Attachment C Construction Experience Project Data Sheet template and details of a solicitation for a design-bid-build project as well as building demolition for a P457 Cryogenics Facility at Marine Corps Air Station (MCAS), Beaufort, South Carolina.

The solicitation is to construct a new, low-rise cryogenics facility of reinforced concrete masonry unit wall system with an exterior split-faced CMU veneer, concrete pile foundations, interior walls of CMU and a standing seam metal roof system. The cryogenics facility includes an administration/maintenance section and a liquid oxygen/nitrogen production section, as well as a covered storage area for gas cylinder storage. Site preparations include removal of contaminated earth, earthwork, site fill, demolition of two buildings, and cryogenic tanks removal. Additional work comprises paving, landscaping, storm water management, equipment shelter, filling stations, and storm water piping. The Naval Facilities Engineering Command is the contracting agency. Offerors must complete the Construction Experience Project Data Sheet to provide details of relevant past projects for consideration. The solicitation number is N4008519R9020.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information: