About this file

This scope of work document outlines the requirements for a federal contract to remove and dispose of sunken sections of Pier 1006 at U.S. Fleet Activities in Sasebo, Japan. The contractor will be responsible for supervision, labor, materials, and equipment to remove pontoon sections A, B, C, and D, which are currently underwater, and will dispose of all demolished materials off base. The contractor must also relocate section E to the location of the removed section A. The contract completion date is 365 calendar days from award. The contractor must submit an accident prevention plan, crane plan, dive plan, construction schedule and disposal documents for approval prior to starting any construction work.

Attachment (5) 1655714 Scope of Work

View the file

Other files

File Type Posted
Amendment 0007_ 20B6501.pdf PDF
Atch_(7)_Pre-Bid_Inquiry Response_20B6501-Amend 0007.pdf PDF
Atch (d)_Bid Price Sheet_20B6501.pdf PDF
Atch (12)1623066-SPEC-Amend0007.pdf PDF
Atch (1)_1623066-Spec-Final (234 pages).pdf PDF
Atch_(7)_Pre-Bid_Inquiry Response_20B6501-Amend 0006.pdf PDF
Amend 0006_20B6501_Maintenance Dredging.pdf PDF
Amendment 05_20B6501.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0005.pdf PDF
Atch (11) Reference dwg_ #1004 #1005 #1006.pdf PDF
Amend 0004_20B6501_Maintain Dregding.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0004.pdf PDF
Atch (10) Reference dwg_Pier-2.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0003.pdf PDF
Amend 0003_20B6501_Maintenance Dredging.pdf PDF
Atch (8)_1623066-SPEC-Amend0002.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0002.pdf PDF
Amend 0002_20B6501_Maintenance Dredging.pdf PDF
Atch (9) 1559823_Revised Drawings (16 Pages)_Amend 02.pdf PDF
Atch (6)_N4008420B6501-eP#1623066 AMEND 0001.pdf PDF
AMEND 0001_IFB 20B6501.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501 Maintenance Dredging.pdf PDF
IFB_N4008420B6501_Maintenance_Dredging.pdf PDF
Atch_(a)_Pre-Bid_Inquiry_Form.doc DOC document
Atch_(b)_Base_Access_Pass_DBIDS_Card.xlsx XLSX spreadsheet
Atch_(3)_1559823_Spec-Final_(8_Pages).pdf PDF
Atch_(2)_1623066_Drawings_(6_pages).pdf PDF
Atch_(4)_1559823_Drawings_(16_Pages).pdf PDF
Atch_(c)_Provision_52.204-24.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Removal and Disposal of Sunken Sections of Pier 1006 Sasebo, Japan 22 October 2019

NAVFAC FAR EAST

SOW 22 Oct 2019

1.0 General Description

1.1 The Contractor shall provide supervision, labor, material, and equipment required to perform all work for the following project: Removal and Disposal of Sunken Sections of Pier 1006. All work shall be done in a manner to provide a complete, usable and finished end product. See section “11. Work Requirements” for an expanded and detailed scope of work.

1.2 All work shall be performed in accordance with, but not limited to, standard industry practices, applicable local, prefectural, and U.S. federal codes, laws, and .

2.0 Location

2.1 The work shall be performed at U.S. Fleet Activities, Sasebo, Japan

3.0 Time for Completion

3.1 The project Contraction Completion Date (CCD) shall be 365 calendar days from award.

4.0 Examination of the Premises

4.1 Contractor shall reference FAR Part 52.236-3 titled “Site Investigation and Conditions Affecting the Work”. Site visits by contractors are encouraged and can be arranged by contacting the Contracting Office.

5.0 Inspection and Approval

5.1 All material and workmanship shall be subject to the inspection and approval of the Government

6.0 Special Scheduling Requirements/Work Procedures

6.1 Existing and adjacent spaces to remain in operation during construction shall be protected from damage, dust, and debris at all times. Damage to any existing spaces, finishes, items, furniture and equipment, as a result of the contractor’s operations, shall be replaced in-kind by the Contractor at no expense to the Government.

6.2 Construction work areas shall have complete and secure separation from adjacent occupied areas.

6.3 Ensure procedures for scheduling outages are included if appropriate.

7.0 Passes and Badges

7.1 All Contractor employees shall obtain the required employee and vehicle passes.

UNCLASSIFIED/FOR OFFICIAL USE ONLY

Removal and Disposal of Sunken Sections of Pier 1006 Sasebo, Japan 22 October 2019

8.0 Safety

8.1 All work shall be conducted in a safe manner and shall comply with all requirements of the U.S. Army Corps of Engineers Safety and Health Requirements Manual EM-385-1-1.

8.2 The Contractor shall submit the Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA) plan for approval by the Contracting Officer. Submit within 60 days from issuance of this Task Order, and obtain approval prior to start of any construction activities.

9.0 Pre-Construction Conference

9.1 Within 90 workdays of issuance of the task order, the contractor shall contact the Contracting Officer Representative to schedule a pre-construction conference.

10.0 Submittals

10.1 The Contractor shall submit an accident prevention plan (APP), crane plan, dive plan, construction schedule, disposal method and manifests documents required for government approval, prior to the start of any construction activities.

11.0 Work Requirements

11.1 Remove and dispose of sunken pontoon sections at Pier 1006 as shown on page of this document.

11.2 The pier sections shall be removed in a manner which preserves as much of the existing piles as possible. Damage to piles shall be minimized in order to preserve for future use.

11.3 Pier utilities shall be disconnected by the Contractor.

11.4 Pontoon sections A, B, C, and D are underwater. Estimated weight calculations are shown on page .

11.5 The contractor shall dispose of all existing demolished/removed material off base and will completely clean up job site daily at the end of every work day.

LOCATION MAP

NAVAL FACILITIES ENGINEERING COMMAND FAR EAST

C1

EX

IS

TI

NG

A

ND

S

IT

E

PL

AN

O F

PI

ER

U N

C

LA

SS

IF

IE

D

/F O

R O

FF

IC

IA

L

U

SE

O N

LY

R em ov e

D is po se of

Su nk en Se ct io n -C

R em ov e

D is po se of

Su nk en Se ct io n -B

R em ov e

D is po se of

Su nk en Se ct io n -D

R em ov e

D is po se of

Su nk en Se ct io n -A

R el oc at e Se ct io n -E to lo ca tio n of re m ov ed se ct io n

-A

U N

C

LA

SS

IF

IE

D

/F O

R O

FF

IC

IA

L

U

SE

O

LY

C

LA

SS

IF

IE

D

/F O

R O

FF

IC

IA

L

U

SE

O

C

LA

SS

IF

IE

D

/F O

R O

FF

IC

IA

L

U

SE

O

File details come from the government source that posted it. Updated .