About this file

This document contains a utility plan drawing and related federal contract opportunity solicitation. The utility plan drawing depicts site utilities for the construction of a new cryogenics facility at Marine Corps Air Station Beaufort in South Carolina. The drawing shows existing site features and proposed utility layouts including water, gas, electrical, and stormwater infrastructure.

The related federal contract opportunity solicitation seeks design-build proposals for the construction of the new cryogenics facility as well as demolition of two existing buildings. The project scope includes site preparation such as earthwork and demolition, construction of the low-rise reinforced concrete masonry unit cryogenics facility, paved parking areas, landscaping, and installation of utilities. The new cryogenics facility will produce and store liquid oxygen and nitrogen and include an administration area. Additional facilities comprise a covered storage area for gas cylinders and filling stations. The solicitation was issued by the Naval Facilities Engineering Command for the Department of the Navy.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FF = 31.50

6,603 SF

P-457 CRYOGENICS

R

C

W

E

S

T

O

A

D

W

E

S

T

C

A

P

E

T

R

E

E

T

J E

T

L A

N

E

N

UT UT UT UT UT UT UT UT

U

T

U

T

U P

U P

U P

U P

U P

U

P

U

P

U

P

U

P

UP UP UP UP UP UP

U

T

U

T

U

T

U

T

U

T

U

T

U

T

U

T

UT UT UT UT

U

T

U

T

U T

U T

U T

U T

UL UL UL

UL

U L

U L

U L

U L

U L

UL

U L

U L

U L

U L

U L

UP UP UP UP UP

U

S

U

S

U T

U T

U T

U T

U T

U

T

UL

U

S

U

S

U

S

U

S

U

S

U S

U

L

U

S

U

S

U

S

US

GRAPHIC SCALE

NEW WORK KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D M

ID

-A

TL

A

N

TI

C

P4

C

RY

O G

EN

IC

S

FA

CI

LI

TY

CU100

GENERAL SHEET NOTES

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

BUILDING OVERHANG

AutoCAD SHX Text

GV

AutoCAD SHX Text D

AutoCAD SHX Text

SN

AutoCAD SHX Text

CL

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text

CL

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

PP#2164

AutoCAD SHX Text

PP#2163

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

GLM

AutoCAD SHX Text

GLM

AutoCAD SHX Text H

AutoCAD SHX Text

GW

AutoCAD SHX Text

GLM

AutoCAD SHX Text

GLM

AutoCAD SHX Text

PLM

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text

12 PA

AutoCAD SHX Text

10 PA

AutoCAD SHX Text

CL

AutoCAD SHX Text S

AutoCAD SHX Text

CL

AutoCAD SHX Text

IR

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text

SN

AutoCAD SHX Text

SN

AutoCAD SHX Text

TR

AutoCAD SHX Text

GW

AutoCAD SHX Text G

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

PP#2156

AutoCAD SHX Text

BACK OF CURB

AutoCAD SHX Text

OLD GATE

AutoCAD SHX Text

MOTOR

AutoCAD SHX Text

GATE

AutoCAD SHX Text

OLD PHONE

AutoCAD SHX Text

PIV

AutoCAD SHX Text

8' CHAIN LINK FENCE

AutoCAD SHX Text

9 PARKING SPACES

AutoCAD SHX Text

5 PARKING SPACES

AutoCAD SHX Text

5 PARKING SPACES

AutoCAD SHX Text

13 PARKING SPACES

AutoCAD SHX Text

PD

AutoCAD SHX Text

SSMH RIM:30.65 IE:23.82

AutoCAD SHX Text

SSMH RIM:25.63 IE:16.26

AutoCAD SHX Text

±108 LF 8" PVC @ 1.05%

AutoCAD SHX Text

SSMH RIM:26.08 IE:15.45

AutoCAD SHX Text

±97 LF 8" PVC @ 0.83%

AutoCAD SHX Text

±73 LF 24" RCP

AutoCAD SHX Text

SDMH RIM:28.66 BOX FULL OF DIRT/DEBRIS

AutoCAD SHX Text

HOLE IN REAR OF CONCRETE STORM BOX IE:24.79

AutoCAD SHX Text

GI RIM:28.91

AutoCAD SHX Text

CMP BURIED TOP:27.64

AutoCAD SHX Text

CMP BURIED TOP:27.47

AutoCAD SHX Text

CMP BURIED TOP:27.51

AutoCAD SHX Text

CMP TOP:27.51

AutoCAD SHX Text

18"RCP IE:25.62

AutoCAD SHX Text

18"RCP IE:25.76

AutoCAD SHX Text

± 23 LF 18"RCP

AutoCAD SHX Text

± 60 LF CMP

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

GI RIM:23.27 IE(SE):17.43 IE:(NE):17.43

AutoCAD SHX Text

GI RIM:25.03 IE(SW):17.91 IE(N):18.13

AutoCAD SHX Text

±88 LF 30" RCP

AutoCAD SHX Text

±175 LF 36" RCP

AutoCAD SHX Text

IE:17.01

AutoCAD SHX Text

GI RIM:25.55 IE(N):19.67 IE(S):19.22

AutoCAD SHX Text

24" RCP

AutoCAD SHX Text

PD

AutoCAD SHX Text

±220 LF 30" RCP

AutoCAD SHX Text

ONE STORY BLOCK BUILDING FFE:31.70

AutoCAD SHX Text 39.30'

AutoCAD SHX Text 32.60'

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE DEPRESSION

AutoCAD SHX Text

GAS TANK

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

EDGE OF PAVEMENT (ASPHALT)

AutoCAD SHX Text 120.20'

AutoCAD SHX Text 41.60'

AutoCAD SHX Text

ONE STORY BRICK BUILDING FFE:26.41'

AutoCAD SHX Text

BUILDING OVERHANG

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

8' CHAIN LINK FENCE

AutoCAD SHX Text E

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

RBS

AutoCAD SHX Text

TP 2 EL.30.67 NAVD 88

AutoCAD SHX Text G

AutoCAD SHX Text N 230506.6010

AutoCAD SHX Text E 2083244.1520

AutoCAD SHX Text

TP 3 EL.30.03 NAVD 88

AutoCAD SHX Text

RBS

AutoCAD SHX Text N 230223.1330

AutoCAD SHX Text E 2083153.6430

AutoCAD SHX Text

EDGE OF PAVEMENT (ASPHALT)

AutoCAD SHX Text

EDGE OF PAVEMENT (ASPHALT)

AutoCAD SHX Text

EDGE OF PAVEMENT (ASPHALT)

AutoCAD SHX Text

EDGE OF PAVEMENT (ASPHALT)

AutoCAD SHX Text

EDGE OF PAVEMENT (ASPHALT)

AutoCAD SHX Text

8"PVC

AutoCAD SHX Text

STORM DRAIN LINE SCALED IN FROM GIS

AutoCAD SHX Text

PD

AutoCAD SHX Text

BACK OF CURB

AutoCAD SHX Text

10 PARKING SPACES

AutoCAD SHX Text

PG

AutoCAD SHX Text

SCO-1

AutoCAD SHX Text

SCO-2

AutoCAD SHX Text

SCO-3

AutoCAD SHX Text

SCO-4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. 264 LF OF 6" GRAVITY SANITARY SEWER LATERAL WITH CLEAN 264 LF OF 6" GRAVITY SANITARY SEWER LATERAL WITH CLEAN OUTS EVERY 70 FT. MINIMUM SLOPE 1%. CLEANOUTS LOCATED IN PAVEMENT MUST HAVE H20 TRAFFIC RATED VALVE BOX. 2. 8" PVC C-900 WATER LINE TO SUPPLY 6" DI FIRE HYDRANT 8" PVC C-900 WATER LINE TO SUPPLY 6" DI FIRE HYDRANT AND 2" HDPE DOMESTIC WATER LINE. 3. SITE LIGHTING (TYP.) SEE ELECTRICAL. SITE LIGHTING (TYP.) SEE ELECTRICAL. 4. 116 LF OF NATURAL GAS LINE AND METER. TIE TO EXISTING 116 LF OF NATURAL GAS LINE AND METER. TIE TO EXISTING GAS LINE. GAS LINE AND METER TO BE INSTALLED BY DOMINION ENERGY COMPANY. 5. UNDERGROUND ELECTRICAL, SEE ELECTRICAL UNDERGROUND ELECTRICAL, SEE ELECTRICAL 6. DUCT BANK, SEE ELECTRICAL DUCT BANK, SEE ELECTRICAL 7. 186 LF OF 6" DUCTILE IRON LINE FOR FIRE HYDRANT. 186 LF OF 6" DUCTILE IRON LINE FOR FIRE HYDRANT. 8. FIRE HYDRANT & 6" G.V. IN BOX. LABEL HYDRANT AS4005. FIRE HYDRANT & 6" G.V. IN BOX. LABEL HYDRANT AS4005. 9. 8"x6" REDUCER 8"x6" REDUCER 10. DUAL SWEEP CLEANOUT AT BUILDING DUAL SWEEP CLEANOUT AT BUILDING 11. TIE TO EXIST MH WITH OUTSIDE DROP CONNECTION TIE TO EXIST MH WITH OUTSIDE DROP CONNECTION INV. IN = 16.75. CORE DRILL AND BOOT. 12. 8" X 2" TEE, 2" GV IN BOX WITH MARKER, RPZ BACKFLOW 8" X 2" TEE, 2" GV IN BOX WITH MARKER, RPZ BACKFLOW PREVENTER AND 2" HDPE 13. EXIST 8" WATER LINE MAY REQUIRE ADJUSTMENT TO EXIST 8" WATER LINE MAY REQUIRE ADJUSTMENT TO ACCOMMODATE NEW DITCH WORK ABOVE. SEE CU101 FOR ADJUSTMENT. CONTRACTOR TO VERIFY. 14. 8"x12" TSV, 8" GV IN H-20 RATED BOX WITH MARKER 8"x12" TSV, 8" GV IN H-20 RATED BOX WITH MARKER 15. 8" - 45 RESTRAINED JOINT BEND (NO THRUST BLOCKS) 8" - 45° RESTRAINED JOINT BEND (NO THRUST BLOCKS)16. ELECTRICAL EQUIPMENT, SEE ELECTRICAL ELECTRICAL EQUIPMENT, SEE ELECTRICAL 17. PAD-MOUNTED TRANSFORMER, SEE ELECTRICAL PAD-MOUNTED TRANSFORMER, SEE ELECTRICAL 18. RAISE EXIST GAS VALVE BOX TO FINISHED GRADE RAISE EXIST GAS VALVE BOX TO FINISHED GRADE 19. MECHANICAL PAD, SEE MECHANICAL. MECHANICAL PAD, SEE MECHANICAL. 20. 8"x6" TS AND 6" G.V. IN BOX. G.V. MUST BE WITHIN 18" OF 8"x6" TS AND 6" G.V. IN BOX. G.V. MUST BE WITHIN 18" OF TEE-TO BE DISCUSSED AT PRE-CON MEETING. 21. 6" - 11.25 RESTRAINED JOINT BEND (NO THRUST BLOCKS) 6" - 11.25° RESTRAINED JOINT BEND (NO THRUST BLOCKS)22. 1-1/4" WATER LINE TO EMERGENCY SHOWER AND EYEWASH 1-1/4" WATER LINE TO EMERGENCY SHOWER AND EYEWASH 23. SEE ES102 AND ES103 FOR CONTINUATION OF NEW SEE ES102 AND ES103 FOR CONTINUATION OF NEW ELECTRICAL WORK 24. PROVIDE AND COORDINATE NATURAL GAS METER RELOCATION PROVIDE AND COORDINATE NATURAL GAS METER RELOCATION WITH DOMINION ENERGY COMPANY. 25. NEW DUCT BANK MUST GO UNDER GAS LINE. FIELD LOCATE NEW DUCT BANK MUST GO UNDER GAS LINE. FIELD LOCATE GAS LINE PRIOR TO BEGINNING DUCT BANK. 26. FIELD VERIFY FM SC AND NATURAL GAS BEFORE LIGHT POLE FIELD VERIFY FM SC AND NATURAL GAS BEFORE LIGHT POLE INSTALLATION. 27. DUCT BANK MUST GO UNDER STORMDRAIN. DUCT BANK MUST GO UNDER STORMDRAIN. 28. VERTICAL 45 DEGREE BENDS TO AVOID CONFLICT WITH STORM VERTICAL 45 DEGREE BENDS TO AVOID CONFLICT WITH STORM DRAIN. WATER MAIN MUST BE DIP IN THIS SECTION CENTERED ON THE CROSSING. 29. FIRE HYDRANT. LABEL HYDRANT AS4004. FIRE HYDRANT. LABEL HYDRANT AS4004. 30. BJWSA POINT OF DEMARCATION. BJWSA POINT OF DEMARCATION.

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

DES

AutoCAD SHX Text

DRW

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 07 AUG 2018

AutoCAD SHX Text

CHK

AutoCAD SHX Text

SATISFACTORY TO DATE

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

OF

AutoCAD SHX Text

EPROJECT NO.

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

UNCLASSIFIED

AutoCAD SHX Text

PM/DM

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

FIRE PROTECTION

AutoCAD SHX Text

MIDLANT CI CORE

AutoCAD SHX Text

NAVAL STATION NORFOLK

AutoCAD SHX Text

MCAS BEAUFORT

AutoCAD SHX Text

BEAUFORT, SC

AutoCAD SHX Text 05/22/2020

AutoCAD SHX Text

MJD/JPC

AutoCAD SHX Text

EJA

AutoCAD SHX Text

DSN

AutoCAD SHX Text 1565952

AutoCAD SHX Text N/A

AutoCAD SHX Text

AutoCAD SHX Text 60'

AutoCAD SHX Text 0'

AutoCAD SHX Text 1"=30'

AutoCAD SHX Text 30'

AutoCAD SHX Text

UTILITY PLAN

AutoCAD SHX Text

MC

AutoCAD SHX Text

AH

AutoCAD SHX Text

MD

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 12812580

AutoCAD SHX Text

AutoCAD SHX Text

DLB

AutoCAD SHX Text

1. ALL UTILITY WORK MUST BE COMPLETED DURING OFF PEAK ALL UTILITY WORK MUST BE COMPLETED DURING OFF PEAK HOURS AND AT THE APPROVAL OF THE CONTRACTING OFFICER. 2. COORDINATE ALL OUTAGES WITH THE CONTRACTING OFFICER. COORDINATE ALL OUTAGES WITH THE CONTRACTING OFFICER. 3. ENSURE ALL VAULTS AND RIMS ARE INSTALLED AT THE FINAL ENSURE ALL VAULTS AND RIMS ARE INSTALLED AT THE FINAL COMPLETED GRADES.

AutoCAD SHX Text APPROVED BY LCDR CRAIG CULBERTSON, PWD MCAS BEAUFORT FEAD DIRECTOR, WITH NAVFAC, VIA EMAIL.

Sheets and Views
CU100 UTILITY PLAN

File details come from the government source that posted it. Updated .