Base Year (CLIN 1001)
| CLIN 1001 | Description | UI | Est Qty | Unit Price |
| Control Hazardous Waste Produced on Naval Vessels in accordance with 077-11-001 | ||||
| AA | Accomplish Control of Hazardous Material In accordance with paragraphs 3.1 through 3.8 | Each | 1 | |
| Remove/Replace/Install Submarine Lead Ballast in accordance with 191-11-001 | ||||
| AB | Accomplish preparation for lead removal and/or installation in accordance with paragraphs 3.1 through 3.6 and 3.11 through 3.15 | Each | 1 | |
| AC | Remove lead ballast (One Long Ton) in accordance with paragraph 3.7. | Each | 1 | |
| AD | Remove lead ballast (2 Long Tons) in accordance with paragraph 3.7. | Each | 1 | |
| AE | Remove lead ballast (5 Long Tons) in accordance with paragraph 3.7. | Each | 1 | |
| AF | Remove lead ballast (10 Long Tons) in accordance with paragraph 3.7. | Each | 1 | |
| AG | Install lead ballast (One Long Ton) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| AH | Install lead ballast (2 Long Tons) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| AJ | Install lead ballast (5 Long Tons) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| AK | Install lead ballast (10 Long Tons) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| Preserve Submarine Main Ballast Tank in accordance with Work Specification 634-13-001 | ||||
| AL | Accomplish total preservation of MBT 1A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.1) | Each | 1 | |
| AM | Accomplish total preservation of MBT 1B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.2) | Each | 1 | |
| AN | Accomplish total preservation of MBT 2A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.3) | Each | 1 | |
| AP | Accomplish total preservation of MBT 2B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.4) | Each | 1 | |
| AQ | Accomplish total preservation of MBT 3A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.5) | Each | 1 | |
| AR | Accomplish total preservation of MBT 3B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.6) | Each | 1 | |
| AS | Accomplish total preservation of MBT 4A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.7) | Each | 1 | |
| AT | Accomplish total preservation of MBT 4B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.8) | Each | 1 | |
| AU | Accomplish total preservation of MBT 5A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.9) | Each | 1 | |
| AV | Accomplish total preservation of MBT 5B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.10) | Each | 1 | |
| AW | Accomplish total preservation of MBT 6 in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.11) | Each | 1 | |
| AX | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| AY | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| AZ | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| BA | Accomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| Preserve Submarine Mud Tank, Torpedo Tube Recesses (Including Doors), Secondary Propulsion Motor Recesses, Torpedo Ejection Pump Recesses in accordance with Work Specification 631-13-002 | ||||
| BB | Accomplish total preservation of Mud Tank in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.1) | Each | 1 | |
| BC | Accomplish total preservation of Port Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.2) | Each | 1 | |
| BD | Accomplish total preservation of Starboard Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.3) | Each | 1 | |
| BE | Accomplish total preservation of Port Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.4) | Each | 1 | |
| BF | Accomplish total preservation of Starboard Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.5) | Each | 1 | |
| BG | Accomplish total preservation of Port Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.6) | Each | 1 | |
| BH | Accomplish total preservation of Starboard Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.7) | Each | 1 | |
| BJ | Accomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6 | Each | 1 | |
| BK | Accomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6 | Each | 1 | |
| Preserve Submarine Chain Locker and Sump, Sonar Penetrant Splice Trunk, MSS Recesses, Sonar Dome Access, Sonar Cavity, Sonar Tube Fairing in accordance with Work Specification 631-13-003 | ||||
| BL | Accomplish total preservation of Chain Locker and Sump in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.1) | Each | 1 | |
| BM | Accomplish total preservation of Sonar Penetrant Splice Trunk in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.2) | Each | 1 | |
| BN | Accomplish total preservation of MSS Recesses in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.3) | Each | 1 | |
| BP | Accomplish total preservation of Sonar Dome Access in accordance with paragraphs3.1 through 3.3, 3.5, and 3.6 (1.2.4) | Each | 1 | |
| BQ | Accomplish total preservation of Sonar Cavity in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.5) | Each | 1 | |
| BR | Accomplish total preservation of Sonar Tube Fairing in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.6) | Each | 1 | |
| BS | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| BT | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| BU | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| Preserve Auxiliary (AUX) Tanks, Depth Control Tank, Forward Trim Tank in accordance with Work Specification 631-13-004 | ||||
| BV | Accomplish total preservation of Aux Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.1) | Each | 1 | |
| BW | Accomplish total preservation of Aux Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.2) | Each | 1 | |
| BX | Accomplish total preservation of Aux Tank 3 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.3) | Each | 1 | |
| BY | Accomplish total preservation of Aux Tank 4 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.4) | Each | 1 | |
| BZ | Accomplish total preservation of Aux Tank 5 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.5) | Each | 1 | |
| CA | Accomplish total preservation of Aux Tank 6 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.6) | Each | 1 | |
| CB | Accomplish total preservation of Aux Tank 2A in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.7) | Each | 1 | |
| CC | Accomplish total preservation of Aux Tank 2B in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.8) | Each | 1 | |
| CD | Accomplish total preservation of Aux Tank 5 in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.9) | Each | 1 | |
| CE | Accomplish total preservation of Depth Control Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.10) | Each | 1 | |
| CF | Accomplish total preservation of Depth Control Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.11) | Each | 1 | |
| CG | Accomplish total preservation of Forward Trim Tank in accordance with paragraphs 3.2 through 3.4, 3.6, and 3.7. (1.2.12) | Each | 1 | |
| CH | Accomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7. | Each | 1 | |
| CJ | Accomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7. | Each | 1 | |
| Preserve Sanitary Tank in accordance with Work Specification 631-13-005 | ||||
| CK | Accomplish total preservation of Sanitary Tank One in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.1) | Each | 1 | |
| CL | Accomplish total preservation of Sanitary Tank 2 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.2) | Each | 1 | |
| CM | Accomplish total preservation of Sanitary Tank 3 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.3) | Each | 1 | |
| CN | Accomplish total preservation of Sanitary Tank 4 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.4) | Each | 1 | |
| CP | Accomplish total preservation of Sanitary Tank 5 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.5) | Each | 1 | |
| CQ | Accomplish total preservation of Sanitary Tank 6 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.6) | Each | 1 | |
| CR | Accomplish total preservation of Sanitary Tank 7 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.7) | Each | 1 | |
| CS | Accomplish total preservation of Sanitary Tank 8 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.8) | Each | 1 | |
| CT | Accomplish total preservation of Sanitary Tank 9 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.9) | Each | 1 | |
| CU | Accomplish total preservation of Sanitary Tank 10 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.10) | Each | 1 | |
| CV | Accomplish total preservation of Sanitary Tank 11 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.11) | Each | 1 | |
| CW | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5. | Each | 1 | |
| CX | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5. | Each | 1 | |
| Preserve Missile Compensating Tank, Main Induction Sump Tank in accordance with Work Specification 631-13-006 | ||||
| CY | Accomplish total preservation of Forward Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.1) | Each | 1 | |
| CZ | Accomplish total preservation of Aft Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5(1.2.2) | Each | 1 | |
| DA | Accomplish total preservation of Main Induction Sump Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.2) | Each | 1 | |
| DB | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5 | Each | 1 | |
| DC | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5 | Each | 1 | |
| DD | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5 | Each | 1 | |
| Preserve Torpedo Impulse Tank in accordance with Work Specification 631-13-007 | ||||
| DE | Accomplish total preservation of Torpedo Impulse Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| DF | Accomplish total preservation of Torpedo Impulse Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2) | Each | 1 | |
| DG | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| DH | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| DJ | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| Preserve Potable Water Tank in accordance with Work Specification 631-13-008 | ||||
| DK | Accomplish total preservation of Potable Water Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| DL | Accomplish total preservation of Potable Water Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2) | Each | 1 | |
| DM | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| DN | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| Preserve Drain Collecting Tank in accordance with Work Specification 631-13-009 | ||||
| DP | Accomplish total preservation of Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| DQ | Accomplish total preservation of Non-Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2) | Each | 1 | |
| DR | Accomplish total preservation of Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.3) | Each | 1 | |
| DS | Accomplish total preservation of Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.4) | Each | 1 | |
| DT | Accomplish total preservation of Non-Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.5) | Each | 1 | |
| DU | Accomplish total preservation of Non-Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.6) | Each | 1 | |
| DV | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4 | Each | 1 | |
| DW | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4 | Each | 1 | |
| Preserve Forward and Aft Superstructure in accordance with Work Specification 631-13-010 | ||||
| DX | Accomplish total preservation of frame 22 to 32 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.1) | Each | 1 | |
| DY | Accomplish total preservation of frame 32 to 37 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.2) | Each | 1 | |
| DZ | Accomplish total preservation of frame 37 to 42 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.3) | Each | 1 | |
| EA | Accomplish total preservation of frame 42 to 50 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.4) | Each | 1 | |
| EB | Accomplish total preservation of frame 50 to 52 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.5) | Each | 1 | |
| EC | Accomplish total preservation of frame 52 to 62 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.6) | Each | 1 | |
| ED | Accomplish total preservation of frame 62 to 71 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.7) | Each | 1 | |
| EE | Accomplish total preservation of frame 71 to 80 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.8) | Each | 1 | |
| EF | Accomplish total preservation of frame 80 to 84 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.9) | Each | 1 | |
| EG | Accomplish total preservation of frame 84 to 94 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.10) | Each | 1 | |
| EH | Accomplish total preservation of frame 94 to 105 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.11) | Each | 1 | |
| EJ | Accomplish total preservation of frame 105 to 113 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.12) | Each | 1 | |
| EK | Accomplish total preservation of frame 113 to 118 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.13) | Each | 1 | |
| EL | Accomplish total preservation of frame 118 to 128 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.14) | Each | 1 | |
| EM | Accomplish total preservation of the Sail (including Diving Planes), frame 32 to 52 in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.15) | Each | 1 | |
| EN | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7 | Each | 1 | |
| EP | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7 | Each | 1 | |
| EQ | Accomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7 | Each | 1 | |
| ER | Accomplish Nonskid replacement (Per Square Foot) in accordance with paragraphs 3.2, 3.6, and 3.7 (1.2.12, 1.2.13) | Each | 2500 | |
| Preserve Underwater Hull in accordance with Work Specification 631-13-011 | ||||
| ES | Accomplish total preservation of underwater hull up to the upper limits of the boottopping, excluding the bow dome (5,000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| ET | Accomplish total preservation of Horizontal and Vertical Stabilizers and Fairings in accordance with paragraphs 3.1, 3.2 and 3.4 (1.2.2) | Each | 1 | |
| EU | Accomplish total preservation of Upper and Lower Rudders, including the interior of the rudder light recess, in accordance with paragraphs 3.1, 3.3 and 3.4 (1.2.3) | Each | 1 | |
| Preserve Underwater Recesses, Sonar Sphere Support Structure, Stern Planes in accordance with Work Specification 631-13-012 | ||||
| EV | Accomplish total preservation of Active Emissions Detector Recess, frame 23 to 24 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.1) | Each | 1 | |
| EW | Accomplish total preservation of Hydrophone U52 Transducer Speed Indicator Recess, frame 26 to 27 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.2) | Each | 1 | |
| EX | Accomplish total preservation of MPTP/VPRS Transducer Recess, frame 22, Group C in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.3) | Each | 1 | |
| EY | Accomplish total preservation of Depth Sounder Transducer Recess, frame 22 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.4) | Each | 1 | |
| EZ | Accomplish total preservation of ELF Stowage Recess, frame 140 to 142 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.5) | Each | 1 | |
| FA | Accomplish total preservation Pintle Bearing Recess, frame 165 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.6) | Each | 1 | |
| FB | Accomplish total preservation of Sonar Tube Cable Guide Foundation Recess, frame 24 port in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.7) | Each | 1 | |
| FC | Accomplish total preservation of Stern Planes, port and starboard, to include upper and lower recesses in accordance with paragraphs 3.1, 3.3, and 3.6 (1.2.8) | Each | 1 | |
| FD | Accomplish total preservation of Sonar Sphere Support Structure, inside dome in accordance with paragraphs 3.1, 3.4, and 3.6 (1.2.9) | Each | 1 | |
| FE | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| FF | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| FG | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| FH | Accomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| Accomplish Cleaning and Pumping in accordance with Work Specification 992-31-001 | ||||
| FJ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1A (1.2.1) | Each | 1 | |
| FK | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1B (1.2.2) | Each | 1 | |
| FL | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2A (1.2.3) | Each | 1 | |
| FM | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2B (1.2.4) | Each | 1 | |
| FN | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3A (1.2.5) | Each | 1 | |
| FP | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3B (1.2.6) | Each | 1 | |
| FQ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4A (1.2.7) | Each | 1 | |
| FR | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4B (1.2.8) | Each | 1 | |
| FS | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5A (1.2.9) | Each | 1 | |
| FT | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5B (1.2.10) | Each | 1 | |
| FU | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 6 (1.2.11) | Each | 1 | |
| FV | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Mud Tank (1.2.12) | Each | 1 | |
| FW | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Starboard Torpedo Tube Recess (Including Doors) (1.2.13) | Each | 1 | |
| FX | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Port Torpedo Tube Recess (Including Doors) (1.2.14) | Each | 1 | |
| FY | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Anchor Chain Locker and Sump (1.2.15) | Each | 1 | |
| FZ | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank One (1.2.16) | Each | 1 | |
| GA | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2 (1.2.17) | Each | 1 | |
| GB | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 3 (1.2.18) | Each | 1 | |
| GC | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 4 (1.2.19) | Each | 1 | |
| GD | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 (1.2.20) | Each | 1 | |
| GE | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 6 (1.2.21) | Each | 1 | |
| GF | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2A in SSGN Class Submarine (1.2.22) | Each | 1 | |
| GG | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2B in SSGN Class Submarine (1.2.23) | Each | 1 | |
| GH | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 in SSGN Class Submarine (1.2.24) | Each | 1 | |
| GJ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank One (1.2.25) | Each | 1 | |
| GK | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank 2 (1.2.26) | Each | 1 | |
| GL | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Trim Tank (1.2.27) | Each | 1 | |
| GM | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank One (1.2.28) | Each | 1 | |
| GN | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 2 (1.2.29) | Each | 1 | |
| GP | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 3 (1.2.30) | Each | 1 | |
| GQ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 4 (1.2.31) | Each | 1 | |
| GR | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 5 (1.2.32) | Each | 1 | |
| GS | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 6 (1.2.33) | Each | 1 | |
| GT | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 7 (1.2.34) | Each | 1 | |
| GU | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 8 (1.2.35) | Each | 1 | |
| GV | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 9 (1.2.36) | Each | 1 | |
| GW | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 10 (1.2.37) | Each | 1 | |
| GX | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 11 (1.2.38) | Each | 1 | |
| GY | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Missile Compensating Tank (1.2.39) | Each | 1 | |
| GZ | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Aft Missile Compensating Tank (1.2.40) | Each | 1 | |
| HA | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Induction Sump Tank (1.2.41) | Each | 1 | |
| HB | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank One (1.2.42) | Each | 1 | |
| HC | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank 2 (1.2.43) | Each | 1 | |
| HD | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank One (1.2.44) | Each | 1 | |
| HE | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank 2 (1.2.45) | Each | 1 | |
| HF | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Oily Drain Collecting Tank (1.2.46) | Each | 1 | |
| HG | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Non-Oily Drain Collecting Tank (1.2.47) | Each | 1 | |
| HH | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number One Oily Drain Collecting Tank (1.2.48) | Each | 1 | |
| HJ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number 2 Oily Drain Collecting Tank (1.2.49) | Each | 1 | |
| HK | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number One Non-Oily Drain Collecting Tank (1.2.50) | Each | 1 | |
| HL | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number 2 Non-Oily Drain Collecting Tank (1.2.51) | Each | 1 | |
| HM | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure/Sail Area, frame 22 to 32 (1.2.52) | Each | 1 | |
| HN | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 32 to 37 (1.2.53) | Each | 1 | |
| HP | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area,, frame 37 to 42 (1.2.54) | Each | 1 | |
| HQ | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 42 to 50 (1.2.55) | Each | 1 | |
| HR | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 50 to 52 (1.2.56) | Each | 1 | |
| HS | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 52 to 62 (Missile Bay One) (1.2.57) | Each | 1 | |
| HT | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 62 to 71 (Missile Bay 2) (1.2.58) | Each | 1 | |
| HU | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 71 to 80 (Missile Bay 3) (1.2.59) | Each | 1 | |
| HV | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 80 to 84 (Missile Bay 4) (1.2.60) | Each | 1 | |
| HW | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 84 to 94 (Buoy Area) (1.2.61) | Each | 1 | |
| HX | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure/Sail Area, frame 94 to 102 (1.2.62) | Each | 1 | |
| HY | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 105 to 113 (1.2.63) | Each | 1 | |
| HZ | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 113 to 118 (1.2.64) | Each | 1 | |
| JA | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 118 to 128 (1.2.65) | Each | 1 |
$ - 0
Option Year One (CLIN 1002)
| CLIN 1002 | Description | UI | Est Qty | Unit Price |
| Control Hazardous Waste Produced on Naval Vessels in accordance with 077-11-001 | ||||
| AA | Accomplish Control of Hazardous Material In accordance with paragraphs 3.1 through 3.8 | Each | 1 | |
| Remove/Replace/Install Submarine Lead Ballast in accordance with 191-11-001 | ||||
| AB | Accomplish preparation for lead removal and/or installation in accordance with paragraphs 3.1 through 3.6 and 3.11 through 3.15 | Each | 1 | |
| AC | Remove lead ballast (One Long Ton) in accordance with paragraph 3.7. | Each | 1 | |
| AD | Remove lead ballast (2 Long Tons) in accordance with paragraph 3.7. | Each | 1 | |
| AE | Remove lead ballast (5 Long Tons) in accordance with paragraph 3.7. | Each | 1 | |
| AF | Remove lead ballast (10 Long Tons) in accordance with paragraph 3.7. | Each | 1 | |
| AG | Install lead ballast (One Long Ton) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| AH | Install lead ballast (2 Long Tons) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| AJ | Install lead ballast (5 Long Tons) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| AK | Install lead ballast (10 Long Tons) in accordance with paragraphs 3.8 through 3.10. | Each | 1 | |
| Preserve Submarine Main Ballast Tank in accordance with Work Specification 634-13-001 | ||||
| AL | Accomplish total preservation of MBT 1A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.1) | Each | 1 | |
| AM | Accomplish total preservation of MBT 1B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.2) | Each | 1 | |
| AN | Accomplish total preservation of MBT 2A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.3) | Each | 1 | |
| AP | Accomplish total preservation of MBT 2B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.4) | Each | 1 | |
| AQ | Accomplish total preservation of MBT 3A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.5) | Each | 1 | |
| AR | Accomplish total preservation of MBT 3B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.6) | Each | 1 | |
| AS | Accomplish total preservation of MBT 4A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.7) | Each | 1 | |
| AT | Accomplish total preservation of MBT 4B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.8) | Each | 1 | |
| AU | Accomplish total preservation of MBT 5A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.9) | Each | 1 | |
| AV | Accomplish total preservation of MBT 5B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.10) | Each | 1 | |
| AW | Accomplish total preservation of MBT 6 in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.11) | Each | 1 | |
| AX | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| AY | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| AZ | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| BA | Accomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| Preserve Submarine Mud Tank, Torpedo Tube Recesses (Including Doors), Secondary Propulsion Motor Recesses, Torpedo Ejection Pump Recesses in accordance with Work Specification 631-13-002 | ||||
| BB | Accomplish total preservation of Mud Tank in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.1) | Each | 1 | |
| BC | Accomplish total preservation of Port Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.2) | Each | 1 | |
| BD | Accomplish total preservation of Starboard Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.3) | Each | 1 | |
| BE | Accomplish total preservation of Port Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.4) | Each | 1 | |
| BF | Accomplish total preservation of Starboard Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.5) | Each | 1 | |
| BG | Accomplish total preservation of Port Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.6) | Each | 1 | |
| BH | Accomplish total preservation of Starboard Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.7) | Each | 1 | |
| BJ | Accomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6 | Each | 1 | |
| BK | Accomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6 | Each | 1 | |
| Preserve Submarine Chain Locker and Sump, Sonar Penetrant Splice Trunk, MSS Recesses, Sonar Dome Access, Sonar Cavity, Sonar Tube Fairing in accordance with Work Specification 631-13-003 | ||||
| BL | Accomplish total preservation of Chain Locker and Sump in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.1) | Each | 1 | |
| BM | Accomplish total preservation of Sonar Penetrant Splice Trunk in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.2) | Each | 1 | |
| BN | Accomplish total preservation of MSS Recesses in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.3) | Each | 1 | |
| BP | Accomplish total preservation of Sonar Dome Access in accordance with paragraphs3.1 through 3.3, 3.5, and 3.6 (1.2.4) | Each | 1 | |
| BQ | Accomplish total preservation of Sonar Cavity in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.5) | Each | 1 | |
| BR | Accomplish total preservation of Sonar Tube Fairing in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.6) | Each | 1 | |
| BS | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| BT | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| BU | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6. | Each | 1 | |
| Preserve Auxiliary (AUX) Tanks, Depth Control Tank, Forward Trim Tank in accordance with Work Specification 631-13-004 | ||||
| BV | Accomplish total preservation of Aux Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.1) | Each | 1 | |
| BW | Accomplish total preservation of Aux Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.2) | Each | 1 | |
| BX | Accomplish total preservation of Aux Tank 3 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.3) | Each | 1 | |
| BY | Accomplish total preservation of Aux Tank 4 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.4) | Each | 1 | |
| BZ | Accomplish total preservation of Aux Tank 5 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.5) | Each | 1 | |
| CA | Accomplish total preservation of Aux Tank 6 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.6) | Each | 1 | |
| CB | Accomplish total preservation of Aux Tank 2A in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.7) | Each | 1 | |
| CC | Accomplish total preservation of Aux Tank 2B in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.8) | Each | 1 | |
| CD | Accomplish total preservation of Aux Tank 5 in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.9) | Each | 1 | |
| CE | Accomplish total preservation of Depth Control Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.10) | Each | 1 | |
| CF | Accomplish total preservation of Depth Control Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.11) | Each | 1 | |
| CG | Accomplish total preservation of Forward Trim Tank in accordance with paragraphs 3.2 through 3.4, 3.6, and 3.7. (1.2.12) | Each | 1 | |
| CH | Accomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7. | Each | 1 | |
| CJ | Accomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7. | Each | 1 | |
| Preserve Sanitary Tank in accordance with Work Specification 631-13-005 | ||||
| CK | Accomplish total preservation of Sanitary Tank One in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.1) | Each | 1 | |
| CL | Accomplish total preservation of Sanitary Tank 2 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.2) | Each | 1 | |
| CM | Accomplish total preservation of Sanitary Tank 3 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.3) | Each | 1 | |
| CN | Accomplish total preservation of Sanitary Tank 4 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.4) | Each | 1 | |
| CP | Accomplish total preservation of Sanitary Tank 5 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.5) | Each | 1 | |
| CQ | Accomplish total preservation of Sanitary Tank 6 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.6) | Each | 1 | |
| CR | Accomplish total preservation of Sanitary Tank 7 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.7) | Each | 1 | |
| CS | Accomplish total preservation of Sanitary Tank 8 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.8) | Each | 1 | |
| CT | Accomplish total preservation of Sanitary Tank 9 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.9) | Each | 1 | |
| CU | Accomplish total preservation of Sanitary Tank 10 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.10) | Each | 1 | |
| CV | Accomplish total preservation of Sanitary Tank 11 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.11) | Each | 1 | |
| CW | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5. | Each | 1 | |
| CX | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5. | Each | 1 | |
| Preserve Missile Compensating Tank, Main Induction Sump Tank in accordance with Work Specification 631-13-006 | ||||
| CY | Accomplish total preservation of Forward Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.1) | Each | 1 | |
| CZ | Accomplish total preservation of Aft Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5(1.2.2) | Each | 1 | |
| DA | Accomplish total preservation of Main Induction Sump Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.2) | Each | 1 | |
| DB | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5 | Each | 1 | |
| DC | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5 | Each | 1 | |
| DD | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5 | Each | 1 | |
| Preserve Torpedo Impulse Tank in accordance with Work Specification 631-13-007 | ||||
| DE | Accomplish total preservation of Torpedo Impulse Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| DF | Accomplish total preservation of Torpedo Impulse Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2) | Each | 1 | |
| DG | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| DH | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| DJ | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| Preserve Potable Water Tank in accordance with Work Specification 631-13-008 | ||||
| DK | Accomplish total preservation of Potable Water Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| DL | Accomplish total preservation of Potable Water Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2) | Each | 1 | |
| DM | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| DN | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4 | Each | 1 | |
| Preserve Drain Collecting Tank in accordance with Work Specification 631-13-009 | ||||
| DP | Accomplish total preservation of Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| DQ | Accomplish total preservation of Non-Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2) | Each | 1 | |
| DR | Accomplish total preservation of Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.3) | Each | 1 | |
| DS | Accomplish total preservation of Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.4) | Each | 1 | |
| DT | Accomplish total preservation of Non-Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.5) | Each | 1 | |
| DU | Accomplish total preservation of Non-Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.6) | Each | 1 | |
| DV | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4 | Each | 1 | |
| DW | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4 | Each | 1 | |
| Preserve Forward and Aft Superstructure in accordance with Work Specification 631-13-010 | ||||
| DX | Accomplish total preservation of frame 22 to 32 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.1) | Each | 1 | |
| DY | Accomplish total preservation of frame 32 to 37 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.2) | Each | 1 | |
| DZ | Accomplish total preservation of frame 37 to 42 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.3) | Each | 1 | |
| EA | Accomplish total preservation of frame 42 to 50 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.4) | Each | 1 | |
| EB | Accomplish total preservation of frame 50 to 52 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.5) | Each | 1 | |
| EC | Accomplish total preservation of frame 52 to 62 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.6) | Each | 1 | |
| ED | Accomplish total preservation of frame 62 to 71 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.7) | Each | 1 | |
| EE | Accomplish total preservation of frame 71 to 80 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.8) | Each | 1 | |
| EF | Accomplish total preservation of frame 80 to 84 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.9) | Each | 1 | |
| EG | Accomplish total preservation of frame 84 to 94 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.10) | Each | 1 | |
| EH | Accomplish total preservation of frame 94 to 105 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.11) | Each | 1 | |
| EJ | Accomplish total preservation of frame 105 to 113 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.12) | Each | 1 | |
| EK | Accomplish total preservation of frame 113 to 118 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.13) | Each | 1 | |
| EL | Accomplish total preservation of frame 118 to 128 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.14) | Each | 1 | |
| EM | Accomplish total preservation of the Sail (including Diving Planes), frame 32 to 52 in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.15) | Each | 1 | |
| EN | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7 | Each | 1 | |
| EP | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7 | Each | 1 | |
| EQ | Accomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7 | Each | 1 | |
| ER | Accomplish Nonskid replacement (Per Square Foot) in accordance with paragraphs 3.2, 3.6, and 3.7 (1.2.12, 1.2.13) | Each | 2500 | |
| Preserve Underwater Hull in accordance with Work Specification 631-13-011 | ||||
| ES | Accomplish total preservation of underwater hull up to the upper limits of the boottopping, excluding the bow dome (5,000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1) | Each | 1 | |
| ET | Accomplish total preservation of Horizontal and Vertical Stabilizers and Fairings in accordance with paragraphs 3.1, 3.2 and 3.4 (1.2.2) | Each | 1 | |
| EU | Accomplish total preservation of Upper and Lower Rudders, including the interior of the rudder light recess, in accordance with paragraphs 3.1, 3.3 and 3.4 (1.2.3) | Each | 1 | |
| Preserve Underwater Recesses, Sonar Sphere Support Structure, Stern Planes in accordance with Work Specification 631-13-012 | ||||
| EV | Accomplish total preservation of Active Emissions Detector Recess, frame 23 to 24 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.1) | Each | 1 | |
| EW | Accomplish total preservation of Hydrophone U52 Transducer Speed Indicator Recess, frame 26 to 27 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.2) | Each | 1 | |
| EX | Accomplish total preservation of MPTP/VPRS Transducer Recess, frame 22, Group C in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.3) | Each | 1 | |
| EY | Accomplish total preservation of Depth Sounder Transducer Recess, frame 22 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.4) | Each | 1 | |
| EZ | Accomplish total preservation of ELF Stowage Recess, frame 140 to 142 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.5) | Each | 1 | |
| FA | Accomplish total preservation Pintle Bearing Recess, frame 165 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.6) | Each | 1 | |
| FB | Accomplish total preservation of Sonar Tube Cable Guide Foundation Recess, frame 24 port in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.7) | Each | 1 | |
| FC | Accomplish total preservation of Stern Planes, port and starboard, to include upper and lower recesses in accordance with paragraphs 3.1, 3.3, and 3.6 (1.2.8) | Each | 1 | |
| FD | Accomplish total preservation of Sonar Sphere Support Structure, inside dome in accordance with paragraphs 3.1, 3.4, and 3.6 (1.2.9) | Each | 1 | |
| FE | Accomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| FF | Accomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| FG | Accomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| FH | Accomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6 | Each | 1 | |
| Accomplish Cleaning and Pumping in accordance with Work Specification 992-31-001 | ||||
| FJ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1A (1.2.1) | Each | 1 | |
| FK | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1B (1.2.2) | Each | 1 | |
| FL | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2A (1.2.3) | Each | 1 | |
| FM | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2B (1.2.4) | Each | 1 | |
| FN | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3A (1.2.5) | Each | 1 | |
| FP | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3B (1.2.6) | Each | 1 | |
| FQ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4A (1.2.7) | Each | 1 | |
| FR | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4B (1.2.8) | Each | 1 | |
| FS | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5A (1.2.9) | Each | 1 | |
| FT | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5B (1.2.10) | Each | 1 | |
| FU | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 6 (1.2.11) | Each | 1 | |
| FV | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Mud Tank (1.2.12) | Each | 1 | |
| FW | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Starboard Torpedo Tube Recess (Including Doors) (1.2.13) | Each | 1 | |
| FX | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Port Torpedo Tube Recess (Including Doors) (1.2.14) | Each | 1 | |
| FY | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Anchor Chain Locker and Sump (1.2.15) | Each | 1 | |
| FZ | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank One (1.2.16) | Each | 1 | |
| GA | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2 (1.2.17) | Each | 1 | |
| GB | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 3 (1.2.18) | Each | 1 | |
| GC | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 4 (1.2.19) | Each | 1 | |
| GD | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 (1.2.20) | Each | 1 | |
| GE | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 6 (1.2.21) | Each | 1 | |
| GF | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2A in SSGN Class Submarine (1.2.22) | Each | 1 | |
| GG | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2B in SSGN Class Submarine (1.2.23) | Each | 1 | |
| GH | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 in SSGN Class Submarine (1.2.24) | Each | 1 | |
| GJ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank One (1.2.25) | Each | 1 | |
| GK | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank 2 (1.2.26) | Each | 1 | |
| GL | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Trim Tank (1.2.27) | Each | 1 | |
| GM | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank One (1.2.28) | Each | 1 | |
| GN | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 2 (1.2.29) | Each | 1 | |
| GP | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 3 (1.2.30) | Each | 1 | |
| GQ | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 4 (1.2.31) | Each | 1 | |
| GR | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 5 (1.2.32) | Each | 1 | |
| GS | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 6 (1.2.33) | Each | 1 | |
| GT | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 7 (1.2.34) | Each | 1 | |
| GU | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 8 (1.2.35) | Each | 1 | |
| GV | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 9 (1.2.36) | Each | 1 | |
| GW | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 10 (1.2.37) | Each | 1 | |
| GX | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 11 (1.2.38) | Each | 1 | |
| GY | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Missile Compensating Tank (1.2.39) | Each | 1 | |
| GZ | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Aft Missile Compensating Tank (1.2.40) | Each | 1 | |
| HA | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Induction Sump Tank (1.2.41) | Each | 1 | |
| HB | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank One (1.2.42) | Each | 1 | |
| HC | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank 2 (1.2.43) | Each | 1 | |
| HD | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank One (1.2.44) | Each | 1 | |
| HE | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank 2 (1.2.45) | Each | 1 | |
| HF | Accomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Oily Drain Collecting Tank (1.2.46) | Each | 1 | |
| HG | Accomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Non-Oily Drain Collecting Tank (1.2.47) | Each | 1 |