N3319124R0014_ATTACHMENT H - RFP Attachments-Part 6.pdf

PDF 35 MB Posted

Attached to
DESIGN-BUILD ELECTRICAL SUBSTATION REPAIRS, NSA SOUDA BAY, CRETE, GREECE.
Solicitation number
N3319124R0014
Issued by

About this file

This document is Attachment H to the Request for Proposal (RFP) for the DESIGN-BUILD ELECTRICAL SUBSTATION REPAIRS, NSA SOUDA BAY, CRETE, GREECE contract opportunity (Solicitation Number N3319124R0014).

The RFP requires the repair and replacement of electrical distribution substations and related equipment at NSA Souda Bay in Crete, Greece. This includes six substations and one medium voltage switchgear that are approaching the end of their service life. The work involves replacing substation equipment such as ring main units, transformers, switches, meters, relays, and cabling. New dry-type transformers, switches, outdoor enclosures, capacitor banks, and advanced metering infrastructure are also required. The magnitude of construction is between $1,000,000 and $5,000,000. Award will be made in U.S. Dollars. The project is being solicited by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RM15-1492 Electrical Substation Repairs WON 1706387 NSA Souda Bay, Crete, Greece

STANDARD TEMPLATE - PART SIX - ATTACHMENTS

PART SIX - ATTACHMENTS

See attached documents:

1. Performance Assessment Plan Form

2. Overall Site Plan

3. Existing Substation Drawings (April 2020)

4. Substation 2 Shop Drawings (November 2022)

5. Field Investigation Report (April 2020)

6. Indicative Substation Load Calculations

7. Environmental Final Governing Standards for Greece

8. OPSNOTE 2020-002 Integration Of Cybersecurity Into PWD Processes

9. AMI Information

1. J&A Letter No. 2405

2. NSA Souda Bay AMI system Description

3. EURAFSWA AMI New Electric Meter Installation Guide

4. NSA Souda Bay AMI Typical Installation Details

5. NSA Souda Bay AMI FAE

6. PM8000 Datasheet

10. Substations Wiring Diagram

11. P-601 Microgrid Design Guide

WON 1706387

RM15-1492 Electrical Substation Repairs NSA Souda Bay, Crete, Greece

PART SIX - ATTACHMENTS

Attachment 1.

Performance Assessment Plan Form

RFP PART 6 – Performance Assessment Plan Page 1

Performance Assessment Plan

MONTHLY EVALUATION

MONTH: __________YEAR:______

Evaluation Factor Yes No N/A Comments

Experience of Personnel

1. Did the team identified in the proposal actively participate in the project?

2. If personnel substitutions were needed, was the degree of technical competence maintained?

Working Relationships

1. Did the Construction team participate in the design process (i.e. attend meetings, provide insight, etc.)?

Were the coordination meetings between Construction and Design team personnel documented?

2. Did the Design team participate in the construction process (i.e. attend CQC meetings, perform field oversight, etc.)? Were coordination meetings between Construction and Design team personnel documented?

3. Did the collaboration between the Construction and Design Team deliver a high value innovative facility?

- Were Total Operating Cost minimized

- What LEED points can be obtained

- Was energy efficiency optimized, and the energy goals exceeded.

4. Was the budget management process clear; was an estimate submitted on time with each design submittal. Was the estimate updated to reflect the changes in the design submittal?

5. Did the Contractor's team effectively manage the project budget and the User's requirements to meet the customer's needs? Was project budget and emphasis in cost control exhibited in the estimate?

(Contractor to document in comments block

RFP PART 6 – Performance Assessment Plan Page 2 materials/systems innovations and provision of higher quality than required in the RFP Part 4)

Additional factors to be developed during Partnering.

Quality Control

1. Were re-submittals of design deliverables or construction rework required this month?

2. Were as built redlines updated this month?

Timely Performance

1. Is the Contractor on schedule?

2. Is the Contractor maintaining the schedule? (Can the Government confirm the project is on schedule?)

3. Is the Contractor following his schedule?

Effectiveness of Management

1. Did the Government need to intercede in resolving a subcontractor issue?

Compliance with Labor Standards

1. Did payrolls have to be resubmitted this month due to inaccuracies or errors?

Compliance with Safety Standards

1. Were there any lost time accidents this month?

RFP PART 6 – Performance Assessment Plan Page 3

GENERAL PERFORMANCE COMMENTS THIS MONTH:

Concurrence:

CM/FEAD Representative ______________Date______.

Project Manager ______________________Date_______.

Contractor Representative ______________Date______.

RM15-1492 Electrical Substation Repairs NSA Souda Bay, Crete, Greece

PART SIX - ATTACHMENTS

Attachment 2.

Overall Site Plan

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D E

U R

A

FC

E N

T

FI

LE

N

AM

E:

C

:\U se rs \M ar ia

.L ag io u.

G R

\D oc um en ts \1

-P ro je ct s\

1-

Pr eA w ar d\

SS

R ep ai rs

\A C

AD

\0

E-

1.

dw g

L

AY

O U

T N

AM

E:

S U

BS

TA

TI

O

N S

O

VE

R

AL

L

SI

TE

P

LA

N

P

LO

TT

ED

: M on da y, S ep te m be r 2

5,

- 1 1:

am

U

SE

R : M ar ia

.L ag io u.

G R

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

SU

BS

TA

TI

O N

S O

VE

R

AL

L

SI

TE

P

LA

N

EL

EC

TR

IC

AL

S

U

BS

TA

TI

O N

R

EP

AI

R

S

ΥΠΟΣΤΑΘΜΟΣ 4

ΥΠΟΣΤΑΘΜΟΣ 3

ΥΠΟΣΤΑΘΜΟΣ 2

ΥΠΟΣΤΑΘΜΟΣ 9

ΥΠΟΣΤΑΘΜΟΣ 8

ΥΠΟΣΤΑΘΜΟΣ 1

ΥΠΟΣΤΑΘΜΟΣ 6

ΥΠΟΣΤΑΘΜΟΣ 7

ΚΑΙ ΔΙΑΚΟΠΤΗΣ 7Α

ΥΠΟΣΤΑΘΜΟΣ 5

ΥΠΟΣΤΑΘΜΟΣ 10

ΜΕΤΑΣΧΗΜΑΤΙΣΤΗΣ

ΑΝΟΔΟΥ ΤΑΣΗΣ

1:2000

E-101

ΕΠ

ΙΣ

ΚΕ

ΥΕ

Σ

ΗΛ

ΕΚ

ΤΡ

ΙΚ

ΩΝ

Υ

ΠΟ

ΣΤ

ΑΘ

ΜΩ

Ν

ΣΥ

ΝΟ

ΛΙ

ΚΟ

Σ

ΧΕ

ΔΙ

Ο

ΠΕ

ΡΙ

ΟΧ

ΗΣ

Υ

ΠΟ

ΣΤ

ΑΘ

ΜΩ

Ν

ΥΠΟΣΤΑΘΜΟΣ 9

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T26

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C47

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T-24

AutoCAD SHX Text T-13

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TRAIN 1

AutoCAD SHX Text

TRAIN 2

AutoCAD SHX Text T-12

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T-16

AutoCAD SHX Text

MCC1

AutoCAD SHX Text

MCC2

AutoCAD SHX Text

TANK T101

AutoCAD SHX Text

TANK T201

AutoCAD SHX Text

FILTRATION

AutoCAD SHX Text

BLDG

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

AutoCAD SHX Text T9A

AutoCAD SHX Text T9B

AutoCAD SHX Text T7

AutoCAD SHX Text T29

AutoCAD SHX Text T30

AutoCAD SHX Text T61B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S/S4

AutoCAD SHX Text S/S3

AutoCAD SHX Text S/S2

AutoCAD SHX Text S/S9

AutoCAD SHX Text S/S8

AutoCAD SHX Text S/S1

AutoCAD SHX Text S/S6

AutoCAD SHX Text S/S5

AutoCAD SHX Text S/S7

AutoCAD SHX Text

MAIN

AutoCAD SHX Text

AutoCAD SHX Text

BRIDGE

AutoCAD SHX Text

RETENTION POND

AutoCAD SHX Text

INFILTRATION POND

AutoCAD SHX Text

AutoCAD SHX Text

NEW AIRTRAFFIC TOWER & OFFICES

AutoCAD SHX Text S3

AutoCAD SHX Text S1

AutoCAD SHX Text S4

AutoCAD SHX Text S2

AutoCAD SHX Text E=514383.15 N=3931716.05 Z=139.80

AutoCAD SHX Text E=514345.00 N=3932038.15 Z=139.26

AutoCAD SHX Text E=514111.67 N=3932107.36 Z=136.67

AutoCAD SHX Text E=513920.42 N=3932093.58 Z=135.77

AutoCAD SHX Text

AutoCAD SHX Text 1:2000

AutoCAD SHX Text

AutoCAD SHX Text 200m

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

<<PM/DM>>

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

DES GAM

AutoCAD SHX Text

DRW AMP

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 10 MARCH 2009

AutoCAD SHX Text

CHK MEM

AutoCAD SHX Text

OF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

MEM

AutoCAD SHX Text

GAM

AutoCAD SHX Text

VLL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ΓΕΩΡΓΙΟΣ Α. ΜΑΡΚΑΝΤΩΝΑΚΗΣ

AutoCAD SHX Text

ΔΙΠΛ. ΗΛΕΚΤΡΟΛΟΓΟΣ ΜΗΧΑΝΙΚΟΣ

AutoCAD SHX Text

ΠOΛΟΓΙΩΡΓΗ 27 ΧΑΝΙΑ ΤΗΛ. 28210-51521

AutoCAD SHX Text

Α.Φ.Μ. 046592798 Α' ΔΟΥ ΧΑΝΙΩΝ

AutoCAD SHX Text

ΠΟΛΥΤΕΧΝΙΚΗΣ ΣΧΟΛΗΣ ΠΑΝ. ΠΑΤΡΩΝ

AutoCAD SHX Text

ΜΕΛΟΣ Τ.Ε.Ε. ΑΡ. ΜΗΤΡΩΟΥ 67443

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

SUBSTATIONS OVERALL SITE PLAN

AutoCAD SHX Text

SCALE 1:2000

AutoCAD SHX Text

NOTES THIS SHEET

AutoCAD SHX Text

SUBSTATION 4

AutoCAD SHX Text

SUBSTATION 3

AutoCAD SHX Text

SUBSTATION 2

AutoCAD SHX Text

SUBSTATION 9

AutoCAD SHX Text

SUBSTATION 8

AutoCAD SHX Text

SUBSTATION 1

AutoCAD SHX Text

SUBSTATION 6

AutoCAD SHX Text

SUBSTATION 7 AND SWITCH 7A

AutoCAD SHX Text

SUBSTATION 5

AutoCAD SHX Text

SUBSTATION 10

AutoCAD SHX Text

STEP-UP TRF

AutoCAD SHX Text

GRAPHIC_SCALE

AutoCAD SHX Text SUBSTATION 10 IS NOT PART OF THIS PROJECT AND IS SHOWN FOR INFORMATIONAL PURPOSES ONLY.

AutoCAD SHX Text

AIRCRAFT APRON AREA.

AutoCAD SHX Text

AIRCRAFT TAXIWAY.

AutoCAD SHX Text

NSA SOUDA BAY LIMITS.

AutoCAD SHX Text

NSA MAIN ENTRANCE, INDIA GATE.

AutoCAD SHX Text

CHARLIE POST GATE.

AutoCAD SHX Text

ΠΕΡΙΟΧΗ ΣΤΑΘΜΕΥΣΗΣ ΑΕΡΟΣΚΑΦΩΝ

AutoCAD SHX Text

/ΣΥΝΟΛΙΚΟ ΣΧΕΔΙΟ ΠΕΡΙΟΧΗΣ ΥΠΟΣΤΑΘΜΩΝ

AutoCAD SHX Text

/ΚΛΙΜΑΚΑ 1:2000

AutoCAD SHX Text

/ΠΑΡΑΤΗΡΗΣΕΙΣ ΣΧΕΔΙΟΥ

AutoCAD SHX Text

ΤΡΟΧΟΔΡΟΜΟΣ ΑΕΡΟΣΚΑΦΩΝ

AutoCAD SHX Text

ΟΡΙΑ ΠΕΡΙΟΧΗΣ NSA ΣΟΥΔΑΣ

AutoCAD SHX Text

ΚΕΝΤΡΙΚΗ ΕΙΣΟΔΟΣ NSA, ΠΥΛΗ INDIA

AutoCAD SHX Text

ΠΥΛΗ CHARLIE POST

AutoCAD SHX Text Ο ΥΠΟΣΤΑΘΜΟΣ 10 ΔΕΝ ΕΙΝΑΙ ΜΕΡΟΣ ΑΥΤΟΥ ΤΟΥ ΕΡΓΟΥ ΚΑΙ ΕΜΦΑΝΙΖΕΤΑΙ ΜΟΝΟ ΓΙΑ ΕΝΗΜΕΡΩΤΙΚΟ ΣΚΟΠΟ.

AutoCAD SHX Text

/ΓΕΝΙΚΕΣ ΠΑΡΑΤΗΡΗΣΕΙΣ

AutoCAD SHX Text

/ΓΡΑΦΙΚΗ ΚΛΙΜΑΚΑ

AutoCAD SHX Text

AutoCAD SHX Text

MEDIUM VOLTAGE CABLE

AutoCAD SHX Text

ΚΑΛΩΔΙΟ ΜΕΣΗΣ ΤΑΣΗΣ

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MEDIUM VOLTAGE CABLE

Maria.Lagiou.GR Oval

RM15-1492 Electrical Substation Repairs NSA Souda Bay, Crete, Greece

PART SIX - ATTACHMENTS

Attachment 3.

Existing Substation Drawings (April 2020)

Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.

ELECTRICAL SUBSTATION REPAIRS MMR-20-G-02

CRETE, GREECE

NAVAL FACILITIES ENGINEERING COMMAND

NSA SOUDA BAY

27 Pologiorgi Str. 73134 Chania, Crete, Greece

Tel:+30-28210-51521, 51522 Fax: +30-28210-51523 e-mail:main@mmgroup.gr http://www.mmgroup.gr

MM group

ECONSULTINGNGINEERS

DEPARTMENT OF THE NAVY

N33191-17-D0800 - T.O.N3319118F4114

G-001

NAVAL FACILITIES ENGINEERING COMMAND

EUROPE AFRICA CENTRAL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D E

U R

A

FC

E N

T

FI

LE

N

AM

E:

W

:\2

9-

IS

O P

J\ M

IL

IT

AR

Y\

ID

IQ

\T O

F(

)S U

BS

TA

TI

O

N U

PG

R

AD

E\

El ec tri ca l S ub st at io n

R ep ai rs

\s he et s\

FI

N

AL

S

ET

\0

G

-0

.d w g L

AY

O

U T

N

AM

E:

T

IT

LE

S H

EE

T

P

LO

TT

ED

: M on da y, A pr il

, 2

- 2

:0 2p m U

SE

R

: a pa pa da ki s

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

TI

TL

E

SH

EE

T

27 POLOGIORGI STR. CHANIA CRETE 73134 GREECE

MM group

ECONSULTINGNGINEERS

N33191-17-D-0800

EL

EC

TR

IC

AL

S

U

BS

TA

TI

O N

R

EP

AI

R

S

04/13/2020

Οδός Πολογιώργη 27 73134 Χανιά, Κρήτη, Ελλάδα

Τη.:+30-28210-51521, 51522 Φαξ: +30-28210-51523 e-mail:main@mmgroup.gr http://www.mmgroup.gr

ΕΠΙΣΚΕΥΕΣ ΗΛΕΚΤΡΙΚΩΝ ΥΠΟΣΤΑΘΜΩΝ MMR-20-G-02

ΚΡΗΤΗ, ΕΛΛΑΔΑNSA, ΚΟΛΠΟΣ ΣΟΥΔΑΣ

ΔΙΟΙΚΗΣΗ ΜΗΧΑΝΙΚΟΥ ΝΑΥΤΙΚΗΣ ΕΥΚΟΛΙΑΣ ΕΥΡΩΠΗ, ΚΕΝΤΡΙΚΗ ΑΦΡΙΚΗ

ΤΜΗΜΑ ΝΑΥΤΙΚΟΥ ΔΙΟΙΚΗΣΗ ΜΗΧΑΝΙΚΟΥ ΝΑΥΤΙΚΗΣ ΕΥΚΟΛΙΑΣ

ΓΕΝΙΚΟΣ ΧΑΡΤΗΣ ΧΑΡΤΗΣ ΤΟΠΟΘΕΣΙΑΣΧΩΡΙΣ ΚΛΙΜΑΚΑ ΧΩΡΙΣ ΚΛΙΜΑΚΑ

14074972

FINAL

REVISED

Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.

AutoCAD SHX Text

AutoCAD SHX Text

NEW AIRTRAFFIC TOWER & OFFICES

AutoCAD SHX Text Alexandroupolis

AutoCAD SHX Text Kavala

AutoCAD SHX Text Thessaloniki

AutoCAD SHX Text Limnos

AutoCAD SHX Text Lesvos

AutoCAD SHX Text Aegean

AutoCAD SHX Text Sea

AutoCAD SHX Text Chios

AutoCAD SHX Text Samos

AutoCAD SHX Text Naxos

AutoCAD SHX Text Kos

AutoCAD SHX Text Rhodes

AutoCAD SHX Text Chania

AutoCAD SHX Text Crete

AutoCAD SHX Text Crete

AutoCAD SHX Text Sea of

AutoCAD SHX Text Mediterranean Sea

AutoCAD SHX Text Sea

AutoCAD SHX Text Ionian

AutoCAD SHX Text Patra

AutoCAD SHX Text Peiralefs

AutoCAD SHX Text Elefsis

AutoCAD SHX Text

ATHENS

AutoCAD SHX Text Chalkis

AutoCAD SHX Text Volos

AutoCAD SHX Text Ioannina

AutoCAD SHX Text Larissa

AutoCAD SHX Text

GREECE

AutoCAD SHX Text

BULGARIA

AutoCAD SHX Text

ALBANIA

AutoCAD SHX Text

SITE MAP

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

SITE MAP

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

SOUDA BAY

AutoCAD SHX Text

NSA

AutoCAD SHX Text

SOUDA BAY

AutoCAD SHX Text

NSA

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text

SITE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

<<PM/DM>>

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

DES GAM

AutoCAD SHX Text

DRW AMP

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 10 MARCH 2009

AutoCAD SHX Text

CHK MEM

AutoCAD SHX Text

OF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

MEM

AutoCAD SHX Text

GAM

AutoCAD SHX Text

VLL

G-002

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D E

U R

A

FC

E N

T

FI

LE

N

AM

E:

C

:\U se rs \M ar ia

.L ag io u.

G R

\D oc um en ts \1

-P ro je ct s\

1-

Pr eA w ar d\

SS

R ep ai rs

\A C

AD

\0

G

-0

.d w g L

AY

O

U T

N

AM

E:

IN

D

EX

O F

D R

AW

IN

G S

P

LO

TT

ED

: M on da y, S ep te m be r 2

5,

- 1 :0

8p m

U

SE

R : M ar ia

.L ag io u.

G R

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

IN

D

EX

O

F D

R

AW

IN

G

S

27 POLOGIORGI STR. CHANIA CRETE 73134 GREECE

MM group

ECONSULTING NGINEERS

N33191-17-D-0800

EL

EC

TR

IC

AL

S

U

BS

TA

TI

O N

R

EP

AI

R

S

04/13/2020

/ΓΕΝΙΚΑ

/ΗΛΕΚΤΡΟΛΟΓΙΚΑ

ΕΠ

ΙΣ

ΚΕ

ΥΕ

Σ

ΗΛ

ΕΚ

ΤΡ

ΙΚ

ΩΝ

Υ

ΠΟ

ΣΤ

ΑΘ

ΜΩ

Ν

ΠΙ

ΝΑ

ΚΑ

Σ

ΠΕ

ΡΙ

ΕΧ

ΟΜ

ΕΝ

ΩΝ

Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.

AutoCAD SHX Text

%%UDESCRIPTION OF DRAWINGS

AutoCAD SHX Text

%%U NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

%%UDWG. NO

AutoCAD SHX Text

NAVFAC

AutoCAD SHX Text

%%UREF. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

%%UTITLE SHEET

AutoCAD SHX Text

%%UINDEX OF DRAWINGS

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text G-002

AutoCAD SHX Text G-001

AutoCAD SHX Text

%%UDESCRIPTION OF DRAWINGS

AutoCAD SHX Text

NAVFAC

AutoCAD SHX Text

%%UDWG. NO

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

%%U NO.

AutoCAD SHX Text

%%UREF. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

%%UDWG. NO

AutoCAD SHX Text

NAVFAC

AutoCAD SHX Text

%%U NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

%%UDESCRIPTION OF DRAWINGS

AutoCAD SHX Text

%%UREF. NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text 14074972

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text

ED102

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%ULEGEND GENERAL NOTES AND ABBREVIATIONS

AutoCAD SHX Text E-001

AutoCAD SHX Text 14074973

AutoCAD SHX Text 14074974

AutoCAD SHX Text 14074977

AutoCAD SHX Text

%%USUBSTATIONS OVERALL SITE PLAN

AutoCAD SHX Text E-101

AutoCAD SHX Text

%%USUBSTATION 2 EXISTING CONDITIONS DEMOLITION PLAN

AutoCAD SHX Text

%%USUBSTATION 4 EXISTING CONDITIONS DEMOLITION PLAN

AutoCAD SHX Text

%%USUBSTATION 5 EXISTING CONDITIONS DEMOLITION PLAN

AutoCAD SHX Text

%%USUBSTATION 6 EXISTING CONDITIONS DEMOLITION PLAN

AutoCAD SHX Text

%%USUBSTATION 7 EXISTING CONDITIONS DEMOLITION PLAN

AutoCAD SHX Text

%%USUBSTATION 9 EXISTING CONDITIONS DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text

ED104

AutoCAD SHX Text 14074979

AutoCAD SHX Text

AutoCAD SHX Text

ED105

AutoCAD SHX Text 14074980

AutoCAD SHX Text

AutoCAD SHX Text

ED106

AutoCAD SHX Text 14074981

AutoCAD SHX Text

AutoCAD SHX Text

ED107

AutoCAD SHX Text 14074982

AutoCAD SHX Text

AutoCAD SHX Text

ED109

AutoCAD SHX Text 14074984

AutoCAD SHX Text

AutoCAD SHX Text 14074985

AutoCAD SHX Text 14074975

AutoCAD SHX Text

%%UMV SWITCH 7A EXISTING CONDITIONS DEMOLITION PLAN

AutoCAD SHX Text

ED110

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

<<PM/DM>>

AutoCAD SHX Text

BRANCH MANAGER

AutoCAD SHX Text

CHIEF ENG/ARCH

AutoCAD SHX Text

AutoCAD SHX Text

DEPARTMENT OF THE NAVY

AutoCAD SHX Text

NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

CONSTR. CONTR. NO.

AutoCAD SHX Text

EPROJECT NO.:

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

DES GAM

AutoCAD SHX Text

DRW AMP

AutoCAD SHX Text

SYM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

APPR

AutoCAD SHX Text

DRAWFORM REVISION: 10 MARCH 2009

AutoCAD SHX Text

CHK MEM

AutoCAD SHX Text

OF

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

MEM

AutoCAD SHX Text

GAM

AutoCAD SHX Text

VLL

AutoCAD SHX Text

ΕΞΩΦΥΛΛΟ

AutoCAD SHX Text

ΕΥΡΕΤΗΡΙΟ ΣΧΕΔΙΩΝ

AutoCAD SHX Text

ΥΠΟΜΝΗΜΑ ΓΕΝΙΚΕΣ ΣΗΜΕΙΩΣΕΙΣ ΚΑΙ ΣΥΝΤΜΗΣΕΙΣ

AutoCAD SHX Text

ΣΥΝΟΛΙΚΟ ΣΧΕΔΙΟ ΠΕΡΙΟΧΗΣ ΥΠΟΣΤΑΘΜΩΝ

AutoCAD SHX Text

ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 2

AutoCAD SHX Text

ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 4

AutoCAD SHX Text

ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 5

AutoCAD SHX Text

ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 6

AutoCAD SHX Text

ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 7

AutoCAD SHX Text

ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 9

AutoCAD SHX Text

ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΔΙΑΚΟΠΤΗ Μ.Τ. 7Α

AutoCAD SHX Text

ΠΕΡΙΓΡΑΦΗ ΣΧΕΔΙΩΝ

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ NAVFAC

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ ΑΝΑΦΟΡΑΣ

AutoCAD SHX Text

ΠΕΡΙΓΡΑΦΗ ΣΧΕΔΙΩΝ

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ NAVFAC

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ ΑΝΑΦΟΡΑΣ

AutoCAD SHX Text

ΠΕΡΙΓΡΑΦΗ ΣΧΕΔΙΩΝ

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ NAVFAC

AutoCAD SHX Text

ΑΡ. ΣΧΕΔΙΟΥ ΑΝΑΦΟΡΑΣ

AutoCAD SHX Text

ΓΕΩΡΓΙΟΣ Α. ΜΑΡΚΑΝΤΩΝΑΚΗΣ

AutoCAD SHX Text

ΔΙΠΛ. ΗΛΕΚΤΡΟΛΟΓΟΣ ΜΗΧΑΝΙΚΟΣ

AutoCAD SHX Text

ΠOΛΟΓΙΩΡΓΗ 27 ΧΑΝΙΑ ΤΗΛ. 28210-51521

AutoCAD SHX Text

Α.Φ.Μ. 046592798 Α' ΔΟΥ ΧΑΝΙΩΝ

AutoCAD SHX Text

ΠΟΛΥΤΕΧΝΙΚΗΣ ΣΧΟΛΗΣ ΠΑΝ. ΠΑΤΡΩΝ

ΜΕΛΟΣ Τ.Ε.Ε. ΑΡ. ΜΗΤΡΩΟΥ 67443

NOTE REFERENCE SYMBOL

COPPERCU

MILLIMETER SQUAREDmm

MILLIMETERmm

(THOUSAND AMPS RMS SYMMETRICAL)

KILOVOLT AMPERE

MAXIMUM INTERRUPTING CURRENT

KVA

MIC kA

GND GROUND

INDICATES WEATHERPROOF EQUIPMENTWP

EXIST EXISTING

C CONDUIT

VOLTS ALTERNATING CURRENT

UNLESS OTHERWISE NOTED

VAC

V

UON

VOLTS

SW SWITCH

POLY VINYL CHLORIDEPVC

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AMPERE FRAME

BLDG BUILDING

AFF

AFG

AF

ALTERNATE CURRENTAC

A AMPERE

PH PHASE

MH MANHOLE

DOWNDN

GFI GROUND FAULT INTERRUPTER

SQUARE FOOTSqFt

INDEX OF PROTECTIONIP

ROOM NUMBER.

Hz HERTZ

METERm

MAXIMUMMAX

REC

RECEPTACLERECEPT

SURGE PROTECTION DEVICESPD

TRF TRANSFORMER

WATTW

DIAMETERØ

TYP TYPICAL

GFGI GOVERNMENT INSTALLED

GOVERNMENT FURNISHED

CATEGORYCAT

COMMUNICATIONS MANHOLECM

NIC NOT IN CONTRACT

JUNCTION BOXJB

P POLE

NF NON-FUSED

CIRCUIT BREAKERCB

ELECTRICAL METALLIC TUBINGEMT

SITE LIGHTINGSL

COMMUNICATIONS COMM

GIP GROUND INSPECTION POINT

PV PHOTOVOLTAIC

LOW VOLTAGELV

MEDIUM VOLTAGEMV

TRANSFORMER

GROUNDING ELECTRODE, COPPER CLAD STEEL Ø17x3000

GROUND INSPECTION PIT WITH ELECTRODE

BOLLARD

LOW VOLTAGE ELECTRICAL PANEL

AMI METER

CIRCUIT BREAKER

SWITCH

MANHOLE / HANHOLE

OR

EXISTING POWER MANHOLE

EXISTING COMMUNICATIONS MANHOLE

EXISTING COMMUNICATIONS DUCTBANK/LINE'C'

EXISTING POWER DUCTBANK/LINE'P'

EXISTING IRRIGATION LINE'I'

EXISTING SEWER LINE'S'

EXISTING WATER LINE'W'

EXISTING DRAIN LINE'D'

E-001

NEW POWER DUCTBANK/LINE

NEW GROUNDING LINE

ΜΕΤΑΧΗΜΑΤΙΣΤΗΣ

ΗΛΕΚΤΡΟΔΙΟ ΓΕΙΩΣΗΣ, ΕΠΙΧΑΛΚΩΜΕΝΟ ΑΤΣΑΛΙ Ø17X3000

ΣΗΜΕΙΟ ΕΛΕΓΧΟΥ ΓΕΙΩΣΗΣ ΜΕ ΗΛΕΚΤΡΟΔΙΟ

ΚΟΛΩΝΑΚΙ

ΗΛΕΚΤΡΙΚΟΣ ΠΙΝΑΚΑΣ ΧΑΜΗΛΗΣ ΤΑΣΗΣ

ΜΕΤΡΗΤΗΣ ΑΜΙ

ΔΙΑΚΟΠΤΗΣ ΚΥΚΛΩΜΑΤΟΣ

ΙΑΚΟΠΤΗΣ

ΑΡΙΘΜΟΣ ΔΩΜΑΤΙΟΥ

ΣΥΜΒΟΛΟ ΣΗΜΕΙΟΥ ΑΝΑΦΟΡΑΣ

ΦΡΕΑΤΙΟ - ΑΝΘΡΩΠΟΘΥΡΙΔΑ/ ΧΕΙΡΟΘΥΡΙΔΑ

ΥΦΙΣΤΑΜΕΝΟ ΦΡΕΑΤΙΟ ΗΛΕΚΤΡΟΛΟΓΙΚΩΝ ΙΣΧΥΟΣ

ΥΦΙΣΤΑΜΕΝΟ ΦΡΕΑΤΙΟ ΕΠΙΚΟΙΝΩΝΙΩΝ

ΝΕΕΣ ΥΠΟΓΕΙΕΣ ΣΩΛΗΝΩΣΕΙΣ ΙΣΧΥΟΣ

ΥΦΙΣΤΑΜΕΝΕΣ ΥΠΟΓΕΙΕΣ ΣΩΛΗΝΩΣΕΙΣ ΙΣΧΥΟΣ

ΥΦΙΣΤΑΜΕΝΗ ΥΠΟΓΕΙΑ ΣΩΛΗΝΩΣΗ ΕΠΙΚΟΙΝΩΝΙΩΝ

ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΑΡΔΕΥΣΗΣ

ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΑΠΟΧΕΤΕΥΣΗΣ

ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΥΔΡΕΥΣΗΣ

ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΟΜΒΡΙΩΝ

ΑΜΠΕΡ

ΕΝΑΛΛΑΣΟΜΕΝΟ ΡΕΥΜΑ

ΠΑΝΩ ΑΠΟ ΤΟ ΤΕΛΕΙΩΜΕΝΟ ΔΑΠΕΔΟ

ΠΑΝΩ ΑΠΟ ΤΟ ΤΕΛΕΙΩΜΕΝΟ ΕΔΑΦΟΣ

ΚΤΙΡΙΟ

ΣΩΛΗΝΑΣ

ΚΑΤΗΓΟΡΙΑ

ΑΣΦΑΛΕΙΑ ΚΥΚΛΩΜΑΤΟΣ

ΦΡΕΑΤΙΟ ΕΠΙΚΟΙΝΩΝΙΩΝ

ΕΠΙΚΟΙΝΩΝΙΕΣ

ΧΑΛΚΟΣ

ΚΑΤΩ

ΥΦΙΣΤΑΜΕΝΟ

ΓΕΙΩΣΗ

ΣΗΜΕΙΟ ΕΛΕΓΧΟΥ ΓΕΙΩΣΗΣ

ΧΕΡΤΖ

ΒΑΘΜΟΣ ΠΡΟΣΤΑΣΙΑΣ

ΚΥΤΙΟ ΔΙΑΚΛΑΔΩΣΗΣ

ΧΙΛΙΟ ΒΟΛΤ ΑΜΠΕΡ

ΧΑΜΗΛΗ ΤΑΣΗ

ΜΕΤΡΟ

ΜΕΓΙΣΤΟ

ΜΕΓΙΣΤΟ ΡΕΥΜΑ ΔΙΑΚΟΠΗΣ

ΦΡΕΑΤΙΟ

ΧΙΛΙΟΣΤΑ

ΤΕΤΡΑΓΩΝΙΚΑ ΧΙΛΙΟΣΤΑ

ΟΧΙ ΣΤΟ ΣΥΜΒΟΛΑΙΟ

ΧΩΡΙΣ ΑΣΦΑΛΕΙΑ

ΠΟΛΟΣ

ΦΑΣΗ

ΦΩΤΟΒΟΛΤΑΙΚΑ

ΠΟΛΥΒΙΝΥΛΟΧΛΩΡΙΔΙΟ

ΡΕΥΜΑΤΟΔΟΤΗΣ

ΦΩΤΙΣΜΟΣ ΠΕΡΙΟΧΗΣ

ΣΥΣΚΕΥΗ ΠΡΟΣΤΑΣΙΑΣ ΑΠΟ ΥΠΕΡΤΑΣΕΙΣ

ΤΕΤΡΑΓΩΝΙΚΑ ΠΟΔΙΑ

ΙΑΚΟΠΤΗΣ

ΜΕΤΑΣΧΗΜΑΤΙΣΤΗΣ

ΤΥΠΙΚΟ

ΕΚΤΟΣ ΕΑΝ ΑΝΑΦΕΡΕΤΑΙ ΔΙΑΦΟΡΕΤΙΚΑ

ΒΟΛΤ

ΒΟΛΤ ΕΝΑΛΛΑΣΟΜΕΝΟΥ ΡΕΥΜΑΤΟΣ

ΒΑΤ

ΥΠΟΔΕΙΚΝΥΕΙ ΑΔΙΑΒΡΟΧΟ ΕΞΟΠΛΙΣΜΟ

ΙΑΜΕΤΡΟΣ

ΜΕΤΑΛΛΙΚΟΣ ΗΛΕΚΤΡΟΛΟΓΙΚΟΣ ΣΩΛΗΝΑΣ

ΠΡΟΜΗΘΕΙΑ ΑΠΟ ΤΗΝ ΚΥΒΕΡΝΗΣΗ

ΕΓΚΑΤΑΣΤΑΣΗ ΑΠΟ ΤΗΝ ΚΥΒΕΡΝΗΣΗ

ΙΑΚΟΠΤΗΣ ΣΦΑΛΜΑΤΟΣ ΓΕΙΩΣΗΣ

ΜΕΣΗ ΤΑΣΗ

ΧΙΛΙΟ ΑΜΠΕΡ ΣΥΜΜΕΤΡΙΚΑ RMS)

ΣΥΝΤΜΗΣΕΙΣ

ΗΛΕΚΤΡΟΛΟΓΙΚΟ ΥΠΟΜΝΗΜΑ

ΣΥΜΒΟΛΟ

ΠΕΡΙΓΡΑΦΗ ΓΕΝΙΚΕΣ ΣΗΜΕΙΩΣΕΙΣ

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D E

U R

A

FC

E N

T

FI

LE

N

AM

E:

W

:\2

9-

IS

O P

J\ M

IL

IT

AR

Y\

ID

IQ

\T O

F(

)S U

BS

TA

TI

O

N U

PG

R

AD

E\

El ec tri ca l S ub st at io n

R ep ai rs

\s he et s\

FI

N

AL

S

ET

\0

E-

1.

dw g

L

AY

O U

T N

AM

E:

L

EG

EN

D

G

EN

ER

AL

N O

TE

S

AN

D

A

BB

R

EV

IA

TI

O N

S P

LO

TT

ED

: M on da y, A pr il

, 2

- 2 :0

2p m

U

SE

R : a pa pa da ki s

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

LE

G

EN

D

G

EN

ER

AL

N O

TE

S

AN

D

A

BB

R

EV

IA

TI

O N

S

27 POLOGIORGI STR. CHANIA CRETE 73134 GREECE

MM group

ECONSULTINGNGINEERS

N33191-17-D-0800

EL

EC

TR

IC

AL

S

U

BS

TA

TI

O N

R

EP

AI

R

S

04/13/2020

XT

MT

ADVANCED METERING INFRASTRUCTUREAMI

ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΓΕΙΩΣΗΣ

ΥΠΟΔΟΜΗ ΠΡΟΗΓΜΕΝΩΝ ΜΕΤΡΗΣΕΩΝ

ΤΥΠ

ΜΕΓΙΣΤΗ ΕΝΤΑΣΗ ΣΕ ΑΜΠΕΡ

ΕΠ

ΙΣ

ΚΕ

ΥΕ

Σ

ΗΛ

ΕΚ

ΤΡ

ΙΚ

ΩΝ

Υ

ΠΟ

ΣΤ

ΑΘ

ΜΩ

Ν

ΥΠ

ΟΜ

ΝΗ

ΜΑ

ΓΕ

ΝΙ

ΚΕ

Σ

ΣΗ

ΜΕ

ΙΩ

ΣΕ

ΙΣ

Κ

ΑΙ

Σ

ΥΝ

ΤΜ

ΗΣ

ΕΙ

ΣDEMOLITION WORK

ΕΡΓΑΣΙΑ ΑΠΟΞΗΛΩΣΕΩΝ

SS SUBSTATION

ΥΠΟΣΤΑΘΜΟΣ

14074974

BENCHMARK

ΣHMEIO ΑΝΑΦΟΡΑΣS1

G

Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.

AutoCAD SHX Text

ELECTRICAL LEGEND/

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION/

AutoCAD SHX Text

ABBREVIATIONS/

AutoCAD SHX Text

AutoCAD SHX Text

ΔΙΑΚΟΠΤΗΣ

AutoCAD SHX Text

ΔΙΑΚΟΠΤΗΣ

AutoCAD SHX Text

ΔΙΑΜΕΤΡΟΣ

AutoCAD SHX Text

ΔΙΑΚΟΠΤΗΣ ΣΦΑΛΜΑΤΟΣ ΓΕΙΩΣΗΣ

AutoCAD SHX Text

(ΧΙΛΙΟ ΑΜΠΕΡ ΣΥΜΜΕΤΡΙΚΑ RMS)

AutoCAD SHX Text

1. PRECISE DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS PRECISE DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT CONCRETE PADS AND CABLE WELLS CONCRETE PADS AND CABLE WELLS CONCRETE PADS AND CABLE WELLS PADS AND CABLE WELLS PADS AND CABLE WELLS AND CABLE WELLS AND CABLE WELLS CABLE WELLS CABLE WELLS WELLS WELLS IS INDICATIVE AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY INDICATIVE AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY INDICATIVE AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY MANUFACTURER REQUIREMENTS. GEOMETRY MANUFACTURER REQUIREMENTS. GEOMETRY REQUIREMENTS. GEOMETRY REQUIREMENTS. GEOMETRY GEOMETRY GEOMETRY OF THE CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL THE CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL THE CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL BE IN SUCH A WAY TO SERVE ALL ELECTRICAL BE IN SUCH A WAY TO SERVE ALL ELECTRICAL IN SUCH A WAY TO SERVE ALL ELECTRICAL IN SUCH A WAY TO SERVE ALL ELECTRICAL SUCH A WAY TO SERVE ALL ELECTRICAL SUCH A WAY TO SERVE ALL ELECTRICAL A WAY TO SERVE ALL ELECTRICAL A WAY TO SERVE ALL ELECTRICAL WAY TO SERVE ALL ELECTRICAL WAY TO SERVE ALL ELECTRICAL TO SERVE ALL ELECTRICAL TO SERVE ALL ELECTRICAL SERVE ALL ELECTRICAL SERVE ALL ELECTRICAL ALL ELECTRICAL ALL ELECTRICAL ELECTRICAL ELECTRICAL EQUIPMENT INSTALLATION AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO INSTALLATION AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO INSTALLATION AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO A CONTAINMENT VOLUME CALCULATED TO A CONTAINMENT VOLUME CALCULATED TO CONTAINMENT VOLUME CALCULATED TO CONTAINMENT VOLUME CALCULATED TO VOLUME CALCULATED TO VOLUME CALCULATED TO CALCULATED TO CALCULATED TO TO TO 125% OF THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT OF THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT OF THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT FURNISHED OIL CAPACITY. EQUIPMENT FURNISHED OIL CAPACITY. EQUIPMENT OIL CAPACITY. EQUIPMENT OIL CAPACITY. EQUIPMENT CAPACITY. EQUIPMENT CAPACITY. EQUIPMENT EQUIPMENT EQUIPMENT ARRANGEMENT SHALL MEET NFPA 70 WORKING SPACE CLEARANCE REQUIREMENTS MANUFACTURER DELEGATED CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH DELEGATED CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH DELEGATED CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH ENGINEER TO CONSIDER A SOIL BEARING STRENGTH ENGINEER TO CONSIDER A SOIL BEARING STRENGTH TO CONSIDER A SOIL BEARING STRENGTH TO CONSIDER A SOIL BEARING STRENGTH CONSIDER A SOIL BEARING STRENGTH CONSIDER A SOIL BEARING STRENGTH A SOIL BEARING STRENGTH A SOIL BEARING STRENGTH SOIL BEARING STRENGTH SOIL BEARING STRENGTH BEARING STRENGTH BEARING STRENGTH STRENGTH STRENGTH OF 200 KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR 200 KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR 200 KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR AND REINFORCEMENT B500C. PAD DESIGNS FOR AND REINFORCEMENT B500C. PAD DESIGNS FOR REINFORCEMENT B500C. PAD DESIGNS FOR REINFORCEMENT B500C. PAD DESIGNS FOR B500C. PAD DESIGNS FOR B500C. PAD DESIGNS FOR PAD DESIGNS FOR PAD DESIGNS FOR DESIGNS FOR DESIGNS FOR FOR FOR EACH SUBSTATION TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBSTATION TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBSTATION TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS TO THE GOVERNMENT, AS SHOP DRAWINGS TO THE GOVERNMENT, AS SHOP DRAWINGS THE GOVERNMENT, AS SHOP DRAWINGS THE GOVERNMENT, AS SHOP DRAWINGS GOVERNMENT, AS SHOP DRAWINGS GOVERNMENT, AS SHOP DRAWINGS AS SHOP DRAWINGS AS SHOP DRAWINGS SHOP DRAWINGS SHOP DRAWINGS DRAWINGS DRAWINGS SIGNED BY THE DELEGATED ENGINEER, FOR APPROVAL. 2. ALL EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS ALL EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS STRIGHTLY WITH MANUFACTURER REQUIREMENTS STRIGHTLY WITH MANUFACTURER REQUIREMENTS WITH MANUFACTURER REQUIREMENTS WITH MANUFACTURER REQUIREMENTS MANUFACTURER REQUIREMENTS MANUFACTURER REQUIREMENTS REQUIREMENTS REQUIREMENTS AND SPECIFICATIONS. 3. PROVIDE RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED PROVIDE RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED IN EXISTING ELECTRICAL VAULTS LOCATED IN EXISTING ELECTRICAL VAULTS LOCATED EXISTING ELECTRICAL VAULTS LOCATED EXISTING ELECTRICAL VAULTS LOCATED ELECTRICAL VAULTS LOCATED ELECTRICAL VAULTS LOCATED VAULTS LOCATED VAULTS LOCATED LOCATED LOCATED ADJACENT TO EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE TO EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE TO EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE AS SPECIFIED FOR EXISTING AND NEW CABLE AS SPECIFIED FOR EXISTING AND NEW CABLE SPECIFIED FOR EXISTING AND NEW CABLE SPECIFIED FOR EXISTING AND NEW CABLE FOR EXISTING AND NEW CABLE FOR EXISTING AND NEW CABLE EXISTING AND NEW CABLE EXISTING AND NEW CABLE AND NEW CABLE AND NEW CABLE NEW CABLE NEW CABLE CABLE CABLE SUPPORT 4. CONSTRUCTION PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY CONSTRUCTION PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY WORK AT ONE ONLY SUBSTATION AT ANY WORK AT ONE ONLY SUBSTATION AT ANY AT ONE ONLY SUBSTATION AT ANY AT ONE ONLY SUBSTATION AT ANY ONE ONLY SUBSTATION AT ANY ONE ONLY SUBSTATION AT ANY ONLY SUBSTATION AT ANY ONLY SUBSTATION AT ANY SUBSTATION AT ANY SUBSTATION AT ANY AT ANY AT ANY ANY ANY TIME. EACH SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER EACH SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER EACH SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SHALL BE COMPLETED BEFORE WORK START AT ANOTHER BE COMPLETED BEFORE WORK START AT ANOTHER BE COMPLETED BEFORE WORK START AT ANOTHER COMPLETED BEFORE WORK START AT ANOTHER COMPLETED BEFORE WORK START AT ANOTHER BEFORE WORK START AT ANOTHER BEFORE WORK START AT ANOTHER WORK START AT ANOTHER WORK START AT ANOTHER START AT ANOTHER START AT ANOTHER AT ANOTHER AT ANOTHER ANOTHER ANOTHER SUBSTATION. PHASING IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE PHASING IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE PHASING IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE IN ORDER TO MINIMIZE DOWNTIME TO THE IN ORDER TO MINIMIZE DOWNTIME TO THE ORDER TO MINIMIZE DOWNTIME TO THE ORDER TO MINIMIZE DOWNTIME TO THE TO MINIMIZE DOWNTIME TO THE TO MINIMIZE DOWNTIME TO THE MINIMIZE DOWNTIME TO THE MINIMIZE DOWNTIME TO THE DOWNTIME TO THE DOWNTIME TO THE TO THE TO THE THE THE FACILITIES. FIRST, AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE FIRST, AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE FIRST, AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE NEW LOW VOLTAGE SWITCHGEAR SHALL BE NEW LOW VOLTAGE SWITCHGEAR SHALL BE LOW VOLTAGE SWITCHGEAR SHALL BE LOW VOLTAGE SWITCHGEAR SHALL BE VOLTAGE SWITCHGEAR SHALL BE VOLTAGE SWITCHGEAR SHALL BE SWITCHGEAR SHALL BE SWITCHGEAR SHALL BE SHALL BE SHALL BE BE BE INSTALLED. REROUTE ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM REROUTE ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM REROUTE ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM TO NEW SWITCHGEAR AND POWER THE SYSTEM TO NEW SWITCHGEAR AND POWER THE SYSTEM NEW SWITCHGEAR AND POWER THE SYSTEM NEW SWITCHGEAR AND POWER THE SYSTEM SWITCHGEAR AND POWER THE SYSTEM SWITCHGEAR AND POWER THE SYSTEM AND POWER THE SYSTEM AND POWER THE SYSTEM POWER THE SYSTEM POWER THE SYSTEM THE SYSTEM THE SYSTEM SYSTEM SYSTEM THROUGH GOVERNMENT FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GOVERNMENT FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GOVERNMENT FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED SET. NEXT INSTALL NEW PAD MOUNTED SET. NEXT INSTALL NEW PAD MOUNTED NEXT INSTALL NEW PAD MOUNTED NEXT INSTALL NEW PAD MOUNTED INSTALL NEW PAD MOUNTED INSTALL NEW PAD MOUNTED NEW PAD MOUNTED NEW PAD MOUNTED PAD MOUNTED PAD MOUNTED MOUNTED MOUNTED MV SWITCH AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR SWITCH AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR SWITCH AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR NEW WIRING AND CONNECT LV SWITCHGEAR NEW WIRING AND CONNECT LV SWITCHGEAR WIRING AND CONNECT LV SWITCHGEAR WIRING AND CONNECT LV SWITCHGEAR AND CONNECT LV SWITCHGEAR AND CONNECT LV SWITCHGEAR CONNECT LV SWITCHGEAR CONNECT LV SWITCHGEAR LV SWITCHGEAR LV SWITCHGEAR SWITCHGEAR SWITCHGEAR TO TRANSFORMER. CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH TRANSFORMER. CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH TRANSFORMER. CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH SHALL PROVIDE PHASING AND WORK PLAN AT EACH SHALL PROVIDE PHASING AND WORK PLAN AT EACH PROVIDE PHASING AND WORK PLAN AT EACH PROVIDE PHASING AND WORK PLAN AT EACH PHASING AND WORK PLAN AT EACH PHASING AND WORK PLAN AT EACH AND WORK PLAN AT EACH AND WORK PLAN AT EACH WORK PLAN AT EACH WORK PLAN AT EACH PLAN AT EACH PLAN AT EACH AT EACH AT EACH EACH EACH SUBSTATION TO THE GOVERNEMNT FOR APPROVAL. 5. EXISTING NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND EXISTING NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND AMI METER ENCLOSURES SHALL BE REMOVED STORED AND AMI METER ENCLOSURES SHALL BE REMOVED STORED AND METER ENCLOSURES SHALL BE REMOVED STORED AND METER ENCLOSURES SHALL BE REMOVED STORED AND ENCLOSURES SHALL BE REMOVED STORED AND ENCLOSURES SHALL BE REMOVED STORED AND SHALL BE REMOVED STORED AND SHALL BE REMOVED STORED AND BE REMOVED STORED AND BE REMOVED STORED AND REMOVED STORED AND REMOVED STORED AND STORED AND STORED AND AND AND REINSTALLED/REWIRED AT NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET AT NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET AT NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET SWITCHGEAR AS SHOWN. REWIRING SHALL MEET SWITCHGEAR AS SHOWN. REWIRING SHALL MEET AS SHOWN. REWIRING SHALL MEET AS SHOWN. REWIRING SHALL MEET SHOWN. REWIRING SHALL MEET SHOWN. REWIRING SHALL MEET REWIRING SHALL MEET REWIRING SHALL MEET SHALL MEET SHALL MEET MEET MEET EXISTING CONDITIONS. 6. ALL EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE ALL EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE BE DISCONNECTED. WHERE INDICATED SHALL BE BE DISCONNECTED. WHERE INDICATED SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE WHERE INDICATED SHALL BE WHERE INDICATED SHALL BE INDICATED SHALL BE INDICATED SHALL BE SHALL BE SHALL BE BE BE REMOVED/STORED AND REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS AND REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS AND REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS AT NEW LOCATIONS INDICATED. ALL AMI METERS AT NEW LOCATIONS INDICATED. ALL AMI METERS NEW LOCATIONS INDICATED. ALL AMI METERS NEW LOCATIONS INDICATED. ALL AMI METERS LOCATIONS INDICATED. ALL AMI METERS LOCATIONS INDICATED. ALL AMI METERS INDICATED. ALL AMI METERS INDICATED. ALL AMI METERS ALL AMI METERS ALL AMI METERS AMI METERS AMI METERS METERS METERS SHALL BE REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL BE REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL BE REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL PROGRAMMED AND SET IN OPERATION AFTER ALL PROGRAMMED AND SET IN OPERATION AFTER ALL AND SET IN OPERATION AFTER ALL AND SET IN OPERATION AFTER ALL SET IN OPERATION AFTER ALL SET IN OPERATION AFTER ALL IN OPERATION AFTER ALL IN OPERATION AFTER ALL OPERATION AFTER ALL OPERATION AFTER ALL AFTER ALL AFTER ALL ALL ALL SUBSTATIONS HAS BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE HAS BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE HAS BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE BY A METER CERTIFIED CONTRACTOR. (SEE BY A METER CERTIFIED CONTRACTOR. (SEE A METER CERTIFIED CONTRACTOR. (SEE A METER CERTIFIED CONTRACTOR. (SEE METER CERTIFIED CONTRACTOR. (SEE METER CERTIFIED CONTRACTOR. (SEE CERTIFIED CONTRACTOR. (SEE CERTIFIED CONTRACTOR. (SEE CONTRACTOR. (SEE CONTRACTOR. (SEE (SEE (SEE SPECIFICATIONS). 7. EXISTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING EXISTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING - PHOTOVOLTAIC REVERSE RELAY, LIGHTING - PHOTOVOLTAIC REVERSE RELAY, LIGHTING PHOTOVOLTAIC REVERSE RELAY, LIGHTING PHOTOVOLTAIC REVERSE RELAY, LIGHTING REVERSE RELAY, LIGHTING REVERSE RELAY, LIGHTING RELAY, LIGHTING RELAY, LIGHTING LIGHTING LIGHTING CONTACTOR/PHOTOCELL SWITCH - SHALL BE REMOVED, STORED AND REINSTALLED SWITCH - SHALL BE REMOVED, STORED AND REINSTALLED SWITCH - SHALL BE REMOVED, STORED AND REINSTALLED - SHALL BE REMOVED, STORED AND REINSTALLED - SHALL BE REMOVED, STORED AND REINSTALLED SHALL BE REMOVED, STORED AND REINSTALLED SHALL BE REMOVED, STORED AND REINSTALLED BE REMOVED, STORED AND REINSTALLED BE REMOVED, STORED AND REINSTALLED REMOVED, STORED AND REINSTALLED REMOVED, STORED AND REINSTALLED STORED AND REINSTALLED STORED AND REINSTALLED AND REINSTALLED AND REINSTALLED REINSTALLED REINSTALLED BUILT-IN TO THE NEW SWITCHGEAR. MOUNT PHOTOCELL ON TOP OF SWITCHGEAR 8. EXISTING UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM EXISTING UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM FROM FACILITY UTILITY MAPPING PLANS AND FROM FROM FACILITY UTILITY MAPPING PLANS AND FROM FACILITY UTILITY MAPPING PLANS AND FROM FACILITY UTILITY MAPPING PLANS AND FROM UTILITY MAPPING PLANS AND FROM UTILITY MAPPING PLANS AND FROM MAPPING PLANS AND FROM MAPPING PLANS AND FROM PLANS AND FROM PLANS AND FROM AND FROM AND FROM FROM FROM SITE SURVEY. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES PRIOR TO ANY WORK 9. EXISTING EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED EXISTING EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED REMOVED SHALL BE DEMOLISHED UNLESS INDICATED REMOVED SHALL BE DEMOLISHED UNLESS INDICATED SHALL BE DEMOLISHED UNLESS INDICATED SHALL BE DEMOLISHED UNLESS INDICATED BE DEMOLISHED UNLESS INDICATED BE DEMOLISHED UNLESS INDICATED DEMOLISHED UNLESS INDICATED DEMOLISHED UNLESS INDICATED UNLESS INDICATED UNLESS INDICATED INDICATED INDICATED OTHERWISE BY THE CONTRACTING OFFICER 10. PAD MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE PAD MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MV SWITCHGEAR ARE PRODUCTS THAT CAN BE SWITCHGEAR ARE PRODUCTS THAT CAN BE SWITCHGEAR ARE PRODUCTS THAT CAN BE ARE PRODUCTS THAT CAN BE ARE PRODUCTS THAT CAN BE PRODUCTS THAT CAN BE PRODUCTS THAT CAN BE THAT CAN BE THAT CAN BE CAN BE CAN BE BE BE FOUND ONLY IN THE US MARKET 11. ALL SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO ALL SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO AROUND SUBSTATIONS SHALL BE RESTORED TO AROUND SUBSTATIONS SHALL BE RESTORED TO SUBSTATIONS SHALL BE RESTORED TO SUBSTATIONS SHALL BE RESTORED TO SHALL BE RESTORED TO SHALL BE RESTORED TO BE RESTORED TO BE RESTORED TO RESTORED TO RESTORED TO TO TO THEIR ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS AND CONDITION AS PER SPECIFICATIONS UNLESS AND CONDITION AS PER SPECIFICATIONS UNLESS CONDITION AS PER SPECIFICATIONS UNLESS CONDITION AS PER SPECIFICATIONS UNLESS AS PER SPECIFICATIONS UNLESS AS PER SPECIFICATIONS UNLESS PER SPECIFICATIONS UNLESS PER SPECIFICATIONS UNLESS SPECIFICATIONS UNLESS SPECIFICATIONS UNLESS UNLESS UNLESS OTHERWISE NOTED ON THE DRAWINGS. 12. NEW GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A NEW GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A AND DUCTS (EXISTING AND NEW) SHOULD KEEP A AND DUCTS (EXISTING AND NEW) SHOULD KEEP A DUCTS (EXISTING AND NEW) SHOULD KEEP A DUCTS (EXISTING AND NEW) SHOULD KEEP A (EXISTING AND NEW) SHOULD KEEP A (EXISTING AND NEW) SHOULD KEEP A AND NEW) SHOULD KEEP A AND NEW) SHOULD KEEP A NEW) SHOULD KEEP A NEW) SHOULD KEEP A SHOULD KEEP A SHOULD KEEP A KEEP A KEEP A A A VERTICAL SEPARATION OF 30cm BETWEEN THEM TO AVOID CONFLICTS. 13. ADDITIONAL CLEARING, GRUBBING AND EXCAVATIONS ARE REQUIRED FOR THE ADDITIONAL CLEARING, GRUBBING AND EXCAVATIONS ARE REQUIRED FOR THE INSTALLATION OF THE NEW GROUNDING LINES. ALL SURFACES SHOULD BE RESTORED TO THEIR ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS OTHERWISE NOTED ON THE DRAWINGS. 14. ELEVATIONS SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC ELEVATIONS SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC IN METERS AND REFER TO PUBLISHED ORTHOMETRIC IN METERS AND REFER TO PUBLISHED ORTHOMETRIC METERS AND REFER TO PUBLISHED ORTHOMETRIC METERS AND REFER TO PUBLISHED ORTHOMETRIC AND REFER TO PUBLISHED ORTHOMETRIC AND REFER TO PUBLISHED ORTHOMETRIC REFER TO PUBLISHED ORTHOMETRIC REFER TO PUBLISHED ORTHOMETRIC TO PUBLISHED ORTHOMETRIC TO PUBLISHED ORTHOMETRIC PUBLISHED ORTHOMETRIC PUBLISHED ORTHOMETRIC ORTHOMETRIC ORTHOMETRIC HEIGHT VALUES. ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA VALUES. ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA VALUES. ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA WERE ESTABLISHED FROM PUBLISHED DATA WERE ESTABLISHED FROM PUBLISHED DATA ESTABLISHED FROM PUBLISHED DATA ESTABLISHED FROM PUBLISHED DATA FROM PUBLISHED DATA FROM PUBLISHED DATA PUBLISHED DATA PUBLISHED DATA DATA DATA RELATED TO PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE TO PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE TO PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE MILITARY BENCHMARK MONUMENT DISKS WITH CODE MILITARY BENCHMARK MONUMENT DISKS WITH CODE BENCHMARK MONUMENT DISKS WITH CODE BENCHMARK MONUMENT DISKS WITH CODE MONUMENT DISKS WITH CODE MONUMENT DISKS WITH CODE DISKS WITH CODE DISKS WITH CODE WITH CODE WITH CODE CODE CODE NAMES "ANEMOMYLOS" AND "VIGLA A". MILITARY PERMANENT BENCHMARK "ANEMOMYLOS" AND "VIGLA A". MILITARY PERMANENT BENCHMARK "ANEMOMYLOS" AND "VIGLA A". MILITARY PERMANENT BENCHMARK AND "VIGLA A". MILITARY PERMANENT BENCHMARK AND "VIGLA A". MILITARY PERMANENT BENCHMARK "VIGLA A". MILITARY PERMANENT BENCHMARK "VIGLA A". MILITARY PERMANENT BENCHMARK A". MILITARY PERMANENT BENCHMARK A".