This amendment modifies solicitation number N4008519R9020 to provide responses to contractor questions. The solicitation is for the design and construction of a new cryogenics facility at Marine Corps Air Station Beaufort in South Carolina. The project scope includes construction of a reinforced concrete masonry building with split-faced CMU veneer, concrete pile foundations, interior CMU and metal roofing. An administration/maintenance section and liquid oxygen/nitrogen production section will be constructed along with a covered gas cylinder storage area. Site preparations involve removal of contaminated earth and demolition of two existing buildings. The amendment specifies that air infiltration testing should be conducted in the field with results reported to the contracting office. Laboratory testing of fenestration is not required beyond manufacturer certifications that products meet specified standards.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-19-R-9020 CON- DBB P457 CRYOGENICS FACILITY MCAS BEAUFORT

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Kristy Wright; kristy.l.w right1@navy.mil; 757-341-1644

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9020

X 9B. DATED (SEE ITEM 11)

15-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jul-2020

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to provide the following:

1. Updated PPI response

PPI #

Reference

Question Response Page Section Paragraph

08 41 13 para 3.4.1.a 3.4.5

The specs instruct to “Test air infiltration in accordance with ASTM E783” but provide no direction regarding number of units required to be tested. Also, the specs start by referencing ASTM E783 in para.

3.4.1 and then go on to reference to ASTM E283 in para. 3.4.1.a. ASTM E783 is a field test an ASTM E283 is a laboratory test. Does the specifier want field testing, lab testing, both, and how many units?

Finally, the specs instruct to “Submit certified test reports showing that the system is designed to provide no uncontrolled water when tested in accordance with ASTM E1105.” Does the specifier intend the same “certified test reports” requirement for the air infiltration testing in 3.4.1, or is field testing and/or additional lab testing for air infiltration actually required?

Perform field tests and provide results to the ROICC. Lab test should have been performed by the manufacturer; check product data to confirm that the proposed fenestration complies with industry standards as listed in the specifications .

Additional Lab testing beyond what is mentioned in the specifications is not required. This specification section deals with the storefront entrance and windows.

(End of Summary of Changes)