P114_SOLICITATION__SET_2_MCAA_BETHESDA_MD.pdf

PDF 486 KB Posted

Attached to
P-114 Medical Center Addition/Alteration, Walter Reed National Military Medical Center, NSA Bethesda, MD
Solicitation number
N4008015R5342
Issued by

View the file

Other files

File Type Posted
AMENDMENT_0016.pdf PDF
AMENDMENT_0015.pdf PDF
P114_SET_2_AMENDMENT_0014.pdf PDF
AMENDMENT_0013.pdf PDF
FINAL_AMENDMENT_0012.pdf PDF
AMENDMENT_0012.pdf PDF
AMENDMENT_0011.pdf PDF
AMENDMENT_0010.pdf PDF
P114_SET_2_AMENDMENT_0009.pdf PDF
P114_SET_2_AMENDMENT_0008.pdf PDF
P114_SET_2_AMENDMENT_0007.pdf PDF
180702_Set_2_Amendment_0006_narrative.pdf PDF
P114_SET_2_AMENDMENT_0006.pdf PDF
P114_site_visit_28_June.pdf PDF
Amendment_6_drawings_and_specs.pdf PDF
P114_SET_2_AMENDMENT_0005.pdf PDF
P114_SET_2_AMENDMENT_0004.pdf PDF
P114_June_5_Site_Visit_Attendance_Log.pdf PDF
P114_Set_2_Price_Schedule_Revised_13_June_18.doc DOC document
P114_SET_2_AMENDMENT_0003.pdf PDF
P114_AMENDMENT_0002.pdf PDF
P114_AMENDMENT_0001.pdf PDF
P114_Draft_Solicitation.pdf PDF
N4008015R5342_P114_Pre-Solicitation_Notice.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-114 MEDICAL CENTER ADDITION/ALTERATION (MCAA), WALTER REED NATIONAL MILITARY MEDICAL CENTER (WRNMMC), NAVAL

SUPPORT ACTIVITY BETHESDA, BETHESDA, MD

COMPETITION REQUIREMENTS: UNRESTRICTED

SOURCE SELECTION PROCEDURES: BEST VALUE SOURCE SELECTION (BVSS), TRADEOFFS, ONE-STEP DESIGN BID BUILD PROCEDURES

PROCUREMENT METHOD: CONTRACTING BY NEGOTIATIONS

TYPE OF CONTRACT: FIRM FIXED PRICE

NAICS CODE: 236220, COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

ESTIMATED CONSTRUCTION COST: BETWEEN $250,000,000 and $500,000,000

THE PRIMARY POINT OF CONTACT FOR THIS PROJECT IS LINDSAY BROWN AT LINDSAY.NAILL@NAVY.MIL

ALL REQUESTS FOR PROPOSAL DOCUMENTS AND AMENDMENTS WILL BE POSTED TO THE NAVY ELECTRONIC COMMERCE ONLINE (NECO) WEBSITE AT HTTPS://WWW.NECO.NAVY.MIL AND FEDERAL BUSINESS OPPORTUNITIES (FBO) AT HTTPS://WWW.FBO.GOV. POTENTIAL

OFFERORS WILL NOT BE CONTACTS REGARDING ANY CHANGES POSTED.

LINDSAY BROWN 202-685-3192

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

08-May-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________2070 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________07 Aug 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080

PAGE OF PAGES

1 OF

CODE N40080

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST SE, BLDG 212

WASHINGTON NAVY YARD DC 20374

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N40080-15-R-5342 68

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N40080-15-R-5342

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Project

BASE BID: BUILDING C - PHASE 1

FFP

The Offeror shall provide all work for Set 2 - New Construction, Building C, Phase 1, complete in accordance with the drawings and specifications.

FOB: Destination

NET AMT

0002 1 Project

BASE BID: BUILDING C - PHASE 2

FFP

The Offeror shall provide all work for Set 2 - New Construction, Building C, Phase 2, complete in accordance with the drawings and specifications.

0003 1 Project

OPTION BUILDING 9 - PHASE 3

FFP

The Offeror shall provide all work for Set 2 - Renovation, Building 9, Phase 3, complete in accordance with the drawings and specifications.

0004 1 Project

OPTION BUILDING 10 - PHASE 3

FFP

The Offeror shall provide all work for Set 2 - Renovation, Building 10, Phase 3, complete in accordance with the drawings and specifications.

0005 1 Project OPTION DEDUCT: (8) Electric Traction Elevators

FFP

Delete (3) electric traction passenger elevators (elevators P5, P6, P7) and (2) electric traction freight elevators (elevators S1 and H1) in Building C - Phase 1.

Delete (3) Electric traction passenger elevators (elevators P4, P10, and P11) in Building C - Phase 2. Add new drywall closure to all elevator shafts.

0006 1 Project

OPTION DEDUCT: LANDSCAPING

FFP

Delete all non-grass and non-labyrinth area landscaping plantings, refer to Landscaping drawings Building C - Phase 1 and 2.

0007 1 Project OPTION DEDUCT: Delete exterior entry canopy

FFP

Delete the exterior entry canopy. Provide pricing for: The removal of the exterior entry canopy as shown on drawing A-460. The remaining east building façade will remain as shown and detailed minus this exterior canopy

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government 0007 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

0006 N/A N/A N/A N/A

0007 N/A N/A N/A N/A

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

All drawings, specifications and amendments shall be posted to the Navy Electronic Commerce Online (NECO) website at www.neco.navy.mil. Potential offerors will not be contacted regarding any changes posted.

The following paragraphs are supplemental instructions to bidders to be used in conjunction with the remaining sections.

1. PRIMARY POINT OF CONTACT:

The primary point of contact for this project is Lindsay Brown at lindsay.naill@navy.mil. Forward any Requests for Information (RFI) regarding this project in writing to Lindsay Brown at lindsay.naill@navy.mil in Microsoft Word format.

2. REQUEST FOR INFORMATION (RFI):

CONTRACTORS ARE REQUIRED TO REVIEW THE ENTIRE SOLICITATION PACKAGE

BEFORE SUBMITTING QUESTIONS. ALL INQUIRIES MUST BE SUBMITTED NO LATER

THAN COB 9 JULY 2018. All inquiries must be submitted in writing and emailed to Lindsay Brown at lindsay.naill@Navy.mil with inquiries attached as a WORD document.

RFI CUT-OFF DATE IS 9 JULY 2018.

3. PROPOSAL DELIVERY INSTRUCTIONS:

Proposals may be sent via express mail carriers or hand-carried to the following address:

NAVFAC Washington Attn: Lindsay Brown 1314 Harwood Street SE, Bldg. 212, First Floor Mail Room Washington Navy Yard Washington, DC 20374

Proposals must be received no later than 7 AUGUST 2018 at 2:00 PM EST.

INSTRUCTIONS FOR HAND DELIVERY OF PROPOSALS:

The current security condition at the Washington Navy Yard requires escorts for entry to the base by individuals not possessing a U.S. Government DoD Common Access Card (CAC) identification card. Individuals without a DoD CAC will not be permitted to enter the Navy Yard.

NAVFAC Washington will NOT be able to provide escorts for Navy Yard entry of hand delivered proposals. NAVFAC Washington will NOT receive hand delivered proposals at the Base Pass Office or any location other than that identified for receipt in the solicitation.

The Government considers use of a courier service, such as FedEx or UPS, as hand delivery of proposals and the responsibility for timely delivery resides with the offeror.

Offerors are notified that the entry point for proposals submitted through the U.S. Postal Service is at Joint Base Anacosta-Bolling and NOT at the Washington Navy Yard. Proposals must be received by NAVFAC Washington at the Navy Yard by the due date and delivery time from the Joint Base Anacosta-Bolling to the Navy Yard cannot be predicted nor guaranteed.

Offerors should take this into consideration when determining delivery method.

Please note offerors have the option to deliver the PRICE SCHEDULE via the Safe Access File Exchange (SAFE) website at https://safe.amrdec.army.mil/SAFE/Welcome.aspx. Instructions on how to use SAFE can be found on this website. Please note ONLY THE PRICE SCHEDULE AND SMALL BUSINESS SUBCONTRACTING PLAN is allowed to be delivered via this website. Other information submitted via this website WILL NOT BE ACCEPTED. Submissions via this method are subject to the same proposals due date and time as listed above.

Facsimile copies or email copies will NOT be accepted.

Please allow SUFFICIENT TIME for your proposal to be received prior to the proposed closing date/time.

Technical and Price proposals shall be submitted in sealed envelopes/boxes marked in the bottom right corner “Solicitation N40080-15-R-5342, DO NOT OPEN.”

All proposals must be received prior to the due date and time. Any proposals submitted after the time set for receipt will be stamped with the date and hour of receipt and held unopened until after award. The file shall be documented in accordance with FAR 15.208(h).

4. PRE-PROPOSAL CONFERENCE AND SITE VISIT:

There will be TWO Government scheduled Site Visits

1. DATE: TUESDAY, 5 JUNE 2018

TIME: 9:00 A.M. EST

LOCATION: B2, 3rd Floor Auditorium, NSA, Bethesda, MD

An organized site visit will be held on 5 June 2018, starting promptly at 9:00 am EST. The site visit will kick off in the Auditorium located on the 3rd floor in Building 2 on the NSA Bethesda Installation at 9:00

AM.

If you do not have a U.S. Government DoD Common Access Card (CAC) identification card and require base access, you must complete the attached Base Access Form "SECNAVF Form 5512" and submit to Lindsay Brown at Lindsay.naill@navy.mil NLT noon on 24 May 2018. By providing your information as instructed above, the Government will register each individual who does not have base access prior to the site visit.

The day of the site visit: ALL PERSONNELL shall muster outside of Gate 1 (North Gate) located at 8901 Rockville Pike on GPS at 9:00 AM. Each individual will be checked in by the Government representative and then be escorted through the Gate to the auditorium.

Please refer to the P114 Set #2 Site Visit Map uploaded as an attachment. Installation parking will not be provided. There is a public parking area as shown on the map, south of the NIH Complex. In addition, there is Metro stop, Medical Center Metro/Naval Med CTR &NIH, located within walking distance from the installation.

2. DATE: THURSDAY, 28 JUNE 2018

TIME: TBD

LOCATION: TBD

An organized site visit will be held on 28 June 2018. The meeting location and time of the site visit will be identified in a later amendment.

5. PROJECT INFORMATION:

Project Title: P114, DBB, SET #2, MEDICAL CENTER ADDITION/ALTERATION (MCAA), NAVAL SUPPORT ACTIVITY BETHESDA

Project Description: P-114, Set #2, Medical Center Addition/Alteration (MCAA) at the Walter Reed National Military Medical Center (WRNMMC), Naval Support Activity (NSA) Bethesda, MD.

P114 project consists of constructing a new addition for in-patient and out-patient medical care (approximately 575,000 GSF), renovation of two (2) existing hospital buildings (approximately 125,000 GSF), and demolition of six (6) existing hospital buildings (approximately 330,000 GSF). Construction will require provision of information systems, ATFP measures, and appropriate setbacks for natural light.

Supporting facilities include utilities, paving, site improvements, special foundations, and environmental mitigation. The project will be constructed in accordance with UFC 4-510-01, DoD Minimum Antiterrorism Standards for Buildings, UFC 4-010-01, Section 1-8.7, Barrier Free Design in accordance with DoD criteria and DEPSECDEF Memorandum “Access for People with Disabilities” dated 31 October 2008, evidence based design principles, MHS World Class Checklist Requirements, and High Performance and Sustainable Building Requirements, UFC 1-200-02.

Contract Type: This is a firm fixed price contract for construction services

Term of Contract: Total Contract duration for Base Bid is 2070 calendar days from Notice to Proceed (NTP). Should the Government choose to exercise any or all options, the contract duration will remain the same.

Important Notes:

Item 0001 – Building C, Phase 1 – Construction duration is approximately 40 months.

Item 0002 – Building C, Phase 2 – Construction cannot start until completion of Phase 1.

Item 0003 – Option 1: Building 9 – If option is exercised, construction cannot start until completion of Building C, Phase 1 and NTP is issued by the Contracting Officer.

Item 0004 – Option 2; Building 10 – If option is exercised, construction cannot start until completion of Building C, Phase 1 and NTP is issued by the Contracting Officer.

Commencement of Work: Work under this contract shall commence 15 days after award. Site access will not be available until notice to proceed is issued by the Contracting Officer, approximately 3 months after contract award. Once notice to proceed is issued, the Contractor will have 2070 calendar days to complete the project.

NAICS Code: 236220

Estimated Price Range: Between $250,000,000 and $500,000,000

Wage Determination: MD180057 04/20/2018 MD57

Liquidated Damages: $224,150 Per Calendar Day

6. EVALUATION CRITERIA

BASIS FOR AWARD

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value – the proposal most adventageous to the Government, cost/price and other factors considered.

2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.

4. As stated in the solicitation, all technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are significantly more important than price.

5. Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions.

Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.

EVALUATION FACTORS FOR AWARD

The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Experience Factor 2 – Construction Management Plan Factor 3 – Safety Factor 4 – Small Business Utilization

Subfactor 4.A. – Past Performance in Utilization of Small Business Concerns Subfactor 4.B. – Small Business Participation

Factor 5 – Past Performance

The distinction between experience and past performance is experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

The relative order of importance of the non-cost/price evaluation factors and subfactors is the technical factors 1,2,3, and 4 and their respective subfactors are of equal importance to each other, respectively, and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor, Factor 5. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost/price evaluation factors) are significantly more important than price. For purposes of determining the technical rating for Factor 4, Subfactors 4.A and 4.B are equal to each other.

The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

PRICE FACTOR

(a) Solicitation Submittal Requirements:

The price proposals shall be submitted separate from technical proposals. The offeror shall submit (1) original, marked “Original”, and (1) copy, marked “copy”, in a separate three ring binder (1&/1/2 inch.

minimum) with the following:

SF1442, signed with all amendments acknowledged P114 Set 2 Price Schedule Bid Guarantee in accordance with Provision NFAS 5252.228-9302-Bid Guarantee Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, phone number, and email address.

Price will be submitted on the P114 Set 2 Price Schedule included in the solicitation that includes completion of all contract line items (CLINS).

(b) Basis of Evaluation:

The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section 00100 or equivalent solicitation provision of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the RFP.

(ii) Comparison of proposed prices with the IGCE.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of market survey results.

NON-PRICE FACTORS

Factor 1 – Experience

The Offeror shall submit the following information:

Construction Experience: Submit a maximum of four (4) relevant construction projects for the Offeror that best demonstrates experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as large, complex multi-phase medical facilities with critical and diverse services that was executed within an occupied medical campus that must remain operational during construction. Critical and diverse services can include a combination of at least three and/or all of the following areas: Surgery, Labor, Delivery, Recovery, Postpartum (LDRP), in-patient services, Intensive Care Units (ICU), Imaging, Laser Vision, and Critical Care areas. Projects must collectively demonstrate experience of renovation and new construction.

Projects submitted for the Offeror shall be completed within the past seven (7) years of the date of issuance of this RFP or shall be at least 50% complete with construction for ongoing projects.

A project is defined as a single construction project in a stand-alone contract, or a single task order project under an Indefinite Delivery Indefinite Quantity (IDIQ) contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;

rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed two (2) double-sided pages (or four (4) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP in a narrative form.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects shall be submitted for all Joint Venture members (1 project minimum per member). Offerors are still limited to a total of four (4) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract. More weight may be given to the Offeror’s projects than to those submitted for subcontractors.

The basis of evaluation will include the Offeror’s demonstrated collective experience and depth of experience in performing relevant construction projects as defined in the RFP. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only evaluate a maximum of four projects for construction. If the Offeror submits more than four (4) projects for evaluation, then the Government will evaluate the first four (4) in the order submitted and disregard any other project information after the first four (4).

Strengths may be warranted for relevant projects that demonstrate any of the following:

Construction in constrained sites (sites with limited access, limited staging area or adjacent to occupied spaces).

Facilities located in sensitive, historic surroundings.

Projects that include relocation of active telecommunications infrastructure including switching equipment.

Projects that demonstrate medical equipment installation to include MRI Imaging and Operating Room equipment.

Factor 2 – Construction Management Plan

Submit a detailed Plan (narrative), which shall not exceed five (5) double-sided pages (or ten (10) single-sided pages). Page limitations shall exclude resumes.

The Offeror must include the following information within the construction management plan:

i. Management Structure. Narratively describe the roles, the lines of authority, and the responsibilities of each entity described in paragraphs iii & iv below. Identify personnel who will have negotiation authority and approval of agreements that are reached between the Government and Contractor. Identify any limitations to this authority, if any exist.

ii. Teaming Relationships. If applicable, provide a narrative describing the proposed primary construction firm(s) for this contract and the rationale for proposing this arrangement as the prime. Provide the roles, responsibilities, and contractual relationships between the various firms. The narrative shall also include the lines of authority between the entities.

If Joint Ventures exist, the Offeror shall submit a signed copy of a Joint Venture agreement, Limited Partnerships (LTD) agreement, and/or Limited Liability Companies (LLC) agreement for the proposed Prime contractor (It is noted that Teaming arrangements are not considered Joint Venture agreements).

Clearly and explicitly identify the managing partner or majority holder in the agreement, if a managing partner or majority holder does exist.

i. Quality Control and Safety. Describe how quality control and safety will be integrated into your proposed teaming approach, as well as each firms’ involvement in quality control and safety throughout the project.

ii. Schedule. Provide a schedule-(a graphic timeline (50 activities maximum))-using Microsoft Project, Primavera PE, or Primavera SureTrak software. The proposal shall clearly show the logic and sequence of events necessary for the successful execution of the total project and each milestone. The schedule must correspond to the nodal diagram included in specification 01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS). Provide durations for each task in calendar days, from contract award through contract completion. The overall contract period must not exceed the contract duration provided in the RFP. All days on the schedule should be in "calendar days". Include the time/duration of construction required to accomplish the base bid, and the time/duration required to accomplish each individual option.

iii. Key Personnel. Submit a resume for each of the following team members. Resumes shall include current employer, professional licenses and certifications, number of years of experience, firms they have worked for, a list of relevant projects (two or more) that they have completed, and a list of projects that they have worked on including their role on these projects. Resumes shall include at least two (2) references that can vouch for recent work performance. Ensure correct phone numbers and email addresses are provided for the references. Resumes for each individual shall not exceed one (1) double-sided page (or two (2) single-sided pages).

See specific personnel positions below for resume requirements.

Project Manager and Management Staff – See specification 01 30 00 for detailed staffing qualifications.

Construction/Project Management Staff– See specification 01 30 00 for detailed staffing qualifications.

Project Supervision and Engineering Staff– See specification 01 30 00 for detailed staffing qualifications.

Quality Control Manager and Management Staff -See specifications 01 45 00.00 20 for detailed staffing qualifications.

Site Safety and Health Officers (SSHOs) & Alternate SSHOs - See specification

01 35 26 for detailed staffing qualifications (minimum).

Project Scheduler - See specifications 01 32 00, 01 32 01.00 10, or 01 32 17.00 20 for detailed staffing qualifications (minimum).

(b) Basis of Evaluation

The Offeror’s Construction Management Plan will be used as a means to evaluate organizational structure and teaming relationships proposed by the Offeror, in order to gauge likelihood for successful project execution. In addition, the Offeror will be evaluated for degree of compliance with requirements discussed above and in the specifications, including organizational effectiveness, level of experience and expertise, optimization of quality control, safety, and minimization of risk. Greater levels of experience, especially related to complex medical projects, may be viewed more favorably. In addition, the Government will evaluate the Offeror’s proposed schedule to the overall contract duration provided in the RFP, as a means of determining whether the contractor understands the scope of work, approaches the tasks in a logical and effective manner, and thoroughly understands the required phased construction.

Factor 3 – Safety

(a) Submittal Requirements:

The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture;

however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.)

(1) Experience Modification Rate (EMR):

For the three (3) (2015, 2016, 2017) previous complete calendar years, submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three (3) year period). If you have no EMR, affirmatively state so and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element.

Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

For the three (3) (2015, 2016, 2017) previous complete calendar years, submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data and upward or downward trends should be addressed as part of this element. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach for Safety:

Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety narrative shall be limited to two (2) pages.

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, if any, and innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety may include, but are not limited to, OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS), and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

- Experience Modification Rate (EMR)

- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

- Offeror Technical Approach to Safety

- Other sources of information available to the Government

(1) Experience Modification Rate (EMR):

The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rating. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach to Safety:

The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project.

The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.

Factor 4 – Small Business Utilization

Factor 4 consists of two Subfactors, 4.A, Past Performance in Utilization of Small Business Concerns, and 4.B, Small Business Participation. The evaluation of Subfactors 4.A and 4.B are of equal importance to the determination of Factor 4 Rating.

Definitions: “SB” as used herein, is intended to include Small Business concerns, Small Disadvantaged Business concerns (SDB), Women-Owned Small Business concerns (WOSB), Historically Underutilized Business Zone Small Business concerns (HUBZone), Veteran-Owned Small Business concerns (VOSB), and Service-Disabled Veteran-Owned Small Business concerns (SDVOSB). All small business programs are self-certifying programs with the exception of HUBZone certifications, see HUBZone SB Certifications below. Small Business Program requirements and definitions may be found in the Federal Acquisition Regulations (FAR), Part 19.

HUBZone SB Certifications: Offerors are reminded that HUBZone SB concerns must obtain formal certification from the Small Business Administration (SBA) if they expect to receive the evaluation benefits associated with the HUBZone SB programs either as a prime or subcontractor(s). For more information on the HUBZone SB certification requirements and available benefits, contact your local SBA representative. Certified HUBZone SB firms are listed on the U.S. Small Business Administration’s Dynamic Small Business Search (DSBS) website at http://web.sba.gov/pro-net/search/dsp_dsbs.cfm. It is the responsibility of the prime contractor to periodically check the DSBS as certifications are subject to change.

SUBFACTOR 4.A – PAST PERFORMANCE IN UTILIZATION OF SMALL BUSINESS CONCERNS

Proposals that do not include responses addressing ALL elements of the requirements stated below (a.

through d.) must include an explanation why that element is not addressed.

a. Provide performance evaluation ratings (i.e., SF1420, DD2626, or equivalent) obtained on the implementation of small business subcontracting plans for all of the offeror’s projects referenced under Factor 5, Past Performance. Recently completed project evaluations are desired, however, in the absence of recently completed project evaluations, interim ratings for projects that are 50% complete may be considered. If more than four evaluation ratings are provided, only the first four will be considered. In addition, the Government may consider past performance information on other projects as made available to the Government from other sources (such as the Construction Contractor Appraisal Support Systems (CCASS)), Architect-Engineer Contract Administration Support System (ACASS) and Contractor Performance Assessment Reporting System (CPARS)).

b. Provide small business subcontracting history. Large businesses with Federal prime contracting experience shall provide final or current Subcontracting Report for Individual Contracts (SF294) or Individual Subcontracting Reports (ISR's) on prime (only) contracts submitted under Factor 5, Past Performance. If Factor 5 submitted contracts are not prime contracts, submit SF294s or ISRs for contracts of similar scope performed as the prime contractor. If goals were not met on any submitted contracts, an explanation for each unmet goal is required. Large Businesses with no documented SF294/ISR history shall submit a subcontracting history on Attachment (E), Small Business Past Performance. If more than four (4) reports are provided, only the first 4 reports will be considered.

c. Small Business proposers shall provide a subcontracting history on Attachment E, Small

Business Past Performance.

d. If an Offeror is utilizing past performance information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the solicitation), the proposal shall clearly demonstrate that the affiliates/subsidiaries/parent/LLC/LTD member companies will have meaningful participation of all members in the management of the subcontracting program/plan by identifying the personnel or resources from the member companies that will be dedicated to managing the plan, and an organization chart which demonstrates the reporting chain within the membership.

If the Offeror is a Joint Venture, Partnership LLC or other entity consisting of more than one entity, provide past performance information, elements a. through d., for each individual business entity(ies) that will be responsible for managing the subcontracting program/plan.

Proposals including information on any of the following additional elements may be rated higher, based on the evaluated extent to which the information addresses the paragraph (b), Basis of Evaluation for Subfactor 4.A.:

a. Provide information on national-level, and industry-issued awards that offerors received for outstanding support to SB concerns within the past five (5) years. Include purpose, issuer, and date of award(s). National and industry-issued awards received beyond five

(5) years will not be considered.

b. Provide information on previous, existing, planned or pending mentor-protégé agreements

(MPA) under any Federal Government, or other, program held within the last five years.

Information should include, at a minimum, the members, objectives, period of performance, and major accomplishments during the MPA.

c. Provide information on past use of Community Rehabilitation Program (CRP) organizations certified under the AbilityOne Program by SourceAmerica, or the National Industry for the Blind (NIB).

Information should include the contract type, type of work performed, period of performance, and number of employed severely handicapped persons.

The extent to which the proposal demonstrates the proposer’s level of past performance in utilizing Small Business (SB) concerns, AbilityOne, Mentor-Protégé Agreements, and other socio-economic programs, as defined in FAR Parts 26.1 and 26.2, in subcontracting, and in meeting established Small Business subcontracting goals.

Subfactor 4.B – Small Business Participation

Identify in terms of dollar value and percentage of the total acquisition, the extent of work you will perform as the prime contractor. If submitting an offer as a Joint-Venture, identify the percentage of work each member will be responsible for and indicate the size status of each member, e.g., LB, SB, SDB, WOSB, HUBZone SB, etc.

If you are a Large Business, submit a Small Business Subcontracting Plan for this project in the format provided in Attachment F for this factor, to include all information required in the attachment. If you are a Small Business, submit a subcontracting participation breakdown in the format provided in Attachment G for this factor. All proposers: To demonstrate commitment in using small business concerns, the Small Business Subcontracting Plan or subcontracting participation breakdown may list all subcontractors by name. If the proposed Small Business Subcontracting goals do not meet the minimum NAVFAC Small Business Subcontracting Targets, include a detailed explanation describing the actions taken to arrive at that determination, along with an explanation for the goals that actually were proposed. For proposals submitted on design-build solicitations, the proposer must identify its designer/design team in its Subcontracting Plan or Small Business Participation Breakdown.

The following will be evaluated on all proposals:

a. The extent to which the proposal demonstrates maximum practicable participation of SBs in terms of the total value of the acquisition, including options.

b. The extent to which the proposal demonstrates a commitment to use SB concerns that are specifically identified in the proposal, including but not limited to use of mentor protégé programs.

c. The extent to which the proposal demonstrates SB participation in a variety of industries expected during the performance of work.

d. The realism of the proposal to meet the proposed goals.

The following will be evaluated on proposals submitted by Large Business firms:

a. The extent to which the proposal provides Small Business Subcontracting goals that meet or exceed the minimum NAVFAC Small Business Subcontracting Targets, and utilization of AbilityOne CRP organizations. Proposals that provide goals exceeding the NAVFAC Subcontracting Targets may be rated higher. The proposed goals and NAVFAC Subcontracting Targets are expressed as a percentage of total subcontracted values. The minimum NAVFAC Subcontracting Targets are as follows:

FY2017

SB 46.18%

SDB 24.48%

WOSB 7.14%

HUBZone 9.18%

SDVOSB 4.08%

b. The extent to which the proposer’s Small Business Subcontracting Plan establishes reasonable efforts demonstrating the subcontracting targets can be met during the performance of the contract:

Attachment E – Small Business Past Performance Attachment F – Small Business Subcontracting Plan.

Attachment G – Small Business Offeror Small Business Participation Breakdown

Factor 5 – Past Performance

The distinction between construction experience and past performance is construction experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE

PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Experience. AN OFFEROR

SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Lindsay Brown, via email at Lindsay.naill@navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

Performance award or additional information submitted will not be considered.

This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 1 – Experience and past performance on other projects currently documented in known sources.

More emphasis will be placed on more relevant projects. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

The Government will consider the currency and relevance of the information, the source of the information and context of the data. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP.

The Government will evaluate the Offeror’s record of conforming to drawings, specifications and standards of good workmanship, and will evaluate the Offeror’s record on cost control/change orders and adherence to contract schedules. Subcontractor management, safety management, and other quality control programs will also be reviewed. The Government will examine the Offeror’s record for reasonable and cooperative behavior, and in general, the Offeror’s business-like concern for the interest of the customer.

Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance.

END OF PRICE AND NON-PRICE EVALUATION FACTORS

Proposal Organization and format:

The proposal submitted in response to this solicitation shall be clear, concise, and shall contain sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposals should not simply rephrase or restate the Government’s requirements, but rather should demonstrate convincing rationale to address how the offeror intends to meet these requirements. The offer shall be compliant with the requirements as stated in the RFP.

Nonconformance with the solicitation requirements, specified organization and content may result in elimination or misevaluation of the proposal. All claimed technical capabilities to meet the requirements shall be realistic and are subject to verification by the Government.

Offerors should assume that the Government has no prior knowledge of the offeror’s business and that the Government will base its evaluation on the information contained in the offeror’s proposals.

Proposal Organization and Number of Copies

(i) Volume 1: Technical Proposal – Offeror shall submit one (1) original and six (6) copies, each in a separate three-ring binder and tabbed appropriately by major evaluation factor with the following characteristics:

(1) Text pages 8 ½ x 11 format, minimum 10 point font.

(2) Include a…