Attachment_C_Price Schedule.docx

DOCX document 33 KB Posted

Attached to
P009U Main Side Parking Marine Corps Base, Quantico, VA
Solicitation number
N4008024R1740
Issued by

About this file

This document contains a price schedule for the construction of three main side parking areas at Marine Corps Base Quantico in Virginia. The base price covers all work required to complete construction of parking areas one, two and three according to the drawings and specifications. Two optional line items are provided to underground electrical and telecommunications lines for areas one and three. Bids must be submitted by only Small Business Multiple Award Construction contract holders for contracts N4008019D0011/0012/0013/0014/0015/0016/0017/0018/0019 and N4008019D0020. The total contract duration is 563 calendar days from notice to proceed should all options be exercised.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

N40080-24-R-1740

MARCH 7, 2024

P009U MAIN SIDE PARKING

MARINE CORPS BASE QUANTICO, VA

Line Item
Description
Quantity
Unit
Sub-Total
Total Price
0001
BASE PRICE: Total Price

for the entire work for P009U

– Main Side Parking Areas 1, 2 and 3 construction in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

1
EA
0001A
Subtotal of Base Price for

the entire work for Main Side Parking Area 1 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item

1
EA
$
0001B
Subtotal of Base Price for

the entire work for Main Side Parking Area 2 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item

1
EA
$
0001C
Subtotal of Base Price for

the entire work for Main Side Parking Area 3 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item

1
EA
$
0002
Option Item No. 1: Price for

providing all work in connection with Area 1:

Undergrounding Electrical/Telecomm Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.

1
EA
0003
Option Item No. 2: Price for

providing all work in connection with Area 3 Undergrounding Electrical Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.complete in accordance with the drawings and specifications.

1
EA

TOTAL PRICE (CLINS 0001, 0001A, 0001B, 0001C, 0002 and 0003) $

General Notes:

1. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.

2. Option items may be awarded at time of award or within 365 days of award.

3. Total Contract duration for Base Bid is 563 calendar days from Notice to Proceed (NTP). Should the Government choose to exercise any or all options, the contract duration will remain the same.