About this file

This amendment modifies the specifications for a federal contract to perform maintenance dredging at Juliet Basin at the U.S. Fleet Activities in Sasebo, Japan. The amendment changes the completion date from 330 to 480 days, establishes an exclusionary period from April 1st to October 31st where dredging of certain areas cannot be performed, and provides that the preferred work sequence is subject to change based on government berthing requirements. Depending on berthing needs, the government may allow multiple sequences to be completed simultaneously. Upon finishing a sequence, the area must be ready for government use.

View the file

Other files

File Type Posted
Amendment 0007_ 20B6501.pdf PDF
Atch_(7)_Pre-Bid_Inquiry Response_20B6501-Amend 0007.pdf PDF
Atch (d)_Bid Price Sheet_20B6501.pdf PDF
Atch (1)_1623066-Spec-Final (234 pages).pdf PDF
Atch_(7)_Pre-Bid_Inquiry Response_20B6501-Amend 0006.pdf PDF
Amend 0006_20B6501_Maintenance Dredging.pdf PDF
Amendment 05_20B6501.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0005.pdf PDF
Atch (11) Reference dwg_ #1004 #1005 #1006.pdf PDF
Amend 0004_20B6501_Maintain Dregding.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0004.pdf PDF
Atch (10) Reference dwg_Pier-2.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0003.pdf PDF
Amend 0003_20B6501_Maintenance Dredging.pdf PDF
Atch (8)_1623066-SPEC-Amend0002.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501_Amend 0002.pdf PDF
Amend 0002_20B6501_Maintenance Dredging.pdf PDF
Atch (9) 1559823_Revised Drawings (16 Pages)_Amend 02.pdf PDF
Atch (6)_N4008420B6501-eP#1623066 AMEND 0001.pdf PDF
AMEND 0001_IFB 20B6501.pdf PDF
Atch (7) Pre-Bid Inquiry Response_20B6501 Maintenance Dredging.pdf PDF
IFB_N4008420B6501_Maintenance_Dredging.pdf PDF
Atch_(a)_Pre-Bid_Inquiry_Form.doc DOC document
Atch_(b)_Base_Access_Pass_DBIDS_Card.xlsx XLSX spreadsheet
Atch_(3)_1559823_Spec-Final_(8_Pages).pdf PDF
Atch_(5)_1655714_Scope_of_Work_(9_Pages).pdf PDF
Atch_(2)_1623066_Drawings_(6_pages).pdf PDF
Atch_(4)_1559823_Drawings_(16_Pages).pdf PDF
Atch_(c)_Provision_52.204-24.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

eProject No. 1623066

AMENDMENT NO. 0007 (1/1)

NAVFAC

SPECIFICATION NO.

eProject No. 1623066

PE: CI45 S.Kumagai

AMENDMENT NO. 0007

DATE: 13 February 2020

MAINTENANCE DREDGING PH-1, JULIET BASIN

At the

U.S. FLEET ACTIVITIES, SASEBO, JAPAN

The purpose of this amendment is to change completion days and special scheduling requirements.

SECTION 01 11 00.00 33 SUMMARY OF WORK

PARA. 1.6.1 Commencement, and Completion of Work:

LINE 2. Change “330” to “480”.

PARA. 1.6.2 Sequence work:

LINE 1 and 2. Delete the Sentence “This contract --- WORK SEQUENCE.”, and substitute: “The table below identifies the preferred WORK

SEQUENCE. The WORK SEQUENCE is subject to change depending on

Government Berthing Requirements.

Exclusionary Period:

No dredging work must be performed sequence work 2,3,4,5, and 6 during the period between 1th April and 31th October.”.

LINE 3, 4, and 5. Delete the Sentence “The Contractor --- Government use.”, and substitute: “Depending on Government Berthing Requirements, the Government may or may not allow multiple Work Sequences to be completed at the same time. After completion of a sequence, the area of the sequence must be ready for Government use.".