This set of construction drawings and specifications is for a vehicle inspection and visitor control center project at a Navy facility. The project includes construction of a 3,326 square foot vehicle control center, an 860 square foot commercial vehicle inspection building, a 5,880 square foot commercial vehicle inspection canopy, a 64 square foot sentry booth, surface parking lot, and related site work. The vehicle control center and commercial vehicle inspection building will be single-story structures with reinforced concrete masonry walls, structural steel framing, and concrete slabs on grade supported by reinforced concrete spread footings.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This project as designed is considered "non-complex" and does not require the review of a Professional Engineer as required per NiSource Gas
Standard 2810.050
TITLE SHEETT-1
DESCRIPTIONDWG.
INSTALL ~4,720'-6" PMMP and ~530'-4"PMMP, 1 NEW COMERCIAL SERVICE LINE 2" PLASTIC
SHEET INDEX
PROJECT DESCRIPTION
O-1 OVERVIEW SHEET
SCALE: NTS
VICINITY MAPPROJECT INFORMATION
DRAWING TITLE:
TITLE SHEET
DRAWING NO:
T-1
PROJECT SUMMARY TABLE
PROPOSED GAS SERVICES
ESTIMATED GAS SERVICES
TIE OVERSREPLACEMENTS METER OUTSTOTAL SERVICES
N/A N/A 1
JOB TYPE: 555
INSTALLATION ORDER NUMBER
QUANTICO VCC
N/AABANDONMENT ORDER NUMBER
PROJECT ID 22-85991
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
FIELD ENGINEER/TECHNICIAN:
ENVIRONMENTAL PERMITPERMITS:
CONSTRUCTION FLL:
MAP/GRID NUMBER:
COUNTY:
TAX DISTRICT/TOWNSHIP ID:
24 HR. EMERGENCY LINE:
TCC/LOA:
ROBERT MOLNAR
JEFF LAVIN
8288264L
STAFFORD (COUNTY)
1790010
22-0378057-00
L-1 -- L-11 LAYOUT PLANS
D-1 CONSTRUCTION DETAILS
GENERAL NOTESGN-1
N/A
* - IF "YES," APPROVAL AND REASON ARE REQUIRED AND SHALL BE DOCUMENTED.
NOTE: IF VALVE COULD NOT BE LOCATED, MAKE APPLICABLE COMMENT IN ABOVE TABLE.
VALVES PLANNED FOR ABANDONMENT
VALVE
NO.
FACILITY
ID LOCATION DESCRIPTION
ABANDONED
VALVE
INSERTED?
DISPOSITION
VALVE REMOVED (NO
BOX; ABOVE GROUND
VALVE)
VALVE, VALVE BOX &
LID REMOVED
VALVE REMAINS IN
PLACE; BOX & LID
REMOVED
VALVE REMAINS IN
PLACE; BOX FILLED W
CONCRETEYES* NO
2/9/2021 - 11x17
N
1-800-544-5606
PROPOSED INSTALLATION PROPOSED ABANDONMENT
LENGTH (FT) SIZE (IN) TYPE LENGTH (FT) SIZE (IN) TYPE
4,720' 6" PMMP 0' 0"
530' 4" PMMP
5,250' TOTAL INSTALLATION (FEET) 0' TOTAL ABANDONMENT (FEET)
BILL OF MATERIALSBOM-1
SYSTEM NUMBER
SYSTEM NAME
MINIMUM TEST PRESSURE (PSIG)
SYSTEM MOP (PSIG)
PROPOSED FACILITIES - SYSTEM MOP AND PRESSURE TEST DATA
SEGMENT MAOP (PSIG)
MAXIMUM TEST PRESSURE (PSIG)
38019030
FBI ACADEMY MP
va811.com
TELEPHONE NUMBER: 811
72 HOURS PRIOR TO ANY EXCAVATION
CONTRACTOR TO NOTIFY
VIRGINIA UTILITIES PROTECTION SERVICEA
C
DIG
W
ITH
R
ECall Miss Utility @
KEEP
V IRG
INIA
SAFE
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
SITE LOCATION
GENERAL NOTES
DRAWING TITLE:
DRAWING NO:
GN-1
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
General Notes
1. Deviation from NiSource CAD Standards is at discretion of reviewing Professional Engineer.
2. Refer to project documentation for the associated Environmental Compliance Plan (ECP) and any project-specific documentation.
3. The proposed gas facility locations shown are approximate and are subject to change.
4. Property lines, structures, street lines, etc. were compiled using the NiSource GIS and are to be considered approximate and not to scale.
5. Existing utilities, where shown, have been compiled from above ground evidence only and are to be considered approximate. NiSource does not guarantee the location of the underground utilities shown or that all existing utilities and/or subsurface structures are shown.
6. Individual service line designs for services smaller than 3 inches in diameter are not provided by Engineering. These services shall be installed using the standard design criteria and material specified in the NiSource standards. Services 3 inches and larger in diameter shall be designed, reviewed, and represented on a separate plan set as necessary.
7. This project will adhere to all applicable federal, state or local permitting requirements for abandonment and installation of natural gas pipelines. All Federal, State, and Local codes and standards will be adhered including, but not limited to, the following:
Code of Federal Regulations (CFR) 49 CFR 192 Pipeline Safety Regulations 29 CFR 1910 Occupational Safety and Health Administration (OSHA)
American Society of Mechanical Engineers (ASME) ASME B31.8 Gas Transmission and Distribution Piping Systems
8. All NiSource design codes and standards will be adhered to as applicable.
9. Prior to beginning any excavation on site, the person responsible for earth moving shall notify utility owners of their intent to excavate and to have the exact locations of the utility lines marked by contacting the one call center in their state subject to any applicable state advance notification requirements.
10. Proposed or completed gas facility installation location references may be indicated by a combination of the following codes:
F - FRONT CLP - CENTER OF PAVEMENT D - DRIVEWAY EDGE
BK - BACK CLR - CENTER OF RIGHT-OF-WAY EP - EDGE OF PAVEMENT
L - LEFT CEL - CENTER OF EASTBOUND LANE ES - EDGE OF SIDEWALK
R - RIGHT CWL - CENTER OF WESTBOUND LANE PL - PROPERTY LINE
B - BUILDING EDGE CNL - CENTER OF NORTHBOUND LANE
CU - CURB CSL - CENTER OF SOUTHBOUND LANE
DRAWING LEGEND
Fire Hydrant
Drain Manhole
Sewer Manhole
Utility Pole
Telephone Manhole
Catch Basis Electric Manhole
Regulator Station
Gas Valve
Reducer
Meter
End Cap Transition
Proposed Gas Main Existing Gas Main to Be Abandoned
Gas Service Replacement Gas Service Tie-over
Meter Move Out
R
M
R Single Customer Regulator
Meter with Regulator Test Point (Station)
MR
MMO
Existing Gas Main
Proposed Gas Main Uprate
W Test Well
Critical Gas Valve
High Volume Tapping Tee
Electronic MarkerEM
T
R
T D E
S
TP
Flush-mounted Tracer Wire StationTWS
Post Pipeline Marker with Tracer Wire
Riser
Gas Main Marker without Tracer WireMM
Gas Main Symbology Gas Facility Symbology
Swing Tie Symbology
Pressure Control Fitting - ShortStopp Tee
E
T C U
WG
WB
Water Gate
Telephone Pedestal
Water Box
Electric Pedestal
Property Marker
Unknown Manhole Television Pedestal
Iron Pin Light Pole
IP
Pressure Control Fitting - Spherical Tee Pressure Control Fitting - Mueller Bottom-out Pressure Control Fitting - Mueller Side-out Pressure Control Fitting - Mueller Flange Tee Pressure Control Fitting - ShortStopp Pressure Control Fitting - Mueller Stopper x"GV x"PV x"HVTT x"SST x"SPH x"MF-BO x"MF-SO x"MF-FT x"SS x"MF
Polytapp Side Saddle Fittingx"x x" POLYTAP
Cast Iron Gas Main
Coated Steel Gas Main
Wrought Iron Gas Main Bare Steel Gas Main
High Density Polyethylene Gas Main
Gas Main Tie-in Location
(E) (P)
Existing Proposed
Gas Main Abandonment Location
Medium Density Polyethylene Gas Main
Weld Location
CI*
CS*
WI*
BS*
PH*
PM*
Low Pressure*LP Intermediate Pressure*IP Medium Pressure*MP High Pressure*HP
Bridge Hanger Attached
Building Hanger Directional Bore
BH
AT
BLGH
DB
InsertedIS Open CutOC Pneumatic BorePB PlowedPL Roof TopRT
Gas Main Material/Pressure Label References
Gas Main Installation Method Label References
MATERIAL CODES
PRESSURE CODES
MISCELLANEOUS CODES
Service*-SER Riser*-R Transmission Class(TC)
W1
T1
A1
(Gate - GV, Plug - PV, PE Ball - BP, ST Ball - BV)
Environmental Notes
1. All NiSource construction activities must be completed in accordance with the Environmental Construction Standards (HSE 4440.020) and the project Environmental Compliance Plan (ECP). Said ECP shall be provided by others.
2. The project ECP and any site-specific erosion control drawings, must be provided to the contractor with the project drawings for review and planning prior to the start of construction activities. This includes any tree clearing activities required prior to the start of facility construction activities.
3. The project ECP and any associated drawings must be reviewed with construction, the contractor, and an environmental representative prior to the start of construction activities.
4. These documents must remain on site for the duration of the construction project, and any project scope changes, with the potential to impact the requirements of the ECP or environmental drawings, must be coordinated with an environmental representative prior to completion.
Drawing Revision Conditions:
1. If, during the course of project construction, anticipated changes to project plans result in complex project criteria being met as defined by NiSource Gas Standard 2810.050 "Stakeholder Reviews of Design Capital Projects," the changes shall not be implemented until revised project documentation is reviewed by the Project Engineer and approved by a Professional Engineer as necessary.
2. Any additional gas pressure containing material not listed on the project Bill of Materials must be reviewed by the Project Engineer and reviewing Professional Engineer prior to use.
3. Any significant changes to proposed primary pipeline installation methods and location must be reviewed by the Project Engineer and reviewing Professional Engineer.
4. Any significant changes to proposed project scope must be reviewed by the Project Engineer and reviewing Professional Engineer.
Significant changes to project scope may include changes to proposed design pressure, change of proposed pipe size and material affecting system hydraulics, and the addition or removal of significant amounts of pipeline installation or abandonment.
5. Any significant changes to proposed tie-ins must be reviewed by the Project Engineer and reviewing Professional Engineer. Significant changes may include the following: addition or removal of a tie-in, change in proposed tie-in material, change in proposed tie-in method, and change in tie-in location if system hydraulics may be affected.
Weld Treated Gas MainWT*
Project Specific Drawing Revision Conditions (add below items to Drawing Revision Conditions notes as applicable):
6. This project is a relocation project and must be installed in accordance with proposed installation locations. If, during the course of installation, it is found that the installation must deviate from any planned horizonal and vertical installation locations, construction must cease until the deviation is reviewed by the Project Engineer and reviewing Professional Engineer.
7. This project involves the installation of facilities within private rights-of-way as indicated by the proposed installation drawing. If, during the course of installation, it is found that the installation must deviate from the planned location within the private right-of-way, construction must cease until the deviation is reviewed by the Project Engineer and reviewing Professional Engineer.
8. This project involves the installation of facilities in permitted locations within public right-of-way. If, during the course of installation, it is found that the installation must deviate from the permitted location, construction must cease until the deviation is reviewed by the Project Engineer and reviewing Professional Engineer.
Know what'sbelow.
before you dig.Call
R
MATERIAL INFORMATION
DRAWING TITLE:
DRAWING NO:
BOM-1
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
V
A
N
V
A
N
DB~40'-6" PMMP
190'-6" P
M M
P
1,080'-6" PM
M P
O C~
170'-4" PM
M
P
O C~
10'-4" PM
M
P
OC~170'-4
" P
MMP
O C
10'-4" PM
M P
O C~
150'-2" SERVICE LINE PM
M
P
O C~
10'-6" PM
M
P
(OC~4,350'-6" P
MMP)
OC~10'-6" PMMP
O C
5' -6
" P M
M P
OC~80'-6" PMMP
D B~
'-6
" P M
M P
OC~15'-6" PMMP
(O C~
4, 0'- 6"
P M
M P)
(O C
4, 0'
-6 " P
M M
P)
(O C~
4, 0'- 6"
P M
M P)
(O C~4,3
'-6
" P
MMP)
(O C~4,3
'-6
" P
MMP)
(O C~4,350'-6" P
MMP)
(OC~4,350'-6" PMMP)
(OC~4,350'-6" PMMP)
OC~4,350'-6" PMMP
L-1 L-2
L-3 L-4
L-5 L-6
L-7
L-8 L-9
L-10
L-11
6"x6" BRANCH SADDLE
4"x2" H
VTT TAP FO
R SERVICE LIN
E
T1
OVERVIEW SHEET
Feet
0 213.5023 427.0047
N
DRAWING TITLE:
DRAWING NO:
O-1
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
CONC. DITCH
AutoCAD SHX Text
CONC. DITCH
AutoCAD SHX Text
CONC. DITCH
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
JB
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
TELEGRAPH ROAD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text
INVERT NOT FOUND
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text C&G
AutoCAD SHX Text C&G
AutoCAD SHX Text C&G
AutoCAD SHX Text
ELEC. PANEL
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
SW
AutoCAD SHX Text
LP
AutoCAD SHX Text
JB
AutoCAD SHX Text
CONC.
AutoCAD SHX Text MHE 22 (#4804) RIM = 211.71 3' X 12' VAULT TOP OF CEILING = 204.71 CONDUITS = 202.71 BOTTOM = 202.01
AutoCAD SHX Text
CONC. WALL
AutoCAD SHX Text
INVERT NOT FOUND
AutoCAD SHX Text
RIP RAP DITCH
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
CONC. DITCH
AutoCAD SHX Text
CONC. DITCH
AutoCAD SHX Text MHE 23 (#4593) RIM = 213.73 3' X 12' VAULT TOP OF CEILING = 206.73 CONDUITS = 204.73 BOTTOM = 204.08
AutoCAD SHX Text MHE 24 (#7117) RIM = 195.60 3' X 12' VAULT TOP OF CEILING = 188.60 CONDUITS = 186.60 BOTTOM = 186.10
AutoCAD SHX Text MHE 25 (#4190) RIM = 187.27 3' X 12' VAULT TOP OF CEILING = 180.27 CONDUITS = 186.60 BOTTOM = 177.62
AutoCAD SHX Text MHE 26 (#4044) RIM = 186.16 3' X 12' VAULT TOP OF CEILING = 179.16 CONDUITS = 177.16 BOTTOM = 176.51
AutoCAD SHX Text MHE 27 (#6975) RIM = 158.96 3' X 12' VAULT TOP OF CEILING = 151.96 CONDUITS = 149.96 BOTTOM = 149.31
AutoCAD SHX Text MHE 28 (#7073) RIM = 116.95 3' X 12' VAULT TOP OF CEILING = 109.95 CONDUITS = 107.95 BOTTOM = 107.25
AutoCAD SHX Text
JB 5899 RIM = 77.50 2' X 3' COMPOSITE BOTTOM = 76.00
AutoCAD SHX Text
JB 4902 RIM = 118.44 1.5' X 2.5' COMPOSITE BOTTOM = 117.04
AutoCAD SHX Text
JB 4458 RIM = 204.50 1.5' X 2.5' COMPOSITE BOTTOM = 203.10
AutoCAD SHX Text
JB 4693 RIM = 207.50 2' X 3' COMPOSITE BOTTOM = 205.60
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
TPED
AutoCAD SHX Text
** UNABLE TO LOCATE UNABLE TO LOCATE G6 LINE BETWEEN MH 23 & MH 24
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text 10+00
AutoCAD SHX Text 11+00
AutoCAD SHX Text 12+00
AutoCAD SHX Text 13+00
AutoCAD SHX Text 14+00
AutoCAD SHX Text 15+00
AutoCAD SHX Text 16+00
AutoCAD SHX Text 17+00
AutoCAD SHX Text 18+00
AutoCAD SHX Text 19+00
AutoCAD SHX Text 20+00
AutoCAD SHX Text 21+00
AutoCAD SHX Text 22+00
AutoCAD SHX Text 23+00
AutoCAD SHX Text 24+00
AutoCAD SHX Text 25+00
AutoCAD SHX Text 26+00
AutoCAD SHX Text 27+00
AutoCAD SHX Text 28+00
AutoCAD SHX Text 29+00
AutoCAD SHX Text 30+00
AutoCAD SHX Text 31+00
AutoCAD SHX Text 32+00
AutoCAD SHX Text 33+00
AutoCAD SHX Text 34+00
AutoCAD SHX Text 35+00
AutoCAD SHX Text 36+00
AutoCAD SHX Text 37+00
AutoCAD SHX Text 38+00
AutoCAD SHX Text 39+00
AutoCAD SHX Text 40+00
AutoCAD SHX Text 41+00
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
RUSSELL ROAD
RUSSELL ROAD
DB~40'-6" PMMP
190'-6" P
M M
P
1,080'-6" PM
M P
OC~10'-6" PMMP
O C
5' -6
" P M
M P
OC~80'-6" PMMP
D B~
'-6
" P M
M P
OC~15'-6" PMMP
OC~4,350'-6" PMMP
6"x6" BRANCH SADDLE
T1
LAYOUT SHEET
Feet
0 20.4446 40.8892
N
DRAWING TITLE:
DRAWING NO:
L-1
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
TELEGRAPH ROAD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT DRIVE
AutoCAD SHX Text C&G
AutoCAD SHX Text C&G
AutoCAD SHX Text
ELEC. PANEL
AutoCAD SHX Text
LP
AutoCAD SHX Text
CONC.
AutoCAD SHX Text MHE 22 (#4804) RIM = 211.71 3' X 12' VAULT TOP OF CEILING = 204.71 CONDUITS = 202.71 BOTTOM = 202.01
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
TPED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UGE
U G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
(OC~4,350'-6" PMMP)
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-2
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text
JB
AutoCAD SHX Text C&G
AutoCAD SHX Text
SW
AutoCAD SHX Text
INVERT NOT FOUND
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
JB 4693 RIM = 207.50 2' X 3' COMPOSITE BOTTOM = 205.60
AutoCAD SHX Text
TPED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(OC~4,350'-6" PMMP)
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-3
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text MHE 23 (#4593) RIM = 213.73 3' X 12' VAULT TOP OF CEILING = 206.73 CONDUITS = 204.73 BOTTOM = 204.08
AutoCAD SHX Text
TPED
AutoCAD SHX Text
** UNABLE TO LOCATE UNABLE TO LOCATE G6 LINE BETWEEN MH 23 & MH 24
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
G
E
U
G
E
U
G
E
(O C~4,350'-6" P
MMP)
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-4
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text MHE 24 (#7117) RIM = 195.60 3' X 12' VAULT TOP OF CEILING = 188.60 CONDUITS = 186.60 BOTTOM = 186.10
AutoCAD SHX Text
TPED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
(O C~4,3
'-6
" P
MMP)
LAYOUT SHEET
Feet
0 20.3899 40.7797
N
DRAWING TITLE:
DRAWING NO:
L-5
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRAVEL ROAD
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
41+00
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
(O C~4,3
'-6
" P
MMP)
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-6
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
WOODS
AutoCAD SHX Text MHE 25 (#4190) RIM = 187.27 3' X 12' VAULT TOP OF CEILING = 180.27 CONDUITS = 186.60 BOTTOM = 177.62
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 36+00
AutoCAD SHX Text 37+00
AutoCAD SHX Text 38+00
AutoCAD SHX Text 39+00
AutoCAD SHX Text 40+00
E
U
G
E
U
G
E
(O C~
4, 0'- 6"
P M
M P)
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-7
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text MHE 26 (#4044) RIM = 186.16 3' X 12' VAULT TOP OF CEILING = 179.16 CONDUITS = 177.16 BOTTOM = 176.51
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 32+00
AutoCAD SHX Text 33+00
AutoCAD SHX Text 34+00
AutoCAD SHX Text 35+00
36+00
E
U
G
E
U
G
E
(O C
4, 0'
-6 " P
M M
P)
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-8
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
GRASS
AutoCAD SHX Text 27+00
AutoCAD SHX Text 28+00
AutoCAD SHX Text 29+00
AutoCAD SHX Text 30+00
AutoCAD SHX Text 31+00
(O C~
4, 0'- 6"
P M
M P)
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-9
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
WOODS
AutoCAD SHX Text MHE 27 (#6975) RIM = 158.96 3' X 12' VAULT TOP OF CEILING = 151.96 CONDUITS = 149.96 BOTTOM = 149.31
AutoCAD SHX Text
TPED
AutoCAD SHX Text 23+00
AutoCAD SHX Text 24+00
AutoCAD SHX Text 25+00
AutoCAD SHX Text 26+00
AutoCAD SHX Text 27+00
E
U
G
E
U
G
E
U
G
E
O C~
170'-4" PM
M
P
O C~
10'-4" PM
M
P
OC~170'-4
" P
MMP
O C~
10'-4" PM
M
P
O C~
10'-6" PM
M
P
(OC~4,350'-6" P
MMP)
4"x2" H
VTT TAP FO
R SERVICE LIN
E
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-10
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
AutoCAD SHX Text
CONC. DITCH
AutoCAD SHX Text
RUSSELL ROAD
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
JB
AutoCAD SHX Text
WOODS
AutoCAD SHX Text
CONC. DITCH
AutoCAD SHX Text 20+00
AutoCAD SHX Text 21+00
22+00
V
A
N
V
A
N
O C~
150'-2" SERVICE LINE PM
M
P
LAYOUT SHEET
Feet
0 20.4449 40.8898
N
DRAWING TITLE:
DRAWING NO:
L-11
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
before you dig.Call
R
X
CONSTRUCTION DETAILS
CONSTRUCTION
DETAILS
DRAWING TITLE:
DRAWING NO:
D-1
SITE NAME:
INST#
PROJECT ID#
ABAN#
QUANTICO VCC
STAFFORD, STAFFORD (COUNTY)
22-0378057-00 N/A
22-85991
DESIGNED BY
NAME DATE PHONE #
DRAWN BY
CHECKED BY
AS-BUILT BY
ROBERT MOLNAR 04/28/22540-604-1874
ROBERT MOLNAR 04/28/22540-604-1874
X X X X X X
PROPOSED
REVISIONS
REV. # DATE DESCRIPTION
04/28/22 ISSUED FOR CONSTRUCTION
2/9/2021 - 11x17
Know what'sbelow.
| Sheets and Views |
| 21-0376720-00 Pro Drawing-T-1 |
| 21-0376720-00 Pro Drawing-GN-1 |
| 21-0376720-00 Pro Drawing-BOM-1 |
| 21-0376720-00 Pro Drawing-O-1 |
| 21-0376720-00 Pro Drawing-L-1 |
| 21-0376720-00 Pro Drawing-L-2 |
| 21-0376720-00 Pro Drawing-L-3 |
| 21-0376720-00 Pro Drawing-L-4 |
| 21-0376720-00 Pro Drawing-L-5 |
| 21-0376720-00 Pro Drawing-L-6 |
| 21-0376720-00 Pro Drawing-L-7 |
| 21-0376720-00 Pro Drawing-L-8 |
| 21-0376720-00 Pro Drawing-L-9 |
| 21-0376720-00 Pro Drawing-L-10 |
| 21-0376720-00 Pro Drawing-L-11 |
| 21-0376720-00 Pro Drawing-D-1 |
File details come from the government source that posted it. Updated .