Russell Road: MCCDC toward Dunlap Circle Work Order No. N40080-12-862898
MCB Quantico, Virginia P-572
PART SIX – ATTACHMENTS - Page 1
PART SIX - ATTACHMENTS
Project Attachments
Russell Road: MCCDC toward Dunlap Circle
P-572
FY13
Category Code 851.10
Marine Corps Base Quantico Quantico, Virginia
November 30, 2012
This Sheet Intentionally Left Blank
Russell Road: MCCDC toward Dunlap Circle WO# 862898
Attachment No. Index
1 Unexploded Ordinance and Telecommunications Maps
2 PAP (Performance Assessments Plan) Form
3 Request for Environmental Impact Analysis
4 PROD (Permits Record of Decisions) Form
5 Construction Waste Management Report
6 Fire & Emergency Services Facility Design & Construction Requirements
7 Quantico Contractor Screening Policy
8 Virginia Quarantine for Movement of Ash Materials in Prince William & Fauquier Counties, Virginia (VA EAB)
9 Water Programs Application Guidance
10 P-307 Navy Crane Center
11 9 VAC 5 Chapter 40 Article 39 Air Pollution Abatement
12 Russell Road (Phase 3) Traffic Study
13 Geotechnical Report
14 Wetlands Delineation Report
15 Environmental Assessment Report
16 Drawings (Bound Separately)
PART SIX - ATTACHMENTS - Page 2
Attachment 1
Unexploded Ordinance and Telecommunications Maps
PART SIX - ATTACHMENTS - Page 3
Attachment 2
PAP (Performance Assessments Plan) Form
RFP PART 6 – Performance Assessment Plan Page 1
Performance Assessment Plan
MONTHLY EVALUATION
MONTH: __________YEAR:______
Evaluation Factor Yes No N/A Comments
Experience of Personnel
1. Did the team identified in the proposal actively participate in the project?
2. If personnel substitutions were needed, was the degree of technical competence maintained?
Working Relationships
1. Did the Construction team participate in the design process (i.e. attend meetings, provide insight, etc.)?
Were the coordination meetings between Construction and Design team personnel documented?
2. Did the Design team participate in the construction process (i.e. attend CQC meetings, perform field oversight, etc.)? Were coordination meetings between Construction and Design team personnel documented?
3. Did the collaboration between the Construction and Design Team deliver a high value innovative facility?
- Were Total Operating Cost minimized
- What LEED points can be obtained
- Was energy efficiency optimized, and the energy goals exceeded.
4. Was the budget management process clear; was an estimate submitted on time with each design submittal. Was the estimate updated to reflect the changes in the design submittal?
5. Did the Contractor's team effectively manage the project budget and the User's requirements to meet the customer's needs? Was project budget and emphasis in cost control exhibited in the estimate?
(Contractor to document in comments block
RFP PART 6 – Performance Assessment Plan Page 2 materials/systems innovations and provision of higher quality than required in the RFP Part 4)
Additional factors to be developed during Partnering.
Quality Control
1. Were re-submittals of design deliverables or construction rework required this month?
2. Were as built redlines updated this month?
Timely Performance
1. Is the Contractor on schedule?
2. Is the Contractor maintaining the schedule? (Can the Government confirm the project is on schedule?)
3. Is the Contractor following his schedule?
Effectiveness of Management
1. Did the Government need to intercede in resolving a subcontractor issue?
Compliance with Labor Standards
1. Did payrolls have to be resubmitted this month due to inaccuracies or errors?
Compliance with Safety Standards
1. Were there any lost time accidents this month?
RFP PART 6 – Performance Assessment Plan Page 3
GENERAL PERFORMANCE COMMENTS THIS MONTH:
Concurrence:
CM/ROICC Representative ______________Date______.
Project Manager ______________________Date_______.
Contractor Representative ______________Date______.
PART SIX - ATTACHMENTS - Page 4
Attachment 3
Request for Environmental Impact Analysis
PART SIX - ATTACHMENTS - Page 5
Attachment 4
PROD (Permits Record of Decisions) Form
R u s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir c le
W o rk
O rd e r
N o N
-1 -8
M
C B
Q u a n ti c o
V ir g in ia
P
-5 a rt
F
R P
P a g e
E R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O D
R
IT
O
J E
C T
T
IT
L
O
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
L
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
U s e r e fe re n c e d n o te s w h e re a d d it io n a l s p a c e r e q u ir e d
A ir
Q u a li ty
R
M
IT
C o n s tr u c ti n te
O b ta in e d
D a te
C lo s e d
B s is o f
D e c is io n
Y e s /N o
Is s u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts
A ir
Q u a
R
M
IT
O p e ra ti g te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts
Q u a
R
M
IT
A s b e s to s D e m o li ti o n
R e m o v a l
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts
Q u a
R
M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
W a te r P o ll u ti
R
M
IT
W a s te w a te r C o ll e c ti o n
S y s te m te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts te r P o ll u ti
R
M
IT
W a s te w a te r P u m p S ta ti te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts te r P o ll u ti
R
M
IT
W a s te w a te r T re a tm e n t P la n t D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts te r P o ll u ti
R
M
IT
P re tr e a tm e n t, i .e
O il /W a te r S e p a ra to r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
W a te r P o ll u ti
R
M
IT
S e p ti c S y s te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts te r P o ll u ti
R
M
IT
E ro s io n
S e d im e n t C o n tr o l D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts te r P o ll u ti
R
M
IT
S to rm w a te r M a n a g e m e n t D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts te r P o ll u ti
R
M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
D is c h a rg e P e rm it
R M
IT
N e w o r
In c re a s e d C a p a c it y N
P D te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts is c h a rg e P e
R M
IT
G e n e ra l N
P D
E S
A c re
L a tu rb a n c e
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts c h a rg e P e
R M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts ri n k in g W a te r P
E R
M
IT
W a te r D is tr ib u ti o n S y s te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
D ri n k in g W a te r P
E R
M
IT
W a te r T re a tm e n t P la n t D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts n k in g W a te r P
E R
M
IT
W e ll C o n s tr u c ti te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts n k in g W a te r P
E R
M
IT
U n d e rg ro u n d
I n je c ti te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts n k in g W a te r P
E R
M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
F u e l T a n k
R
M
IT
U n d e rg ro u n d
S to ra g e T a n s tr u c ti te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts
F e l T a n
R
M
IT
U n d e rg ro u n d
S to ra g e T a n k O p e ra ti s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts
F e l T a n
R
M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts li d a n d H a z a rd o
R
M
IT
H a z a rd o u s W a s te
T re a tm e n t, S to ra g e
D is p o s a l, H a n d li te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
S o li d a n d H a z a rd o
R
M
IT
L a n d fi ll te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts li d a n d H a z a rd o
R
M
IT
U s e d
O il C o ll e c ti o n
C e n te r, A g g re g a ti in t, T ra n s p o rt e r
T ra n s fe r F a c il y te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts li d a n d H a z a rd o
R
M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts a s ta l M a n a g e m e n t P e
R M
IT
C o a s ta l C o n s is te n c y D e te rm in a ti th o ri z a ti te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
C o a s ta l M a n a g e m e n t P e
R M
IT
C o a s ta l B a rr ie r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts a s ta l M a n a g e m e n t P e
R M
IT
F lo o d p la in M a n a g e m e n t D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts a s ta l M a n a g e m e n t P e
R M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts th e r
P e rm
R M
IT
W o rk i n
N a v ig a b le W a rs te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
O th e r
P e rm
R M
IT
D re d g te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
C le a ri te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
E s s e n ti a l F is h
H a b it a t
A s s e s s m e n t C o n s u lt a ti te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
M a ri n e M a m m a l P ro te c ti o n
A c t D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g e
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
O th e r
P e rm
R M
IT
T a k e P e rm te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
W o rk i n
W e tl a n te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
D ig g in g P e te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
T ra ff ic te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g e
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
O th e r
P e rm
R M
IT
A ir p o rt H a z a rd /A ir fi e ld
S a fe a ra n c te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
R a il ro a d
C ro s s te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
H is to ri c P re s e rv a ti te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
N o is e A b a te m e n t D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts s s e ll
R o a d M
C C
D C t o w a rd
D u n la p C ir rk
O rd e r
N o N
-1 -8
B
Q u a n ti c o
V ir g rt
F
R P
P a g e
R
M
IT
S R
E C
O R
D O
F D
E C
IS
IO
N
P R
O
R
O
J E
C T
T
IT
L
R K
O R
D E
R N
U M
B E
R
R E
Q U
IR
C A
T
IO
N
(C h e c k B o x
G O
V E
R N
M E
N T
P R
O J E
C T
M A
N A
G E
R
O th e r
P e rm
R M
IT
E n d a n g e re d /S p e c ie s /C ri ti c a l H a b it a t
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts e r
P e rm
R M
IT
O th e r
D a te
O b ta in e d
D a te
C lo s e s is o f
D e c is io n
Y e s /N o u in g A g e n c y
S p e c ia l P ro v is io n s a n d R e q u ir e m e n ts re p a re d b y:
PART SIX - ATTACHMENTS - Page 6
Attachment 5
Construction Waste Management Report Form
NREA Rcvd:___________
FY Reporting Period:______
Form created 11/2008, revised 1/2010 for P2ADS support
Construction Waste Management Report Quantico Marine Corps Base
Report Date:
Project Number: Project Name:
Contract Number: Contract Task Order/Delivery Order:
Reporting Period: to
RETURN THIS FORM TO FAX (703) 784-4953 ATTN:
Comments:
Waste Stream Disposal
(Tons)
Disposal
Cost
Recycled
(Tons)
Recycled
Cost
Recycled
Revenues
C&D $ $ $
CONSTRUCTION & DEMOLITION DEBRIS (C&D).
Record hazardous and non-hazardous C&D waste as one entry. Enter total tons of C&D disposed of in a landfill, by incineration, and/or by hazardous waste contract.
Enter total disposal cost for C&D.
Enter the recycled hazardous and non-hazardous C&D tons as one entry under the recycling column. You can also claim C&D diversion conducted by a construction contractor or MILCON project. If you have recycled C&D, it is likely that some was disposed of as well. Therefore, if there are recycled tons of C&D there should be some disposed tons of C&D.
Enter the cost associated with recycling. Recycling costs include handling, processing, transportation, and other costs associated with recycling C&D. Soils that are used at another location or that are reclaimed count toward recycling.
Enter Recycling Revenues. Enter only actual revenues received from recycling. Do not enter cost avoidance for recycling revenues.
Reported by:
Company: Contact:
Address: Title:
E-mail address:
Telephone:
Fax:
Definitions:
Construction and Demolition (C&D) Debris. Waste derived from the construction, renovation, demolition or deconstruction of residential and commercial buildings and their infrastructure.
C&D waste typically includes concrete, wood, metals, gypsum wallboard, asphalt, and roofing material.
Other Select Waste (OSW). Construction and demolition debris are the “Other Select Waste” categories for purposes of DoD metric reporting via SW module. If the Other Select Wastes are hazardous they must also be reported in the calendar year HW module.
PART SIX - ATTACHMENTS - Page 7
Attachment 6
Fire & Emergency Services Facility Design & Construction Requirements