Text version

1 of 4 631-13-010

SHIP: PER DELIVERY ORDER (IDIQ) ITEM NO: 631-13-010

COAR: 26 PCN: EX01-0555

LWT FILE NO: 631-12 CMP: NONE

REVISED: 30 Jun 2015 PLANNER: PERRONE

1. SCOPE:

1.1 Title: Submarine Forward and After Superstructure; preserve (IDIQ)

1.2 Location of Work:

1.2.1 Entire Interior and Exterior of the Superstructure (Forward

Logistics Trunk Area), Frame 22 to 32 (AS PER DELIVERY ORDER)

1.2.2 Entire Interior and Exterior of the Superstructure, Frame 32 to 37 (AS PER DELIVERY ORDER)

1.2.3 Entire Interior and Exterior of the Superstructure, Frame 37 to 42 (AS PER DELIVERY ORDER

1.2.4 Entire Interior and Exterior of the Superstructure, Frame 42 to 50 (AS PER DELIVERY ORDER)

1.2.5 Entire Interior and Exterior of the Superstructure, Frame 50 to 52 (AS PER DELIVERY ORDER)

1.2.6 Entire Interior and Exterior of the Superstructure, Frame 52 to 62, Missile Bay Number One (AS PER DELIVERY ORDER)

1.2.7 Entire Interior and Exterior of the Superstructure, Frame 62 to 71, Missile Bay Number 2 (AS PER DELIVERY ORDER)

1.2.8 Entire Interior and Exterior of the Superstructure, Frame 71 to 80, Missile Bay Number 3 (AS PER DELIVERY ORDER)

1.2.9 Entire Interior and Exterior of the Superstructure, Frame 80 to 83, Missile Bay Number 4 (AS PER DELIVERY ORDER)

1.2.10 Entire Interior and Exterior of the Superstructure (Buoy

Area), Frame 83 to 94 (AS PER DELIVERY ORDER)

1.2.11 Entire Interior and Exterior of the Superstructure, Frame 94 to 105 (AS PER DELIVERY ORDER)

1.2.12 Entire Interior and Exterior of the Superstructure, Frame 105 to 113 (AS PER DELIVERY ORDER)

1.2.13 Entire Interior and Exterior of the Superstructure, Frame 113 to 118 (AS PER DELIVERY ORDER)

2 of 4 631-13-010

1.2.14 Entire Interior and Exterior of the Superstructure, Frame 118 to 128 (AS PER DELIVERY ORDER)

1.2.15 Entire Interior and Exterior of the Sail (Including Diving

Planes), Frame 32 to 52 (AS PER DELIVERY ORDER)

1.2.16 Nonskid From Frame 22 to Frame 52

1.2.17 Nonskid From Frame 84 to Frame 128

1.3 Identification

1.3.1 Not Applicable

1.4 Security Classification of Equipment, Components, Spaces and

Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program

Operating Manual, DOD 5220.22−M (0584−LP−179−6400).

1.4.1 Spaces: Interior and Topside of the Submarine. The Waterfront

Restricted Area (WRA) is to be considered a Level 3 Area and Treated as a Controlled and Restricted Industrial Area. Personnel must have

Proper Clearances to Accomplish Work within the WRA. All Personnel will be required to have the Proper Clearances (Confidential or

Secret only for access to the interior of the submarine−Excluding those Areas Accessed from the Drydock) or a completed Facility

Access Determination (FAD). The Prime Contractor shall be responsible to ensure that all Sub−Contractor Personnel Meet all

Security Requirements, and hold Proper Clearances to Support the

Availability. (CONFIDENTIAL)

2. REFERENCES:

2.1 Standard Items

2.2 Systems and Specifications, SSPC Painting Manual, Volume 2

3. REQUIREMENTS:

3.1 THE CONTRACTOR IS NOT TO ENTER THE LOCATIONS LISTED IN 1.2.11 and

1.2.12 UNTIL RADIATION SURVEYS ARE COMPLETE AND NO FURTHER RADIATION

CONTROLS ARE REQUIRED. The SUPERVISOR will provide notification to the contractor verifying that the Radiation controls are no longer required and all Radiation signs are covered.

(V) (G) “VERIFY PROTECTIVE MEASURES”

3.2 All protective measures are to be in place prior to the start of any contamination−producing operations and shall remain in place until the contamination−producing operations are complete. Note: This (V)(G)

Checkpoint replaces the (V) Checkpoint in paragraph 3.2.3 of 009−06 of

2.1.

(V) (G) “VISUAL INSPECTION”

3 of 4 631-13-010

3.3 Conduct a visual inspection of non-steel dampening and acoustic restraining covers (Septum Plates), with the SUPERVISOR and TRF representative, to establish existing condition of Septum plates.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

3.4 Accomplish the requirements of 009−32 of 2.1, including Table 6, Line 2, and Table 8, Line 20 for total preservation of the exterior

(including cleat boxes) and interior surfaces, including fairwater, pressure hull plating, framing, foundations, piping, pipe hangers, appendages and normally painted surfaces therein, for each location listed in 1.2.1 through 1.2.15.

3.4.1 Non−steel damping and acoustic restraining covers (Septum

Plates) are not intended to be painted. Accidental overspray is acceptable. Ensure that paint does not bridge the gap between the rubber and the restraining cover over more than 75 percent of the edge of each tile. DO NOT DAMAGE TILES.

3.4.2 Surface preparation for piping one inch in diameter and over to be SSPC−SP−7 of 2.2 (Brush off Blast Cleaning). Surface preparation for piping under 1 inch diameter, and H.P. Air/Gas

Piping to be SSPC−SP 2 of 2.2 (Hand tool cleaning). DO NOT DAMAGE

PIPING.

3.4.3 Top coat of exterior surfaces to be Black (color chip 37038) and interior surfaces to be Gray (color chip 26270).

3.4.4 Submit one legible copy, in hard copy or approved

transferrable media, of a report notifying the SUPERVISOR 48 hours prior to completion of surface preparation.

3.4.5 Suspend operations upon completion of surface preparation and provide access for up to 10 working days for normal Refits and

Docking Availabilities, up to 21 working days for ERP and SSGN availabilities, and up to 45 days for location listed in 1.2.15, for the accomplishment of Government inspection and repairs.

3.4.6 Upon completion of Government inspection/repair, the surfaces shall be reactivated by abrasive blasting, power or hand tool cleaning to re−establish original prepared conditions as specified in 3.4.

3.5 Accomplish the requirements of 009−32 of 2.1 including Table 6, Line

2, and Table 8, Line 20 for partial preservation of the exterior

(including cleat boxes) and interior surfaces, including fairwater, pressure hull plating, framing, foundations, piping, pipe hangers, appendages and normally painted surfaces therein, for each location listed in 1.2.1 through 1.2.15, as designated by the SUPERVISOR.

4 of 4 631-13-010

3.5.1 Surface preparation for partial preservation shall be in accordance with Table 6, Lines One and 2, and Table 8, Line 20, Column A. SSPC-SP 11 is acceptable for areas originally requiring a

NACE 2/SSPC-SP 10 or NACE 5/SSPC-SP 12.

3.5.1.1 Surface preparation for all piping shall be SSPC−SP 2 of 2.2 (Hand tool cleaning). DO NOT DAMAGE PIPING.

3.5.2 Non−steel damping and acoustic restraining covers (Septum

Plates) are not intended to be painted. Accidental overspray is acceptable. Ensure that paint does not bridge the gap between the rubber and the restraining cover over more than 75 percent of the edge of each tile. DO NOT DAMAGE TILES.

3.5.3 Top coat of exterior surfaces to be Black (color chip 37038) and interior surfaces to be Gray (color chip 26270).

3.6 Accomplish the requirements of 009−32 of 2.1, including Table 6, Line 6 for Nonskid replacement, in each location listed in 1.2.16 and

1.2.17.

3.5.1 Non−skid is not to be applied to hatch components, safety tracks, lifeline sockets, deck fittings and gear, faying surfaces of hatches, contact or bearing surfaces and approximately one inch around the periphery of DSRV seating surfaces, cleats and access covers.

3.7 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Removal and reinstallation of interferences will be accomplished by the Government when the interferences are agreed to by the SUPERVISOR as being reasonable. Temporary metal blanks and plugs used as Foreign

Material Exclusion (FME) will be provided by the Government.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.