This document includes a design package for an underground electrical distribution project and details of a related federal contract opportunity. The design package provides specifications for installing approximately 5,200 feet of underground 1/0 primary cable along Russell Road to feed a new visitor center for the Department of Defense. It includes requirements for cable, conduits, grounding materials, transformers, and other electrical equipment. The related federal contract opportunity is a solicitation from the Department of the Navy to construct a vehicle inspection and visitor control center building, commercial vehicle inspection building, inspection canopy, sentry booth, parking lot, and other incidental work at a naval facility. The solicitation seeks construction of single-story reinforced concrete and masonry buildings, structural steel framing, and concrete slabs on grade supported by spread footings.

View the file

Other files

File Type Posted
Solicitation N4008023R0007 Amendment 0009.pdf PDF
IFC Specifications 9.12.22.pdf PDF
Preaward Inquiry Form Responses dated 1.12.23.pdf PDF
Soliciation N4008023R0007 Amendment 0008.pdf PDF
N4008023R0007 Amendment 0007.pdf PDF
Preaward Inquiry Form Responses 1.5.23.pdf PDF
N4008023R0007 Amendment 0006.pdf PDF
PPI No. 22-23 Attachment_Price Schedule-Blank.pdf PDF
Preaward Inquiry Form Responses Amendment 05.pdf PDF
Soliciation P656 N4008023R0007 Amendment 05.pdf PDF
Soliciation N4008023R0007 Amendment 0004.pdf PDF
PPI Number 11 Attachment_Columbia Gas Design Package.pdf PDF
PPI Numbers 12-14_Updated Project Specifications.pdf PDF
Soliciation N4008023R0007 Amendment 0003.pdf PDF
Site Visit Log_P656_6Dec22.pdf PDF
P656 Preaward Inquiry Form Responses.pdf PDF
Solicitation P656 23R0007 Amendment 02.pdf PDF
N4008023R0007 Amendment 0001.pdf PDF
Davis-Bacon Act WD VA20220174.pdf PDF
1620397_P656_VCC-Compiled_IFC_Drawings-09122022_Signed___PART 3.pdf PDF
1620397_P656_VCC-Compiled_IFC_Drawings-09122022_Signed___PART 1.pdf PDF
P656 VCC - Project Site Location.pdf PDF
1620397_P656_VCC-Compiled_IFC_Drawings-09122022_Signed___PART 2.pdf PDF
1620397_P656_VCC-Specifications_IFC-09122022_Signed.pdf PDF
ATTACHMENT - Small Business Subcontracting Plan Template.pdf PDF
SOLICITATION P656 23R0007.pdf PDF
ATTACHMENT - Small Business Participation and Commitment Strategy.docx.pdf PDF
ATTACHMENT - SMALL BUSINESS SUBCONTRACTING RECORD.pdf PDF
Attachment B Preaward Inquiry Form (Template).xlsx XLSX spreadsheet
P656_Price Schedule.pdf PDF
ATTACHMENT - Past Performance Questionnaire.pdf PDF
ATTACHMENT - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5/23/2022

1 RUSSELL RD QUANTICO VA

DANI402

57597

MUNICIPAL NEW UNDERGROUND- I/S 3PH UG PRI APPRX 5200' ALONG

RUSSELL RD TO AN UG TX TO FEED A NEW VISITOR CENTER.

DEPT OF DEFENSE

10476705

Daniel J Taylor 1 inch = 166.7 feet

Designer:WR#: Date:

Location:

WR Name:

Project Manager:

Phone #:

Sub Sta. Cir. #:

Tax District:

Easement #:

Volt. Drop:Fault Current:

Scale:

Miss U # Co. Grid #

Est. Demand Device #

PROJECT DATA

Flicker:

Dominion Energy Virginia or

Dominion Energy North Carolina

VIRGINIA ELECTRIC AND POWER COMPANY

doing business as

AB

C

N

RH59

1 -25 C

PI87

1 - 1 ABC

PI49

1 - 25 A

RI21

1 - 25 A

PI48

1 - 50 B

VA45

1 -150 ABC

428 F264

QI15

3 - 200 N ABC

428 F22

QI84

3 - 20 N ABC

1-4

PV

C)

0'

/// U 34.

5 1/0 /// 1

U 3

4.5 1/0

WL 4

C0200 UN78

INSTALL:

DTM3P

FEEDTHRU (3)

CND6S490D36 (2)

CND6S4BELL (2)

U310J3PP (1016)

KTB30 (951)

KCND6TUNNEL (65)

CND6S4BG (65)

KTUNNEL6 (65)

KCBLCND3 (195)

GNDKITLC

GRCP

KXHOLEASC

KXHOLEASO

PDDTM3P

#RODS:____

OHMS:____

WL 1

C0200 QI84

50' Class 2 - NJU

INSTALL:

P502

FRP3

TIE24POST (3)

PWIREXFERA (3)

X10FG (BH=16")

X10FG (BH=36")

AR27TMMOVP (3)

CO27LINE1 (3)

F6220203

TMT310J3 (BH=60")

TM310J3

S1 (BH=48")

TIE10SPOOL

SWIREXFERA

RSP4

U310J3OP (1210)

KTB30 (1090)

KCBLCND3 (360)

KCND6TUNNEL (120)

KTUNNEL6 (120)

CND6S4BG (120)

GRCP

#RODS:____

OHMS:____

WL 3

C0200 TL58

INSTALL:

DTM3P

U310J3PP (1207)

CND6S4BELL (2)

CND6S490D36 (2)

KTB30 (1207)

GNDKITLC

GRCP

KXHOLEASC

KXHOLEASO

PDDTM3P

FEEDTHRU (3)

#RODS:____

OHMS:____

U 34

.5 1/0

WL 5

C0201 VA45

INSTALL:

TD3515048

LT340 (125)

GROD4CUUG (15)

GRODCUUGF

MS3

MMC400

MCT3B100

M3DVRTSS

#RODS:____

OHMS:____

U

.5

1/0

WL 2

C0200 RK90

INSTALL:

PDDTM3P

FEEDTHRU (3)

CND6S4BELL (2)

CND6S490D36 (2)

GNDKITLC

GRCP

U310J3PP (1195)

KTB30 (1195)

DTM3P

KXHOLEASC

KXHOLEASO

#RODS:____

OHMS:____

1-4 '' (P

VC

) 6

5'

2-4'' (PVC) 125'

Ru sse ll R d

Telegraph Rd

I-9

VICINITY MAP CONSTRUCTION NOTES CUSTOMER NOTES

42428

C0200

N/A

N/A N/A

42428 R52 N/A N/A

N/A

AQUIA

NEW COMMERICAL SERVICE...I/S 50'

TERMINAL POLE AND APPOX. 5200' OF 1/0

PRIMARY ALONG WITH 3 SECTOR CABINETS

TO 277/480 150KVA TX FOR 400AMP 3PH

SERVICE.

DESIGNER: DAN TAYLOR 540-220-3189

COORDINATOR: WILLIS TWUM 540-905-5076

Reliability Notes

1) Grounding: Repair/Upgrade grounding as needed. Ensure all poles touching primary are grounded, and all grounds are installed and megger according to current methods and standards.

2) Install/Repair ground molding and staples as needed.

Install guy bonding, anchor clamps and repair slack guys as needed.

3) Stencil/ Restencil /Repair: Stencil on new and existing poles to include: Device #, Grid #, Pole #, and company I.D. tag

4) Install wildlife guards as required.

5) Install K-Mate as required.