AMENDMENT 0002 PHASE II DETERMINATION INSTRUCTIONS TO OFFERORS PHASE II EVALUATION CRITERIA PRICE SCHEDULE WAGE RATE AND CONTRACT CLAUSES

View the file

Other files

File Type Posted
AMENDMENT_0007_P572.pdf PDF
P572_-_RFP_Cover_Sheet.pdf PDF
P572_-_Amend_0006_Geometric_Design_Standards.pdf PDF
AMENDMENT_0006_P572.pdf PDF
P572_-_Amend_0006_Env_Assessment.pdf PDF
AMENDMENT_0005.pdf PDF
AMENDMENT_0004_P572.pdf PDF
Site_Visit_P5721.PDF PDF
AMENDMENT_0003_P572.pdf PDF
Pages_from_Part_6-7.pdf PDF
Part-2_updated.pdf PDF
Pages_from_Part_6-8_Part4.pdf PDF
Pages_from_Part_6-8_Part2.pdf PDF
Pages_from_Part_6-8_Part1.pdf PDF
Pages_from_Part_6-2.pdf PDF
Part_4.pdf PDF
Pages_from_Part_6-5_Part3.pdf PDF
Pages_from_Part_6-1.pdf PDF
Pages_from_Part_6-4_Part3.pdf PDF
Pages_from_Part_6-8_Part3.pdf PDF
Pages_from_Part_6-4_Part1.pdf PDF
Pages_from_Part_6-6.pdf PDF
Pages_from_Part_6-4_Part4.pdf PDF
Pages_from_Part_6-3.pdf PDF
Pages_from_Part_6-5_Part2.pdf PDF
Part_3.pdf PDF
Pages_from_Part_6-5_Part1.pdf PDF
Pages_from_Part_6-4_Part2.pdf PDF
AMEND_0001_P572.pdf PDF
AMEND_0001_REVISED_RFP_ATTACH_A_-_PROJECT_DATA_SHEET.doc DOC document
RFP_ATTACH_A_-_PROJECT_DATA_SHEET.doc DOC document
RFP_ATTACH_C_-_PRE-PROPOSAL_INQUIRY_FORM.doc DOC document
RFP_ATTACH_B_-_PPQ.doc DOC document
Solicitation_N40080-14-R-8600_-_P572_Widen_Russell_Road.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION N40080-14-R-8600, P572 INFRASTRUCTURE WIDEN RUSSELL ROAD, MARINE CORPS BASE, QUANTICO, VA

Continuation on Page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Mar-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N40080-14-R-8600

X 9B. DATED (SEE ITEM 11)

18-Nov-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Mar-2014

CODE

NAVAL FACILITIES ENG COMMAND WASHINGTON

1314 HARWOOD ST SE, BLDG 212, 3RD FLOOR

WASHINGTON NAVY YARD DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N40080-14-R-8600

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT TWO

CONTINUATION PAGE

The purpose of this amendment is to accomplish the following:

Incorporate Phase II Determination Incorporate revised Instructions to Offerors Re-state Phase II Evaluation Criteria Incorporate Price Schedule Incorporate Wage Determination Incorporate Contract Clauses

All other items remain unchanged.

Phase II Determination

“The short-list determination has been made and the purpose of this amendment is to begin Phase II of the procurement. In accordance with Naval Facilities Acquisition Supplement 36.303-1-100 the number and identity of the most highly qualified offerors selected to submit Phase II proposals is not releasable. Phase II proposals will only be accepted from those offerors determined the most highly qualified and invited to submit Phase II proposals.”

Phase II Instructions to Offerors

1) Your acquisition points of contact for this project are Contract Specialist Kennett Morris at 202-685-3155, or email Kennett.morris@navy.mil and Contracting Officers Elias Stamatiades at 202-685-3192, or email elias.stamatiades@navy.mil , Cynthia Crowder at 202-685-3157, or email cyndi.crowder@navy.mil .

2) Project Description: The project includes design and construction to widen Russell Road, beginning at the intersection of Building 3300, MCCDC HQ drive entrance and moving eastward toward Dunlap Circle. This project also includes the following: installation of all required traffic markings and signaling devices with cameras to control traffic, including pedestrian devices and emergency pre-emption equipment, acceleration and deceleration lanes, relocation of existing utilities, both above and below ground, such as telecommunications, water, sewer, electric power, and natural gas lines, to a designated location outside of the proposed pavement. The roadway widening shall be constructed as a “Rural Road”, open section, undivided, without curb and gutter, to current VDOT standards and specifications (Latest Edition). The road shall generally have 8 foot shoulders, except where indicated on the plans. All roadway widening and associated improvements and repairs shall be designed and constructed in accordance with VDOT standards and specifications (Latest Edition), the AASHTO “Policy on

Geometric Design of Highways and Streets” (Latest Edition), the Federal Highway Administration (FHWA) and The Manual on Uniform Traffic Control Devices (MUTCD). The roadway in this phase shall be designed for a 45 mph speed. Work is proposed in wetland areas, and wetland creation shall not be permitted. The Design-Build Contractor shall be responsible for any permitting and mitigation payments to a wetlands bank required for wetland impacts.

Some demolition of the existing roadway surface and associated appurtenances shall be required, such as milling and cleaning out existing storm drainage pipes in the disturbed areas. Extension of existing storm pipes shall be required and proper inlet and outlet protection. Existing pavement shall be patched and repaired along the length of any trenching for utility replacement or adjustment. Additionally, existing underground utilities shall be abandoned in place and new conduits and/or piping shall be installed outside of the new roadway pavement limits. Utilities are to be relocated to the north side of the roadway unless approved by the Contracting Officer. Low impact development (LID) shall be utilized in the design and construction of this project. Stormwater management shall be provided in accordance with current UFCs, MCB Quantico guidelines and requirements, the current Commonwealth of Virginia Stormwater Management Program (VSMP) regulations (4VAC50-60), and the Energy Independence and Security Act (EISA). Erosion and sediment control shall be provided in strict accordance with current MCB Quantico guidelines and requirements, and with the Commonwealth of Virginia Erosion and Sediment Control Handbook (VESCH). It shall be the responsibility of the Design-Build Contractor to make all necessary drainage improvements to ensure adequate outfall requirements are met. The design shall provide Anti- Terrorism/Force Protection (AT/FP) features and comply with Department of Defense (DoD) AT/FP regulations. ADA Requirements shall be incorporated into the design and construction, to be in compliance with Department of Defense (DoD) letter 31 of October 2008, Subject: “Access for People with Disabilities”.

3) The subject project is Design-Build. Award will be based on best value in accordance with Evaluation Factors for Award for Phase I and Phase II.

4) The Design Build Budget amount is $12,400,000, inclusive of all options.

5) Offer guarantees are required to be provided for Phase II

6) Proposals for Phase II are due by 2:00 P.M. on Tuesday, 6 May 2014. Please provide one (1) original and two (2) copies of your technical proposal, and one (1) original and two (2) copies of your price proposal, bound in THREE RING BINDERS.

There should absolutely be no price included in the technical proposal package.

Submit your proposals to:

NAVFAC Washington Attn: Kennett Morris 1314 Harwood Street SE, Bldg 212 Washington Navy Yard Washington, DC 20374

INSTRUCTIONS FOR HAND DELIVERY OF PROPOSALS:

The current security condition at the Washington Navy Yard requires escorts for entry to the base by individuals not possessing a U.S. Government DoD Common Access Card (CAC) identification card.

Individuals without a DoDCAC will not be permitted to enter the Navy Yard. NAVFAC Washington will

NOT be able to provide escorts for Navy Yard entry of hand delivered proposals. NAVFAC Washington will NOT receive hand delivered proposals at the Base Pass Office or any location other than that identified for receipt in the solicitation.

The Government considers use of a courier service, such as FedEx or UPS, as hand delivery of proposals and the responsibility for timely delivery resides with the offeror. Offerors are notified that the entry point for proposals submitted through the U.S. Postal Service is at Joint Base Anacostia-Bolling and NOT at the Washington Navy Yard. Contractors proposals must be received by NAVFAC Washington at the Navy Yard by the due date outlines in the solicitation and delivery time from the Joint Base Anacostia- Bolling to the Navy Yard cannot be predicted nor guaranteed. Offerors should take this into consideration when determining delivery method.

Facsimile copies and email copies will NOT be accepted.

All proposals must be received prior to the due date and time. Any proposals submitted after the time set for receipt will be stamped with the date and hour of receipt and held unopened until after award. The file shall be documented in accordance with

FAR 14.304-4.

7) Location and Time for Pre-Proposal Conference/Site Visit

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.

Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit is scheduled for:

Tuesday, 3 April, 2014 at 10:00 AM EST

(c) Participants will meet at:

Location: Marine Corps Base Quantico Public Works Department Public Works Building 2004 First Floor HR Training Room (#110A) 2004 Barnett Ave Quantico, VA 22134-0855

Access: Valid ID such as Driver’s License

8) Pre Proposal Inquiries (PPI) must be submitted in a MS-WORD document and submitted by the Prime Contractor only. Subcontractors with questions must submit them through the Prime Contractor. The PPI cut-off date is close of business 18 APRIL 2014. PPI during the proposal preparation period shall be submitted by email to Kennett Morris at Kennett.morris@navy.mil. and Contracting Officers Elias Stamatiades at email elias.stamatiades@navy.mil, Cynthia Crowder at email cyndi.crowder@navy.mil .

PHASE II

EVALUATION FACTORS

Factor 3 – Safety

(a) Submittal Requirements:

The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture;

however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.)

(1) Experience Modification Rate (EMR):

For the three (3) [2009-2012] years previous complete calendar years, submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three (3) year period). If you have no EMR, affirmatively state so and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

For the three (3) [2009-2012] years previous complete calendar years, submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data and upward or downward trends should be addressed as part of this element. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach for Safety:

Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety narrative shall be limited to two (2) single-sided pages in total (minimum 11 font).

(b) Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, any and innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety may include, but are not limited to, OSHA, NAVFAC’s Facility Accident and Incident Reporting (FAIR) database, and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

- Experience Modification Rate (EMR)

- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate

- Offeror Technical Approach to Safety

- Other sources of information available to the Government

(1) Experience Modification Rate (EMR):

The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rating. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach to Safety:

The Government will make a determination to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project.

The Government will also determine the degree to which innovations are being proposed that may enhance safety on this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.

Factor 4 – Technical Solution

Solicitation Submittal Requirements:

Provide a narrative describing the technical solution to the project that meets the requirements of the RFP.

Include the following:

Site layout description including roadways, traffic signalization, emergency vehicle access, and ATFP standoff distances. Also include in the narrative a description of the general concept proposed to meet low impact development (LID) and approach to traffic planning and snow removal plans during construction.

Narrative shall not exceed twelve (12) single-sided pages (minimum 11 font). Do not provide plans and sketches as part of the proposal. The RFP contains plans, so concept drawings are not required. The successful contractor shall develop the final plans and layouts after contract award.

The solicitation allows for a maximum of 545 calendar days to complete the project. An Offeror can provide a shorter schedule from contract award through construction completion for the Base Bid and all possible options to complete the project in less than 545 calendar days. In this case, the Offeror should provide a maximum of 30 milestones and explain how they plan to accomplish this schedule without reducing scope requirements, submissions, and Government review periods. All days should be “calendar days”. Schedules should be limited to two (2) 11”x17” pages. Submissions of length beyond two (2) pages will not be evaluated. If a shorter schedule is proposed, discuss in the narrative the proposed schedule and milestones to complete the project.

The Offeror should express whether they intend to comply with the solicitation requirements.

Basis of Evaluation:

The Government will make a subjective evaluation to determine the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the Offeror's technical solution to determine adherence to the technical requirements of the RFP.

Proposals demonstrating a shorter schedule that is realistic and acceptable to the Government, will be given a greater weight in the evaluation.

The contract completion date for design and construction is 545 calendar days after award, inclusive of 15 calendar days for the submittal of bonds and insurance. If a schedule of lesser duration is determined to be acceptable, it will become part of the successful Offeror’s contract.

PRICE:

(a) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

In separate binder from Phase II technical factors, Offeror shall submit two copies of Price Proposal. Each copy of Price Proposal binder shall have the title “Price Proposal” clearly displayed on the cover page. In addition to the title on cover page, include Solicitation Number, Solicitation Title, Prime Contractor name, Address, Phone Number, Fax Number, DUNS number, CAGE Code, Main Point of Contact, POC’s phone Number, POC’s e-mail address.

Each copy of Price Proposal Binder shall contain the following information in the order listed:

• SF-1442, signed with all solicitation amendments acknowledged

• Completed Price Schedule from Section 00101 of solicitation

• Copy of ORCA Representations and Certifications

• Bid Guarantee Bond in accordance with Provision NFAS 5252.228-9302-Bid Guarantee

If applicable, Offerors shall identify all items in the RFP that have been deleted or modified and the associated price adjustments included in the Price Proposal.

Items deleted or modified should also have been clearly identified and described in the appropriate technical factor submission of the Technical Proposal. Any pricing information shall not be included in the Technical Proposal.

(b) Basis of Evaluation:

(1) The Government will evaluate price based on the total price. Total price includes the basic requirements, and all option items, plus the calculation of mark-ups. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (July 1990) in section 00100 of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Price analysis will be performed by one or more of the following methods to ensure a fair and reasonable price:

• Comparison of proposed prices received in response to the RFP.

• Comparison of proposed prices with the IGCE.

• Comparison of proposed prices with available historical information.

• Comparison of market survey results.

• This project Design to Build Budget amount range is between $10M-$15M and is inclusive of Items 0001 thru 0004.

Prices will be evaluated in terms of reasonableness based on a comparison to the Government Estimate and other prices received from this solicitation.

PRICE SCHEDULE

SOLICITATION N40080-14-R-8600

P-572, INFRASTRUCTURE WIDEN RUSSELL ROAD

MARINE CORPS BASE, QUANTICO, VIRGINIA

ITEM DESCRIPTION PRICE

0001 All labor, management, supervision, tools, materials, site work, and complete and useable roadway widening and associated improvements from station 79+00 to station 143+79, complete in accordance with the RFP specifications and drawings, but not including work indicated or specified to be provided under any of the other items. Price for all work except the work listed in the other items or options.

PRICE FOR ITEM 0001 $_________

0001A All labor, management, supervision, tools, materials, site work, regarding Part 4, Section G103004, paragraph 1.2 and Part 3, Chapter 3, subpart 3.2.3 (b), provide the following: Remove unsatisfactory soil and material and replace with new satisfactory soil and material (including but not limited to soil/material, backfilling and compaction). Unsatisfactory soil and material shall be removed from Government property and properly disposed of by the Contractor. For the purposes of this solicitation, assume quantity of unsatisfactory soil and material to be 27,580 cubic yards.

PRICE FOR ITEM 0001A: $___________

$____/Cubic Yard 27,580 Cubic Yard =

TOTAL PRICE FOR ITEMS 0001 thru 0001A $__________

OPTIONS

0002-OPTION ITEM 1

All labor, management, supervision, tools, materials, site work, for Item 0002 shall be complete and useable roadway widening and associated improvements from station 143+79 to station 146+79, complete in accordance with the RFP specifications and drawings, but not including work indicated or specified to be provided under any of the other items.

PRICE FOR ITEM 0002 OPTION 1 $_________

0003-OPTION ITEM 2

All labor, management, supervision, tools, materials, site work, for Item 0003 shall be complete and useable roadway widening and associated improvements from station 146+79 to station 149+79, complete in accordance with the RFP specifications and drawings, but not including work indicated or specified to be provided under any of the other items.

PRICE FOR ITEM 0003 OPTION 2 $_________

PRICE FOR ALL ITEMS 0001 thru 0003 $________

Notes:

(1) Offeror shall provide a price for all items on the Price Schedule.

(2) A firm fixed price is required for each item and no provision will be made for economic price adjustments.

(3) The Design Build Budget is $12,400,000 and is inclusive of Items 0001 thru 0003.

(4) The Offeror’s price is valid for 60 days from the receipt of proposals.

(5) It is noted that in addition to other requirements, the Base Bid also includes full design services for Base Bid Items. Design services are included in the scope (and cost) of all Option Items.

(6) Options will be evaluated in accordance with 52.217-5 Evaluation of Options.

(7) Options(s) 1: Options Items may be awarded at time of award. Each Item is “option” in price. For each Item, Offeror must include on the price schedule the cost, in addition to Item 0001, to perform each item of work. A firm fixed price is required for the Base Bid and Items.

No provision is made for economic price adjustment.

(8) Offeror shall submit their best price for this project, inclusive of Item 0001, 0001A and all Options.

Name & Address of Firm Submitting Offer:

Signature: ___________________________________

Phone: ______________________________________

ACKNOWLEDGEMENT OF AMENDMENT(S):___________________________

General Decision Number: VA140131 01/24/2014 VA131

Superseded General Decision Number: VA20130142

State: Virginia

Construction Type: Highway

Counties: Charles*, Chesterfield, Colonial Heights*, Dinwiddie, Goochland, Hanover, Henrico, Hopewell*, New Kent, Petersburg*, Powhatan, Prince George and Richmond* Counties in Virginia.

*INDEPENDENT CITIES

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Modification Number Publication Date 0 01/03/2014 1 01/24/2014

SUVA2013-006 09/20/2013

Rates Fringes

ASBESTOS WORKER..................$ 18.30

CARPENTER (STRUCTURE)............$ 20.00

CEMENT MASON/CONCRETE FINISHER...$ 16.03

ELECTRICIAN......................$ 26.00

FORM SETTER......................$ 14.24

IRONWORKER, REINFORCING..........$ 29.80

IRONWORKER, STRUCTURAL...........$ 20.80

LABORER

Asphalt Raker...............$ 18.13 Blaster.....................$ 16.56 Construction Worker I (Skilled Laborer)...........$ 17.38 Construction Worker II (Laborer)...................$ 13.01 Deckhand....................$ 11.88 Fence Erector...............$ 13.20 Flagger.....................$ 11.19 Grade Checker...............$ 7.50 Guardrail Erector...........$ 17.82 Landscape Worker............$ 14.48 Pipe Layer..................$ 14.82 Power Tool Operator.........$ 14.08 Sign Erector................$ 16.10

MASON (STRUCTURE)................$ 13.00

PAINTER..........................$ 14.00

PLUMBER..........................$ 17.10

POWER EQUIPMENT OPERATOR:

Air Compressor Operator.....$ 11.50 Asphalt Distributor.........$ 17.70 Asphalt Paver...............$ 18.49 Backhoe.....................$ 17.07 Boom/Auger..................$ 12.95 Bulldozer (Utility).........$ 10.68 Bulldozer...................$ 17.55 Concrete Finish Machine Operator....................$ 11.25 Concrete Finish Machine Screed Operator (Bridge)....$ 19.73

Concrete Paving Machine.....$ 22.70 Concrete Pump Operator......$ 25.00 Concrete Saw Operator.......$ 25.00 Crane, Derrick, Dragline (1 cm & under)..............$ 22.00 Crane, Derrick, Dragline (over 1 cm).................$ 23.72

Drill Operator..............$ 18.83 Excavator (Gradall).........$ 19.62 Front End Loader............$ 15.40 Hydro Seeder................$ 14.19 Log Skidder Operator........$ 11.50 Mechanic....................$ 19.97 Mobile Mixer Operator.......$ 15.00 Motor Grader (Fine Grade)...$ 20.50 Motor Grader (Rough Grade)..$ 16.21 Oiler, Greaser..............$ 9.00 Pavement Marking Operator...$ 23.41 Pavement Marking Truck Operator....................$ 18.70 Pavement Planing Groundman..$ 16.61 Pavement Planing Operator...$ 18.81 Pile Driver Leadsman........$ 23.41 Pile Driver Operator........$ 23.41 Pipe Boring/Jacking Machine.$ 22.00 Plant Operator..............$ 17.10 Roller (Finish).............$ 18.57 Roller (Rough)..............$ 14.44 Scraper Pan.................$ 13.88 Shot Blast Machine Operator.$ 17.50 Shovel Operator.............$ 17.50 Slip-Form Paver Operator....$ 16.25 Slurry Seal Paver Machine Operator....................$ 12.90 Slurry Seal Paver Truck Operator....................$ 18.00 Stabilizer Operator.........$ 14.25 Stone-Spreader..............$ 18.00 Subgrade Machine Operator...$ 11.30 Tractor Operator (Utility)..$ 12.06 Tractor, Crawlers...........$ 12.46 Trenching Machine Operator..$ 18.25 Vacuum Machine Operator.....$ 18.96

TRAFFIC SIGNALIZATION:

Traffic Signal Installation......$ 34.61

TRUCK DRIVER

Fuel & Lubricant Service

Truck Driver................$ 14.95 Transit Mix Truck Driver....$ 18.00

Truck Driver (Single, Tandem, Multi-Rear Axle)....$ 16.13 Truck Driver, Heavy Duty (7 c.y & under).............$ 14.37 Truck Driver, Heavy Duty (over 7 c.y.)...............$ 17.41

WELDER...........................$ 13.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

CONTRACT CLAUSES

FAR 52.222-6, DAVIS BACON ACT

The applicable Department of Labor General Wage Decision for this work is: VA140131 Modification Number 1 dated 01/24/2014.

FAR 52.222-23, NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY (APR 1984)

Goals for minority participation 28% Goals for female participation for each trade 6.9%

FAR 52.211-12, LIQUIDATED DAMAGES - CONSTRUCTION (SEP 2000)

If the contractor fails to complete the work within the time specified in the contract, or any extension, the contractor shall pay to the Government as liquidated damages as follows, the sum of $6,459.17 per calendar day for each day of delay.

FAR 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

– ALT I

The Contractor shall be required to commence work under this order within 15 calendar days (administrative time for submission and approval of bonds and insurance), and complete the entire work not later than 545 calendar days.

All clauses and provisions included in the basic contract remain applicable to any resultant task order. The following clauses specific to this RFP are hereby incorporated in full text or by reference

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.222-6 Davis Bacon Act JUL 2005 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 545 calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

Goals for minority participation

28%

Goals for female participation for each trade

6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is

Marine Corps Base Quantico, Quantico, VA

(End of provision)

The following were previously included by reference and are now included by full text:

52.222-6 DAVIS-BACON ACT (JUL 2005)

(a) Definition.—“Site of the work”—

(1) Means—

(i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and

(ii) The secondary site of the work, if any. Any other site where a significant portion of the building or work is constructed, provided that such site is—

(A) Located in the United States; and

(B) Established specifically for the performance of the contract or project;

(2) Except as provided in paragraph (3) of this definition, includes any fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided—

(i) They are dedicated exclusively, or nearly so, to performance of the contract or project; and

(ii) They are adjacent or virtually adjacent to the “primary site of the work” as defined in paragraph (a)(1)(i), or the “secondary site of the work” as defined in paragraph (a)(1)(ii) of this definition;

(3) Does not include permanent home offices, branch plant establishments, fabrication plants, or tool yards of a Contractor or subcontractor whose locations and continuance in operation are determined wholly without regard to a particular Federal contract or project. In addition, fabrication plants, batch plants, borrow pits, job headquarters, yards, etc., of a commercial or material supplier which are established by a supplier of materials for the project before opening of bids and not on the Project site, are not included in the “site of the work.” Such permanent, previously established facilities are not a part of the “site of the work” even if the operations for a period of time may be dedicated exclusively or nearly so, to the performance of a contract.

(b)(1) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, or as may be incorporated for a secondary site of the work, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Any wage determination incorporated for a secondary site of the work shall be effective from the first day on which work under the contract was performed at that site and shall be incorporated without any adjustment in contract price or estimated cost. Laborers employed by the construction Contractor or construction subcontractor that are transporting portions of the building or work between the secondary site of the work and the primary site of the work shall be paid in accordance with the wage determination applicable to the primary site of the work.

(2) Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (e) of this clause; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such period.

(3) Such laborers and mechanics shall be paid not less than the appropriate wage rate and fringe benefits in the wage determination for the classification of work actually performed, without regard to skill, except as provided in the clause entitled Apprentices and Trainees. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein; provided that the employer’s payroll records accurately set forth the time spent in each classification in which work is performed.

(4) The wage determination (including any additional classifications and wage rates conformed under paragraph (c) of this clause) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the primary site of the work and the secondary site of the work, if any, in a prominent and accessible place where it can be easily seen by the workers.

(c)(1) The Contracting Officer shall require that any class of laborers or mechanics which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The Contracting Officer shall approve an additional classification and wage rate and fringe benefits therefor only when all the following criteria have been met:

(i) The work to be performed by the classification requested is not performed by a classification in the wage determination.

(ii) The classification is utilized in the area by the construction industry.

(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.

(2) If the Contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the Contracting Officer agree on the classification and wage rate (including the amount designated for fringe benefits, where appropriate), a report of the action taken shall be sent by the Contracting Officer to the Administrator of the:

Wage and Hour Division Employment Standards Administration U.S. Department of Labor Washington, DC 20210

The Administrator or an authorized representative will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary.

(3) In the event the Contractor, the laborers or mechanics to be employed in the classification, or their representatives, and the Contracting Officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the Contracting Officer shall refer the questions, including the views of all interested parties and the recommendation of the Contracting Officer, to the Administrator of the Wage and Hour Division for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary.

(4) The wage rate (including fringe benefits, where appropriate) determined pursuant to paragraphs (c)(2) and (c)(3) of this clause shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.

(d) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the Contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.

(e) If the Contractor does not make payments to a trustee or other third person, the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program; provided, That the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .