AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION N40080-15-R-5342 DBB, P-114 SET #2, MEDICAL CENTER ADDITION/ALTERATION (MCAA), WALTER REED NATIONAL
MILITARY MEDICAL CENTER (WRNMMC), NAVAL SUPPORT ACTIVITY BETHESDA, BETHESDA, MD
PLEASE SEE SECTION SF 30 - BLOCK 14 CONTINUATION PAGE FOR DETAILS OF AMENDMENT
1. CONTRACT ID CODE PAGE OF PAGES
J 1 69
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N40080-15-R-5342
X 9B. DATED (SEE ITEM 11)
08-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2018
CODE
NAVAL FACILITIES ENG COMMAND WASHINGTON
1314 HARWOOD ST
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N40080-15-R-5342
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0009
The purpose of this amendmnet is to incorporate the following:
1. Provide SF1442 Revisions
2. Provide Clarification
3. Provide RFI Responses
4. Attachments uploaded under the additional documents link in NECO.
5. Liquidated Damages have been revised. See Clause 52.211-12
6. The proposal due date has been extended to 10 October 2018 by 2:00 PM EST.
7. Revised Wage Determination: MD180057 09/07/2018 MD57 located in Section 00800 –
Special Contract Requirements
All other terms and conditions remain unchanged.
1. SF1442 REVISIONS
PRICE FACTOR (pg.12)
(a) Solicitation Submittal Requirements has been revised as follows:
The price proposals shall be submitted separate from technical proposals. The offeror shall submit (1) original, marked “Original”, and (1) copy, marked “copy”, in a separate three ring binder (1&/1/2 inch.
minimum) with the following:
SF1442, signed with all amendments acknowledged P114 Set 2 Price Schedule Copy of Online Representation and Certifications and proof of registration in System for
Award Management (SAM) Confirmation of filing of Veterans' Employment and Training (VETS) VETS 4212 and/or
VETS report for the cycle.
Bid Guarantee in accordance with FAR Clause 52.228-1 Bid Guarantee. Amount shall be at least 20 percent of the bid price but shall not exceed $3 million.
Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor
Name, Address, Phone Number, DUNS, Cage Code, Point of Contact, phone number, and email address.
Subcontracting Plan in accordance with FAR Part 52.219-9 - Small Business Subcontracting Plan.
Please note offerors have the option to deliver the PRICE SCHEDULE AND SMALL BUSINESS SUBCONTRACTING PLAN via the Safe Access File Exchange (SAFE) website at https://safe.amrdec.army.mil/SAFE/Welcome.aspx. Instructions on how to use SAFE can be found on this website. Please note ONLY THE PRICE SCHEDULE AND SMALL BUSINESS SUBCONTRACTING PLAN is allowed to be delivered via this website. Other information submitted via this website WILL NOT
BE ACCEPTED. Submissions via this method are subject to the same proposals due date and time as listed above.
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting plan goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 65%
SDB 15%
HUBZone SB 6%
WOSB 15%
SDVOSB 5%
Small businesses identified by name in offerors’ proposals/participation and commitment strategies and considered in the evaluation shall be listed in small business subcontracting plans submitted pursuant to FAR 52.219-9 in order to facilitate compliance with 252.219-7003(e). Material discrepancies between the small business participation and commitment strategy and small business subcontracting plan (if required) shall be corrected and responses provided to questions identified.
See “REVISED ATTACHMENT F SMALL BUSINESS SUBCONTRACTING PLAN (TEMPLATE)” for format.
Offerors shall submit their Price proposal in accordance with the solicitation requirements. Price will be submitted on the P114 Set 2 Price Schedule included in the solicitation that include completion of all contract line items (CLINS).
FACTOR 4 – SMALL BUSINESS UTILIZATION (pg. 16)
Factor 4, Small Business Utilization and related subfactors, that are utilized for this procurement no longer follow DoD regulations. The Small Business factor has since been revised in order to be compliant with the DoD regulations. Therefore, this amendment removes Factor 4, Small Business Utilization and subfactors in its entirety, and replaces it with the most current Small Business Utilization factor.
Remove all references to “and subfactors” within the solicitation.
Factor 4 has been replaced in its entirety with the following:
FACTOR 4 – SMALL BUSINESS UTILIZATION
This Factor assesses both the historical achievements in utilizing small business concerns as subcontractors and proposed small business participation and commitment strategies.
a. Solicitation Submittal Requirements:
1. Achievements: All offerors shall provide a narrative (limited to two pages) to describe their achievements in supporting the Government’s policy to provide maximum practicable opportunities for small business (SB), veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), historically underutilized business zone (HUBZone) small business, small disadvantaged business (SDB), and women-owned small business (WOSB) concerns to participate as subcontractors consistent with efficient contract performance. In support of narrative submissions:
a. All offerors shall submit small business subcontracting information associated with each project cited under the Corporate Experience Factor in the format provided in Attachment Small Business Subcontracting Record.
b. Offerors representing as other than small businesses shall also provide copies of the most current individual subcontracting reports (ISRs) associated with each project cited under the Corporate Experience Factor if a small business subcontracting plan was required by the contract. If such projects were completed under specific task orders, provide ISRs for the overall contract. For cited projects with state and local government agencies, provide similar subcontracting performance reports if required by the contracts.
When not specifically addressed in the ISR or similar report, offerors shall provide explanations for all instances of failures to meet dollar or percentage goals in individual subcontracting plans.
Notes:
The Government reserves the right to consider achievements information on other recent, relevant projects from all available sources.
Offerors utilizing achievements information of team members or key subcontractors shall clearly demonstrate how these companies will have meaningful involvement in the management of the subcontracting program for this acquisition. If not, such achievement information will not be considered under this factor. If the offeror is a new joint venture, partnership or other entity consisting of more than one company, provide achievements information for each individual business entity(ies) that will be responsible for managing the subcontracting program and clearly describe those responsibilities.
Failure to provide ISRs or any other requested information must be fully explained and may negatively impact your evaluation.
2. Small Business Participation and Commitment: All offerors shall submit a small business participation and commitment strategy including all data elements shown in Attachment Small Business Participation and Commitment Strategy.
a. Identify in terms of dollar value and percentage of the total acquisition the extent of work the offeror will self-perform as the prime contractor. If submitting an offer as a joint venture, identify the percentage of work each member will be responsible for and indicate the size status of each member (e.g. small business, woman-owned small business, other than small business).
b. Include supplemental narratives (limited to five pages) to address other elements of the offeror’s strategy such as binding agreements covering post award roles for execution of the contract and specific initiatives and tools that will be employed under the contract to enhance small businesses opportunities to both participate in this acquisition and build capabilities to support future NAVFAC acquisitions.
c. The anticipated prime and first tier overall small business participation rate for this acquisition (i.e. work to be performed by small businesses as the prime and/or subcontractors) is 20% of the contract value. Offerors are encouraged to exceed this percentage and seek meaningful levels of participation in each of the small business socioeconomic programs listed in Attachment Small Business Participation and Commitment Strategy consistent with efficient contract performance. Offerors shall explain in their participation and commitment strategies how proposed participation rates were established. The small business participation and commitment strategy must be in agreement with any required small business subcontracting plan and will be made a part of the contract upon award.
(b) Basis of Evaluation:
Offerors will be evaluated on the extent to which their proposals and other performance information available to the Government demonstrate a history of successfully supporting Government policies concerning utilization of small business concerns as subcontractors including, when applicable, achievements against established small business subcontracting plan goals. Offerors will also be evaluated on the levels of small business participation proposed and the degree of commitment to use named sources. The anticipated benefits of proposed initiatives and tools to enhance small business participation and capabilities will be considered. The Government will assess proposal realism and the likelihood of success in achieving the small business objectives of this acquisition.
Forms to be used for offeror submission of Small Business Utilization Factor information are:
Attachment Small Business Subcontracting Record Attachment Small Business Participation and Commitment Strategy
2. CLARIFICATION
Government Clarification with regards to Small Business Subcontracting Plan and Factor 4 – Small Business Utilization:
All offerors shall submit a “small business participation and commitment strategy" per Factor 4. The anticipated prime and first tier overall small business participation rate for thisacquisition is 20% of the contract value. This 20% and other percentages in the offeror's commitment strategy are not considered subcontracting goals, but are participation rates and are included in the offeror's commitment strategy.
The participation rates are separate from subcontracting goals found in the small business subcontracting plan.
This solicitation provides NAVFAC's command-wide small business subcontracting targets, and these targets are included in this amendment. These small business subcontracting targets listed in this amendment may be higher or lower percentages that would represent realistic challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting goals that are consistent with their small business participation and commitment strategies submitted for evaluation under the small business utilization source selection factor in this solicitation and shall document in their subcontracting plans the basis for all proposed goals.
3. RFI RESPONSE
52. The notes states "Patch and repair existing building surfaces and provide parging as needed to maintain a weathertight exterior." Please confirm if we can provide alternate pricing for this activity.
Reference A5/AD-301.3
GOVERNMENT RESPONSE: Patch and repair existing building surfaces and provide parging as needed to maintain a weathertight exterior at the areas shown on the A5/AD-301.3 is included in the base bid
57. Detail 7 on Drawing P-501 shows drain pipe routed in the utility space schematically. The pipe is run below and through the mat foundation, which varies in thickness from 48 to 60 inches, turning and running horizontally in the utility space on concrete curbs shown on the structural drawings below the metal deck and turning up through the metal deck with a sleeve. (a) Are sleeves required where the plumbing piping penetrates the concrete curb? If yes, please provide a detail. (b) Where the piping is installed parallel to the concrete curb shown typical on S-10B-E, what is intended method of support for the piping in the utility space? Please provide a detail/sketch. (c) Are the penetrations through the mat foundation and metal deck floor to be water tight? If yes, please provide a detail/sketch. (d) Are pipe supports or hangers required below the mat foundation? If yes please provide a detail/sketch.
Reference P-501
GOVERNMENT RESPONSE: 57 (a) - Refer to attached drawing P-502 for detail of pipe sleeve through the basement floor above utility space and for pipe penetration through mat foundation. This detail provided for Contractor’s use is similar to pipe penetration through below-grade wall detail already provided, on drawing P-502. No water shall be permitted in utility space. Matt foundation penetrations shall be water tight.
Items (b) through (d) are Contractor’s Means and Methods in accordance with project documents
62. Building 10 M-582, Detail C1 says to run the steam vent from the steam condensate pump CP-5-1 to the outside. Drawing M-105-AA4 shows CP-5-1 is located on the 5th floor. The steam vent is not shown on the drawing. Please provide the steam vent size and routing. Reference M-582
GOVERNMENT RESPONSE: Extend vent through exterior wall as high as possible. Extend vent pipe 12" from exterior wall.
63. Building 10 Isolation Rooms have hard ceilings in them. There are (2) CV boxes that will require access doors in the ceiling in each of these rooms. There are also (3) manual dampers in the ductwork in each of the Isolation rooms. Please clarify if these CV boxes and/or manual dampers will require access doors in the ceiling.
GOVERNMENT RESPONSE: Reference A2 & A4/AI-482, issued 2/28/18. Access doors are shown.
71. M802 Note on plan which states “To Siemens building automation system site server BACnet over Ethernet protocol located in building #14.” This is in contradiction to Specification 2309231320 which requires (in multiple sections) connection and integration to the existing Johnson Controls Inc. (Metasys) Server in building 14. Please confirm the connection is to the existing Johnson Controls Inc. Metasys Server.
GOVERNMENT RESPONSE: All BAS documented work on the drawings and specifications shall be interfaced to the Johnson Controls Site Server located in Building 14.
72. Does any portion of the New DDC BAS system require the use of embedded encryption technology and required to meet Common Criteria Certified and/ or the Federal Information Processing Standard (FIPS)-140-2, Level 2?
GOVERNMENT RESPONSE: The only encryption requirements for the electronic security system portion pertained to card reader communication to a panel under FIPS 201, not network communications.
73. 01400.1.4.1.2 Rapidgate Passes and associated costs. Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling. 00.1.4.1.2.e States current cost for Rapidgate is $5000/person. However upon contacting Fortior Solutions the company responsible for Rapidgate we were informed that the US Navy no longer uses this system. Please clarify if there is an alternative solution to the facility security access process and any associated costs.
GOVERNMENT RESPONSE: Obtain access to NSA Bethesda through participation in the Defense Biometrics Identification System (DBIDS). Please see Installation Access in amended specification 01 14 00, Work Restrictions for details. No fees are associated with obtaining a DBIDS credential. Lead time is 30 days.
74. 230923.1320.1.4.a Building 9 and 10 states “All existing controls will need to be decommissioned and new controls installed and made operational based on the phasing schedule.” This sections does not appear to address who is responsible for updating and editing the existing database to remove the existing controls, alarms, trends and graphics associated with these systems. Please clarify who will be responsible for the stated work?
GOVERNMENT RESPONSE: The existing database is on the Johnson Controls server, so Johnson Controls will need to be the vendor to remove and update the existing database. If Johnson controls is the vendor being awarded this contract, then the work is included in the current drawings and specification. If Johnson Controls is not being awarded this contract, then the construction manager for this project will need to contact Johnson Controls to have them provide a quote to perform the necessary work.
75. 230923.1320 The project plans and specifications do not appear to address who is responsible for updating and editing the existing database to remove the existing controls, alarms, trends and graphics associated with controls systems located within the buildings to be demolished to make space for Building C (All or portions of existing Buildings 2, 3, 4, 5, 6, 7 & 8). Please clarify who will be responsible for decommissioning and removal of the Johnson Controls Inc. database modifications as listed above
GOVERNMENT RESPONSE: Response to this RFI will be provided in a later Amendment
76. 230913.3.6.3 Appears to have a number of refrigerators and Freezers with require both a Digital Input (Dry Contact Alarm) from the equipment and a temperature probe both of which are to be alarmed by the BAS. Please confirm this is correct.
GOVERNMENT RESPONSE: This is correct. System shall be bid using the two type of signals and initial amount of refrigerators and freezers shown in the miscellaneous points list in specification 23 09 23.13 20 article 3.6.3, and shown on electrical and lab planing drawings. Once contract has been assigned, and prior to construction, BAS shall set up a meeting with the Government to discuss which refrigerators and freezers shall need final BAS monitoring.
77. 230913.3.6.3 Network Transformers Electric Room 1S13 Temperature Alarm #2, and Liquid Level Alarm quantity columns are blank? Please confirm these points are not required.
GOVERNMENT RESPONSE: Specification 26 11 16.00 23 - 2.2.2.6.h indicates that there will be one pressure and two temperature alarms for each of the three transformers in 1D13. So the quantity for temperature alarm #2 shall also be 3 to match temperature 1 and pressure alarms.
Specification only refers to local liquid level alarms. BAS shall not monitor the liquid level alarm.
78. MD-101B-1C, General note #3 indicates if there are controls related to demolition they are to be removed. Please indicate which equipment has existing controls which will be required to be relocated or demolished. (Example EF-2-4 is to be relocated, are there existing controls? If there are existing DDC controls are they to be relocated or installed new?)
GOVERNMENT RESPONSE: Existing controls for EF-2-4 are to be reused and relocated with the fan.
79. FCU-B.18 appears on MH-10B-B4 but does not appear in M-600 Schedules? Please confirm this unit is required.
GOVERNMENT RESPONSE: FCU-B.18 is shown on the Fan Coil Unit Schedule on M-628.
80. Is there any requirement for Buy American? Please identify any related Far-Clauses?
GOVERNMENT RESPONSE: Refer to Clauses 52.225-12, 52.225-11, 52.225-22 in the SF1442 Solicitation.
81. AHU-27 M-626 and M725 indicate there are two airflow measuring stations required for this unit.
(Supply Air and Outside Air). We are unable to locate these airflow stations elsewhere on the plans.
Please confirm they are required and indicate their size and or location on plans.
GOVERNMENT RESPONSE: AHU-27 has two airflow measuring stations - one to measure the supply air and one to measure outside air. The airflow measuring stations will be added to the floor plans.
82. Please indicate who provides the Disconnect position monitoring (End-Switch/ Micro-Switch) switches for FSCS Smoke Control as per Note 8 on M730?
GOVERNMENT RESPONSE: Specification 26 20 00 shall be revised to include a auxiliary contact in the disconnect switch for use by BAS.
83. M731 Detail A4 depicts a 20 Gallon tank connected to the Static Pressure Port (Designated PP).
Please indicate who provides this tank? Please indicate where it is to be located? What specification sections will apply to this tank?
GOVERNMENT RESPONSE: Tank shall be provided by the BAS contractor. Tank shall be located in the penthouse. Tank shall be including but not limited to: Horizontal type, welded steel hot-dip galvanized after fabrication, ASME code stamped for a working pressure of 50 psig at 120 degrees F. and pressure gauge.
84. M-731 Detail B4 Note 3 states “TUBING TYPE AND SIZE SPECIFIED IN SECTION 23 09 23.13 20” We are unable to locate any tubing types or size requirements in this section. Please provide a specification for this material.
GOVERNMENT RESPONSE:
Copper Tubing:
1. Copper tubing shall be hard-drawn in exposed areas and either hard-drawn or annealed in concealed areas. Only tool-made bends shall be used. Fittings for copper tubing shall be brass or copper solder joint type except at connections to apparatus, where fittings shall be brass compression type.
2. Sub-mains located in and serving local offices and laboratories may be fire rated polyethylene.
3. Use copper tubing where subject to damage or temperatures over 130 degrees F, in building shafts, where adjacent to heating pipes passing through common sleeve.
4. Purge and test tubing before connecting control instruments.
Plastic Tubing:
1.Plastic tubing shall be run within covered raceways or conduit except when otherwise specified.
Plastic tubing shall not be used for applications where the tubing could be subjected to a temperature exceeding 130 degrees F. The working pressure at ambient temperatures shall not be exceeded. Fittings for plastic tubing shall be for instrument service and shall be brass or acetal resin of the compression or barbed push-on type. Purge and test tubing before connecting control instruments.
Pneumatic Lines:
1. Pneumatic lines shall be installed such that they are not exposed to outside air temperatures.
Pneumatic lines shall be concealed except in mechanical rooms and other areas where other tubing and piping is exposed.
2. All tubes and tube bundles exposed to view shall be installed neatly in lines parallel to the lines of the building. Tubing in mechanical/electrical spaces shall be routed so that the lines are easily traceable.
3. Air lines shall be purged of dirt, impurities and moisture before connecting to the control equipment. Air lines shall be number coded or color coded and keyed in the As-Built Drawings for future identification and servicing the control system.
4. Static pressure sensing lines installed outdoors shall be provided with a drip leg for the collection of condensation. The drip leg shall be no less than three feet long and shall be provided with hand valves and a vent cock so that the drip leg can be manually drained without disrupting the static pressure control of the system.
Pneumatic Lines in Mechanical/Electrical Spaces:
1. Use copper tubing or polyethylene tubing in EMT within mechanical equipment rooms, penthouse and whenever exposed.
Pneumatic Lines External to Mechanical/Electrical Spaces:
1. Tubing external to mechanical/electrical spaces shall be soft copper with sweat fittings or plastic tubing in raceways not containing power wiring. Raceways and tubing not in raceways shall be supported every 4 to 6 feet. Pneumatic lines concealed in walls shall be hard-drawn copper tubing or plastic tubing in rigid conduit. Plastic tubing in a protective sheath, run parallel to the building lines and supported as specified, may be used above accessible ceilings and in other concealed but accessible locations.
2. Provide minimum 3/8 inch pneumatic tubing for transmitter sensing lines.
85. M-731 Detail A4 Note 3 states “PROVIDE STATIC PRESSURE PROBE DESIGNED TO MINIMIZE PRESSURE FLUCTUATIONS DUE TO WIND PER SECTION 23 09 23.13 20.” We are unable to locate pressure probes requirements for wind fluctuations in this section. Please provide a specification for this material.
GOVERNMENT RESPONSE: Static Outside Air Probe: Capable of sensing outside atmospheric air pressure to within 2 percent of actual value. Operation not affected or impaired by rain or snow.
Sensing accuracy not affected by wind velocities up to 80 miles per hour. Anodized aluminum construction has no moving parts or required maintenance. Provide all mounting hardware.
Sensing device to be located minimum of 15 feet above roof.
86. M731 detail B4 appears to require all Differential Pressure Transmitters (DPT) to be piped in ½” minimum copper pipe. Does this detail apply to all DPT connections?
GOVERNMENT RESPONSE: This detail only applies to AHU's where the duct static pressure probe is located outdoors and is piped to a static pressure sensor located indoors.
87. Please clarify if Polyethylene tubing is acceptable for use at DPT ports for interior use such as Down Duct Remote Static Pressure sensors and alike.
GOVERNMENT RESPONSE: Polyethylene tubing is acceptable for use at DPT ports. Provide in accordance with specification below:
Plastic Tubing:
1.Plastic tubing shall be run within covered raceways or conduit except when otherwise specified. Plastic tubing shall not be used for applications where the tubing could be subjected to a temperature exceeding 130 degrees F. The working pressure at ambient temperatures shall not be exceeded. Fittings for plastic tubing shall be for instrument service and shall be brass or acetal resin of the compression or barbed push-on type. Purge and test tubing before connecting control instruments.
88. M720 Detail C1 Typical Operating Room Control diagram indicates the use of Terminal Air Valves.
(Venturi types) The diagram does not identify the terminal unit designation. (VAE, VVS, VAV, or VAR etc.)
Please confirm that not all areas which may be designate an Operating Room will be provided with Venturi type Terminal Air Valves for both Supply and Return/Exhaust. Please identify the spaces for which this diagram applies.
GOVERNMENT RESPONSE: Detail applies to the supply air control valve and exhaust air control valves schedules shown on M-631.
89. M721 Detail C3 Typical Lab Control diagram Note 7 States” Refer to Mechanical Drawings for location. Please confirm that M631 Schedule for VAE units identified under the Column Heading “System” are connected to fume hoods (Although not shown on plans at the terminus of the duct served by these units) or please identify the spaces for which this diagram applies.
GOVERNMENT RESPONSE: M-631 should not be used to identify systems connected to fume hoods as all VAE units do not connect to fume hoods. Refer to the mechanical ductwork plans for location of food hood connections.
The fume hood portion of detail C3/M-721 only applies to labs with fume hoods. Ignore the fume hood portion of this detail for any lab without a fume hood.
90. 230923.1320.1.9.e requires the BAS vendor to supply Fume Hood face Velocity monitor/controller to Fume Hood manufacturer for installation. Section 2.2.11 provides the specification for these devices.
However, section 115313 describes fume hoods designed for Radioisotope and Explosion proof use.
Please confirm that 230923.1320.1.9.e is correct. Please confirm that there are no additional requirements to be met by this device for use in environments where Radioisotopes or Explosive conditions are present.
GOVERNMENT RESPONSE: Contractor to coordinate with the fume hood schedules and fume hood manufacturer for the applicable style of monitor to be furnished. A style of explosion proof monitor shall be added to the specification.
91. M750 Detail C4 Existing Supply Fan Detail Note 2 “Refer to mechanical drawings for quantities and locations of fans.” “Note 3 replace existing AHU's duct static pressure sensors. Wire sensors back to the existing associated BAS AHU control panel and reprogram system as required.” We are unable to confirm the number of fans for AHUs located in Building 9. Please confirm this applies to AHUs AHU-24, 41 and 50 only and the number of fans for these units.
GOVERNMENT RESPONSE: Applies to only AHU-41 and AHU-50.
92. 230923.1320. 3.6.3 Miscellaneous Points appears to list points which do not appear elsewhere in the design documents. Some points are shown to be located in buildings not included in the project plans.
Some point locations are not given, however the point name would appear to be located within the design documents. Please confirm these points are required for this project. If required indicate where the requested information can be found or please provide complete information, these points cannot be confirmed as to quantity and location.
GOVERNMENT RESPONSE: RFI point list is accurate for points that are expected to be monitored.
RFI does not specifically indicate what locations are not shown or are unclear. For all units intended for medical purposes, utilize equipment’s remote monitoring capabilities. For all patient/nutrition equipment, provide estimate proposal for ability to monitor temperature of equipment remotely utilizing an appropriate temperature sensor. If equipment cannot be located or line-item estimates cannot be provided for this phase of construction, submit additional RFI detailing specifically what information is missing.”
93. Who is to provide wiring for the Kitchen Exhaust Systems as shown on the QF-Series of Exhaust System Vendor detail drawings (Marked for Information Only)?
GOVERNMENT RESPONSE: Clarify what specific wiring and components are in question.
94. Is BAS integration (BACnet) required for the Kitchen Exhaust Systems as shown on the QF-Series of Exhaust System Vendor detail drawings (Marked for Information only)?
GOVERNMENT RESPONSE: BAS integration for kitchen exhaust system shall be by food service fit-out vendor.
95. As per 230002.13.2.3.i.1 Variable Volume units are to include direct airflow measuring devices. Air Valves shall be provided with direct airflow measurement devices (Position feedback is unacceptable) which complies with 23092313 DDC Specification, however M-720 and M721 Detail C1 Note 12 indicates that Air Flow Sensors is to be provided by BAS. Please clarify who should provide the direct airflow measurement devices.
GOVERNMENT RESPONSE: Air flow sensor shall be provided with the Variable volume units as specified in 23 00 00 and not by BAS. BAS drawings M-720 detail C1 note 12 and M-721 detail C1 note 11 shall be revised.
96. M-702 General note located on the 3rd floor level states “PROVIDE THE QUANTITY OF ROUTERS REQUIRED TO SATISFY THE BANDWIDTH REQUIREMENTS IN SECTION 23 09 23.” However we are not able to locate a Bandwidth requirement in section 230923.1320. With the exception for the requirement for the BACnet Protocol Analyzer to measure the bandwidth usage. Please provide any bandwidth usage or limit requirements.
GOVERNMENT RESPONSE:
The network bandwidth usage under a heavily loaded condition shall not exceed 60 percent for either the primary level network or the secondary level networks.
1. A heavily loaded primary level network is characterized as one performing the following activities simultaneously:
a. Transmitting batches of trend data for every point in the building in response to polling requests at 15-minute intervals.
b. Transmitting 500 point values to the server in response to polling requests at 5-second intervals.
c. Transmitting 100 point override commands from the server to every SC or PSC at 10 second intervals.
2. Heavily loaded secondary level networks are characterized as ones performing the following activities simultaneously:
a. Transmitting trend data for every point on the secondary level network to the supervisory controller in response to polling requests at 5-minute intervals.
b. Transmitting every point value to the supervisory controller in response to polling requests at 5-second intervals.
c. Transmitting 100 point override commands from the supervisory controller to the
Application Specific Controllers at 10 second intervals.
97. M-705 Detail A4 and M705A Atrium Smoke Evacuation Exhaust Fan system requires the interface of the BAS system with the FAS system to function. The FAS is to provide the major portion of the control over the Atrium system, including the FSCS override panel. The interface between the FAS and the BAS provides Smoke Exhaust fan status and trouble alerts via the BAS controllers and upon activation indexes the associated VAVs serving the Atrium area to fully open. The entire interface could be provided by the FAS directly, increasing reliability and reducing response time. The BAS could provide Fire-Smoke rated fast acting, Fail-open, modulating actuators for the VAV air control valves. Upon determination by the FAS to start the smoke evacuation mode would denergized the power source to the associated VAVs causing them to open in less than 30 seconds, directly start and monitor the fan status’ and associated switches as described in the sequence as designed. The cost impact to the FAS would amount to a single addressable command module to interrupt the power to the VAVs. The cost to the BAS would be offset by its removal from the smoke control responsibility. This system appears to be dedicated to the Atrium Smoke Control System and has no other HVAC function which would require an interface to the BAS.
Please indicate if this is an acceptable alternative to the design of this system.
GOVERNMENT RESPONSE: The atrium smoke evacuation system does not rely on the operation of AHU-24 to function as designed. The requirement in the ATRIUM EVACUATION CONTROL- EF- 28 THROUGH EF-42 sequence on M-705 to index the terminal boxes to their full open positions will be removed.
98. 230000.2.14.6 Controllers for Energy recovery Units (ERU) indicates that the unit manufacturer is to provide an electronically programmable controller and controls, software and programing, however M705 Detail A1 and M705A Sequence of Operations for the ERUs would appear to require the BAS system to provide GPPC controllers, control devices, programming and software. Please confirm these units are to be provided with a full factory packaged control system meeting all sequence of operations requirements.
GOVERNMENT RESPONSE: ERU shall be provided with a full factory packaged control system.
Drawing and sequence shall be revised.
99. There are a number of duct mounted humidifiers located in building C. These units appear to serve NICUs spaces. No associated humidity sensors are located on the plans in these spaces. There does not appear to be a room control diagram for these spaces which includes this equipment. Please provide clarification as to the control and monitoring of these units. Please confirm there is to be a humidity sensor located within these spaces.
GOVERNMENT RESPONSE: Humidistats will be provided for each NICU room. These will be added to the floor plans in a future Amendment. A control diagram and sequence has been included in Amendment 009.
100. Specification 230923.1320.2.1.6.1.h states the following “Controllers shall provide operators with the ability to manually override automatic or centrally executed commands at the GPPC via local, point discrete on-board Hand/Off/Auto override switches for digital control type points and gradual switches for analog control type points. Override switches shall be operable whether the panel processor is operational or not:” However section 230923.1320.2.1.1.9.e (Input and Output Interface) would appear to allow a Keypad Display/Interface. Such an interface would not function if the processor was not operational. Please clarify the requirements for I/O overrides as this requirement has multiple negative ramifications for this facility. Local manual override of primary HVAC equipment may result in a loss of control for critical spaces such as Operating rooms, ICUs, and Isolation rooms. Additionally, energy efficiency, and effective management of the automatic control systems may be greatly reduced. The cost of implementing this hardwired override system will negatively impact the budget for this project for very little or no benefit to the facility. In our long term experience with this facility we understand the current practice at WRNMMC is the provision of a Keypad Display for local operator interface/control. This method can be released of local control by the BAS operator workstation. Please clarify the requirement for local input/output override capability to be provided for this project.
GOVERNMENT RESPONSE: Provide the keypad display, in lieu of the discrete on-board hand/off/auto override since it is the current WRNMMC common practice.
101. Will there be an additional opportunity to walk the project prior to the bid date? We would like to include additional subcontractor participation for clarity.
GOVERNMENT RESPONSE: The Government conducted 2 site visits one on Jun 05, 2018 and the second site visit on Jun 28, 2018. There is no intention to schedule another site visit.
102. 230923.1320.2.1.6.1.c, states “Provide one GPPC per air handling unit (AHU). Provide one GPPC to control manifolded exhaust fans systems. Provide one GPPC per bank of HRUs associated each AHU zone. Miscellaneous exhaust fans shall be controlled from slaved controllers.” Please clarify if the “HRUs” as listed above are same as the ERUs on the plans.
GOVERNMENT RESPONSE: Yes, the tag designation should all be ERU's.
103. 230923.1320.2.1.6.1.c, states “Provide one GPPC per air handling unit (AHU). Provide one GPPC to control manifolded exhaust fans systems. Provide one GPPC per bank of HRUs associated each AHU zone. Miscellaneous exhaust fans shall be controlled from slaved controllers.” If the HRUs are actually the ERUs please confirm these units are factory packaged and clarify if they require the additional GPPC as listed above.
GOVERNMENT RESPONSE: ERU shall be provided with a full factory packaged control system.
Drawing and sequence shall be revised.
104. 230923.1320.2.1.6.1.c, states “Provide one GPPC per air handling unit (AHU). Provide one GPPC to control manifolded exhaust fans systems. Provide one GPPC per bank of HRUs associated each AHU zone. Miscellaneous exhaust fans shall be controlled from slaved controllers. Please define the term “Slaved controllers” in reference to the miscellaneous exhaust fans statement above. This term is undefined in this specification.
GOVERNMENT RESPONSE: The slaved controller is not a standalone GPPC controller but is a remote I/O device interfaced and dependent upon the logic provided in the standalone GPPC controller.
105. M730 Details D1 and D4 provide control diagrams for exhaust fan control, which requires a magnetic contactor type starter. The starter would be provided with a Hand-Off-Auto (HOA) Selector switch. The following exhaust fans: EF-03, 06, 08B, 17A, 17B, 21, 23, 25, 26A, 26B and 43 are fractional horsepower motor type fans. These fans are shown on electrical plans to protected by manual motor starters, which are neither magnetic starters nor are they provided with HOAs (refer to 26200.2.20 Manual Motor Starters). Please indicate who will provide the fan control contactor. Please clarify if HOAs are required, and who is to provide them.
GOVERNMENT RESPONSE: Provide single phase HOA motor starter with magnetic contactor per specification 262000 for connection to BACnet DDC System specification 230923.13. The electrical floorplans will be revised to show a HOA starter in lieu of manual starter.
106. We are requesting the bid due date be postponed to the end of September 2018.
There are a tremendous number of documents and details in the bid package that require coordination among numerous trades and this takes a lot of time. Also, many critical components such as the Geotech reports were not available until recently issued under Amendment 4. The initial high cost of Liquidated Damages in the RFP has deterred too many vendors and Subcontractors. This was only recently modified in Amendment 4, and then again in Amendment 5, however this revision takes time to redistribute into the vendor network when so many have already moved on due to the high LD’s indicated initially.
Additionally, the DC market is extremely busy, and extending the bid date will provide the Government with the most fair and accurate pricing based on a response from a larger pool of subcontractors and vendors.
GOVERNMENT RESPONSE: Any extensions to the bid date will be issued via an amendment.
Please continue to check the NECO website for any amendment issued to the solicitation.
107. Pending response to Question 106, we are requesting the RFI deadline of July 9 be extended accordingly.
GOVERNMENT RESPONSE: Any extensions will be issued via an amendment. Please continue to check the NECO website for any amendment issued to the solicitation.
108. Given the complexities of the project and the sheer volume of drawings, can the Government provide a copy of the current BIM file for the project to provide further clarity?
GOVERNMENT RESPONSE: BIM file that includes all amendments will be provided prior to the contract award
109. Drawing A-104-F, in Package 1, Volume 1.02a, was not included with the RFP documents. Pleased provide.
GOVERNMENT RESPONSE: Sheet A-104-F is not listed in drawing index for Volume 1.02a. There is no sheet A-104-F.
110. Drawing AI-430-B, Details C1, C2 C3, D1 – Both ceramic and porcelain tile are shown. Please confirm this detail to align with each location it is intended to represent, and tile type.
GOVERNMENT RESPONSE: Tile types shall be as indicated on the referenced drawings and in the finish schedule. Detail name on AI-506C has been changed to “Wall Tile at Outside Edge – Plan Detail.”
111. Please confirm the referenced SMACNA 1966 supersedes SMACNA 2005 3rd Edition for this contract.
GOVERNMENT RESPONSE: Use SMACNA HVAC Duct Construction Standards - Metal and Flexible 2005, 3rd Edition as referenced in project specification section 23 00 00 - 1.1.
112. MH-015 - Please confirm mechanical ducts should be strictly based on duct size designation tags, and not drawings or symbols, other than layout. Specifically, 24x12 indicates Rectangular, 24” indicates Round, and 24/12 indicates Oval.
GOVERNMENT RESPONSE: Duct tags indicate both size and shape of ductwork as demonstrated on MH-015.
113. M-627 - Exhaust Fan Schedule references Kitchen type 1 & 2. M-826 shows both Kitchen types with fire/smoke dampers and fire dampers in this kitchen exhaust riser.
GOVERNMENT RESPONSE: Fire damper and Fire/Smoke damper will be removed from M-826 in the two exhaust ducts serving type I hoods (EF-19A and EF-19B).
114. Please confirm the installation of these dampers types in kitchen exhaust ducts.
GOVERNMENT RESPONSE: Fire damper and Fire/Smoke damper will be removed from M-826 in the two exhaust ducts serving type I hoods (EF-19A and EF-19B).
115. Nurse Call System:
A. 2nd Floor - Dental Treatment Areas – there are master consoles in the reception areas which suggests these are patient care units. However, in the treatment rooms to the right (highlighted in the squares), there were no devices called out on the drawing. The written spec states there should be Emergency and Code Blue devices in treatment rooms (see pages 16 & 17).
B. 3rd Floor - A block of rooms is missing devices in the Patient Prep/Induct area.
C. 4th Floor - Mental Health Area – there is one room with a Staff Emergency device. Should all the rooms have these? Also, the Staff Console in the Reception area is not shown.
GOVERNMENT RESPONSE:
A. A lighted Annunciator (LA) was included in Dental Reception to respond to Emergency Pull cord in TLT 2E24. As a norm Dental Treatment rooms (DNTG1) do not receive Nurse Call devices.
B. Typical PATIENT PREP/INDUCT room layouts are provided on sheet ET-423 in details C1 & D1.
C. There is a NC Dome Light outside of room 4M38 which does not belong and should be ignored for bidding purposes.
116. Building Controls System:
A. M-702 – [Controls Network Riser] indicates “To Siemens Building Automation System Site Server BACnet over Ethernet Protocol located in building #14. To Building 55.”
B. WRNMMC Campus has a Siemens BACnet DDC server located in Building 14.
C. Please confirm work in Building 9, 10, and C can be tied into Siemens BACnet DDC Server located in Building #14.
GOVERNMENT RESPONSE: All BAS documented work on the drawings and specifications shall be interfaced to the Johnson Controls Site Server located in Building 14.
117. Price Schedule, Item 0005 requests pricing for the Record Model at closeout, referencing Specification 01 78 00 Closeout Submittals. No definition exists there for the Record Model. Please clarify the desired detail level of the Record Model [How detailed/tagged/hyper-linked is the BIM As-Built file intended to be?].
GOVERNMENT RESPONSE: Revised specification 01 78 00 issued in Amendment 0008 gives requirements for the record model.
118. Drilled Piers: Given the boring locations and the differing locations of the piers required, please identify an overall pier length/footage on which to base or measure this pricing.
GOVERNMENT RESPONSE: Pier lengths for pricing can be estimated from the geotechnical report (i.e. contour plans) and construction drawings.
119. Please confirm Substantial Completion, Acceptance and all warranties for Phase 1 systems and equipment will be separate and distinct from Phase 2, Buildings 9, 10 and other work.
GOVERNMENT RESPONSE: Substantial Completion for Phase 1 will be separate and distinct from Phase 2, Buildings 9 and 10.
120. Specification Section 14 42 16 contains information regarding vertical platform lifts but none are shown on the drawings. Please confirm that this specification section is not applicable. Reference 14 42 16.
GOVERNMENT RESPONSE: Vertical platform lift is shown in the southeast corner of the auditorium along GL 36 on sheets AI-441-E and AI-551-P, among others.
121. Spec Section 08 60 45 (Skylights) calls for a blast resistant skylight system that includes an automated smoke vent system. Please confirm whether the vent system consisting of operable panels can be excluded as the blast requirements cannot be met while being combined with this feature.
Reference Spec 08 60 45 and A-246, A-544
GOVERNMENT RESPONSE: Skylight system with operable panels is not exempt from blast requirements.
122. Volume 2.07a Drawing ED-10B-J note 2 says to contact base utilities for retention of existing Substation 2 in Building 2.