Attachment 13 - QASP Matrix.pdf
PDF 211 KB Posted
- Solicitation number
- N3904020R0288
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) matrix and details of a solicitation for dismantlement and disposal of a Submarine Support Facility.
The QASP matrix establishes performance standards and monitoring procedures for demolition, transport, and disposal of a dry dock refueling complex. Key personnel qualifications, equipment performance, and responsiveness are measured against error rate standards of zero percent. Positive and negative contractor performance will be recorded in monthly reports and the Contractor Performance Assessment Reporting System.
The solicitation seeks offers for dismantlement, transportation and disposal of a radiologically controlled Submarine Support Facility at Portsmouth Naval Shipyard. The estimated 1,600,000 pounds of waste must be disposed of using bulk assay or count and release processes. Offerors must be qualified for radioactive waste handling and transportation. A site tour is required for proposals to be considered for awarding a contract to the successful bidder. The Navy seeks these services to dismantle and dispose of the facility offsite.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN, (MATRIX)
Demolition, transport, and disposal of the Dry Dock # 2 Refueling Complex
IN SUPPORT OF PNSY
Deliverable or Service
Requirement
Measurement/
Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Demolition, transport, and disposal of the Dry
Dock # 2 Refueling
Complex
Quality
Timeliness
Responsiveness
Contractor shall provide and maintain quality personnel who meet all requirements as identified in the Performance Work
Statement (PWS).
Contractor shall provide and maintain quality personnel who meet all skill requirements as identified in the PWS. All equipment provided shall perform in accordance with requirements identified in the Specification.
Contractor shall submit verification of personnel qualifications as identified in the PWS.
Contractor’s ability to respond to concerns with workforce personnel as well as the approach used to resolve problems.
0%
Inspections conducted by
Contracting Officer’s
Representative (COR) and/or
Surveillance/Technical
POC
Customer feedback
Positive and negative performance by the
Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance.
Negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance.
All positive and negative findings will be reported in the Contractor Performance
Appraisal Rating System (CPARS).