N4008025R9500-0039.pdf
PDF 1 MB Posted
- Solicitation number
- N4008025R9500
About this file
Summary of Amendment 0039 to Contract N4008025R9500
This is Amendment 0039 to solicitation N4008025R9500, a Design-Build (DB)/Design-Bid-Build (DBB) Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) for large-scale U.S. military projects in Washington D.C., Maryland, and Virginia. The amendment was issued by COMNAVFACSYSCOM Washington on April 21, 2026, and is applicable only to offerors determined to be in the competitive range. The amendment extends the proposal due date to April 28, 2026, no later than 1400 local time, with receipt of revised proposals serving as Final Proposal Revisions (FPR). The Government intends to make award without obtaining further revisions unless otherwise determined to be in its best interest.
The amendment revises solicitation Section 00 21 00 (Instructions to Proposers) to clarify that the schedule must demonstrate understanding of the work including the base CLIN and Option CLINs 0001-0006, logical sequence of events, and sufficient detail to identify all major milestones. The amendment updates Section 6 ATTACHMENTS, including revisions to Attachment D (Past Performance Questionnaire, revised April 22, 2025) and Attachment H (P-691 Price Proposal Form, revised April 20, 2026). Enclosure 1 implements changes in accordance with the Revolutionary FAR Overhaul, removing numerous older FAR clauses and revising or adding clauses with November 2025, February 2026, June 2025, and July 2025 effective dates across Sections 00 21 00 (Instructions), 00 45 00 (Representations and Certifications), and 00 72 00 (General Conditions).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40080-25-R-9500- Design-Build (DB)/Design-Bid-Build (DBB) Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Aw ard Construction Contract (MACC) for Large Scale U.S. Military Projects, Locations in Washington D.C., Maryland, and Virginia
PLEASE SEE SF30 BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Apr-2026
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008025R9500
X 9B. DATED (SEE ITEM 11)
13-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21 APR 2026
CODE
COMNAVFACSYSCOM WASHINGTON
1314 HARWOOD ST
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008025R9500
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
1. Revise proposal due date of 28 April 2026 NLT 1400 local time. Receipt of revised proposals concludes discussions and serves as Final Proposal Revisions (FPR). The Government intends to make an award without obtaining further revisions unless determined otherwise to be in the Government's best interest.
2. Revise Solicitation:
Section 00 21 00 – INSTRUCTIONS TO PROPOSERS Revise Non-Price Factor 6, to read:
TO: "The schedule shall demonstrate an understanding of the work to include the base CLIN and Option CLINS 0001-0006, a logical sequence of events to accomplish the work, and be sufficiently detailed so as to identify all of the major milestones."
Revise Section 6 ATTACHMENTS:
TO:
Attachment A PIEE Vendor Registration Instructions Attachment B PPI Log Attachment C Construction and Design Experience Project Data Sheet Attachment D Past Performance Questionnaire (REVISED 04022025) Attachment E Small Business Subcontracting Plan Attachment F Historical SB Utilization Attachment G Small Business Participation Commitment Document Attachment H P-691 Price Proposal Form (REV04202026) Attachment I P-691 Specifications Attachment J P-691 Drawings Attachment K SECNAV5512 Access Form Attachment L N4008025JA009 (Redacted) Attachment M Preproposal Conference and Site Visit Presentation Attachment N Preproposal Conference and P691 Site Visit Attendee Log Attachment O Signage Guideline from IAP
Enclosure 1. (page 3 of 4) captures the revisions to the following sections IAW FAR Overhaul:
Section 00 21 00 – Instructions Section 00 45 00 - Representations and Certifications Section 00 72 00 - General Conditions
THE FOLLOWING IS LIMITED TO THOSE OFFERORS DETERMINED TO BE IN THE COMPETITIVE RANGE
The purpose of this amendment is to:
Enclosure 1.
This solicitation is hereby revised as follows in accordance with the Revolutionary FAR Overhaul:
REMOVES: REVISES: ADDS:
52.203-15 52.204-1 52.204-2 52.204-8 52.204-16 52.204-17 52.204-18 52.204-21 52.204-23 52.204-24 52.204-25 52.204-27 52.204-28 52.204-29 52.204-30 52.211-6 52.211-10 52.219-32 52.223-20
52.223-21
52.236-1 52.236-4
52.236-26
52.236-27 52.236-28
52.204-7 (NOV 2025)
52.204-13 (NOV 2025)
52.209-2 (NOV 2025)
52.209-7 (NOV 2025)
52.209-9 (NOV 2025)
52.209-10 (NOV 2025)
52.209-11 (NOV 2025)
52.209-13 (NOV 2025)
52.210-1 (NOV 2025)
52.215-1 (NOV 2025)
52.215-2 (NOV 2025)
52.215-6 (NOV 2025)
52.215-11 (NOV 2025)
52.215-13 (NOV 2025)
52.215-19 (NOV 2025)
52.215-20 (NOV 2025)
52.215-21 (NOV 2025)
52.216-21 (NOV 2025)
52.216-22 (NOV 2025)
52.217-5 (NOV 2025)
52.219-1 (NOV 2025)
52.219-8 (NOV 2025)
52.219-9 (FEB 2026)
52.219-14 (NOV 2025)
52.219-28 (NOV 2025)
52.222-3 (NOV 2025)
52.222-4 (NOV 2025)
52.222-5 (NOV 2025)
52.222-6 (NOV 2025)
52.222-7 (NOV 2025)
52.222-8 (NOV 2025)
52.222-9 (NOV 2025)
52.222-10 (NOV 2025)
52.222-11 (NOV 2025)
52.222-13 (NOV 2025)
52.222-14 (NOV 2025)
52.222-33 (NOV 2025)
52.222-35 (NOV 2025)
52.222-36 (NOV 2025)
52.222-37 (NOV 2025)
52.222-50 (NOV 2025)
52.222-54 (NOV 2025)
52.222-55 (NOV 2025)
52.222-62 (NOV 2025)
52.223-2 (NOV 2025)
52.223-3 (NOV 2025)
52.223-11 (NOV 2025)
52.223-12 (NOV 2025)
52.225-9 (NOV 2025)
52.204-90 52.204-91 52.240-90 52.240-91 52.240-92 52.240-93
N4008025R9500
52.225-11 (NOV 2025)
52.229-3 (JUL 2025)
52.233-1 (NOV 2025)
52.233-2 (NOV 2025)
52.233-3 (NOV 2025)
52.233-4 (NOV 2025)
52.236-2 (JUL 2025)
52.236-3 (JUL 2025)
52.236-5 (JUL 2025)
52.236-6 (JUL 2025)
52.236-7 (JUL 2025)
52.236-8 (JUL 2025)
52.236-9 (JUL 2025)
52.236-10 (JUL 2025)
52.236-11 (JUL 2025)
52.236-12 (JUL 2025)
52.236-13 (JUL 2025)
52.236-17 (JUL 2025)
52.236-21 (JUL 2025)
52.243-4 (JUN 2025)
52.243-6 (JUN 2025)
52.244-6 (NOV 2025)
52.253-1 (NOV 2025)
(End of Summary of Changes)
N4008025R9500
Blank Page
File details come from the government source that posted it. Updated .