This document contains a price schedule for the construction of three main side parking areas at Marine Corps Base Quantico in Virginia. The base price covers all work required to complete construction of parking areas one, two and three according to the drawings and specifications. Two optional line items are provided to underground electrical and telecommunications lines for areas one and three. Bids must be submitted by only Small Business Multiple Award Construction contract holders for contracts N4008019D0011/0012/0013/0014/0015/0016/0017/0018/0019 and N4008019D0020. The total contract duration is 563 calendar days from notice to proceed should all options be exercised.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
N40080-24-R-1740
MARCH 7, 2024
P009U MAIN SIDE PARKING
MARINE CORPS BASE QUANTICO, VA
| Line Item |
| Description |
| Quantity |
| Unit |
| Sub-Total |
| Total Price |
| 0001 |
| BASE PRICE: Total Price |
for the entire work for P009U
– Main Side Parking Areas 1, 2 and 3 construction in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
| 1 |
| EA |
| 0001A |
| Subtotal of Base Price for |
the entire work for Main Side Parking Area 1 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item
| 1 |
| EA |
| $ |
| 0001B |
| Subtotal of Base Price for |
the entire work for Main Side Parking Area 2 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item
| 1 |
| EA |
| $ |
| 0001C |
| Subtotal of Base Price for |
the entire work for Main Side Parking Area 3 construction complete in accordance with the drawings and specifications, but excluding work provided in another line item
| 1 |
| EA |
| $ |
| 0002 |
| Option Item No. 1: Price for |
providing all work in connection with Area 1:
Undergrounding Electrical/Telecomm Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
| 1 |
| EA |
| 0003 |
| Option Item No. 2: Price for |
providing all work in connection with Area 3 Undergrounding Electrical Lines to include demolition and installation requirements, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.complete in accordance with the drawings and specifications.
| 1 |
| EA |
TOTAL PRICE (CLINS 0001, 0001A, 0001B, 0001C, 0002 and 0003) $
General Notes:
1. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.
2. Option items may be awarded at time of award or within 365 days of award.
3. Total Contract duration for Base Bid is 563 calendar days from Notice to Proceed (NTP). Should the Government choose to exercise any or all options, the contract duration will remain the same.