DEPARTMENT OF THE NAVY

SERMC

TRIDENT IDIQ (SSBN/SSGN)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSP: SERM-SUB-IDIQ-16

INCLUDES ALL CHANGES THROUGH 3/8/2016

INDEX

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT

CATEGORY I. FY-17 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER

REFERENCE.

ITEM NO. TITLE DATE

009-01 General Criteria; accomplish 30 JUL 2015

009-02 Environmental Compliance Reports for Material Usage at 18 JUL 2014

Naval Facilities; provide

009-03 Toxic and Hazardous Substances; control 18 JUL 2014

009-04 Quality Management System; provide 30 JUL 2015

009-05 Temporary Accesses; provide 30 JUL 2015

009-06 Maintaining Protection and Cleanliness from 30 JUL 2015

Non-Radioactive Contaminate-Producing Operations; accomplish

009-07 Confined Space Entry, Certification, Fire Prevention and 30 JUL 2015

Housekeeping; accomplish

009-08 Fire Protection at Contractor's Facility; accomplish 30 JUL 2015

009-10 Shipboard Asbestos-Containing Material (ACM); control 18 JUL 2014

009-18 Magnetic Material; control 18 JUL 2014

009-19 Provisioning Technical Documentation (PTD); provide 30 JUL 2015

009-20 Government Property; control 18 JUL 2014

009-21 Logistics and Technical Data; provide 18 JUL 2014

009-23 Interferences; remove and install 30 JUL 2015

009-24 Authorization, Control, Isolation, Blanking, and Tagging 30 JUL 2015

Requirements; Accomplish

009-28 Fire Prevention Requirements; accomplish 30 JUL 2015

009-29 Asbestos-Free Pipe Hanger Liner Material; install 29 JUL 2004

009-34 Fire Protection of Unmanned Vessels at Contractor's 17 JAN 2013

Facility; provide

009-35 Confined Space Entry, Certification, Fire Prevention 30 JUL 2015

Utilizing Military Fire Watches, and Housekeeping; accomplish

009-39 Technical Manual Contract Requirement (TMCR) for New 30 JUL 2015

Technical Manuals for Commercial Equipment/component; provide

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines 18 JUL 2014 and Material Handling Equipment at Naval Facilities;

accomplish

009-59 Organotin Antifouling Material; control 29 JUL 2011

009-60 Schedule and Associated Reports for Availabilities Over 9 01 SEP 2015

Weeks in Duration; provide and manage

009-61 Shipboard Use of Fluorocarbons; control 18 JUL 2014

009-64 Synthetic Fire-Resistant Hydraulic Fluids; control 18 JUL 2014

009-65 Polychlorinated Biphenyls (PCBs); control 29/JUL 2011

009-67 Integrated Total Ship Testing; manage 18 JUL 2014

009-69 Heavy Weather/Mooring Plan; provide 30 JUL 2015

009-70 Confined Space Entry, Certification, Fire Prevention and 30 JUL 2015

Housekeeping for Unmanned Vessels; accomplish

009-72 Physical Security at Private Contractor's Facility; 18 JUL 2014 accomplish

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, 30 JUL 2015 relocate, repair, and install

009-74 Occupational, Safety and Health Requirements; accomplish 30 JUL 2015

009-77 Cofferdam Requirements; accomplish 29 JUL 2011

009-79 Government Owned Material (GOM); status reporting 18 JUL 2014

009-80 Ship's Facilities; provide 18 JUL 2014

009-81 Compartment Closeout; accomplish 30 JUL 2015

009-82 Data Requirements When Installing an Equal Component Vice 29 JUL 2011

Specified Component; provide

009-83 Wire Rope Fitting Verification; provide 17 JAN 2013

009-84 Accountability of Temporary Fasteners; provide 18 JUL 2014

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire 1 AUG 2008

Suppressant Halon (H) Materials; accomplish

009-87 Chemical Disinfection Procedures; accomplish 18 JUL 2014

009-88 Collection, Holding and Transfer (CHT) amd Mogas tanks, 18 JUL 2014

Spaces, and Piping, including Sewage or Mogas-Contaminated

Tanks, Spaces, and Piping; certify

009-89 Purchase and Inspection Requirements for Contractor- 29 JUL 2011

Furnished Anodes; accomplish

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) 18 JUL 2014 and Pollution Prevention Act (PPA) Information; provide

009-94 General Environmental Requirements for Work at Contractor's 17 JAN 2013

Facility; accomplish

009-95 Mechanically Attached Fittings (MAFs) for Piping Systems; 18 JUL 2014 install

009-97 Shipbuilding and Ship Repair Operations National Emission 17 JAN 2013

Standard for Hazardous Air Pollutants (NESHAPS) for Surface

Coatings Information; provide

009-99 Ship Departure Report; provide 18 JUL 2014

009-100 Ship's Stability Process Control Procedure (PCP); maintain 18 JUL 2014

009-101 Requirements for Entry to and Departure from Contractor's 18 JUL 2014

Facility; accomplish

009-102 Alteration Verification; provide 29 JUL 2011

009-103 Weight and Moment Change Data; provide 18 JUL 2014

009-106 Work Authorization Form Coordinator (WAFCOR); provide 06 JAN 2014

009-108 Aircraft Carrier Requirements for Entry to, Movement 18 JUL 2014 within, and Departure from Contractor's Facility; accomplish

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE- 18 JUL 2014

Certified Vessels; accomplish

009-110 Special Requirements for Non-Nuclear Work on Nuclear 18 JUL 2014

Vessels; accomplish

009-111 Schedule and Associated Reports for Availabilities 9 Weeks 30 JUL 2015 or Less in Duration; provide and manage

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation 18 JUL 2014

Hazards; accomplish

009-118 CG Deck Loading; accomplish 18 JUL 2014

009-120 Fact Finding and Critique of Unplanned Events; manage 30 JUL 2015

009-121 Ship Assessment/Inspection Requirements; provide 18 JUL 2014

099-08 Temporary Fire Protection Services for Naval Station 13 MAY 2013

Mayport Availabilities; accomplish

099-51 Non-Hazardous Liquid Waste Removal Operations at Naval 19 FWB 2013

Station Mayport; accomplish

099-53 Temporary Hazardous Material (HM) Hazardous Waste 31 JAN 2012

(HW)/Satellite Accumulation Point (SAP) Storage Units for Ship's Force Use; provide

099-55 Cleaning and Pumping; Accomplish (CMAV) 31 JAN 2012

099-58 Heavy Weather Plan for Naval Station Availabilities; provide 23 OCT 2008

099-59 Cancelled 17 JAN 2013

099-60 General Environmental Requirements for NAVSTA Mayport 13 MAY 2013

Availabilities; accomplish

099-61 Temporary Hazardous Material (HM)/ Hazardous Waste 27 JAN 2009

(HW)/ Satellite Accumulation Point (SAP) Storage Units for Ship's Force Use at Contractor's Facility; provide

099-74 General Safety Requirements; accomplish 18 FEB 2014

099-100 FFG Stability; maintain 25 JAN 2011

CATEGORY II. FY-17 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS

JOB ORDER

009-32 Cleaning and Painting Requirements; accomplish 10 JUL 2015

ITEM NO. TITLE

000-00-001 Administrative Requirements; accomplish

077-11-001 Hazardous Waste Produced on Naval Vessels; control

191-11-001 Lead Ballast Removal/Re-ballast/Installation; accomplish

631-13-001 Submarine Main Ballast Tank; preserve (IDIQ)

631-13-002 Submarine Mud Tank, Torpedo Tube Recess, Secondary Propulsion Motor Recesses (Port and Starboard), Torpedo Ejection Pump Recesses (Port and Starboard); preserve (IDIQ)

631-13-003 Submarine Chain Locker and Sump, Sonar Penetrant Splice Trunk, MSS Recesses, Sonar Dome Access, Sonar Cavity, Sonar Tube Fairing;

preserve (IDIQ)

631-13-004 Submarine Auxiliary Tank, Depth Control Tank, Forward Trim Tank;

preserve (IDIQ)

631-13-005 Submarine Sanitary Tank; preserve (IDIQ)

631-13-006 Submarine Missile Compensating Tank, Main Induction Sump Tank;

preserve (IDIQ)

631-13-007 Submarine Torpedo Impulse Tank; preserve (IDIQ)

631-13-008 Submarine Potable Water Tank; preserve (IDIQ)

631-13-009 Submarine Drain Collecting Tank; preserve (IDIQ)

631-13-010 Submarine Forward and After Superstructure; preserve (IDIQ)

631-13-011 Submarine Underwater Hull; preserve (IDIQ)

631-13-012 Submarine Underwater Recesses, Sonar Sphere Support Structure, Stern Planes; preserve (IDIQ)

992-31-001 Submarine Cleaning and Pumping; accomplish (IDIQ)

1 of 1 000-00-001

SHIP: PER DELIVERY ORDER (IDIQ) ITEM NO: 000-00-001

COAR: 26 PCN: EX01-0555

LWT FILE NO: 631-12 CMP: NONE

REVISED: 30 Jun 2015 PLANNER: PERRONE

1. SCOPE:

1.1 Title: Administrative Purposes; accomplish (IDIQ)

1.2 Location of Work:

1.2.1 Not Applicable

1.3 Identification

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

3. REQUIREMENTS:

3.1 This work item is written as a repository for reports generated from Standard Items that are not tied to a specific work item.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

1 of 6 077-11-001

SHIP: PER DELIVERY ORDER (IDIQ) ITEM NO: 077-11-001

COAR: 26 PCN: EX01-0553

SWT FILE NO: 077-001 CMP: NONE

REVISED: 30 Jun 2015 PLANNER: PERRONE

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Resource Conservation and Recovery Act, (RCRA)

2.2 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act

2.3 Applicable Hazardous Waste, Manifest Form

2.4 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work

Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy, in hard copy or approved

transferrable media, of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

2 of 6 077-11-001

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship’s Force or Navy employees (termed Navy-Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVSOR’S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the NAVY) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of NAVY and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also site in the remarks block a generator identification number generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also site in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVSOR’S concurrence with the categorization of the waste as co-generated before completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining the approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor

3 of 6 077-11-001 generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during the performance of this Job Order:

AMOUNT

TYPE NAVY CO-GENERATED CONTRACTOR

Acid Solutions (may include N/A N/A N/A

Spent sulfamic, citric, Chromic, nitric, sulfuric, Hydrochloric, etc.)

Ethylene Glycol (Antifreeze) N/A N/A N/A

Sodium Hydroxide N/A N/A N/A

Cleaning Solvents N/A N/A 50 GALS

Sodium Phosphates (Tri, Bi, N/A N/A N/A

Or Mono)

Fluorocarbons N/A N/A N/A

Morpholine N/A N/A N/A

Sodium Chromates N/A N/A N/A

Hydrazine N/A N/A N/A

Methyl Ethyl Ketone N/A N/A N/A

Spent Abrasive Blast Material N/A N/A 12 TONS

(contaminated with a known

Hazardous waste)

Trichloroethane N/A N/A N/A

Miscellaneous Chemicals N/A N/A 100 LBS

(Ignitable)

4 of 6 077-11-001

Miscellaneous Chemicals N/A N/A N/A

(Corrosive)

Miscellaneous Chemicals N/A N/A N/A

(TCLP Toxic)

Miscellaneous Chemicals N/A N/A N/A

(Reactive)

Oil (Synthetic) N/A N/A N/A

Paints (Enamel, Latex, N/A N/A 1200 LBS

Epoxy, thinners, oil based, Rubber paint, nonskid, Lacquer, remover, varnishes)

Paints (May include lead, N/A N/A 20 LBS cadmium, or chrome)

Sludge (contaminated N/A N/A 100 GALS with a known hazardous waste)

Wool Felt (Contaminated N/A N/A N/A

With chromium and PCB’s)

Ventilation Debris/Residue N/A N/A N/A

(Heavy Metals, e.g., cadmium, Chromium)

Lead Debris N/A N/A 500 LBS

3.6 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

3.7 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.7.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.

3.7.1.1 Chemical analysis shall be accomplished by

laboratories with state or EPA approved quality assurance programs.

5 of 6 077-11-001

3.7.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

3.8 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

4.1.1 The types and amounts of wastes listed in 3.5 are

estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure – TCPL) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, fuel oil tanks, skegs (West Coast), PCB’s (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are

6 of 6 077-11-001 hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

1 of 10 191-11-001

SHIP: PER DELIVERY ORDER (IDIQ) ITEM NO: 191-11-001

COAR: 26 PCN: EX01-0556

LWT FILE NO: 191-01 CMP: NONE

1.1 Title: Lead Ballast Removal/Re-ballast/Installation; accomplish

1.2 Location of Work:

1.2.1 (As Per Delivery Order)

1.3 Identification

1.3.1 (As Per Delivery Order)

1.4 Security Classification of Equipment, Components, Spaces and Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program Operating Manual, DOD 5220.22−M (0584−LP−179−6400). Contractor shall also comply with the security requirements of Kings Bay NSB/Trident Refit Facility. All contractor employees shall require U.S. citizenship. This applies to vendor delivery personnel as well. Confidential security clearances are required for all Contractor personnel that will access the submarine.

1.4.1 Contractor shall access lead ballast work area in the Main

Ballast Tank, via drydock steps or elevator. At no time should the Contractor access the ship topside via gangway or other means.

Access to the ship topside by the Contractor is strictly forbidden.

Personnel found in unauthorized areas will be turned over to Trident Refit Facility Kings Bay (TRFKB) Security Department. Contractor Supervisors shall be required to attend a TRFKB Project Team orientation brief to discuss in detail the security requirements.

The Contractor shall be required to ensure all Contractor and Subcontractor personnel understand the security requirements of the work site. The Prime Contractor shall be responsible to ensure that all Subcontractor personnel meet all security requirements, and hold proper clearances to support availability.

2.1 Standard Items

2.2 29 CFR 1910.1025 Occupational Safety and Health Standards, Lead

2 of 10 191-11-001

2.3 29 CFR 1910.134 Occupational Safety and Health Standards, Respiratory Protection

2.4 NAVSHIPYDNORINST P5090.2 VOLUME II CHAPTER 38 Policy, Procedures and Requirements - Non Bulk Recovery Material Control

2.5 INDUSTRIAL PROCESS INSTRUCTION 992-454D Non-nuclear Temporary Services and Shipyard Support Systems for Naval Vessels

2.6 S6470-AA-SAF-010 Naval Maritime Confined Space Program

2.7 S9086-VC-STM-030/CH-631 Preservation of Ships in Service – Surface Ship/Submarine Applications

2.8 COMFLTFORCOMINST 4790.3 Joint Fleet Maintenance Manual

2.9 121-5583076 Rev D, SSGN-728 Weight Summary Lead Ballast

2.10 121-5767012 Rev D, SSBN-729 Weight Summary Lead Ballast

2.11 121-6165584 Rev D, SSBN-732 Weight Summary Lead Ballast

2.12 121-6319562 Rev C, SSBN-734 Weight Summary Lead Ballast

2.13 121-6543629 Rev B, SSBN-736 Weight Summary Lead Ballast

2.14 121-6543783 Rev B, SSBN-738 Weight Summary Lead Ballast

2.15 121-6691048 Rev A, SSBN-740 Weight Summary Lead Ballast

2.16 121-7006338 Rev A, SSBN-742 Weight Summary Lead Ballast

3. REQUIREMENTS:

3.1 Contractor shall ensure personnel involved with lead work are trained in accordance with 2.2 prior to commencement of work.

3.1.1 Contractor Safety Representative shall submit one legible copy, in hard copy or approved transferrable media, of a list of personnel that will be performing lead work and have current training as required by 2.2 to the SUPERVISOR.

3.1.1.1 Submit updates to the SUPERVISOR each time personnel

are added or deleted.

3.2 Provide electrical services and connect hookups or configure equipment to connect to existing Trident Refit Facility Kings Bay (TRFKB) water systems adjacent to the drydock or pier.

3.2.1 Identify special temporary services required to perform lead work to the TRFKB Submarine Project team a minimum of 14 days prior to start of work.

3.2.2 Route and maintain all temporary services in accordance with 2.5.

3 of 10 191-11-001

3.2.3 Provide a certified scale for the duration of the operation.

The scale shall remain on the work site until all lead work is complete.

3.2.4 TRFKB shall provide crane services. Notify the SUPERVISOR 48 hours in advance to schedule lifts.

3.3 Damage to systems, components or other items incurred through improper lead ballast handling/carelessness by the Contractor shall be repaired by the TRFKB Submarine Project Team at the Contractor's expense.

Contractor is to install adequate protection where required and conduct a pre-work inspection. The inspection is to ensure that all components are adequately protected in areas of lead work. Inspection shall be conducted with the Contractor, SUPERVISOR, TRFKB Tank Area Manager (TAM), and those parties deemed necessary by the TRFKB TAM. The Liability and Insurance Clause (AUG 2003), DFAR 252.217-7012, is in effect for loss or damage from each occurrence or incident at the time of the event. Some factors such as: the process or action that caused the damage, the amount and areas that the damage is in and when the damage was discovered will be considered.

(I)(G) “PRE-WORK INSPECTION""

3.3.1 The Contractor, SUPERVISOR, TRFKB Submarine Project Team, TRFKB TAM, and those parties deemed necessary by the TRFKB TAM shall perform a joint inspection of contract areas prior to executing additional work.

3.4 Interferences, including sound damping shall be identified by the Contractor to the SUPERVISOR. Interferences deemed necessary by TRFKB Submarine Project Team for removal will be removed/reinstalled by TRFKB Submarine Project Team.

3.5 Accomplish the following safety and health precautions:

3.5.1 Contractor Safety Representative shall review procedures and ensure proper safety and health controls are established and performed in accordance with 2.2 and 2.3.

3.5.2 Contractor shall perform air monitoring in accordance with 2.2.

3.5.3 Contractor personnel shall be informed that lead ballast handling, lead ballast cutting, or working in the same compartment with said processes ongoing, may expose personnel to airborne levels of lead at or above the Permissible Exposure Limit for lead as established in 2.2, and should utilize proper controls (e.g., engineering controls, Personal Protection Equipment [PPE], respiratory protection, change room/showers, etc.) as directed by the Contractor Safety Representative in accordance with 2.2 and 2.3.

4 of 10 191-11-001

3.5.4 To reduce potential exposure to employees in ballast tanks, Contractor shall ensure employee respirators are equipped with communication components to be fitted to the required respiratory equipment, as applicable, in accordance with 2.3.

3.5.5 The lead ballast shall be kept wet with water spray prior to handling and where necessary to prevent the generation and release of airborne lead oxide dust. Runoff from water used to spray lead/lead particles shall be contained/collected in accordance with

2.4 as directed by TRFKB Code 108, and disposed of in accordance with Work Item 077-11-001.

3.5.6 Boundaries shall be established, maintained, and posted by the Contractor in accordance with 2.2 while performing lead work operations in any area expected to exceed the medical surveillance action level (MSAL) of 0.03 milligrams per cubic meter of air.

3.5.6.1 Lead staging/storage areas for covered/protected

pallets of lead may be enclosed within a roped or taped boundary and identified as such. Lead staging/storage areas SHALL NOT be posted as a Lead Work Area.

3.5.7 Contractor Safety Representative shall establish a laydown area for personnel to remove outer PPE prior to leaving lead work boundary. Blowing with compressed air or dry sweeping/brushing to remove lead dust from clothing is prohibited in accordance with 2.2.

3.5.8 Contractor shall ensure all lead workers are required to wash their hands and face prior to eating, drinking or smoking in accordance with 2.2.

3.5.8.1 EMPLOYEES SHALL NOT BE PERMITTED TO EAT, DRINK OR

SMOKE IN THE LEAD WORK AREA

3.5.9 Before leaving TRFKB, Contractor personnel shall shower if required by 2.2.

3.5.9.1 Contractor shall provide appropriate shower/change

room facilities, soap and disposable towels in accordance with

2.2. The change room/shower facilities shall be utilized by

Contractor and TRFKB personnel during the performance of this Work Item when required by 2.2.

3.5.9.2 Shower facilities shall be equipped with a catch tank or other means capable of capturing shower drain water. Shower drain water shall be handled and disposed of in accordance with local requirements as designated by TRFKB Code 108 via the

SUPERVISOR.

3.5.9.3 Location of the change room/shower facilities shall

be as designated by the TRFKB Submarine Project Team via the

SUPERVISOR.

5 of 10 191-11-001

3.5.10 Notify the SUPERVISOR prior to performing any work that is expected to generate Recovery Material/Hazardous Waste (RM/HW). This is mandatory to identify the location of the work areas where RM/HW will be generated. Establish and properly post any Satellite Accumulation Area (SAA) in the drydock if collection of lead waste will be accumulated in UN Performance Oriented Packaging (POP) containers with watertight lids in accordance with 2.4. Storage areas will be authorized by TRFKB Code 108 and the containers shall be labeled in accordance with 2.4. Ensure the area is properly posted, containers are kept closed/secured at all times except when adding waste, and record an outage date on the container when the container reaches outage. Upon completion of packaging, the SUPERVISOR shall be contacted for disposal turnover requirements.

Notify TRFKB Code 108 via the SUPERVISOR the same day the container reached outage and was dated. Material in excess of 55 gallons for Satellite Accumulation Areas cannot be stored for longer than 72 hours in the SAA.

3.5.10.1 Lead contaminated PPE and other lead contaminated

waste shall be handled in accordance with 2.4 and disposed of in accordance with 3.5.10 and Work Item 077-11-001.

3.5.11 General area ventilation shall be installed in accordance with the requirements of 2.5. Ventilation exhaust to the atmosphere must be equipped with a high efficiency (HEPA) filter. Contractor shall provide HEPA ventilation. Monitoring of ventilation filter media with static pressure gages and maintenance procedures is required. Use backup filters with an automatic system for shut down with alarms or venting to the outside with provisions for makeup air in the event of a filter failure.

3.5.12 Maintain all surfaces in lead work areas as free as

practicable from accumulations of lead. Contractor shall ensure all lead cutting work surfaces are cleaned at least once per shift to prevent accumulation of lead dust. Use the following guidelines for clean-up:

3.5.12.1 Use vacuums designated for lead use equipped with

high efficiency particulate filter (HEPA VAC) to clean work surfaces of lead dust. Empty vacuums in a manner to minimize re-entry of lead into the workplace. Blowing down of work surfaces and tools for clean-up is PROHIBITED.

3.5.12.2 Wipe visible dust from work areas, floors, equipment and tools using wetted rags.

3.5.12.3 Use of shovel, wet sweeping, and brushing for lead

flakes, chips, and pieces shall be permitted only when vacuuming or other equally effective methods have been tried and found not to be effective.

6 of 10 191-11-001

3.5.13 Contractor shall ensure that all glue applications in

confined spaces are ventilated and performed in accordance with 2.6.

3.5.14 General exhaust ventilation required for adhesive

applications shall be in accordance with 2.5. Contractor Safety Representative shall ensure personnel utilize appropriate PPE and respiratory protection in accordance with 2.2.

3.6 Staging for entry into tank(s) listed in 1.2 will be provided by TRFKB. If staging is required to be modified, the contractor shall provide a 24 hour notice to SUPERVISOR.

3.7 Remove lead ballast, liners and petroleum based products from tank(s) listed in 1.2 at locations identified in 1.3 utilizing 2.9 through 2.16 for information and guidance.

3.7.1 Exercise care when handling lead ballast in order to

eliminate damage to lead bin and surrounding structure.

3.7.1.1 Ship structure (hydrophones, cables, etc.) are to be

wrapped/shielded to prevent damage.

3.7.2 After removal, lead/liners is to be placed on Contractor furnished pallets. If pallets are constructed of wood, all lumber and plywood shall be fire-retardant conforming to MIL L 19140E.

Lead/liners is to be kept segregated from any other lead/liners;

lead/liners from different lead ballast bins are not to be mixed.

Pallets shall be marked and tagged to identify location that lead was removed from. After removal of lead from each location listed in 1.3, lead shall be weighed by Contractor, witnessed by TRFKB and data verified by TRFKB. After completion of weighing of lead/liners, Contractor is to transport lead to laydown area. Laydown area is to be provided by TRFKB. If review of weight data sheets is determined unsatisfactory, TRFKB Project Team will notify Contractor via the SUPERVISOR and will determine required resolution (for example, remove or install lead ballast to reach initial quantity of lead ballast weight specified). Contractor shall provide certified scales to accomplish this task. Weight data sheets will be filled out by Contractor and provided to TRFKB via the SUPERVISOR for review and final acceptance.

3.7.2.1 Capture petroleum based products removed in way of

cleaning each lead bin. After removal from each lead bin, petroleum shall be weighed and data recorded by TRFKB personnel.

3.7.2.2 Laydown areas will be provided by TRFKB Submarine

Project Team. All specific equipment dimensions must be provided to TRFKB Submarine Project Team via the SUPERVISOR no later than five days after award to allow for specific allocation of space. Lay down areas are solely for material needed to support current work evolutions and are not intended

7 of 10 191-11-001 for long term storage. All material shall be kept to a minimum.

The lay down area shall not be used for conex boxes unless approved by TRFKB Submarine Project Team via the SUPERVISOR.

Vehicles are not to be parked in any area intended for material storage. Contractor shall maintain Shipyard cleanliness requirements in laydown areas. If conex boxes are approved for use, no material shall be stored around, between or on top of conex boxes. A source of electricity and phone services will be provided by TRFKB for approved conex boxes. Services for conex boxes will be installed/maintained/removed by contractor.

3.7.3 All stored lead shall be protected from the weather.

Contractor shall provide material and services to cover, label with location/weight, and band lead placed on pallets to protect lead from the weather.

3.7.4 Accomplish cleaning of each lead pig, to remove oxidation and other foreign matter. Cleaning to be accomplished by melting, scraping, or hydro-blasting. Scraping is the preferred method of cleaning and shall be utilized when possible. If melting will be the method of cleaning/repair, TRFKB Code 108 must be notified via the

SUPERVISOR.

3.7.5 Clean lead bin pockets where lead was removed utilizing scrapers, rags, and Simple Green Liquid. Stage pipes, stage boards, and general work area will be cleaned/covered/protected to prevent the spread of Petrolatum. All petroleum based products are detrimental to preservation processes.

3.7.5.1 If using Simple Green Liquid or other solvent, ventilation shall be installed in accordance with 2.5.

3.7.5.2 Satisfactory cleanliness is defined as lead bin

pocket being grease free and satisfactory for hot work. All areas of work site including staging (boards and piping), dry dock floor, and plastic drop clothes are to be clean and grease free.

3.7.5.3 Notify SUPERVISOR that lead bins are clean and ready

for inspection.

(I)(G) "CLEANLINESS INSPECTION"

3.7.6 Accomplish a cleanliness inspection of lead bins.

Inspections shall be accomplished by the Contractor, SUPERVISOR, TRFKB Tank Manager (TAM), and those parties deemed necessary by the TRFKB Submarine Project Team.

3.7.6.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.7.6 to the SUPERVISOR.

8 of 10 191-11-001

3.7.7 TRFKB will provide welding services required for canning plate removal on lead bins.

3.8 The Contractor shall furnish all lead cutting equipment.

3.8.1 The Contractor shall provide a containment/facility at the forward end or aft end of the drydock for cutting and containing lead. Containments/facilities shall be capable of meeting the requirements of 2.2.

3.8.1.1 Locations for the containments/facilities shall be as designated by the TRFKB Submarine Project Team via the

SUPERVISOR.

3.9 Receive lead ballast and liners for tanks listed in 1.2 from TRFKB Submarine Project Team via the SUPERVISOR.

3.9.1 Laydown areas will be provided by TRFKB Submarine Project Team. All specific equipment dimensions must be provided to TRFKB Submarine Project Team via the SUPERVISOR no later than 5 days after Task Order award to allow for specific allocation of space. Laydown areas are solely for material needed to support current work evolutions and are not intended for long term storage. All material shall be kept to a minimum. The laydown area shall not be used for conex boxes unless approved by TRFKB Submarine Project Team via the SUPERVISOR. Vehicles are not to be parked in any area intended for material storage. Contractor shall maintain TRFKB cleanliness requirements in laydown areas. If conex boxes are approved for use, no material shall be stored around, between, or on top of conex boxes. A source of electricity and phone services will be provided by TRFKB Submarine Project Team for approved conex boxes. Services for conex boxes shall be installed/maintained/removed by Contractor.

3.9.2 All stored lead shall be protected from the weather.

Contractor shall provide material and services to secure and protect lead from the weather. No stored lead pigs shall be larger than 9- 3/8 inches in length. Contractor shall cut lead pigs to a size of 9- 3/8 inch or less prior to installation.

3.10 Install lead ballast with liners in tanks listed in 1.2 in quantities and at locations listed in 1.3 for re-ballasting, using 2.9 through 2.16 for guidance. Installation of lead shall be accomplished after preservation of lead bins and as designated by the TRFKB Submarine Project Team via the SUPERVISOR and the following:

3.10.1 Contractor shall install glued liners, lead ballast, with lead shims (cut to suit by contractor) where necessary, to ensure a good fit and compaction rate within the lead ballast bin. Liners shall be installed and glued in place in accordance with Table 8-18 Note 5 of 2.7. No lead pigs shall be installed that are larger than 9-3/8 inches in length. Contractor shall cut lead pigs to a size of 9-3/8 inch or less prior to installation. When stacking lead pigs

9 of 10 191-11-001 and shims into lead bins, make sure lead pigs and shims are stacked level, there is no space between lead pigs and shims, and the faces and tops of the bays are flat to ensure canning plates can be installed. TRFKB Submarine Project Team Structural Zone Manager/Code 413 will provide final acceptance of lead installation. TRFKB Submarine Project Team personnel will be available to provide guidance. Lead is to be kept segregated from any other lead; lead from different lead ballast bins shall not be mixed. The contractor shall weigh and record data for liners/lead ballast, including lead shims, installed by the contractor. TRFKB Code 413 shall witness the weighing and recording of data for liners/lead ballast, including lead shims, installed by the Contractor. If review of weight data sheet is determined to be unsatisfactory, TRFKB Submarine Project Team will notify Contractor via the SUPERVISOR of required resolution (for example, remove or install lead ballast to reach initial quantity of lead ballast weight specified). Contractor shall provide certified scales to accomplish this task. TRFKB Submarine Project Team personnel shall provide weight data sheets for each lead ballast bin to NNSY Design Division (Code 253) for review.

3.10.2 Contractor is to exercise care when handling lead ballast in order to eliminate damage to lead bins and surrounding structure.

3.10.2.1 Ship structure (hydrophones, cables, etc.) shall be

wrapped/shielded to prevent damage.

3.10.3 TRFKB Submarine Project Team will install canning plates and will provide welding services required for canning plate installations on lead bins.

3.10.3.1 TRFKB Submarine Project Team and Contractor shall

accomplish a lead installation mock up for each lead bin listed in 1.3, as designated by the SUPERVISOR, to determine exact height of canning plates installation.

3.10.4 TRFKB Submarine Project Team will provide lead for

reballasting/installation.

3.10.5 TRFKB Submarine Project Team will provide material for new liners to Contractor.

3.10.6 Lead that is not installed, excluding scrap lead, shall be placed on pallets. Contractor shall provide material and services to secure and protect lead from the weather. Pallets shall be shrink wrapped and turned over to TRFKB for long term storage.

3.11 Crane and rigging services will be provided by TRFKB to remove all lead removed in 3.7, including lead to be scrapped, from drydock floor to pier side. All other rigging and forklift services are to be accomplished by the Contractor. Crane services will be provided on weekdays and weekends as required. Weekend lifts will be accomplished to support Schedule at TRFKB Submarine Project Team discretion. The Contractor

10 of 10 191-11-001 representative must make lift notifications 24 hours prior to need during the TRFKB Project Team meeting. Weekend crane lifts shall be requested by noon on Thursday of the week preceding the weekend lift due to overtime considerations. TRFKB will attempt to perform the lift within the requested shift (eight hour timeframe) based on the logistics of the total number of pieces of equipment or material requested to be lifted within the shift. All contractor furnished equipment must have the empty weight and full weight clearly marked on it with sketches for lifting attachments and certifications of attachment points.

3.12 Accomplish lead ballast handling in accordance with 2.2 through 2.5.

3.13 Contractor is responsible for scrapping any lead that is deemed unusable by the SUPERVISOR and/or TRFKB.

3.14 All lead deemed usable by the SUPERVISOR and/or TRFKB shall be routed to the nearest Naval Property Administrator.

3.15 All work shall be in accordance with local, regional, state, and federal rules and regulations regarding safety, health, and the environment.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

DRYDOCK REQUIRED

1 of 4 631-13-001

SHIP: PER DELIVERY ORDER (IDIQ) ITEM NO: 631-13-001

1.1 Title: Submarine Main Ballast Tank; preserve (IDIQ)

1.2 Location of Work:

1.2.1 Interior of Main Ballast Tank 1A (AS PER DELIVERY ORDER)

1.2.2 Interior of Main Ballast Tank 1B (AS PER DELIVERY ORDER)

1.2.3 Interior of Main Ballast Tank 2A (AS PER DELIVERY ORDER)

1.2.4 Interior of Main Ballast Tank 2B (AS PER DELIVERY ORDER)

1.2.5 Interior of Main Ballast Tank 3A (AS PER DELIVERY ORDER)

1.2.6 Interior of Main Ballast Tank 3B (AS PER DELIVERY ORDER)

1.2.7 Interior of Main Ballast Tank 4A (AS PER DELIVERY ORDER)

1.2.8 Interior of Main Ballast Tank 4B (AS PER DELIVERY ORDER)

1.2.9 Interior of Main Ballast Tank 5A (AS PER DELIVERY ORDER)

1.2.10 Interior of Main Ballast Tank 5B (AS PER DELIVERY ORDER)

1.2.11 Interior of Main Ballast Tank 6 (AS PER DELIVERY ORDER)

1.3 Identification

1.3.1 (As Per Delivery Order)

1.4 Security Classification of Equipment, Components, Spaces and Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program Operating Manual, DOD 5220.22−M (0584−LP−179−6400).

1.4.1 Spaces: Interior and Topside of the Submarine. The Waterfront Restricted Area (WRA) is to be considered a Level 3 Area and Treated as a Controlled and Restricted Industrial Area. Personnel must have Proper Clearances to Accomplish Work within the WRA. All Personnel will be required to have the Proper Clearances (Confidential or Secret only for access to the interior of the submarine−Excluding those Areas Accessed from the Drydock) or a completed Facility

2 of 4 631-13-001

Access Determination (FAD). The Prime Contractor shall be responsible to ensure that all Sub−Contractor Personnel meet all Security Requirements, and hold Proper Clearances to Support the Availability. (CONFIDENTIAL)

2. REFERENCES:

2.1 Standard Items

2.2 Systems and Specifications, SSPC Painting Manual, Volume 2

3. REQUIREMENTS:

(V) (G) “VERIFY PROTECTIVE MEASURES”

3.1 All protective measures are to be in place prior to the start of any contamination−producing operations and shall remain in place until the contamination−producing operations are complete. Note: This (V)(G) Checkpoint replaces the (V) Checkpoint in paragraph 3.2.3 of 009−06 of 2.1

(V) (G) “VISUAL INSPECTION”

3.2 Conduct a visual inspection of non-steel dampening and acoustic restraining covers (Septum Plates), with the SUPERVISOR and TRF representative, to establish existing condition of Septum plates.

3.2.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.

3.3 Accomplish the requirements of 009−32 of 2.1, including Table 8, Line 10 and 11 for total preservation of the interior surfaces, including plating, framing, foundations, air flasks, piping, pipe hangers, flood grates at tank openings, appendages and normally painted surfaces therein, in each location listed in 1.2.

3.3.1 Non−steel damping and acoustic restraining covers (Septum Plates) are not intended to be painted. Accidental overspray is acceptable. Ensure that paint does not bridge the gap between the rubber and the restraining cover over more than 75 percent of the edge of each tile. DO NOT DAMAGE TILES.

3.3.2 Surface preparation for piping one inch in diameter and over to be SSPC−SP−7 of 2.2 (Brush off Blast Cleaning). Surface preparation for piping under 1 inch diameter, and H.P. Air/Gas Piping to be SSPC−SP 2 of 2.2 (Hand tool cleaning). DO NOT DAMAGE

PIPING.

3.3.3 Submit one legible copy, in hard copy or approved

transferrable media, of a report notifying the SUPERVISOR 48 hours prior to completion of surface preparation.

3 of 4 631-13-001

3.3.4 Suspend operations upon completion of surface preparation and provide access for up to 10 working days for normal Refits and Docking Availabilities and up to 21 working days for ERP and SSGN availabilities, for the accomplishment of Government inspection and repairs.

3.3.5 Upon completion of Government inspection/repair, the surfaces shall be reactivated by abrasive blasting, power or hand tool cleaning to re−establish original prepared conditions as specified in 3.3.

3.3.6 To prevent operating problems; preservation of the vent valves vertical surface between the seating surface and outer hull shall consist of hand tool cleaning (SSPC-SP 2) to the maximum extent, apply two contrasting coats of MIL-PRF-23236, topcoat to be black at 4 to 6 mils DFT per coat. Preservation of the vent valve vertical surface below the seating surface which ties into the newly applied high solids paint system shall consist of hand tool cleaning (SSPC-SP 2) to the maximum extent, apply two coats of MIL-PRF-23236, Type VI, Class 5 or 7 at 4 to 6 mils DFT per coat and shall overlap the newly applied high solids coating on the vertical edge.

3.4 Accomplish the requirements of 009−32 of 2.1 including Table 8, Line 10 and 11 for partial preservation of the interior surfaces, including plating, framing, foundations, air flasks, piping, pipe hangers, flood grates at tank openings, appendages and normally painted surfaces therein, in each location listed in 1.2, as designated by the SUPERVISOR.

3.4.1 Surface preparation for partial preservation shall be in accordance with Table 8, Lines 10 and 11. SSPC-SP11 is acceptable for areas originally requiring a NACE 2/SSPC-SP 10 or NACE 5/SSPC-SP 12.

3.4.1.1 Surface preparation for all piping shall be SSPC−SP 2 of 2.2 (Hand tool cleaning). DO NOT DAMAGE PIPING.

3.4.2 Non−steel damping and acoustic restraining covers (Septum Plates) are not intended to be painted. Accidental overspray is acceptable. Ensure that paint does not bridge the gap between the rubber and the restraining cover over more than 75 percent of the edge of each tile. DO NOT DAMAGE TILES.

(V) (G) “VISUAL INSPECTION”

3.5 Conduct a visual inspection of non-steel dampening and acoustic restraining covers (Septum Plates), with the SUPERVISOR and TRF representative, to verify final condition of Septum plates.

3.5.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.

4 of 4 631-13-001

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 Removal and reinstallation of interferences will be accomplished by the Government when the interferences are agreed to by the SUPERVISOR as being reasonable. Temporary metal blanks and plugs used as Foreign Material Exclusion (FME) will be provided by the Government.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

1 of 4 631-13-002

SHIP: PER DELIVERY ORDER (IDIQ) ITEM NO: 631-13-002

1.1 Title: Submarine Mud Tank, Torpedo Tube Recess (Including Doors), Secondary Propulsion Motor Recesses (Port and Starboard), Torpedo Ejection Pump Recesses (Port and Starboard); preserve (IDIQ)

1.2 Location of Work:

1.2.1 Interior of the Mud Tank, Frame 161 to 168 (AS PER DELIVERY

ORDER)

1.2.2 Interior of the Port Torpedo Tube Recesses (Including

Doors) Frame 10 to 20 (AS PER DELIVERY ORDER)

1.2.3 Interior of the Starboard Torpedo Tube Recesses (Including Doors) Frame 10 to 20 (AS PER DELIVERY ORDER)

1.2.4 Interior of Port Secondary Propulsion Motor Recess (AS PER

DELIVERY ORDER)

1.2.5 Interior of Starboard Secondary Propulsion Motor Recess (AS

PER DELIVERY ORDER)

1.2.6 Interior of Port Torpedo Ejection Pump Recess

(Approximately 445 Square Feet) (AS PER DELIVERY ORDER)

1.2.7 Interior of Starboard Torpedo Ejection Pump Recess

(Approximately 445 Square Feet) (AS PER DELIVERY ORDER)

1.3 Identification

1.3.1 Not Applicable

1.4 Security Classification of Equipment, Components, Spaces and Documents: The Equipment, Space or Document is classified and subject to the applicable provisions of the National Industrial Security Program Operating Manual, DOD 5220.22−M (0584−LP−179−6400).

1.4.1 Spaces: Interior and Topside of the Submarine. The

Waterfront Restricted Area (WRA) is to be considered a Level 3 Area and Treated as a Controlled and Restricted Industrial Area.

Personnel must have Proper Clearances to Accomplish Work within the WRA. All Personnel will be required to have the Proper Clearances (Confidential or Secret only for access to the interior of the submarine−Excluding those Areas Accessed from the Drydock) or a completed Facility Access Determination (FAD). The Prime

2 of 4 631-13-002

Contractor shall be responsible to ensure that all Sub−Contractor Personnel meet all Security Requirements, and hold Proper Clearances to Support the Availability. (CONFIDENTIAL)

2. REFERENCES:

2.1 Standard Items

2.2 Systems and Specifications, SSPC Painting Manual, Volume 2

3. REQUIREMENTS:

(V) (G) “VERIFY PROTECTIVE MEASURES”

3.1 All protective measures are to be in place prior to the start of any contamination−producing operations and shall remain in place until the contamination−producing operations are complete. Note: This (V)(G) Checkpoint replaces the (V) Checkpoint in paragraph 3.2.3 of 009−06 of 2.1

(V) (G) “VISUAL INSPECTION”

3.2 Conduct a visual inspection of non-steel dampening and acoustic restraining covers (Septum Plates), with the SUPERVISOR and TRF representative, to establish existing condition of Septum plates.

3.2.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.

3.3 Accomplish the requirements of 009−32 of 2.1, including Table 8, Line 21 for total preservation of the interior surfaces, including plating, framing,…