Base Year (CLIN 1001)

CLIN 1001DescriptionUIEst QtyUnit Price
Control Hazardous Waste Produced on Naval Vessels in accordance with 077-11-001
AAAccomplish Control of Hazardous Material In accordance with paragraphs 3.1 through 3.8Each1
Remove/Replace/Install Submarine Lead Ballast in accordance with 191-11-001
ABAccomplish preparation for lead removal and/or installation in accordance with paragraphs 3.1 through 3.6 and 3.11 through 3.15Each1
ACRemove lead ballast (One Long Ton) in accordance with paragraph 3.7.Each1
ADRemove lead ballast (2 Long Tons) in accordance with paragraph 3.7.Each1
AERemove lead ballast (5 Long Tons) in accordance with paragraph 3.7.Each1
AFRemove lead ballast (10 Long Tons) in accordance with paragraph 3.7.Each1
AGInstall lead ballast (One Long Ton) in accordance with paragraphs 3.8 through 3.10.Each1
AHInstall lead ballast (2 Long Tons) in accordance with paragraphs 3.8 through 3.10.Each1
AJInstall lead ballast (5 Long Tons) in accordance with paragraphs 3.8 through 3.10.Each1
AKInstall lead ballast (10 Long Tons) in accordance with paragraphs 3.8 through 3.10.Each1
Preserve Submarine Main Ballast Tank in accordance with Work Specification 634-13-001
ALAccomplish total preservation of MBT 1A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.1)Each1
AMAccomplish total preservation of MBT 1B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.2)Each1
ANAccomplish total preservation of MBT 2A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.3)Each1
APAccomplish total preservation of MBT 2B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.4)Each1
AQAccomplish total preservation of MBT 3A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.5)Each1
ARAccomplish total preservation of MBT 3B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.6)Each1
ASAccomplish total preservation of MBT 4A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.7)Each1
ATAccomplish total preservation of MBT 4B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.8)Each1
AUAccomplish total preservation of MBT 5A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.9)Each1
AVAccomplish total preservation of MBT 5B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.10)Each1
AWAccomplish total preservation of MBT 6 in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.11)Each1
AXAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
AYAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
AZAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
BAAccomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
Preserve Submarine Mud Tank, Torpedo Tube Recesses (Including Doors), Secondary Propulsion Motor Recesses, Torpedo Ejection Pump Recesses in accordance with Work Specification 631-13-002
BBAccomplish total preservation of Mud Tank in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.1)Each1
BCAccomplish total preservation of Port Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.2)Each1
BDAccomplish total preservation of Starboard Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.3)Each1
BEAccomplish total preservation of Port Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.4)Each1
BFAccomplish total preservation of Starboard Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.5)Each1
BGAccomplish total preservation of Port Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.6)Each1
BHAccomplish total preservation of Starboard Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.7)Each1
BJAccomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6Each1
BKAccomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6Each1
Preserve Submarine Chain Locker and Sump, Sonar Penetrant Splice Trunk, MSS Recesses, Sonar Dome Access, Sonar Cavity, Sonar Tube Fairing in accordance with Work Specification 631-13-003
BLAccomplish total preservation of Chain Locker and Sump in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.1)Each1
BMAccomplish total preservation of Sonar Penetrant Splice Trunk in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.2)Each1
BNAccomplish total preservation of MSS Recesses in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.3)Each1
BPAccomplish total preservation of Sonar Dome Access in accordance with paragraphs3.1 through 3.3, 3.5, and 3.6 (1.2.4)Each1
BQAccomplish total preservation of Sonar Cavity in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.5)Each1
BRAccomplish total preservation of Sonar Tube Fairing in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.6)Each1
BSAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
BTAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
BUAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
Preserve Auxiliary (AUX) Tanks, Depth Control Tank, Forward Trim Tank in accordance with Work Specification 631-13-004
BVAccomplish total preservation of Aux Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.1)Each1
BWAccomplish total preservation of Aux Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.2)Each1
BXAccomplish total preservation of Aux Tank 3 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.3)Each1
BYAccomplish total preservation of Aux Tank 4 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.4)Each1
BZAccomplish total preservation of Aux Tank 5 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.5)Each1
CAAccomplish total preservation of Aux Tank 6 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.6)Each1
CBAccomplish total preservation of Aux Tank 2A in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.7)Each1
CCAccomplish total preservation of Aux Tank 2B in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.8)Each1
CDAccomplish total preservation of Aux Tank 5 in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.9)Each1
CEAccomplish total preservation of Depth Control Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.10)Each1
CFAccomplish total preservation of Depth Control Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.11)Each1
CGAccomplish total preservation of Forward Trim Tank in accordance with paragraphs 3.2 through 3.4, 3.6, and 3.7. (1.2.12)Each1
CHAccomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7.Each1
CJAccomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7.Each1
Preserve Sanitary Tank in accordance with Work Specification 631-13-005
CKAccomplish total preservation of Sanitary Tank One in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.1)Each1
CLAccomplish total preservation of Sanitary Tank 2 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.2)Each1
CMAccomplish total preservation of Sanitary Tank 3 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.3)Each1
CNAccomplish total preservation of Sanitary Tank 4 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.4)Each1
CPAccomplish total preservation of Sanitary Tank 5 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.5)Each1
CQAccomplish total preservation of Sanitary Tank 6 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.6)Each1
CRAccomplish total preservation of Sanitary Tank 7 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.7)Each1
CSAccomplish total preservation of Sanitary Tank 8 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.8)Each1
CTAccomplish total preservation of Sanitary Tank 9 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.9)Each1
CUAccomplish total preservation of Sanitary Tank 10 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.10)Each1
CVAccomplish total preservation of Sanitary Tank 11 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.11)Each1
CWAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5.Each1
CXAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5.Each1
Preserve Missile Compensating Tank, Main Induction Sump Tank in accordance with Work Specification 631-13-006
CYAccomplish total preservation of Forward Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.1)Each1
CZAccomplish total preservation of Aft Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5(1.2.2)Each1
DAAccomplish total preservation of Main Induction Sump Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.2)Each1
DBAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5Each1
DCAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5Each1
DDAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5Each1
Preserve Torpedo Impulse Tank in accordance with Work Specification 631-13-007
DEAccomplish total preservation of Torpedo Impulse Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
DFAccomplish total preservation of Torpedo Impulse Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2)Each1
DGAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
DHAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
DJAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
Preserve Potable Water Tank in accordance with Work Specification 631-13-008
DKAccomplish total preservation of Potable Water Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
DLAccomplish total preservation of Potable Water Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2)Each1
DMAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
DNAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
Preserve Drain Collecting Tank in accordance with Work Specification 631-13-009
DPAccomplish total preservation of Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
DQAccomplish total preservation of Non-Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2)Each1
DRAccomplish total preservation of Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.3)Each1
DSAccomplish total preservation of Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.4)Each1
DTAccomplish total preservation of Non-Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.5)Each1
DUAccomplish total preservation of Non-Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.6)Each1
DVAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4Each1
DWAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4Each1
Preserve Forward and Aft Superstructure in accordance with Work Specification 631-13-010
DXAccomplish total preservation of frame 22 to 32 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.1)Each1
DYAccomplish total preservation of frame 32 to 37 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.2)Each1
DZAccomplish total preservation of frame 37 to 42 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.3)Each1
EAAccomplish total preservation of frame 42 to 50 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.4)Each1
EBAccomplish total preservation of frame 50 to 52 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.5)Each1
ECAccomplish total preservation of frame 52 to 62 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.6)Each1
EDAccomplish total preservation of frame 62 to 71 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.7)Each1
EEAccomplish total preservation of frame 71 to 80 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.8)Each1
EFAccomplish total preservation of frame 80 to 84 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.9)Each1
EGAccomplish total preservation of frame 84 to 94 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.10)Each1
EHAccomplish total preservation of frame 94 to 105 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.11)Each1
EJAccomplish total preservation of frame 105 to 113 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.12)Each1
EKAccomplish total preservation of frame 113 to 118 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.13)Each1
ELAccomplish total preservation of frame 118 to 128 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.14)Each1
EMAccomplish total preservation of the Sail (including Diving Planes), frame 32 to 52 in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.15)Each1
ENAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7Each1
EPAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7Each1
EQAccomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7Each1
ERAccomplish Nonskid replacement (Per Square Foot) in accordance with paragraphs 3.2, 3.6, and 3.7 (1.2.12, 1.2.13)Each2500
Preserve Underwater Hull in accordance with Work Specification 631-13-011
ESAccomplish total preservation of underwater hull up to the upper limits of the boottopping, excluding the bow dome (5,000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
ETAccomplish total preservation of Horizontal and Vertical Stabilizers and Fairings in accordance with paragraphs 3.1, 3.2 and 3.4 (1.2.2)Each1
EUAccomplish total preservation of Upper and Lower Rudders, including the interior of the rudder light recess, in accordance with paragraphs 3.1, 3.3 and 3.4 (1.2.3)Each1
Preserve Underwater Recesses, Sonar Sphere Support Structure, Stern Planes in accordance with Work Specification 631-13-012
EVAccomplish total preservation of Active Emissions Detector Recess, frame 23 to 24 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.1)Each1
EWAccomplish total preservation of Hydrophone U52 Transducer Speed Indicator Recess, frame 26 to 27 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.2)Each1
EXAccomplish total preservation of MPTP/VPRS Transducer Recess, frame 22, Group C in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.3)Each1
EYAccomplish total preservation of Depth Sounder Transducer Recess, frame 22 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.4)Each1
EZAccomplish total preservation of ELF Stowage Recess, frame 140 to 142 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.5)Each1
FAAccomplish total preservation Pintle Bearing Recess, frame 165 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.6)Each1
FBAccomplish total preservation of Sonar Tube Cable Guide Foundation Recess, frame 24 port in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.7)Each1
FCAccomplish total preservation of Stern Planes, port and starboard, to include upper and lower recesses in accordance with paragraphs 3.1, 3.3, and 3.6 (1.2.8)Each1
FDAccomplish total preservation of Sonar Sphere Support Structure, inside dome in accordance with paragraphs 3.1, 3.4, and 3.6 (1.2.9)Each1
FEAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
FFAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
FGAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
FHAccomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
Accomplish Cleaning and Pumping in accordance with Work Specification 992-31-001
FJAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1A (1.2.1)Each1
FKAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1B (1.2.2)Each1
FLAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2A (1.2.3)Each1
FMAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2B (1.2.4)Each1
FNAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3A (1.2.5)Each1
FPAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3B (1.2.6)Each1
FQAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4A (1.2.7)Each1
FRAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4B (1.2.8)Each1
FSAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5A (1.2.9)Each1
FTAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5B (1.2.10)Each1
FUAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 6 (1.2.11)Each1
FVAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Mud Tank (1.2.12)Each1
FWAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Starboard Torpedo Tube Recess (Including Doors) (1.2.13)Each1
FXAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Port Torpedo Tube Recess (Including Doors) (1.2.14)Each1
FYAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Anchor Chain Locker and Sump (1.2.15)Each1
FZAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank One (1.2.16)Each1
GAAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2 (1.2.17)Each1
GBAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 3 (1.2.18)Each1
GCAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 4 (1.2.19)Each1
GDAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 (1.2.20)Each1
GEAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 6 (1.2.21)Each1
GFAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2A in SSGN Class Submarine (1.2.22)Each1
GGAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2B in SSGN Class Submarine (1.2.23)Each1
GHAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 in SSGN Class Submarine (1.2.24)Each1
GJAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank One (1.2.25)Each1
GKAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank 2 (1.2.26)Each1
GLAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Trim Tank (1.2.27)Each1
GMAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank One (1.2.28)Each1
GNAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 2 (1.2.29)Each1
GPAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 3 (1.2.30)Each1
GQAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 4 (1.2.31)Each1
GRAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 5 (1.2.32)Each1
GSAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 6 (1.2.33)Each1
GTAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 7 (1.2.34)Each1
GUAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 8 (1.2.35)Each1
GVAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 9 (1.2.36)Each1
GWAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 10 (1.2.37)Each1
GXAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 11 (1.2.38)Each1
GYAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Missile Compensating Tank (1.2.39)Each1
GZAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Aft Missile Compensating Tank (1.2.40)Each1
HAAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Induction Sump Tank (1.2.41)Each1
HBAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank One (1.2.42)Each1
HCAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank 2 (1.2.43)Each1
HDAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank One (1.2.44)Each1
HEAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank 2 (1.2.45)Each1
HFAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Oily Drain Collecting Tank (1.2.46)Each1
HGAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Non-Oily Drain Collecting Tank (1.2.47)Each1
HHAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number One Oily Drain Collecting Tank (1.2.48)Each1
HJAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number 2 Oily Drain Collecting Tank (1.2.49)Each1
HKAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number One Non-Oily Drain Collecting Tank (1.2.50)Each1
HLAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR 2 Number 2 Non-Oily Drain Collecting Tank (1.2.51)Each1
HMAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure/Sail Area, frame 22 to 32 (1.2.52)Each1
HNAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 32 to 37 (1.2.53)Each1
HPAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area,, frame 37 to 42 (1.2.54)Each1
HQAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 42 to 50 (1.2.55)Each1
HRAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 50 to 52 (1.2.56)Each1
HSAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 52 to 62 (Missile Bay One) (1.2.57)Each1
HTAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 62 to 71 (Missile Bay 2) (1.2.58)Each1
HUAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 71 to 80 (Missile Bay 3) (1.2.59)Each1
HVAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 80 to 84 (Missile Bay 4) (1.2.60)Each1
HWAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 84 to 94 (Buoy Area) (1.2.61)Each1
HXAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure/Sail Area, frame 94 to 102 (1.2.62)Each1
HYAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 105 to 113 (1.2.63)Each1
HZAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 113 to 118 (1.2.64)Each1
JAAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Interior Superstructure Area, frames 118 to 128 (1.2.65)Each1

$ - 0

Option Year One (CLIN 1002)

CLIN 1002DescriptionUIEst QtyUnit Price
Control Hazardous Waste Produced on Naval Vessels in accordance with 077-11-001
AAAccomplish Control of Hazardous Material In accordance with paragraphs 3.1 through 3.8Each1
Remove/Replace/Install Submarine Lead Ballast in accordance with 191-11-001
ABAccomplish preparation for lead removal and/or installation in accordance with paragraphs 3.1 through 3.6 and 3.11 through 3.15Each1
ACRemove lead ballast (One Long Ton) in accordance with paragraph 3.7.Each1
ADRemove lead ballast (2 Long Tons) in accordance with paragraph 3.7.Each1
AERemove lead ballast (5 Long Tons) in accordance with paragraph 3.7.Each1
AFRemove lead ballast (10 Long Tons) in accordance with paragraph 3.7.Each1
AGInstall lead ballast (One Long Ton) in accordance with paragraphs 3.8 through 3.10.Each1
AHInstall lead ballast (2 Long Tons) in accordance with paragraphs 3.8 through 3.10.Each1
AJInstall lead ballast (5 Long Tons) in accordance with paragraphs 3.8 through 3.10.Each1
AKInstall lead ballast (10 Long Tons) in accordance with paragraphs 3.8 through 3.10.Each1
Preserve Submarine Main Ballast Tank in accordance with Work Specification 634-13-001
ALAccomplish total preservation of MBT 1A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.1)Each1
AMAccomplish total preservation of MBT 1B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.2)Each1
ANAccomplish total preservation of MBT 2A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.3)Each1
APAccomplish total preservation of MBT 2B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.4)Each1
AQAccomplish total preservation of MBT 3A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.5)Each1
ARAccomplish total preservation of MBT 3B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.6)Each1
ASAccomplish total preservation of MBT 4A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.7)Each1
ATAccomplish total preservation of MBT 4B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.8)Each1
AUAccomplish total preservation of MBT 5A in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.9)Each1
AVAccomplish total preservation of MBT 5B in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.10)Each1
AWAccomplish total preservation of MBT 6 in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (Para 1.2.11)Each1
AXAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
AYAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
AZAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
BAAccomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
Preserve Submarine Mud Tank, Torpedo Tube Recesses (Including Doors), Secondary Propulsion Motor Recesses, Torpedo Ejection Pump Recesses in accordance with Work Specification 631-13-002
BBAccomplish total preservation of Mud Tank in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.1)Each1
BCAccomplish total preservation of Port Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.2)Each1
BDAccomplish total preservation of Starboard Torpedo Tube Recesses (Including Doors) in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.3)Each1
BEAccomplish total preservation of Port Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.4)Each1
BFAccomplish total preservation of Starboard Secondary Propulsion Motor Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.5)Each1
BGAccomplish total preservation of Port Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.6)Each1
BHAccomplish total preservation of Starboard Torpedo Ejection Pump Recess in accordance with paragraphs 3.1 through 3.3, 3.5 and 3.6 (1.2.7)Each1
BJAccomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6Each1
BKAccomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1, 3.2 and 3.4 through 3.6Each1
Preserve Submarine Chain Locker and Sump, Sonar Penetrant Splice Trunk, MSS Recesses, Sonar Dome Access, Sonar Cavity, Sonar Tube Fairing in accordance with Work Specification 631-13-003
BLAccomplish total preservation of Chain Locker and Sump in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.1)Each1
BMAccomplish total preservation of Sonar Penetrant Splice Trunk in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.2)Each1
BNAccomplish total preservation of MSS Recesses in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.3)Each1
BPAccomplish total preservation of Sonar Dome Access in accordance with paragraphs3.1 through 3.3, 3.5, and 3.6 (1.2.4)Each1
BQAccomplish total preservation of Sonar Cavity in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.5)Each1
BRAccomplish total preservation of Sonar Tube Fairing in accordance with paragraphs 3.1 through 3.3, 3.5, and 3.6 (1.2.6)Each1
BSAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
BTAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
BUAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 through 3.6.Each1
Preserve Auxiliary (AUX) Tanks, Depth Control Tank, Forward Trim Tank in accordance with Work Specification 631-13-004
BVAccomplish total preservation of Aux Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.1)Each1
BWAccomplish total preservation of Aux Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.2)Each1
BXAccomplish total preservation of Aux Tank 3 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.3)Each1
BYAccomplish total preservation of Aux Tank 4 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.4)Each1
BZAccomplish total preservation of Aux Tank 5 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.5)Each1
CAAccomplish total preservation of Aux Tank 6 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.6)Each1
CBAccomplish total preservation of Aux Tank 2A in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.7)Each1
CCAccomplish total preservation of Aux Tank 2B in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.8)Each1
CDAccomplish total preservation of Aux Tank 5 in SSGN Class Submarines in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.9)Each1
CEAccomplish total preservation of Depth Control Tank One in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.10)Each1
CFAccomplish total preservation of Depth Control Tank 2 in accordance with paragraphs 3.1 through 3.4, 3.6, and 3.7. (1.2.11)Each1
CGAccomplish total preservation of Forward Trim Tank in accordance with paragraphs 3.2 through 3.4, 3.6, and 3.7. (1.2.12)Each1
CHAccomplish partial preservation (Per 10 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7.Each1
CJAccomplish partial preservation (Per 100 Square Feet) in accordance with paragraphs 3.1 through 3.3, and 3.5 through 3.7.Each1
Preserve Sanitary Tank in accordance with Work Specification 631-13-005
CKAccomplish total preservation of Sanitary Tank One in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.1)Each1
CLAccomplish total preservation of Sanitary Tank 2 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.2)Each1
CMAccomplish total preservation of Sanitary Tank 3 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.3)Each1
CNAccomplish total preservation of Sanitary Tank 4 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.4)Each1
CPAccomplish total preservation of Sanitary Tank 5 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.5)Each1
CQAccomplish total preservation of Sanitary Tank 6 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.6)Each1
CRAccomplish total preservation of Sanitary Tank 7 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.7)Each1
CSAccomplish total preservation of Sanitary Tank 8 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.8)Each1
CTAccomplish total preservation of Sanitary Tank 9 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.9)Each1
CUAccomplish total preservation of Sanitary Tank 10 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.10)Each1
CVAccomplish total preservation of Sanitary Tank 11 in accordance with paragraphs 3.1, 3.2, 3.4, and 3.5 (1.2.11)Each1
CWAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5.Each1
CXAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, and 3.3 through 3.5.Each1
Preserve Missile Compensating Tank, Main Induction Sump Tank in accordance with Work Specification 631-13-006
CYAccomplish total preservation of Forward Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.1)Each1
CZAccomplish total preservation of Aft Missile Comp Tank in accordance with paragraphs 3.1 through 3.3, and 3.5(1.2.2)Each1
DAAccomplish total preservation of Main Induction Sump Tank in accordance with paragraphs 3.1 through 3.3, and 3.5 (1.2.2)Each1
DBAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5Each1
DCAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5Each1
DDAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.2, 3.4 and 3.5Each1
Preserve Torpedo Impulse Tank in accordance with Work Specification 631-13-007
DEAccomplish total preservation of Torpedo Impulse Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
DFAccomplish total preservation of Torpedo Impulse Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2)Each1
DGAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
DHAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
DJAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
Preserve Potable Water Tank in accordance with Work Specification 631-13-008
DKAccomplish total preservation of Potable Water Tank One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
DLAccomplish total preservation of Potable Water Tank 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2)Each1
DMAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
DNAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 , 3.3, and 3.4Each1
Preserve Drain Collecting Tank in accordance with Work Specification 631-13-009
DPAccomplish total preservation of Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
DQAccomplish total preservation of Non-Oily Drain Collecting Tank One AMR One in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.2)Each1
DRAccomplish total preservation of Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.3)Each1
DSAccomplish total preservation of Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.4)Each1
DTAccomplish total preservation of Non-Oily Drain Collecting Tank One AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.5)Each1
DUAccomplish total preservation of Non-Oily Drain Collecting Tank 2 AMR 2 in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.6)Each1
DVAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4Each1
DWAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.3, and 3.4Each1
Preserve Forward and Aft Superstructure in accordance with Work Specification 631-13-010
DXAccomplish total preservation of frame 22 to 32 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.1)Each1
DYAccomplish total preservation of frame 32 to 37 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.2)Each1
DZAccomplish total preservation of frame 37 to 42 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.3)Each1
EAAccomplish total preservation of frame 42 to 50 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.4)Each1
EBAccomplish total preservation of frame 50 to 52 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.5)Each1
ECAccomplish total preservation of frame 52 to 62 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.6)Each1
EDAccomplish total preservation of frame 62 to 71 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.7)Each1
EEAccomplish total preservation of frame 71 to 80 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.8)Each1
EFAccomplish total preservation of frame 80 to 84 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.9)Each1
EGAccomplish total preservation of frame 84 to 94 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.10)Each1
EHAccomplish total preservation of frame 94 to 105 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.11)Each1
EJAccomplish total preservation of frame 105 to 113 Area in accordance with 3.1 through 3.4, 3.6, and 3.7 (1.2.12)Each1
EKAccomplish total preservation of frame 113 to 118 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.13)Each1
ELAccomplish total preservation of frame 118 to 128 Area in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.14)Each1
EMAccomplish total preservation of the Sail (including Diving Planes), frame 32 to 52 in accordance with 3.2 through 3.4, 3.6, and 3.7 (1.2.15)Each1
ENAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7Each1
EPAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7Each1
EQAccomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1 through 3.3, 3.5, 3.6, and 3.7Each1
ERAccomplish Nonskid replacement (Per Square Foot) in accordance with paragraphs 3.2, 3.6, and 3.7 (1.2.12, 1.2.13)Each2500
Preserve Underwater Hull in accordance with Work Specification 631-13-011
ESAccomplish total preservation of underwater hull up to the upper limits of the boottopping, excluding the bow dome (5,000 square feet) in accordance with paragraphs 3.1, 3.2, and 3.4 (1.2.1)Each1
ETAccomplish total preservation of Horizontal and Vertical Stabilizers and Fairings in accordance with paragraphs 3.1, 3.2 and 3.4 (1.2.2)Each1
EUAccomplish total preservation of Upper and Lower Rudders, including the interior of the rudder light recess, in accordance with paragraphs 3.1, 3.3 and 3.4 (1.2.3)Each1
Preserve Underwater Recesses, Sonar Sphere Support Structure, Stern Planes in accordance with Work Specification 631-13-012
EVAccomplish total preservation of Active Emissions Detector Recess, frame 23 to 24 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.1)Each1
EWAccomplish total preservation of Hydrophone U52 Transducer Speed Indicator Recess, frame 26 to 27 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.2)Each1
EXAccomplish total preservation of MPTP/VPRS Transducer Recess, frame 22, Group C in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.3)Each1
EYAccomplish total preservation of Depth Sounder Transducer Recess, frame 22 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.4)Each1
EZAccomplish total preservation of ELF Stowage Recess, frame 140 to 142 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.5)Each1
FAAccomplish total preservation Pintle Bearing Recess, frame 165 in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.6)Each1
FBAccomplish total preservation of Sonar Tube Cable Guide Foundation Recess, frame 24 port in accordance with paragraphs 3.1, 3.2, and 3.6 (1.2.7)Each1
FCAccomplish total preservation of Stern Planes, port and starboard, to include upper and lower recesses in accordance with paragraphs 3.1, 3.3, and 3.6 (1.2.8)Each1
FDAccomplish total preservation of Sonar Sphere Support Structure, inside dome in accordance with paragraphs 3.1, 3.4, and 3.6 (1.2.9)Each1
FEAccomplish partial preservation (Per 10 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
FFAccomplish partial preservation (Per 100 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
FGAccomplish partial preservation (Per 500 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
FHAccomplish partial preservation (Per 1000 square feet) in accordance with paragraphs 3.1, 3.5 and 3.6Each1
Accomplish Cleaning and Pumping in accordance with Work Specification 992-31-001
FJAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1A (1.2.1)Each1
FKAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 1B (1.2.2)Each1
FLAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2A (1.2.3)Each1
FMAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 2B (1.2.4)Each1
FNAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3A (1.2.5)Each1
FPAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 3B (1.2.6)Each1
FQAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4A (1.2.7)Each1
FRAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 4B (1.2.8)Each1
FSAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5A (1.2.9)Each1
FTAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 5B (1.2.10)Each1
FUAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Main Ballast Tank 6 (1.2.11)Each1
FVAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Mud Tank (1.2.12)Each1
FWAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Starboard Torpedo Tube Recess (Including Doors) (1.2.13)Each1
FXAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Port Torpedo Tube Recess (Including Doors) (1.2.14)Each1
FYAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Anchor Chain Locker and Sump (1.2.15)Each1
FZAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank One (1.2.16)Each1
GAAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2 (1.2.17)Each1
GBAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 3 (1.2.18)Each1
GCAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 4 (1.2.19)Each1
GDAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 (1.2.20)Each1
GEAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 6 (1.2.21)Each1
GFAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2A in SSGN Class Submarine (1.2.22)Each1
GGAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 2B in SSGN Class Submarine (1.2.23)Each1
GHAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Auxiliary Tank 5 in SSGN Class Submarine (1.2.24)Each1
GJAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank One (1.2.25)Each1
GKAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Depth Control Tank 2 (1.2.26)Each1
GLAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Trim Tank (1.2.27)Each1
GMAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank One (1.2.28)Each1
GNAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 2 (1.2.29)Each1
GPAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 3 (1.2.30)Each1
GQAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 4 (1.2.31)Each1
GRAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 5 (1.2.32)Each1
GSAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 6 (1.2.33)Each1
GTAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 7 (1.2.34)Each1
GUAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 8 (1.2.35)Each1
GVAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 9 (1.2.36)Each1
GWAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 10 (1.2.37)Each1
GXAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Sanitary Tank 11 (1.2.38)Each1
GYAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Forward Missile Compensating Tank (1.2.39)Each1
GZAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Aft Missile Compensating Tank (1.2.40)Each1
HAAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Main Induction Sump Tank (1.2.41)Each1
HBAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank One (1.2.42)Each1
HCAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Torpedo Impulse Tank 2 (1.2.43)Each1
HDAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank One (1.2.44)Each1
HEAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of Potable Water Tank 2 (1.2.45)Each1
HFAccomplish cleaning and Pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Oily Drain Collecting Tank (1.2.46)Each1
HGAccomplish cleaning and pumping in accordance with paragraphs 3.1 through 3.3, of AMR One Number One Non-Oily Drain Collecting Tank (1.2.47)Each1