Attachment_C_Revised Price Schedule 03.28.2024.pdf

PDF 135 KB Posted

Attached to
P009U Main Side Parking Marine Corps Base, Quantico, VA
Solicitation number
N4008024R1740
Issued by

About this file

This document is a Price Schedule for Solicitation N4008024R1740 for the P009U Main Side Parking project at Marine Corps Base Quantico, VA. The solicitation is set aside for Small Business Multiple Award Construction (GOLD SB MACC) contract holders. The Price Schedule includes a Base Price for the entire work, as well as two Option Items - one for undergrounding electrical/telecom lines in Area 1, and another for undergrounding electrical lines in Area 3. The Total Contract duration for the Base Bid is 563 calendar days from Notice to Proceed, and the Government may choose to exercise the Options at the time of award or within 365 days. Pricing is requested for each line item, with the total price to be provided. The solicitation is being issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

N40080-24-R-1740

REVISED MARCH 28, 2024

P009U MAIN SIDE PARKING

MARINE CORPS BASE QUANTICO, VA

Line

Item

Description Quantity Unit Sub-Total Total Price

0001 BASE PRICE: Total Price for the entire work for P009U

– Main Side Parking Areas 1, 2 and 3 construction in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

1 EA $

0001A Subtotal of Base Price for the entire work for Main

Side Parking Area 1 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $

0001B

Subtotal of Base Price for the entire work for Main

Side Parking Area 2 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $

0001C Subtotal of Base Price for the entire work for Main

Side Parking Area 3 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $

0002 Option Item No. 1: Price for providing all work in connection with Area 1:

Undergrounding

Electrical/Telecomm Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another

Priced line item.

TOTAL PRICE (CLINS 0001, 0002 and 0003) $

General Notes:

1. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options.

Evaluation of the Options will not obligate the Government to execute any or all of the

Options.

2. Option items may be awarded at time of award or within 365 days of award.

3. Total Contract duration for Base Bid is 563 calendar days from Notice to Proceed (NTP).

Should the Government choose to exercise any or all options, the contract duration will remain the same.

Acknowledgement of Amendments______, ______, ______, ______, ______, ______

Contractor Name: ________________________________________

Contractor Signature: ________________________________________ Date: _________________

0003 Option Item No. 2: Price for providing all work in connection with Area 3

Undergrounding Electrical

Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another

Priced line item.complete in accordance with the drawings and specifications.