P114_Set_2_Price_Schedule_Revised_13_June_18.doc
DOC document 43 KB Posted
- Attached to
- P-114 Medical Center Addition/Alteration, Walter Reed National Military Medical Center, NSA Bethesda, MD
- Solicitation number
- N4008015R5342
About this file
P114_Set_2_Price_Schedule_Revised_13_June_18.doc
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
N40080-15-R-5342 Revised 13 June 2018
P-114, DBB, SET #2 MEDICAL CENTER ADDITION/ALTERATION (MCAA)
WALTER REED NATIONAL MILITARY MEDICAL CENTER
NAVAL SUPPORT ACTIVITY BETHESDA
ITEM
DESCRIPTION
PRICE
BASE BID: BUILDING C - PHASE 1: Entire work for Set 2 – New Construction, Building C, Phase 1, Complete in accordance with the drawings and specifications.
TOTAL PRICE FOR ITEM 0001
BASE BID: BUILDING C – PHASE 2: Entire work for Set 2 – New Construction, Building C, Phase 2, complete in accordance with the drawings and specifications.
TOTAL PRICE FOR ITEM 0002
TOTAL PRICE FOR BASE BID: ITEMS 0001 & 0002
OPTION 1: BUILDING 9 – PHASE 3: Entire work for Set 2 – Renovation 9, Phase 3, complete in accordance with the drawings and specifications.
TOTAL PRICE FOR ITEM 0003
OPTION 2: BUILDING 10 – PHASE 3: Entire work for Set #2 – Renovation, Building 10, Phase 3, complete in accordance with the drawings and specifications.
TOTAL PRICE FOR ITEM 0004
TOTAL FOR ITEMS 0001 thru 0004
OPTION 3: BIM As-Built Files. Price to provide the Record Model at closeout, refer to Specification 01 78 00 CLOSEOUT SUBMITTIALS.
TOTAL PRICE FOR ITEM 0005
OPTION 4: Delete (8) Electric Traction Elevators. Delete (3) electric traction passenger elevators (elevators P5, P6, P7) and (2) electric traction freight elevators (elevators S1 and H1) in Building C - Phase 1. Delete (3) Electric traction passenger elevators
(elevators P4, P10, and P11) in Building C - Phase 2. Add new drywall closure to all elevator shafts.
TOTAL PRICE FOR ITEM 0006
OPTION 5: Delete all non-grass and non-labyrinth area landscaping plantings, refer to
Landscaping drawings Building C - Phase 1 and 2.
TOTAL PRICE FOR ITEM 0007
OPTION 6: Delete the exterior entry canopy. Provide pricing for: The removal of the exterior entry canopy as shown on drawing A-460. The remaining east building façade will remain as shown and detailed minus this exterior canopy.
TOTAL PRICE FOR ITEM 0008
TOTAL FOR ITEMS 0001 thru 0008
NOTES:
1. Offeror shall provide a price for all items on the Price Schedule. The Government will evaluate offers based on the total evaluated price which is the sum of Items 0001 through 0008.
2. The Offeror shall provide a firm fixed price for Items 0001 through 0008. No provisions will be made for economic adjustments.
3. In accordance with FAR 52.215-1, The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
4. Failure to enter a price for any of the Items will result in the proposal being rejected as unacceptable.
5. The Offeror’s price is valid for 120 days from the receipt of proposals.
6. Options will be evaluated in accordance with FAR 52.217-5 Evaluation of Options. Evaluation of the Options will not obligate the Government to execute any or all of the Options.
7. Option items may be awarded at time of award or within 365 days of award.
8. Total Contract duration for Base Bid is 2070 calendar days from Notice to Proceed (NTP). Should the Government choose to exercise any or all options, the contract duration will remain the same.
9. Item 0001 – Building C, Phase 1 – Construction duration is approximately 40 months.
Item 0002 – Building C, Phase 2 – Construction cannot start until completion of Phase 1.
Item 0003 – Option 1: Building 9 – If option is exercised, construction cannot start until completion of Building C, Phase 1 and NTP is issued by the Contracting Officer
Item 0004 – Option 2; Building 10 – If option is exercised, construction cannot start until completion of Building C, Phase 1 and NTP is issued by the Contracting Officer
10. If option items are exercised after award, additional bonding and consent of surety will be required. Consequently, the Performance Bond shall reflect 100 percent of the aggregate amount of all items.
Name of Firm Submitting Offer:
Signature: ___________________________________
Email: ______________________________________
ACKNOWLEDGEMENT OF AMENDMENT(S): ___________________________