Attachment_C_Revised Price Schedule 03.28.2024.pdf
PDF 135 KB Posted
- Solicitation number
- N4008024R1740
About this file
This document is a Price Schedule for Solicitation N4008024R1740 for the P009U Main Side Parking project at Marine Corps Base Quantico, VA. The solicitation is set aside for Small Business Multiple Award Construction (GOLD SB MACC) contract holders. The Price Schedule includes a Base Price for the entire work, as well as two Option Items - one for undergrounding electrical/telecom lines in Area 1, and another for undergrounding electrical lines in Area 3. The Total Contract duration for the Base Bid is 563 calendar days from Notice to Proceed, and the Government may choose to exercise the Options at the time of award or within 365 days. Pricing is requested for each line item, with the total price to be provided. The solicitation is being issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
N40080-24-R-1740
REVISED MARCH 28, 2024
P009U MAIN SIDE PARKING
MARINE CORPS BASE QUANTICO, VA
Line
Item
Description Quantity Unit Sub-Total Total Price
0001 BASE PRICE: Total Price for the entire work for P009U
– Main Side Parking Areas 1, 2 and 3 construction in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $
0001A Subtotal of Base Price for the entire work for Main
Side Parking Area 1 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $
0001B
Subtotal of Base Price for the entire work for Main
Side Parking Area 2 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $
0001C Subtotal of Base Price for the entire work for Main
Side Parking Area 3 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $
0002 Option Item No. 1: Price for providing all work in connection with Area 1:
Undergrounding
Electrical/Telecomm Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.
TOTAL PRICE (CLINS 0001, 0002 and 0003) $
General Notes:
1. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options.
Evaluation of the Options will not obligate the Government to execute any or all of the
Options.
2. Option items may be awarded at time of award or within 365 days of award.
3. Total Contract duration for Base Bid is 563 calendar days from Notice to Proceed (NTP).
Should the Government choose to exercise any or all options, the contract duration will remain the same.
Acknowledgement of Amendments______, ______, ______, ______, ______, ______
Contractor Name: ________________________________________
Contractor Signature: ________________________________________ Date: _________________
0003 Option Item No. 2: Price for providing all work in connection with Area 3
Undergrounding Electrical
Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.complete in accordance with the drawings and specifications.