AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N40080-15-R-5342 DBB, P-114 SET #2, MEDICAL CENTER ADDITION/ALTERATION (MCAA), WALTER REED NATIONAL

MILITARY MEDICAL CENTER (WRNMMC), NAVAL SUPPORT ACTIVITY BETHESDA, BETHESDA, MD

PLEASE SEE SECTION SF 30 - BLOCK 14 CONTINUATION PAGE FOR DETAILS OF AMENDMENT

1. CONTRACT ID CODE PAGE OF PAGES

J 1 37

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Oct-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N40080-15-R-5342

X 9B. DATED (SEE ITEM 11)

08-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Oct-2018

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N40080-15-R-5342

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0011

The purpose of this amendment is to incorporate the following:

1. RFI Responses

2. Attachments

3. Provide reviised wage determination.

All other terms and conditions remain unchanged.

1. RFI RESPONSES

90. 230923.1320.1.9.e requires the BAS vendor to supply Fume Hood face Velocity monitor/controller to Fume Hood manufacturer for installation. Section 2.2.11 provides the specification for these devices.

However, section 115313 describes fume hoods designed for Radioisotope and Explosion proof use.

Please confirm that 230923.1320.1.9.e is correct. Please confirm that there are no additional requirements to be met by this device for use in environments where Radioisotopes or Explosive conditions are present.

GOVERNMENT RESPONSE REVISED: Contractor to coordinate with the fume hood schedules and fume hood manufacturer for the applicable style of monitor to be furnished. See section 23 09

23.13 20 in Amendment 0008.

95. As per 230002.13.2.3.i.1 Variable Volume units are to include direct airflow measuring devices. Air Valves shall be provided with direct airflow measurement devices (Position feedback is unacceptable) which complies with 23092313 DDC Specification, however M-720 and M721 Detail C1 Note 12 indicates that Air Flow Sensors is to be provided by BAS. Please clarify who should provide the direct airflow measurement devices.

GOVERNMENT RESPONSE REVISED: Air flow sensor shall be provided with the Variable volume units as specified in 23 00 00 and not by BAS. BAS drawings M-720 detail C1 note 12 and M-721 detail C1 note 11 was revised in Amendment 0008.

98. 230000.2.14.6 Controllers for Energy recovery Units (ERU) indicates that the unit manufacturer is to provide an electronically programmable controller and controls, software and programing, however M705 Detail A1 and M705A Sequence of Operations for the ERUs would appear to require the BAS system to provide GPPC controllers, control devices, programming and software. Please confirm these units are to be provided with a full factory packaged control system meeting all sequence of operations requirements.

GOVERNMENT RESPONSE REVISED: ERU shall be provided with a full factory packaged control system. Drawing and sequence was revised in amendment 0008 (Sheets M-705 & M-705A)

103. 230923.1320.2.1.6.1.c, states “Provide one GPPC per air handling unit (AHU). Provide one GPPC to control manifolded exhaust fans systems. Provide one GPPC per bank of HRUs associated each AHU zone. Miscellaneous exhaust fans shall be controlled from slaved controllers.” If the HRUs are actually the ERUs please confirm these units are factory packaged and clarify if they require the additional GPPC as listed above.

GOVERNMENT RESPONSE REVISED: ERU shall be provided with a full factory packaged control system. Reference 23 09 23.13 20, revised 8/8/18 in Amendment 0009.

105. M730 Details D1 and D4 provide control diagrams for exhaust fan control, which requires a magnetic contactor type starter. The starter would be provided with a Hand-Off-Auto (HOA) Selector switch. The following exhaust fans: EF-03, 06, 08B, 17A, 17B, 21, 23, 25, 26A, 26B and 43 are fractional horsepower motor type fans. These fans are shown on electrical plans to protected by manual motor starters, which are neither magnetic starters nor are they provided with HOAs (refer to 26200.2.20 Manual Motor Starters). Please indicate who will provide the fan control contactor. Please clarify if HOAs are required, and who is to provide them.

GOVERNMENT RESPONSE REVISED: Provide single phase HOA motor starter with magnetic contactor per specification 262000 for connection to BACnet DDC System specification 230923.13.

Reference drawings EP-10B-G4, EP-105-N1, EP-106-B4, EP-106-E2, EP-106-N1, EP-107-G3, EP-716- 02, and EP-725-02, revised 8/24/18 in Amendment 0009, to show HOA starter in lieu of manual starter.

108. Photographic documentation spec 01 32 33 calls for a series of aerial photography, however there is a TFR (temporary flight restriction) over the Walter Reed site. Please confirm that the photographic documenters will receive special permission/permits to fly in this air space. Reference Spec 01 32 33

GOVERNMENT RESPONSE: If the photos are by helicopter, the only actions required will be to:

1.) Go through the normal FAA requirements for flying in D.C.

2.) Notify Base Security of the flyover dates at least 3 business day prior so we have time to pass the information to the teams.

115. Nurse Call System:

A. 2nd Floor - Dental Treatment Areas – there are master consoles in the reception areas which suggests these are patient care units. However, in the treatment rooms to the right (highlighted in the squares), there were no devices called out on the drawing. The written spec states there should be Emergency and Code Blue devices in treatment rooms (see pages 16 & 17).

B. 3rd Floor - A block of rooms is missing devices in the Patient Prep/Induct area.

C. 4th Floor - Mental Health Area – there is one room with a Staff Emergency device. Should all the rooms have these? Also, the Staff Console in the Reception area is not shown.

GOVERNMENT RESPONSE REVISED:

A. A lighted Annunciator (LA) was included in Dental Reception to respond to Emergency Pull cord in TLT 2E24. As a norm Dental Treatment rooms (DNTG1) do not receive Nurse Call devices.

B. Typical PATIENT PREP/INDUCT room layouts are provided on sheet ET-423 in details C1 & D1.

C. NC Dome Light outside of room 4M38 removed; Reference ET-104-M, revised 9/13/18 in Amendment 0011

122. Volume 2.07a Drawing ED-10B-J note 2 says to contact base utilities for retention of existing Substation 2 in Building 2. Please confirm if any other existing electrical equipment in Building C is to be salvaged for return to the Owner. Reference ED-10B-J

GOVERNMENT RESPONSE REVISED: Contract Documents are correct in retaining Substation 2 in Building 2. No other electrical equipment to be returned to gov't. Only substation 2 to be returned. Contractor must remove switchgear and transformers at substation 2 and put on gov't truck.

134. Please confirm that all light fixtures in Building 9 Areas FF and HH are to be removed, even in areas where the walls and electrical power outlets are remaining and these fixtures are all to be replaced in accordance with the lighting plan shown on EL-102-FF and EL-102-HH. Please provide lighting demolition drawings for Building 9 Areas HH and FF. Reference ED-102-FF &ED-102-HH and EL-102-FF

&EL-102-HH

GOVERNMENT RESPONSE REVISED: The lighting in the existing space shall be demolished only in areas where new lighting is shown on drawings EL-102-FF and EL-102-HH. Demolition drawings will be issued in Amendment 0012.

181. M730 Detail A3 Notes 3 States “Provide fire fighters smoke control station override for AHUs utilized for smoke control.” Please confirm or clarify the following:

1. The Fire Fighter’s Smoke Control panel is provided by the Fire Alarm System Contractor as described in Div. 283176.2.25.

2. Given that AHUs are only used in post event Smoke Purge (Not Smoke Control) as per the Sequences of Operation on M703A and M704A. (Refer to Paragraph titled Air Handling Unit Building Flush Mode) does this note apply to any AHU in this project?

3. If in fact this paragraph does apply to any AHU, which AHUs does it apply to, and How would it interface with the sequence (Building Flush mode) as described, as it does not appear to be controlled in any manner by a Fire Fighter’s Smoke Control Panel, but solely by the BAS.

GOVERNMENT RESPONSE REVISED: No AHU’s are required to function as part of the smoke control system; reference M-730, revised 9/13/18 in Amendment 0011.

264. One of the conference rooms in the mental health area of the fourth floor in Phase 2 has a Staff Emergency nurse call device. Please clarify if all rooms should have a staff emergency nurse call device.

Reference ET-104-K.2

GOVERNMENT RESPONSE REVISED: Nurse Call device in 4K27 removed; reference ET-104-K.2, revised 9/13/18 in Amendment 0011.

290. With regards to the specification 31.66.13-3.3.2, are alternate forms of installation acceptable provided the installer can furnish a record of experience using the same equipment and the design is verified by load testing? Limiting the installation to a single method of installation, the downward tamper, limits the number of installers to bid the project to one. This technology is patented (and routinely marketed as such), sole-sourcing the project to the patent-holder. Aggregate piers can be installed to the same or better quality using alternate forms of installation equipment. Reference 31 66 13

GOVERNMENT RESPONSE: The spec section 31 66 13 will be modified to include alternate aggregate pier systems using acceptable installation procedures. The revised spec 31 66 13 will be issued in Amendment 0012.

292. With regards to the specification 31.66.13-3.4.1, bottom-stabilization (and crowd-stabilization) testing is applicable only to the downward tamper installation method. If an alternate technology is used for installation, will this testing be waived? Reference 31 66 13

GOVERNMENT RESPONSE: As mentioned in comment 290, spec section 31 66 13 will be modified to include alternate aggregate pier systems such as stone columns. Stone column aggregate piers don’t require crowd-stabilization testing thus it can be waived. The revised spec 31 66 13 will be issued in Amendment 0012.

315. Please clarify what work shown on Drawing ET-609 is to be provided under this contract. The cable ID's in the chart on the right do not appear in the one line on the left. For example, cable S-24 and S-25 are listed on the chart to go to Frame F-4 but are not shown on the one line. Cables #S-(26,57) are shown on the one line going to Frame F-4, however most of those cables are redacted from the chart.

Please clarify what work is to be provided. Reference ET-609

GOVERNMENT RESPONSE: Reference ET-609, revised 9/13/18 in Amendment 0011, for clarification of scope in Set 2.

335. EF-03/04A/04B/11/12A/12B/13A/13B/16 all appear on the plan view drawings to be high plume lab type fans, however, the schedule on M-627 indicates that these are typical “Upblast” fans. The specifications do not include a section for high plume lab type fans. Please indicate what type of fans are required. Reference M-627

GOVERNMENT RESPONSE REVISED: Reference M-627, revised 8/24/18 in Amendment 0009, for schedule revisions to indicate plume type fan for fans in question. Reference 23 00 00, revised 9/13/18 in Amendment 0011, for clarification of fan type.

336. Smoke exhaust fans EF-28 thru EF-42 are shown on the contract drawings as upblast PRV type smoke exhaust fans (i.e. Twin City Fan model “BCRUSH”). The detail drawings, however, show these fans with stack extensions (see Detail C4 on M-526). The specified fan type is not compatible with a stack extension. Either the specified fan type needs to be revised, or the stack extensions need to be deleted.

Please advise. Reference M-526

GOVERNMENT RESPONSE REVISED: Reference M-526, revised 8/24/18 in Amendment 0009, and 23 00 00, revised 9/13/18 in Amendment 0011, for revisions to indicate smoke exhaust fan with extended stack.

382. Drawing EP-623 has the label for a key note 1 on the one line diagram, however there are no key notes on this drawing. Please provide key note 1 for Drawing EP-623. Reference EP-623

GOVERNMENT RESPONSE REVISED: Key note is extraneous and will be deleted. Drawing EP-623 will be updated accordingly. This change was provided in Amendment 0009.

383. Please clarify if this project will require E-verify background checks for all workers on site.

GOVERNMENT RESPONSE: All personnel that do not have a credential to gain access to the installation will need to be Vetted.

384. Section 08 88 56 lists glazing types G-4 and G-5 for skylights under paragraph 2.2.3 Details B2 and C2 on drawing A-246 note that all glazing is to be G-4 U.N.O. Please confirm that G-5 is not to be used for skylights as no locations calling out G-5 have been found. Reference 08 88 56 and A-246.

GOVERNMENT RESPONSE: G-5 is not used and has been removed from 08 88 56, revised 8/24/18 in Amendment 0009.

385. Section 08 56 19 describes a radiation resistant pass through cabinet under paragraph 2.1. Please provide locations for this product as none have been identified. Please also confirm that detail B5/AI- 504D is a radiation resistant pass through cabinet. Reference 08 56 19 and B5/AI-504D

GOVERNMENT RESPONSE: Radiation-resistant pass-through cabinet is not used; reference specifications TOC revised 8/24/18 in Amendment 0009, which removes section 08 56 19.

386. Please confirm if any caulking will be required at the heads of non-fire rated CMU partitions.

Reference AI-505-A

GOVERNMENT RESPONSE: Sealant is required at heads of all CMU walls with an STC rating indicated; reference AI-501-F, revised 8/24/18 in Amendment 0009.

387. The Medical Equipment Support shown on A1/AI-520A is not specifically cut for any of the equipment. Please provide a list of equipment this support will be required for. Reference AI-520A

GOVERNMENT RESPONSE: Detail applies to ceiling-mounted medical equipment; reference 11 73 01, issued 2/28/18.

388. The Medical Equipment Support detail has 5 different support types (A-E). There isn't anything indicating which type belongs with which piece of equipment. Please clarify. Reference AI-520A

GOVERNMENT RESPONSE: Contractor shall determine which condition fits the proposed equipment to be installed based on individual manufacturer’s information and specifications.

A1/AI-520A provides criteria for making this determination. Reference 11 70 00 and 11 73 01, issued 2/28/18.

389. Typically there is a "responsibility matrix" associated with equipment, indicating rough-in requirements, structural requirements etc., for all equipment (including government furnished/installed equipment) clarifying who is responsible for each portion of work. Should it be assumed since nothing was issued, that the government will be providing all aspects required for installation of GFGI equipment?

For example, the TV Studio has several pieces of equipment, including UT010 (Q-10B-B4). According to the Equipment List on Q-602 this is a GFGI Lighting Grid, Ceiling Mounted - Visual Dept. There is nothing showing any specific details on how this would be connected to the slab. Based on that, it is assumed there are no embed plates or connections provided by the Contractor, and that everything is post installed by the Government. Please confirm/clarify. Reference Q-10B-B4

GOVERNMENT RESPONSE: The Information requested is provided in the equipment list on Q-600 sheets at the back of each Q volume, divided per building. Individual specification sections in Divisions 11, 22, 23 and 26 indicate required backing and coordination of utilities with equipment to be provided.

390.The typical public bathroom countertops do not have any specific section cuts (see AI-101-J.1; AI- 432-B for typical conditions). The typical millwork details shown on A-530A and A-530B do not appear to have a typical restroom countertop detail. Typically there is steel support framing for the countertops, but there doesn't appear to be anything indicated on the project. Please confirm. Reference AI-101-J.1; AI-

432-B; AI-530A; AI-530B

GOVERNMENT RESPONSE: Reference AI-530A, revised 8/24/18 in Amendment 0009 for required support at countertops.

391. The details on this page indicate waterproofing at the walls of the tunnels however there are no specific architectural details describing this waterproofing. Please provide more information. Reference S-381

GOVERNMENT RESPONSE: Reference A-556, issued 2/28/18, for architectural waterproofing details.

392. Section 08 81 00 references glazing tags GT-01, GT-02, GM-01, GM-02, GT-05, GT-04R, and PG-

01. These specific tags have not been located in the drawings. Please confirm that these glazing types exist within the glazing scope of work and provide their locations. Reference 08 81 00

GOVERNMENT RESPONSE: Reference 08 81 00, revised 8/24/18 in Amendment 0009. General descriptions of annealed, laminated, and heat-strengthened glass have been retained. Glass mirrors GM-01 and GM-02, red-tinted glass GT-04R, and polycarbonate glazing PG-01 have been removed.

393. Please provide a structural detail or section cut that shows the foundation transition between Phase 1 and Phase 2. Reference Structural

GOVERNMENT RESPONSE: No special transition between foundation mats of Phase 1 & Phase 2.

Per structural foundation drawings (SB-101X series), foundation mats are separated by 1".

Section between adjacent foundation mats can be inferred from contract documents.

394. Amendment 6 included specification 23 05 48.00 40; Vibration and Seismic Controls for HVAC Piping and Equipment. Paragraph 2.2.6 Pipe and Duct Vibration and its sub paragraphs .1 and .2 state to “Provide isolators….” without indicating where the isolators are to be furnished and installed. Is the intent that all piping shall be isolated in accordance with Paragraph 2.2.6 for the entire project? If not, please provide a schedule of the isolation types identifying pipe and ductwork sizes and locations where each type of vibration isolation is required for the project. Reference 23 05 48.00 40

GOVERNMENT RESPONSE: Refer to ASHRAE HVAC Applications Handbook for isolator types and locations as specified in project specification section 23 05 48.00 40 - 2.1.1 Design Requirements.

395. Detail A4/S-534 shows the Mechanical Equipment Room to have epoxy waterproofing. Drawing A- 106-B does not provide any additional detail. Please provide the manufacturer and epoxy waterproofing product to be used at the Mechanical Equipment Room. Reference A4/A-534 and A2/A325, A-106-B

GOVERNMENT RESPONSE: Reference specification 09 96 00, issued 2/28/18. Any manufacturer and product may be used that meets all requirements of the contract documents.

396. Spec 08 41 23 states that door and window assemblies should be capable of providing a fire rating of 60 minutes. The phase 1 window schedule on AI-610 and the phase 2 window schedule on AI-630 list windows with fire ratings of 45 min. and 2 HR. Please confirm if the spec section or the schedules are to be complied with. Reference 08 41 23 and AI-610, AI-630

GOVERNMENT RESPONSE: Fire ratings of door and window assemblies shall be as indicated on the schedules; reference 08 41 23, revised 8/24/18 in Amendment 0009.

397. Spec 08 41 23 states that door and window assemblies should be capable of providing a fire rating of 60 minutes. The door schedule on AI-621B lists glass door type AG/AG with a fire rating of 90 min for the level 1 vestibule. Please confirm if the spec section or the schedule is to be complied with. Reference 08 41 23 and AI-621B

GOVERNMENT RESPONSE: Fire ratings of door and window assemblies shall be as indicated on the schedules; reference 08 41 23, revised 8/24/18 in Amendment 0009.

398. Please provide information as to what the fire rating designation "S" means on AI-625C. Reference

AI-625C

GOVERNMENT RESPONSE: “S” indicates smoke door; reference revised legend on AI-600 series, revised 8/24/18 in Amendment 0009.

399. Clarify if the cold formed shoring is required to support each cantilevered floor slab or only at level 1 as shown. Reference A1/AD301.1 and C4/AD-520.1

GOVERNMENT RESPONSE: Provide shoring at each cantilevered floor slab; reference A1/AD- 301.1, revised 8/24/18 in Amendment 0009.

400. Details A3/A-537 and A4/A-521 both call for liquid applied waterproofing whereas specification 07 13 53 calls for sheet waterproofing at concrete foundation walls and slab on grade. Please confirm if the drawing details or specification are to be complied with. Reference A3/A537; A4/A-521 and Spec 07 13

GOVERNMENT RESPONSE: Reference A3/A-537 and A4/A-521, revised 8/24/18 in Amendment 0009. Waterproofing at foundation shall be in accordance with 07 13 53, issued 2/28/18.

401. Confirm that where temporary exterior walls are required that back-up to existing interior construction, the interior layer of drywall may be omitted. Reference AD-101A.1 and A-462

GOVERNMENT RESPONSE: Interior layer of drywall at temporary partition may not be omitted.

Reference A3/AD-520.1; temporary partition is a fire-rated assembly.

402. Paragraph 2.1.10 of spec 08 44 00 states to design panels as if they are to be set from outside the building UNO. Paragraph 3.3.5.3 states to set glass from inside the building UNO. Please confirm if panels are to be set from the inside or outside of the building. Reference 08 44 00

GOVERNMENT RESPONSE: Reference 08 44 00, revised 8/24/18 in Amendment 0009. Curtain wall system is to be unitized; specification has been modified accordingly.

403. Please provide exterior elevations or floor-to-floor heights for existing Building 10. Reference Vol 4.01

GOVERNMENT RESPONSE: Instruction on how to obtain available Existing Building information were provided in Amendment 0008.

404. Section 08 81 20, paragraph 1.4.5 states that independent testing is to be performed by a testing laboratory approved by the contracting office. Please confirm is the contracting office or the subcontractor is responsible for purchasing the independent testing. Reference 08 81 20

GOVERNMENT RESPONSE: Independent testing referenced in 08 81 20 section 1.4.5 shall be provided by the Specialty Glazed Structure Contractor.

405. An elevation detail for the wheelchair lift on Page AI-441-E refers to AI-551-P, but this page is not included in the documents. Please provide page AI-551-P. Reference AI-441-E and AI-551-P

GOVERNMENT RESPONSE: AI-551-P was issued 2/28/18 in volume 5.04.

406. The phase 2 door schedule on A-621 lists door X1N01A.4 as type AW doors at level 1 vestibule 1N01A. This door cannot be located within the drawings. Please provide the correct location of this door or confirm that it can be excluded. Reference A-621 and AI-101-Q

GOVERNMENT RESPONSE: Door X1N01A.4 is located on sheet A-101-Q between gridlines 8.6 and 9.3, sheet quadrant 3C.

407. Doors X1B01.1 and X1B01.1 at the N-S corridor (level 1, phase 1) are listed to be door type AW on the phase 1 door schedule. Drawing AI-101-D shows two double doors at the vestibule which are more similar to door type AW/AW. Please confirm that the doors at the corridor are to be AW/AW. Reference A-620, A625 and AI-101-D

GOVERNMENT RESPONSE: Response assumes two doors in question are X1B01.1 and X1B01.2.

Doors are shown and labelled respectively on A-101-B and A-101-E, issued 2/28/18.

408. Specification 05 72 00- 2.3 indicates to fabricate bronze grill to match existing grill. This isn't possible since there isn't detailed on information on how this grill is constructed. Please confirm that the building the grille as indicated on the drawings is the intent. Reference 05 72 00

GOVERNMENT RESPONSE: Reference 05 72 00 issued 2/28/18, section 1.3.2. Contractor shall determine existing conditions and dimensions of existing ornamental grille and fabricate new grille to match existing.

409. Doors X1K18.1, X1K18.2, X1K18.3, and X1K18.4 at the level 1 vestibule are listed to be door type AW on the phase 2 door schedule. Drawing AI-101-2 shows four double doors at the vestibule which are more similar to door type AW/AW. Please confirm that the doors at the vestibule are to be AW/AW.

Reference A-621, A625 and AI-101-2

GOVERNMENT RESPONSE: Reference A-621, revised 8/24/18 in Amendment 0009.

410. The general notes in drawing IP-106-CC state that typical wall protection details are shown on AI- 506A. However, drawing AI-506A does not exist. Please clarify. Reference IP-106-CC

GOVERNMENT RESPONSE: AI-506A was issued 2/28/18 in volume 5.04.

411. A typical height for the corner guards are not provided. Please clarify. Reference Spec 102600

GOVERNMENT RESPONSE: Reference 10 26 00, issued 2/28/18, section 2.2. Corner guards shall extend from floor to ceiling.

412. Drawing AI-480 calls out SWP-2. However, SWP-2 does not appear in the wall protection drawings.

Please clarify. Reference C4/AI-480

GOVERNMENT RESPONSE: SWP-2 is intended to be casework finish and therefore factory-installed. As such, it has not been shown on IP-series sheets. Reference C4/AI-480 and AI-591, issued 2/28/18.

413. There is no door shown for Dental Treatment Room (Tag 2F64) on the Finish Plan (IN-102F) or the Door Schedule (AI-622B). Please confirm this door is the same product and dimensions as the similar Dental Treatment Rooms in the surrounding area. Reference Ai-622B and IN-102-F

GOVERNMENT RESPONSE: Door to 2F64 shall be provided; reference AI-102-F, AI-622B, and IN- 102-F, revised 8/24/18 in Amendment 0009.

414. Detail A4/A-551 shows stone floor at elevator cabs. Detail C4/A-554 shows terrazzo TT-1. Please confirm terrazzo TT-1 is required at elevator floors. Reference A4/A-551 and C4/A-554

GOVERNMENT RESPONSE: Provide TT-1 at elevator floors; reference A4/A-551, revised 8/24/18 in Amendment 0009.

415. Spec 08 44 00, paragraph 1.10, calls for a materials and labor warranty for a period of time no less than ten (10) years from the date of acceptance of work for curtain wall, ribbon window, and punched window systems. Please confirm whether the period of time can be decreased to five (5) years for both material and labor as this is more commonly provided by curtain wall manufacturers. Reference 08 44 00

GOVERNMENT RESPONSE: Please comply with the warranty requirement as specified. Reference Spec 08 44 00.

416. Spec 08 44 00, paragraph 1.10.0 (lines d and f) calls for a finish warranty for a period of ten (10) years. Please confirm whether the period of time can be decreased to five (5) years as this is more commonly provided for anodized finishes. If the period of warranty is to remain the same, please confirm if a 2 or 3 coat Kynar finish is acceptable in lieu of anodized. Reference 08 44 00

GOVERNMENT RESPONSE: Reference 08 44 00, revised 8/24/18 in Amendment 0009.

417. Exterior elevations in Vol 5.02 show tags for precast panel systems PPA-1 and PPA-2 in the exterior assemblies table. Specification section 03 45 00 does not define these systems. Please provide details for precast panel systems PPA-1 and PPA-2. Reference Vol 5.02 and 03 45 00

GOVERNMENT RESPONSE: PPA-2 is not used. Section 03 45 00 applies to PPA-1. Reference 03 45 00, revised 8/24/18 in Amendment 0009.

418. Exterior elevations in Vol 5.02 show tags for precast panel system PPA-2 in the exterior assemblies table. This system is not called out anywhere in the elevations. Please clarify if precast system PPA-2 is to be used. Reference Vol 5.02

GOVERNMENT RESPONSE: PPA-2 is not used. Section 03 45 00 applies to PPA-1. Reference 03 45 00, revised 8/24/18 in Amendment 0009.

419. Keyed Note #3 is called out by column lines D and 4 on PL-101-B4 but no note is provided. Please clarify what the note is referencing. Reference PL-101-B4

GOVERNMENT RESPONSE: Refer to revised drawing PL-101-B4 to be issued under Amendment 0009. Also refer to drawing PL-601 for OSD at SD/1 located above ceiling as per keynote #2 on PL- 101-B4. Note: Drawings are diagrammatic in nature, contractor shall coordinate condensate pipe with plumbing drains connected to storm piping, as required, per 22 00 70 section 3.3.2. Refer to mechanical drawings for condensate piping routed to OSD’s.

420. Please provide kitchen waste interceptor details.

GOVERNMENT RESPONSE: Information requested is in the Documents. See section 22 00 70, para 2.23.1

421. On PL-101-E4 at column lines GG and G, a callout notes 6" SD from above for SD-21 however there is no riser shown. Please confirm SD-21 should follow OD-21. Reference PL-101-E4

GOVERNMENT RESPONSE: SD-21 does not follow OD-21. 4”SD from riser SD-21 connects to 6” SD from riser SD-5 above level two ceiling as indicated on drawing PL-102-E4 Modified drawing PL-101-E4 shall be issued under Amendment 0009

422. Amendment 8 pushed the bid date to September 21. Please confirm if the RFI deadline will be extended as well. Reference General

GOVERNMENT RESPONSE: Any extensions will be issued via an amendment. Please continue to check the NECO website for any amendment issued to the solicitation.

423. RFP page 47 of 68: Clause 52.217-9 Option To Extend The Term Of The Contract (MAR 2000):

Paragraph (C) indicates the total duration “shall not exceed 1825 calendar days after Notice to Proceed”.

Please clarify this clause relative to the Phased Construction Schedule information in Amendment 8.

GOVERNMENT RESPONSE: The clause has been revised. Please refer to Amendment 0011.

424. RFP page 14 of 68: Paragraph (a): subparagraph I “Management Structure” indicates The Offerer shall narratively describe roles and responsibilities “…described in paragraphs iii & iv below”. It appears that paragraph iv has not been included in the RFP. Please clarify the content of this portion of Factor 2.

GOVERNMENT RESPONSE: The lower case Roman numerals in the Solicitation Submittal were autocorrected in the solicitation. The information within the construction management plan is numbered as follows:

i. Management Structure

ii. Teaming Relationships

iii. Quality Control and Safety

iv. Schedule

v. Key Personnel

i. Management Structure, has been revised as follows:

“Narratively describe the roles, the lines of authority, and the responsibilities of each entity described in paragraph v. below. Identify personnel who will have negotiation authority and approval of agreements that are reached between the Government and Contractor. Identify any limitations to this authority, if any exist.”

425. We believe the Liquidated Damages are still extremely high. This risk factor is still minimizing the number of bidders, and we request that these LD’s be substantially reduced.

GOVERNMENT RESPONSE: Please refer to Amendment 0009.

426. Drawing Q-630 calls for rod, shower curtain, 1"diameter, w/curtain and hooks (A5170) in the equipment list. However, the specification appendix vol 1 of 2 calls for hook-less shower curtain and rods.

Please clarify. Reference Q-630

GOVERNMENT RESPONSE: There is no conflict with regard to A5170 between specification 10 28 13 and description given on Q-630, issued 2/28/18. Could not locate RFI reference to “specification appendix vol 1 of 2”.

427. The Locations for sign types 22B, 28, and EVAC are not given. Please clarify. Reference Appendix C

GOVERNMENT RESPONSE: Locations for sign types 22B, 28, and EVAC are shown on location plans, AG-100 series, issued 2/28/18. Reference, for example, AG-10B-J.1 and AG-104-D.

428. Multiple signs in appendix C do not provide the appropriate mounting procedure. Please clarify.

Reference Appendix C

GOVERNMENT RESPONSE: RFI does not indicate specific requirement or detail in question;

therefore, the Government could not provide an adequate response.

429. Detail A1 on drawing A-616 refers to detail B1/A-616 for information about the window jamb. Detail B1/A-616 is a curtain wall sill detail. Please confirm that this reference on A1/A-616 is incorrect and provide the correct jamb detail that should be referred to. Reference A1/A-616 and B1/A-616

GOVERNMENT RESPONSE: Detail A1/A-616 does not reference B1/A-616, issued 2/28/18.

430. On the door schedule shown on AI-681, the frame "Type" column is not consistent with the "Sidelight Width Latch Side" column. There are a number of doors with a Type 1 typical frame (no sidelight) that have notes for a 1'-6" sidelight. Please confirm the frame "Type" column takes precedent over the "Sidelight" column. Reference AI-681

GOVERNMENT RESPONSE: Frame types have been corrected to agree with sidelight presence indicated in schedule. Reference AI-681 and AI-683, revised 9/13/18 in Amendment 0011.

431. Sign types FI, AR, and SAR are shown in drawing AG-530 but do not appear in appendix C. Please clarify. Reference Appendix C and AG-530

GOVERNMENT RESPONSE: Sign types in question are shown on landscape sheets; reference AG-530, issued 2/28/18, for landscape sheet reference.

432. Appendix C calls out signage types 10A and 10B. However, Vol 5.05 only provide a sign detail for type 10. Not 10A or 10B. Reference Appendix C and Vol 5.05

GOVERNMENT RESPONSE: Reference AG-510, issued 2/28/18, for sign types 10A and 10B.

433. Spec 01 43 30, paragraph 1.2 states that wall sections requiring mock up testing are indicated in drawings and include one curtainwall mockup. Drawings A-321 and A-322 both indicate that a performance mock up and visual mock up is needed for the curtain wall systems integrated in the precast on the west and south faces of the building. Please confirm whether one or two performance, and one or two visual mockups for curtain wall integrated into precast is required. Reference Spec 01 43 39 and A- 321, A-322

GOVERNMENT RESPONSE: Performance and visual mock-up requirements have been clarified.

Reference 01 43 39, revised 09/13/18 in Amendment 0011, and drawings A-242, A-321, A-322, A- 341, A-344, and A-536, revised 09/13/18 in Amendment 0011.

434. Plumbing plans in Building 10 show a 4th floor on PG-104AA, BB and CC. Please provide architectural plans and details for millwork. Reference PG-104AA

GOVERNMENT RESPONSE: PG-104AA et al. show above ceiling piping work to serve Level 5.

Reference AD-104-AA, AD-104-BB, and AD-104-CC, issued 2/28/18 for corresponding architectural work.

435. Millwork details on AI-401-D call for Fire Treated Plywood. This is not recommended for custom millwork use. Please confirm veneer core plywood or fire resistant MDF is acceptable. Reference AI-401- D

GOVERNMENT RESPONSE: Custom millwork carcass construction shall comply with 06 41 16.00 10, revised 8/8/18 in Amendment 0009. Reference also AI-401D, revised 9/13/18 in Amendment 0011.

436. Spec Section 090690/2.7.1 SSM-3 calls for LG Hi-Macs G117 Cappuccino. This color has been discontinued. Please provide alternate. Reference Spec 09 06 90

GOVERNMENT RESPONSE: Reference 09 06 90, revised 9/13/18 in Amendment 0011. SSM-3 BOD shall be Avonite Surfaces, Gulf Coast F1-7710.

437. Spec 07 42 13.03, paragraph 2.1 states that equivalent products for MWCPS-1 and MWCPS-2 can be submitted for approval prior to the bid in lieu of the basis of design products. Please confirm if alternates can be submitted on bid day due to the limited time frame leading up to bid day. If this is not allowed, please provide information about how to submit an alternate product before bid day. Reference Spec 07 42 13.03

GOVERNMENT RESPONSE: Requirement for equivalent products to be submitted prior to bid has been removed. The revised spec 07 42 13.03 will be issued in Amendment 0012.

438. The following signs are called out in appendix C but are not shown in the signage drawings. BB07.1, 1J18.1, 2F07.1, 5F09.7, BG01.1, BJ02.1, BBENW.1, BBESW.1, BBENE.1, BBESE.1, BB043.1, BGEN.1, BGES.1, 1E01.1, 1K02.2, 1K04.1, 1K04.4, 2J04.1, 2E01.1, 2H02.2, 3J02.1, 3E01.2, 3M04.1, 4J04.1, 4E01.1, 5J05.1. Please confirm that these signs should be carried with the rest of the signage package.

Reference Appendix C

GOVERNMENT RESPONSE: Signs 1J18.1, 2F07.1, 5F09.7, 2H02.2, and 3M04.1 have been removed from Appendix C, revised 09/13/18 in Amendment 0011. Signs BBENW.1, BBESW.1, BBENE.1, BBESE.1, 3E01.2, 4J04.1, 4E01.1, and 5J05.1 are new inserts as noted in Appendix C comments and not new signs; therefore, they are not included in the AG plan sheets. The remainder of signs indicated in the RFI are shown in the AG plan sheets, issued 2/28/18.

439. Signs 3C01.1 (5A vs 5B), BF59.3 (10B vs 9), and 4E21 (10A vs12) have different sign types when comparing appendix C and the wayfinding drawings. Please confirm which sign type is correct. Reference Appendix C

GOVERNMENT RESPONSE: Sign location 3C01.2 is shown correctly in AG series drawings and shall be sign type 5B; reference Appendix C, revised 9/13/18 in Amendment 0011. Sign location BF59.3 shall be sign type 10B; reference AG-10B-G and Appendix C, revised 9/13/18 in Amendment 0011. Sign location 4E21 shall be sign type 10A; reference AG-104-E, revised 9/13/18 in Amendment 0011.

440. Signs 1C01-23, 3D16.1-23, 3D16.2-23, 5F01.2-23, 5F01.2-23, 5F51.2-23 found in drawings AG- 101-F, AG-103-D, AG-103-D, AG-105-F, AG-105-F, AG-105-F respectively are not provided in appendix C. Please confirm if theses should be carried with the rest of the signage package. Reference Appendix C

GOVERNMENT RESPONSE: Signs in question are provided in Appendix C, revised 9/13/18 in Amendment 0011.

441. Detail A2 and B2 on A-523 call out a prefinished galv steel cladding with concealed anchors on the interior side of the zinc fin at the entrance tower. Please provide a BOD manufacturer and product for the prefinished galv steel cladding with concealed anchors. Reference A-345, A2/A-523, B2/A-523

GOVERNMENT RESPONSE: Reference 07 43 13.03, issued 2/28/18, for requirements of MWCPS system.

442. With regards to the Blast requirements described for the skylight system, do the required loads have to be met when the windows are open as well as closed. Reference Spec 08 60 45 and A-246, A-544

GOVERNMENT RESPONSE: Skylight system is required to resist blast loads when windows are closed only.

443. Drawing AI-102-J.1 calls out an operable partition between rooms 2J18 and 2H11. However, the spec only provides details on vertical skyfold partitions. Please provide additional spec requirements for the operable partition. Reference AI-102-J.1 and Spec 10 22 39

GOVERNMENT RESPONSE: Reference 10 22 39, revised 09/13/18 in Amendment 0011, for horizontal folding partition requirements.

444. Spec 08 81 20, paragraph 1.4.2 states that proposal data for the bolted structural glazing assembly must be submitted through the general contractor to the contracting office no later than 72 hours after the bid. Please confirm whether this means pricing for the bolted structural glazing assembly is still supposed to be included in the total price on bid day. Reference Spec 08 81 20

GOVERNMENT RESPONSE: Requirement to submit information within 72 hours of bid has been removed. The revised spec 08 81 20 will be issued in Amendment 0012.

445. Spec 08 41 26, All Glass Door Entrances, describes the BOD product as an all glass entrance system secured to an upper and lower door rail system. Drawing AI-601A lists all-glass doors matching the description per spec to have the tag "AG". No doors with this tag have been located within the door schedule. Please confirm that this scope of work does not exist. Reference Spec 08 41 26

GOVERNMENT RESPONSE: Reference AI-621B revised 8/24/18 in Amendment 0009, for example, for instance of “AG” type door.

446. Drawing AI-441-P shows the flower shop elevation and specifically calls out decorative glass (DG-1) and clear glass. Please provide information as to what type of glazing the clear glass is to receive.

Reference AI-441-P

GOVERNMENT RESPONSE: Reference 08 81 00, revised 8/24/18 in Amendment 0009, section 2.1.1 for clear glass description.

447. Detail B1/AI-601-B shows the different wrapped frame elevation types for doors. Types 4, 5, 6, 7, and 8 reference drawings AI-504-A and AI-504-B for jamb, sill and head section cuts at sidelights and transoms. These drawings do not indicate the glazing type at sidelights and transoms. Please provide information as to the sidelight and transom glazing at door frames 4, 5, 6, 7, and 8. Reference B1/AI-601- B and AI-504-A, AI-504-B

GOVERNMENT RESPONSE: Reference door schedules for types of glazing in sidelights.

448. The drawings call out cubical tracks (A5180) but is not listed in the equipment list. Please confirm whether the cubical tracks are to be contractor or government furnished. Reference Q-630 and Spec 10 21 23.16

GOVERNMENT RESPONSE: A5180 is contractor-furnished, contractor-installed. The revised Q- 630 will be issued in Amendment 0012.

449. The JSN schedule calls out several cabinet tags that are not found in Spec 06 41 16.00 10. Please provide JSN description information for the following tags: C03C0M, C04J0, CB060M, CD030, CO4P0, CR020, CW140. Reference 06 41 16.00 0

GOVERNMENT RESPONSE: CB060M is not in the project. Could not locate JSN C03C0M referenced in RFI. The revised spec 06 41 16.00 will be issued in Amendment 0012 which will include descriptions of C04J0, CD030, CO4P0, CR020, and CW140. JSN CB060M will be revised to CB060 in drawings AI-484, Q-103-CC4, Q-105-BB1, Q-106-BB1, and Q-630 and will be issued in Amendment 0012.

450. Spec section 08 88 56 calls for a fluoropolymer finish in zinc panel color for CWS-1 and a dark bronze anodized finish for CWS-2. Spec section 09 06 90 calls for a dark bronzed anodized finish for both CWS-1 and CWS-2. Please confirm that both curtain wall systems are to receive a dark bronze anodized finish. Reference Spec 08 88 56 and Spec 09 06 90

GOVERNMENT RESPONSE: CWS-1 and CWS-2 shall both receive dark bronze anodized finish.

The revised spec 08 88 56 will be issued in Amendment 0012

451. Spec 08 88 56 calls out G-1F blast resistant frosted glazing where indicated for exterior aluminum doors. Exterior door schedules for phase 1 and phase 2 on A-620 and A-621 respectively list G-1 as the glazing type for exterior door type AW. Please confirm whether the door schedules are to be followed and where G1-F is used anywhere. Reference Spec 08 88 56 and A-620, A-621

GOVERNMENT RESPONSE: G-1F is not used and has been removed. The revised spec 08 88 56 will be issued in Amendment 0012

452. There are several JSN descriptions found in the 06 41 16.00 10 specification that are not found in the drawings. Please confirm the following JSNs are not used: C03A0, C03H0M, C03POM, CB060.

Reference 06 41 16.00 10

GOVERNMENT RESPONSE: Reference 06 41 16.00 10, will be revised and issued in Amendment 0012. C03A0, C03H0M, and C03POM are not used and have been removed. CB060 is indicated on sheets AI-484, Q-103-CC4, Q-105-BB1, Q-106-BB1, and Q-630. These will be revised and issued in Amendment 0012.

453. Demolition keynote 2 of AD-101A.2 indicates a precast panel wall to be saw cut and removed but this note is not shown on the drawings. Please confirm that this note is not applicable. Reference AD- 101A.2

GOVERNMENT RESPONSE: Reference AD-101A.2 will be revised and issued in Amendment 0012 for location of keynote 2.

454. M-322 and M-323 show motorized dampers installed on the MER Roof in the cold formed G 90 galv.

wall well below the underhang. A-576 shows motorized dampers installed such that the overhang protects the motorized damper. Please confirm the motorized dampers will be installed in accordance with M-322 and M-323 ILO A-576. Reference M-322; M-323 and A-576

GOVERNMENT RESPONSE: Architectural details have been revised to match mechanical.

Reference mechanical drawings and specifications for specific requirements of motorized damper. It is still the intent that the overhang will protect the motorized damper. Reference A-576 will be revised and issued in Amendment 0012.

455. Detail B3 on drawing A-576 shows 1/2"x1/2" stainless steel bird screens. However, it is unclear if these screens are continuous along the galv studs or just at the dampers. Please clarify. Reference B3/A- 576 and A-107.1

GOVERNMENT RESPONSE: Bird screens are continuous. Reference A-576 will be revised and issued in Amendment 0012.

456. Note #5 on ET-421 indicates that plywood should be installed on all telecom room walls. However, elevations on ET-504 and ET-505 appear to show plywood only on certain walls. Please confirm that Note #5 is correct and plywood should be installed on all walls. Reference ET-421 and ET-504

GOVERNMENT RESPONSE: Provide plywood on all telecom room walls as indicated by keynote 5 on ET-421, issued 2/28/18.

457. Drawing A-625 for Exterior Door Types calls out Type L and L/L as "louvered door flush". There is no specification section provided for this type of door. Please provide a specification section. Reference A-

GOVERNMENT RESPONSE: Reference 08 91 00 will be revised and issued in Amendment 0012 for information on louvered doors.

458. Spec section 06 20 00 details "closet hanger rods", but does not provide any locations. Please either confirm these are not needed on the job, or clarify locations. Reference 06 20 00

GOVERNMENT RESPONSE: Reference 06 20 00 will be revised and issued in Amendment 0012.

Closet hanger rods have been removed. Rods have been added. Spec section 06 4 1 16.00 10 will be revised and issued in Amendment 0012.

459. Please confirm SECTION 23 08 00.00 10 - 1.6 can be performed by the first TAB contractor since the TAB contractor has similar qualifications. Please confirm the intention of SECTION 23 08 00.00 10 is for the Contractor to participate in, not lead, the Commissioning effort for the HVAC systems. Reference 23 08 00.00 10

GOVERNMENT RESPONSE: The Commissioning Firm shall be a subcontractor of the prime Contractor and shall be financially and corporately independent of all other subcontractors as directed in 23 08 00.00 10, section 1.6.1. General Contractor is finally responsible to ensure all specified work is performed.

460. Specification section 01 43 39 Mock Ups, part 1.4, 1.5, and 1.6 indicate visual mockups are to be provided for Interior Wall Systems and Div 10 Headwalls and a coordination mockup for equipment.

Please provide details showing the extent of the mockups requested and clarify if the mockups can remain as part of the final construction. Reference 01 43 39

GOVERNMENT RESPONSE: Reference 01 43 39 will be revised and issued un Amendment 0012, for extent of interior and headwall mockups, and clarification on incorporating mockups into final construction.

461. Details A1 and B1 on A-524 graphically depicts a large structural tube and a smaller tube support.

These members are not sized. Please provide sizing. Reference A1/A-524, B1/A-524

GOVERNMENT RESPONSE: Structural framing information is provided on sheets S-102-E, S-104- E, S-523, and A-524, will be revised and issued in Amendment 0012.

462. Detail B1 on A-524 indicates a structural pin connector at the base of the point supported glass system. The detail does not show sizing. Please provide information regarding this connector. Reference B1/A-524

GOVERNMENT RESPONSE: Structural framing information is provided on sheets S-102-E, S-104- E, S-523, and A-524, will be revised and issued in Amendment 0012.

463. Column line on 5 on drawing A-101-L indicates a 1 HR fire rated wall with an opening. There is a curtainwall that attaches to this wall. It is unclear whether this curtainwall needs to be fire rated. Please confirm. A-101-L

GOVERNMENT RESPONSE: Reference A-101-L and A-242 will be revised to include extents…