This document is Attachment H to the Request for Proposal (RFP) for the DESIGN-BUILD ELECTRICAL SUBSTATION REPAIRS, NSA SOUDA BAY, CRETE, GREECE contract opportunity (Solicitation Number N3319124R0014).
The RFP requires the repair and replacement of electrical distribution substations and related equipment at NSA Souda Bay in Crete, Greece. This includes six substations and one medium voltage switchgear that are approaching the end of their service life. The work involves replacing substation equipment such as ring main units, transformers, switches, meters, relays, and cabling. New dry-type transformers, switches, outdoor enclosures, capacitor banks, and advanced metering infrastructure are also required. The magnitude of construction is between $1,000,000 and $5,000,000. Award will be made in U.S. Dollars. The project is being solicited by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RM15-1492 Electrical Substation Repairs WON 1706387 NSA Souda Bay, Crete, Greece
STANDARD TEMPLATE - PART SIX - ATTACHMENTS
PART SIX - ATTACHMENTS
See attached documents:
1. Performance Assessment Plan Form
2. Overall Site Plan
3. Existing Substation Drawings (April 2020)
4. Substation 2 Shop Drawings (November 2022)
5. Field Investigation Report (April 2020)
6. Indicative Substation Load Calculations
7. Environmental Final Governing Standards for Greece
8. OPSNOTE 2020-002 Integration Of Cybersecurity Into PWD Processes
9. AMI Information
1. J&A Letter No. 2405
2. NSA Souda Bay AMI system Description
3. EURAFSWA AMI New Electric Meter Installation Guide
4. NSA Souda Bay AMI Typical Installation Details
5. NSA Souda Bay AMI FAE
6. PM8000 Datasheet
10. Substations Wiring Diagram
11. P-601 Microgrid Design Guide
WON 1706387
RM15-1492 Electrical Substation Repairs NSA Souda Bay, Crete, Greece
PART SIX - ATTACHMENTS
Attachment 1.
Performance Assessment Plan Form
RFP PART 6 – Performance Assessment Plan Page 1
Performance Assessment Plan
MONTHLY EVALUATION
MONTH: __________YEAR:______
Evaluation Factor Yes No N/A Comments
Experience of Personnel
1. Did the team identified in the proposal actively participate in the project?
2. If personnel substitutions were needed, was the degree of technical competence maintained?
Working Relationships
1. Did the Construction team participate in the design process (i.e. attend meetings, provide insight, etc.)?
Were the coordination meetings between Construction and Design team personnel documented?
2. Did the Design team participate in the construction process (i.e. attend CQC meetings, perform field oversight, etc.)? Were coordination meetings between Construction and Design team personnel documented?
3. Did the collaboration between the Construction and Design Team deliver a high value innovative facility?
- Were Total Operating Cost minimized
- What LEED points can be obtained
- Was energy efficiency optimized, and the energy goals exceeded.
4. Was the budget management process clear; was an estimate submitted on time with each design submittal. Was the estimate updated to reflect the changes in the design submittal?
5. Did the Contractor's team effectively manage the project budget and the User's requirements to meet the customer's needs? Was project budget and emphasis in cost control exhibited in the estimate?
(Contractor to document in comments block
RFP PART 6 – Performance Assessment Plan Page 2 materials/systems innovations and provision of higher quality than required in the RFP Part 4)
Additional factors to be developed during Partnering.
Quality Control
1. Were re-submittals of design deliverables or construction rework required this month?
2. Were as built redlines updated this month?
Timely Performance
1. Is the Contractor on schedule?
2. Is the Contractor maintaining the schedule? (Can the Government confirm the project is on schedule?)
3. Is the Contractor following his schedule?
Effectiveness of Management
1. Did the Government need to intercede in resolving a subcontractor issue?
Compliance with Labor Standards
1. Did payrolls have to be resubmitted this month due to inaccuracies or errors?
Compliance with Safety Standards
1. Were there any lost time accidents this month?
RFP PART 6 – Performance Assessment Plan Page 3
GENERAL PERFORMANCE COMMENTS THIS MONTH:
Concurrence:
CM/FEAD Representative ______________Date______.
Project Manager ______________________Date_______.
Contractor Representative ______________Date______.
RM15-1492 Electrical Substation Repairs NSA Souda Bay, Crete, Greece
PART SIX - ATTACHMENTS
Attachment 2.
Overall Site Plan
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D E
U R
A
FC
E N
T
FI
LE
N
AM
E:
C
:\U se rs \M ar ia
.L ag io u.
G R
\D oc um en ts \1
-P ro je ct s\
1-
Pr eA w ar d\
SS
R ep ai rs
\A C
AD
\0
E-
1.
dw g
L
AY
O U
T N
AM
E:
S U
BS
TA
TI
O
N S
O
VE
R
AL
L
SI
TE
P
LA
N
P
LO
TT
ED
: M on da y, S ep te m be r 2
5,
- 1 1:
am
U
SE
R : M ar ia
.L ag io u.
G R
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
SU
BS
TA
TI
O N
S O
VE
R
AL
L
SI
TE
P
LA
N
EL
EC
TR
IC
AL
S
U
BS
TA
TI
O N
R
EP
AI
R
S
ΥΠΟΣΤΑΘΜΟΣ 4
ΥΠΟΣΤΑΘΜΟΣ 3
ΥΠΟΣΤΑΘΜΟΣ 2
ΥΠΟΣΤΑΘΜΟΣ 9
ΥΠΟΣΤΑΘΜΟΣ 8
ΥΠΟΣΤΑΘΜΟΣ 1
ΥΠΟΣΤΑΘΜΟΣ 6
ΥΠΟΣΤΑΘΜΟΣ 7
ΚΑΙ ΔΙΑΚΟΠΤΗΣ 7Α
ΥΠΟΣΤΑΘΜΟΣ 5
ΥΠΟΣΤΑΘΜΟΣ 10
ΜΕΤΑΣΧΗΜΑΤΙΣΤΗΣ
ΑΝΟΔΟΥ ΤΑΣΗΣ
1:2000
E-101
ΕΠ
ΙΣ
ΚΕ
ΥΕ
Σ
ΗΛ
ΕΚ
ΤΡ
ΙΚ
ΩΝ
Υ
ΠΟ
ΣΤ
ΑΘ
ΜΩ
Ν
ΣΥ
ΝΟ
ΛΙ
ΚΟ
Σ
ΧΕ
ΔΙ
Ο
ΠΕ
ΡΙ
ΟΧ
ΗΣ
Υ
ΠΟ
ΣΤ
ΑΘ
ΜΩ
Ν
ΥΠΟΣΤΑΘΜΟΣ 9
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T26
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C47
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T-24
AutoCAD SHX Text T-13
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TRAIN 1
AutoCAD SHX Text
TRAIN 2
AutoCAD SHX Text T-12
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T-16
AutoCAD SHX Text
MCC1
AutoCAD SHX Text
MCC2
AutoCAD SHX Text
TANK T101
AutoCAD SHX Text
TANK T201
AutoCAD SHX Text
FILTRATION
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
AutoCAD SHX Text T9A
AutoCAD SHX Text T9B
AutoCAD SHX Text T7
AutoCAD SHX Text T29
AutoCAD SHX Text T30
AutoCAD SHX Text T61B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S/S4
AutoCAD SHX Text S/S3
AutoCAD SHX Text S/S2
AutoCAD SHX Text S/S9
AutoCAD SHX Text S/S8
AutoCAD SHX Text S/S1
AutoCAD SHX Text S/S6
AutoCAD SHX Text S/S5
AutoCAD SHX Text S/S7
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
RETENTION POND
AutoCAD SHX Text
INFILTRATION POND
AutoCAD SHX Text
AutoCAD SHX Text
NEW AIRTRAFFIC TOWER & OFFICES
AutoCAD SHX Text S3
AutoCAD SHX Text S1
AutoCAD SHX Text S4
AutoCAD SHX Text S2
AutoCAD SHX Text E=514383.15 N=3931716.05 Z=139.80
AutoCAD SHX Text E=514345.00 N=3932038.15 Z=139.26
AutoCAD SHX Text E=514111.67 N=3932107.36 Z=136.67
AutoCAD SHX Text E=513920.42 N=3932093.58 Z=135.77
AutoCAD SHX Text
AutoCAD SHX Text 1:2000
AutoCAD SHX Text
AutoCAD SHX Text 200m
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
<<PM/DM>>
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
DES GAM
AutoCAD SHX Text
DRW AMP
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 10 MARCH 2009
AutoCAD SHX Text
CHK MEM
AutoCAD SHX Text
OF
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
MEM
AutoCAD SHX Text
GAM
AutoCAD SHX Text
VLL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ΓΕΩΡΓΙΟΣ Α. ΜΑΡΚΑΝΤΩΝΑΚΗΣ
AutoCAD SHX Text
ΔΙΠΛ. ΗΛΕΚΤΡΟΛΟΓΟΣ ΜΗΧΑΝΙΚΟΣ
AutoCAD SHX Text
ΠOΛΟΓΙΩΡΓΗ 27 ΧΑΝΙΑ ΤΗΛ. 28210-51521
AutoCAD SHX Text
Α.Φ.Μ. 046592798 Α' ΔΟΥ ΧΑΝΙΩΝ
AutoCAD SHX Text
ΠΟΛΥΤΕΧΝΙΚΗΣ ΣΧΟΛΗΣ ΠΑΝ. ΠΑΤΡΩΝ
AutoCAD SHX Text
ΜΕΛΟΣ Τ.Ε.Ε. ΑΡ. ΜΗΤΡΩΟΥ 67443
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
SUBSTATIONS OVERALL SITE PLAN
AutoCAD SHX Text
SCALE 1:2000
AutoCAD SHX Text
NOTES THIS SHEET
AutoCAD SHX Text
SUBSTATION 4
AutoCAD SHX Text
SUBSTATION 3
AutoCAD SHX Text
SUBSTATION 2
AutoCAD SHX Text
SUBSTATION 9
AutoCAD SHX Text
SUBSTATION 8
AutoCAD SHX Text
SUBSTATION 1
AutoCAD SHX Text
SUBSTATION 6
AutoCAD SHX Text
SUBSTATION 7 AND SWITCH 7A
AutoCAD SHX Text
SUBSTATION 5
AutoCAD SHX Text
SUBSTATION 10
AutoCAD SHX Text
STEP-UP TRF
AutoCAD SHX Text
GRAPHIC_SCALE
AutoCAD SHX Text SUBSTATION 10 IS NOT PART OF THIS PROJECT AND IS SHOWN FOR INFORMATIONAL PURPOSES ONLY.
AutoCAD SHX Text
AIRCRAFT APRON AREA.
AutoCAD SHX Text
AIRCRAFT TAXIWAY.
AutoCAD SHX Text
NSA SOUDA BAY LIMITS.
AutoCAD SHX Text
NSA MAIN ENTRANCE, INDIA GATE.
AutoCAD SHX Text
CHARLIE POST GATE.
AutoCAD SHX Text
ΠΕΡΙΟΧΗ ΣΤΑΘΜΕΥΣΗΣ ΑΕΡΟΣΚΑΦΩΝ
AutoCAD SHX Text
/ΣΥΝΟΛΙΚΟ ΣΧΕΔΙΟ ΠΕΡΙΟΧΗΣ ΥΠΟΣΤΑΘΜΩΝ
AutoCAD SHX Text
/ΚΛΙΜΑΚΑ 1:2000
AutoCAD SHX Text
/ΠΑΡΑΤΗΡΗΣΕΙΣ ΣΧΕΔΙΟΥ
AutoCAD SHX Text
ΤΡΟΧΟΔΡΟΜΟΣ ΑΕΡΟΣΚΑΦΩΝ
AutoCAD SHX Text
ΟΡΙΑ ΠΕΡΙΟΧΗΣ NSA ΣΟΥΔΑΣ
AutoCAD SHX Text
ΚΕΝΤΡΙΚΗ ΕΙΣΟΔΟΣ NSA, ΠΥΛΗ INDIA
AutoCAD SHX Text
ΠΥΛΗ CHARLIE POST
AutoCAD SHX Text Ο ΥΠΟΣΤΑΘΜΟΣ 10 ΔΕΝ ΕΙΝΑΙ ΜΕΡΟΣ ΑΥΤΟΥ ΤΟΥ ΕΡΓΟΥ ΚΑΙ ΕΜΦΑΝΙΖΕΤΑΙ ΜΟΝΟ ΓΙΑ ΕΝΗΜΕΡΩΤΙΚΟ ΣΚΟΠΟ.
AutoCAD SHX Text
/ΓΕΝΙΚΕΣ ΠΑΡΑΤΗΡΗΣΕΙΣ
AutoCAD SHX Text
/ΓΡΑΦΙΚΗ ΚΛΙΜΑΚΑ
AutoCAD SHX Text
AutoCAD SHX Text
MEDIUM VOLTAGE CABLE
AutoCAD SHX Text
ΚΑΛΩΔΙΟ ΜΕΣΗΣ ΤΑΣΗΣ
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MEDIUM VOLTAGE CABLE
Maria.Lagiou.GR Oval
RM15-1492 Electrical Substation Repairs NSA Souda Bay, Crete, Greece
PART SIX - ATTACHMENTS
Attachment 3.
Existing Substation Drawings (April 2020)
Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.
ELECTRICAL SUBSTATION REPAIRS MMR-20-G-02
CRETE, GREECE
NAVAL FACILITIES ENGINEERING COMMAND
NSA SOUDA BAY
27 Pologiorgi Str. 73134 Chania, Crete, Greece
Tel:+30-28210-51521, 51522 Fax: +30-28210-51523 e-mail:main@mmgroup.gr http://www.mmgroup.gr
MM group
ECONSULTINGNGINEERS
DEPARTMENT OF THE NAVY
N33191-17-D0800 - T.O.N3319118F4114
G-001
NAVAL FACILITIES ENGINEERING COMMAND
EUROPE AFRICA CENTRAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D E
U R
A
FC
E N
T
FI
LE
N
AM
E:
W
:\2
9-
IS
O P
J\ M
IL
IT
AR
Y\
ID
IQ
\T O
F(
)S U
BS
TA
TI
O
N U
PG
R
AD
E\
El ec tri ca l S ub st at io n
R ep ai rs
\s he et s\
FI
N
AL
S
ET
\0
G
-0
.d w g L
AY
O
U T
N
AM
E:
T
IT
LE
S H
EE
T
P
LO
TT
ED
: M on da y, A pr il
, 2
- 2
:0 2p m U
SE
R
: a pa pa da ki s
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
TI
TL
E
SH
EE
T
27 POLOGIORGI STR. CHANIA CRETE 73134 GREECE
MM group
ECONSULTINGNGINEERS
N33191-17-D-0800
EL
EC
TR
IC
AL
S
U
BS
TA
TI
O N
R
EP
AI
R
S
04/13/2020
Οδός Πολογιώργη 27 73134 Χανιά, Κρήτη, Ελλάδα
Τη.:+30-28210-51521, 51522 Φαξ: +30-28210-51523 e-mail:main@mmgroup.gr http://www.mmgroup.gr
ΕΠΙΣΚΕΥΕΣ ΗΛΕΚΤΡΙΚΩΝ ΥΠΟΣΤΑΘΜΩΝ MMR-20-G-02
ΚΡΗΤΗ, ΕΛΛΑΔΑNSA, ΚΟΛΠΟΣ ΣΟΥΔΑΣ
ΔΙΟΙΚΗΣΗ ΜΗΧΑΝΙΚΟΥ ΝΑΥΤΙΚΗΣ ΕΥΚΟΛΙΑΣ ΕΥΡΩΠΗ, ΚΕΝΤΡΙΚΗ ΑΦΡΙΚΗ
ΤΜΗΜΑ ΝΑΥΤΙΚΟΥ ΔΙΟΙΚΗΣΗ ΜΗΧΑΝΙΚΟΥ ΝΑΥΤΙΚΗΣ ΕΥΚΟΛΙΑΣ
ΓΕΝΙΚΟΣ ΧΑΡΤΗΣ ΧΑΡΤΗΣ ΤΟΠΟΘΕΣΙΑΣΧΩΡΙΣ ΚΛΙΜΑΚΑ ΧΩΡΙΣ ΚΛΙΜΑΚΑ
14074972
FINAL
REVISED
Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.
AutoCAD SHX Text
AutoCAD SHX Text
NEW AIRTRAFFIC TOWER & OFFICES
AutoCAD SHX Text Alexandroupolis
AutoCAD SHX Text Kavala
AutoCAD SHX Text Thessaloniki
AutoCAD SHX Text Limnos
AutoCAD SHX Text Lesvos
AutoCAD SHX Text Aegean
AutoCAD SHX Text Sea
AutoCAD SHX Text Chios
AutoCAD SHX Text Samos
AutoCAD SHX Text Naxos
AutoCAD SHX Text Kos
AutoCAD SHX Text Rhodes
AutoCAD SHX Text Chania
AutoCAD SHX Text Crete
AutoCAD SHX Text Crete
AutoCAD SHX Text Sea of
AutoCAD SHX Text Mediterranean Sea
AutoCAD SHX Text Sea
AutoCAD SHX Text Ionian
AutoCAD SHX Text Patra
AutoCAD SHX Text Peiralefs
AutoCAD SHX Text Elefsis
AutoCAD SHX Text
ATHENS
AutoCAD SHX Text Chalkis
AutoCAD SHX Text Volos
AutoCAD SHX Text Ioannina
AutoCAD SHX Text Larissa
AutoCAD SHX Text
GREECE
AutoCAD SHX Text
BULGARIA
AutoCAD SHX Text
ALBANIA
AutoCAD SHX Text
SITE MAP
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
SITE MAP
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
SOUDA BAY
AutoCAD SHX Text
NSA
AutoCAD SHX Text
SOUDA BAY
AutoCAD SHX Text
NSA
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
SITE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
<<PM/DM>>
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
DES GAM
AutoCAD SHX Text
DRW AMP
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 10 MARCH 2009
AutoCAD SHX Text
CHK MEM
AutoCAD SHX Text
OF
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
MEM
AutoCAD SHX Text
GAM
AutoCAD SHX Text
VLL
G-002
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D E
U R
A
FC
E N
T
FI
LE
N
AM
E:
C
:\U se rs \M ar ia
.L ag io u.
G R
\D oc um en ts \1
-P ro je ct s\
1-
Pr eA w ar d\
SS
R ep ai rs
\A C
AD
\0
G
-0
.d w g L
AY
O
U T
N
AM
E:
IN
D
EX
O F
D R
AW
IN
G S
P
LO
TT
ED
: M on da y, S ep te m be r 2
5,
- 1 :0
8p m
U
SE
R : M ar ia
.L ag io u.
G R
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
IN
D
EX
O
F D
R
AW
IN
G
S
27 POLOGIORGI STR. CHANIA CRETE 73134 GREECE
MM group
ECONSULTING NGINEERS
N33191-17-D-0800
EL
EC
TR
IC
AL
S
U
BS
TA
TI
O N
R
EP
AI
R
S
04/13/2020
/ΓΕΝΙΚΑ
/ΗΛΕΚΤΡΟΛΟΓΙΚΑ
ΕΠ
ΙΣ
ΚΕ
ΥΕ
Σ
ΗΛ
ΕΚ
ΤΡ
ΙΚ
ΩΝ
Υ
ΠΟ
ΣΤ
ΑΘ
ΜΩ
Ν
ΠΙ
ΝΑ
ΚΑ
Σ
ΠΕ
ΡΙ
ΕΧ
ΟΜ
ΕΝ
ΩΝ
Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.
AutoCAD SHX Text
%%UDESCRIPTION OF DRAWINGS
AutoCAD SHX Text
%%U NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
%%UDWG. NO
AutoCAD SHX Text
NAVFAC
AutoCAD SHX Text
%%UREF. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
%%UTITLE SHEET
AutoCAD SHX Text
%%UINDEX OF DRAWINGS
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text G-002
AutoCAD SHX Text G-001
AutoCAD SHX Text
%%UDESCRIPTION OF DRAWINGS
AutoCAD SHX Text
NAVFAC
AutoCAD SHX Text
%%UDWG. NO
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
%%U NO.
AutoCAD SHX Text
%%UREF. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
%%UDWG. NO
AutoCAD SHX Text
NAVFAC
AutoCAD SHX Text
%%U NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
%%UDESCRIPTION OF DRAWINGS
AutoCAD SHX Text
%%UREF. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text 14074972
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ED102
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%ULEGEND GENERAL NOTES AND ABBREVIATIONS
AutoCAD SHX Text E-001
AutoCAD SHX Text 14074973
AutoCAD SHX Text 14074974
AutoCAD SHX Text 14074977
AutoCAD SHX Text
%%USUBSTATIONS OVERALL SITE PLAN
AutoCAD SHX Text E-101
AutoCAD SHX Text
%%USUBSTATION 2 EXISTING CONDITIONS DEMOLITION PLAN
AutoCAD SHX Text
%%USUBSTATION 4 EXISTING CONDITIONS DEMOLITION PLAN
AutoCAD SHX Text
%%USUBSTATION 5 EXISTING CONDITIONS DEMOLITION PLAN
AutoCAD SHX Text
%%USUBSTATION 6 EXISTING CONDITIONS DEMOLITION PLAN
AutoCAD SHX Text
%%USUBSTATION 7 EXISTING CONDITIONS DEMOLITION PLAN
AutoCAD SHX Text
%%USUBSTATION 9 EXISTING CONDITIONS DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text
ED104
AutoCAD SHX Text 14074979
AutoCAD SHX Text
AutoCAD SHX Text
ED105
AutoCAD SHX Text 14074980
AutoCAD SHX Text
AutoCAD SHX Text
ED106
AutoCAD SHX Text 14074981
AutoCAD SHX Text
AutoCAD SHX Text
ED107
AutoCAD SHX Text 14074982
AutoCAD SHX Text
AutoCAD SHX Text
ED109
AutoCAD SHX Text 14074984
AutoCAD SHX Text
AutoCAD SHX Text 14074985
AutoCAD SHX Text 14074975
AutoCAD SHX Text
%%UMV SWITCH 7A EXISTING CONDITIONS DEMOLITION PLAN
AutoCAD SHX Text
ED110
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
<<PM/DM>>
AutoCAD SHX Text
BRANCH MANAGER
AutoCAD SHX Text
CHIEF ENG/ARCH
AutoCAD SHX Text
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
EPROJECT NO.:
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
DES GAM
AutoCAD SHX Text
DRW AMP
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 10 MARCH 2009
AutoCAD SHX Text
CHK MEM
AutoCAD SHX Text
OF
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
MEM
AutoCAD SHX Text
GAM
AutoCAD SHX Text
VLL
AutoCAD SHX Text
ΕΞΩΦΥΛΛΟ
AutoCAD SHX Text
ΕΥΡΕΤΗΡΙΟ ΣΧΕΔΙΩΝ
AutoCAD SHX Text
ΥΠΟΜΝΗΜΑ ΓΕΝΙΚΕΣ ΣΗΜΕΙΩΣΕΙΣ ΚΑΙ ΣΥΝΤΜΗΣΕΙΣ
AutoCAD SHX Text
ΣΥΝΟΛΙΚΟ ΣΧΕΔΙΟ ΠΕΡΙΟΧΗΣ ΥΠΟΣΤΑΘΜΩΝ
AutoCAD SHX Text
ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 2
AutoCAD SHX Text
ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 4
AutoCAD SHX Text
ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 5
AutoCAD SHX Text
ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 6
AutoCAD SHX Text
ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 7
AutoCAD SHX Text
ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΥΠΟΣΤΑΘΜΟΥ 9
AutoCAD SHX Text
ΥΦΙΣΤΑΜΕΝΗ ΚΑΤΑΣΤΑΣΗ ΣΧΕΔΙΟ ΑΠΟΞΗΛΩΣΕΩΝ ΔΙΑΚΟΠΤΗ Μ.Τ. 7Α
AutoCAD SHX Text
ΠΕΡΙΓΡΑΦΗ ΣΧΕΔΙΩΝ
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ NAVFAC
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ ΑΝΑΦΟΡΑΣ
AutoCAD SHX Text
ΠΕΡΙΓΡΑΦΗ ΣΧΕΔΙΩΝ
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ NAVFAC
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ ΑΝΑΦΟΡΑΣ
AutoCAD SHX Text
ΠΕΡΙΓΡΑΦΗ ΣΧΕΔΙΩΝ
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ NAVFAC
AutoCAD SHX Text
ΑΡ. ΣΧΕΔΙΟΥ ΑΝΑΦΟΡΑΣ
AutoCAD SHX Text
ΓΕΩΡΓΙΟΣ Α. ΜΑΡΚΑΝΤΩΝΑΚΗΣ
AutoCAD SHX Text
ΔΙΠΛ. ΗΛΕΚΤΡΟΛΟΓΟΣ ΜΗΧΑΝΙΚΟΣ
AutoCAD SHX Text
ΠOΛΟΓΙΩΡΓΗ 27 ΧΑΝΙΑ ΤΗΛ. 28210-51521
AutoCAD SHX Text
Α.Φ.Μ. 046592798 Α' ΔΟΥ ΧΑΝΙΩΝ
AutoCAD SHX Text
ΠΟΛΥΤΕΧΝΙΚΗΣ ΣΧΟΛΗΣ ΠΑΝ. ΠΑΤΡΩΝ
ΜΕΛΟΣ Τ.Ε.Ε. ΑΡ. ΜΗΤΡΩΟΥ 67443
NOTE REFERENCE SYMBOL
COPPERCU
MILLIMETER SQUAREDmm
MILLIMETERmm
(THOUSAND AMPS RMS SYMMETRICAL)
KILOVOLT AMPERE
MAXIMUM INTERRUPTING CURRENT
KVA
MIC kA
GND GROUND
INDICATES WEATHERPROOF EQUIPMENTWP
EXIST EXISTING
C CONDUIT
VOLTS ALTERNATING CURRENT
UNLESS OTHERWISE NOTED
VAC
V
UON
VOLTS
SW SWITCH
POLY VINYL CHLORIDEPVC
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMPERE FRAME
BLDG BUILDING
AFF
AFG
AF
ALTERNATE CURRENTAC
A AMPERE
PH PHASE
MH MANHOLE
DOWNDN
GFI GROUND FAULT INTERRUPTER
SQUARE FOOTSqFt
INDEX OF PROTECTIONIP
ROOM NUMBER.
Hz HERTZ
METERm
MAXIMUMMAX
REC
RECEPTACLERECEPT
SURGE PROTECTION DEVICESPD
TRF TRANSFORMER
WATTW
DIAMETERØ
TYP TYPICAL
GFGI GOVERNMENT INSTALLED
GOVERNMENT FURNISHED
CATEGORYCAT
COMMUNICATIONS MANHOLECM
NIC NOT IN CONTRACT
JUNCTION BOXJB
P POLE
NF NON-FUSED
CIRCUIT BREAKERCB
ELECTRICAL METALLIC TUBINGEMT
SITE LIGHTINGSL
COMMUNICATIONS COMM
GIP GROUND INSPECTION POINT
PV PHOTOVOLTAIC
LOW VOLTAGELV
MEDIUM VOLTAGEMV
TRANSFORMER
GROUNDING ELECTRODE, COPPER CLAD STEEL Ø17x3000
GROUND INSPECTION PIT WITH ELECTRODE
BOLLARD
LOW VOLTAGE ELECTRICAL PANEL
AMI METER
CIRCUIT BREAKER
SWITCH
MANHOLE / HANHOLE
OR
EXISTING POWER MANHOLE
EXISTING COMMUNICATIONS MANHOLE
EXISTING COMMUNICATIONS DUCTBANK/LINE'C'
EXISTING POWER DUCTBANK/LINE'P'
EXISTING IRRIGATION LINE'I'
EXISTING SEWER LINE'S'
EXISTING WATER LINE'W'
EXISTING DRAIN LINE'D'
E-001
NEW POWER DUCTBANK/LINE
NEW GROUNDING LINE
ΜΕΤΑΧΗΜΑΤΙΣΤΗΣ
ΗΛΕΚΤΡΟΔΙΟ ΓΕΙΩΣΗΣ, ΕΠΙΧΑΛΚΩΜΕΝΟ ΑΤΣΑΛΙ Ø17X3000
ΣΗΜΕΙΟ ΕΛΕΓΧΟΥ ΓΕΙΩΣΗΣ ΜΕ ΗΛΕΚΤΡΟΔΙΟ
ΚΟΛΩΝΑΚΙ
ΗΛΕΚΤΡΙΚΟΣ ΠΙΝΑΚΑΣ ΧΑΜΗΛΗΣ ΤΑΣΗΣ
ΜΕΤΡΗΤΗΣ ΑΜΙ
ΔΙΑΚΟΠΤΗΣ ΚΥΚΛΩΜΑΤΟΣ
ΙΑΚΟΠΤΗΣ
ΑΡΙΘΜΟΣ ΔΩΜΑΤΙΟΥ
ΣΥΜΒΟΛΟ ΣΗΜΕΙΟΥ ΑΝΑΦΟΡΑΣ
ΦΡΕΑΤΙΟ - ΑΝΘΡΩΠΟΘΥΡΙΔΑ/ ΧΕΙΡΟΘΥΡΙΔΑ
ΥΦΙΣΤΑΜΕΝΟ ΦΡΕΑΤΙΟ ΗΛΕΚΤΡΟΛΟΓΙΚΩΝ ΙΣΧΥΟΣ
ΥΦΙΣΤΑΜΕΝΟ ΦΡΕΑΤΙΟ ΕΠΙΚΟΙΝΩΝΙΩΝ
ΝΕΕΣ ΥΠΟΓΕΙΕΣ ΣΩΛΗΝΩΣΕΙΣ ΙΣΧΥΟΣ
ΥΦΙΣΤΑΜΕΝΕΣ ΥΠΟΓΕΙΕΣ ΣΩΛΗΝΩΣΕΙΣ ΙΣΧΥΟΣ
ΥΦΙΣΤΑΜΕΝΗ ΥΠΟΓΕΙΑ ΣΩΛΗΝΩΣΗ ΕΠΙΚΟΙΝΩΝΙΩΝ
ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΑΡΔΕΥΣΗΣ
ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΑΠΟΧΕΤΕΥΣΗΣ
ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΥΔΡΕΥΣΗΣ
ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΟΜΒΡΙΩΝ
ΑΜΠΕΡ
ΕΝΑΛΛΑΣΟΜΕΝΟ ΡΕΥΜΑ
ΠΑΝΩ ΑΠΟ ΤΟ ΤΕΛΕΙΩΜΕΝΟ ΔΑΠΕΔΟ
ΠΑΝΩ ΑΠΟ ΤΟ ΤΕΛΕΙΩΜΕΝΟ ΕΔΑΦΟΣ
ΚΤΙΡΙΟ
ΣΩΛΗΝΑΣ
ΚΑΤΗΓΟΡΙΑ
ΑΣΦΑΛΕΙΑ ΚΥΚΛΩΜΑΤΟΣ
ΦΡΕΑΤΙΟ ΕΠΙΚΟΙΝΩΝΙΩΝ
ΕΠΙΚΟΙΝΩΝΙΕΣ
ΧΑΛΚΟΣ
ΚΑΤΩ
ΥΦΙΣΤΑΜΕΝΟ
ΓΕΙΩΣΗ
ΣΗΜΕΙΟ ΕΛΕΓΧΟΥ ΓΕΙΩΣΗΣ
ΧΕΡΤΖ
ΒΑΘΜΟΣ ΠΡΟΣΤΑΣΙΑΣ
ΚΥΤΙΟ ΔΙΑΚΛΑΔΩΣΗΣ
ΧΙΛΙΟ ΒΟΛΤ ΑΜΠΕΡ
ΧΑΜΗΛΗ ΤΑΣΗ
ΜΕΤΡΟ
ΜΕΓΙΣΤΟ
ΜΕΓΙΣΤΟ ΡΕΥΜΑ ΔΙΑΚΟΠΗΣ
ΦΡΕΑΤΙΟ
ΧΙΛΙΟΣΤΑ
ΤΕΤΡΑΓΩΝΙΚΑ ΧΙΛΙΟΣΤΑ
ΟΧΙ ΣΤΟ ΣΥΜΒΟΛΑΙΟ
ΧΩΡΙΣ ΑΣΦΑΛΕΙΑ
ΠΟΛΟΣ
ΦΑΣΗ
ΦΩΤΟΒΟΛΤΑΙΚΑ
ΠΟΛΥΒΙΝΥΛΟΧΛΩΡΙΔΙΟ
ΡΕΥΜΑΤΟΔΟΤΗΣ
ΦΩΤΙΣΜΟΣ ΠΕΡΙΟΧΗΣ
ΣΥΣΚΕΥΗ ΠΡΟΣΤΑΣΙΑΣ ΑΠΟ ΥΠΕΡΤΑΣΕΙΣ
ΤΕΤΡΑΓΩΝΙΚΑ ΠΟΔΙΑ
ΙΑΚΟΠΤΗΣ
ΜΕΤΑΣΧΗΜΑΤΙΣΤΗΣ
ΤΥΠΙΚΟ
ΕΚΤΟΣ ΕΑΝ ΑΝΑΦΕΡΕΤΑΙ ΔΙΑΦΟΡΕΤΙΚΑ
ΒΟΛΤ
ΒΟΛΤ ΕΝΑΛΛΑΣΟΜΕΝΟΥ ΡΕΥΜΑΤΟΣ
ΒΑΤ
ΥΠΟΔΕΙΚΝΥΕΙ ΑΔΙΑΒΡΟΧΟ ΕΞΟΠΛΙΣΜΟ
ΙΑΜΕΤΡΟΣ
ΜΕΤΑΛΛΙΚΟΣ ΗΛΕΚΤΡΟΛΟΓΙΚΟΣ ΣΩΛΗΝΑΣ
ΠΡΟΜΗΘΕΙΑ ΑΠΟ ΤΗΝ ΚΥΒΕΡΝΗΣΗ
ΕΓΚΑΤΑΣΤΑΣΗ ΑΠΟ ΤΗΝ ΚΥΒΕΡΝΗΣΗ
ΙΑΚΟΠΤΗΣ ΣΦΑΛΜΑΤΟΣ ΓΕΙΩΣΗΣ
ΜΕΣΗ ΤΑΣΗ
ΧΙΛΙΟ ΑΜΠΕΡ ΣΥΜΜΕΤΡΙΚΑ RMS)
ΣΥΝΤΜΗΣΕΙΣ
ΗΛΕΚΤΡΟΛΟΓΙΚΟ ΥΠΟΜΝΗΜΑ
ΣΥΜΒΟΛΟ
ΠΕΡΙΓΡΑΦΗ ΓΕΝΙΚΕΣ ΣΗΜΕΙΩΣΕΙΣ
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D E
U R
A
FC
E N
T
FI
LE
N
AM
E:
W
:\2
9-
IS
O P
J\ M
IL
IT
AR
Y\
ID
IQ
\T O
F(
)S U
BS
TA
TI
O
N U
PG
R
AD
E\
El ec tri ca l S ub st at io n
R ep ai rs
\s he et s\
FI
N
AL
S
ET
\0
E-
1.
dw g
L
AY
O U
T N
AM
E:
L
EG
EN
D
G
EN
ER
AL
N O
TE
S
AN
D
A
BB
R
EV
IA
TI
O N
S P
LO
TT
ED
: M on da y, A pr il
, 2
- 2 :0
2p m
U
SE
R : a pa pa da ki s
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
LE
G
EN
D
G
EN
ER
AL
N O
TE
S
AN
D
A
BB
R
EV
IA
TI
O N
S
27 POLOGIORGI STR. CHANIA CRETE 73134 GREECE
MM group
ECONSULTINGNGINEERS
N33191-17-D-0800
EL
EC
TR
IC
AL
S
U
BS
TA
TI
O N
R
EP
AI
R
S
04/13/2020
XT
MT
ADVANCED METERING INFRASTRUCTUREAMI
ΥΦΙΣΤΑΜΕΝΗ ΓΡΑΜΜΗ ΓΕΙΩΣΗΣ
ΥΠΟΔΟΜΗ ΠΡΟΗΓΜΕΝΩΝ ΜΕΤΡΗΣΕΩΝ
ΤΥΠ
ΜΕΓΙΣΤΗ ΕΝΤΑΣΗ ΣΕ ΑΜΠΕΡ
ΕΠ
ΙΣ
ΚΕ
ΥΕ
Σ
ΗΛ
ΕΚ
ΤΡ
ΙΚ
ΩΝ
Υ
ΠΟ
ΣΤ
ΑΘ
ΜΩ
Ν
ΥΠ
ΟΜ
ΝΗ
ΜΑ
ΓΕ
ΝΙ
ΚΕ
Σ
ΣΗ
ΜΕ
ΙΩ
ΣΕ
ΙΣ
Κ
ΑΙ
Σ
ΥΝ
ΤΜ
ΗΣ
ΕΙ
ΣDEMOLITION WORK
ΕΡΓΑΣΙΑ ΑΠΟΞΗΛΩΣΕΩΝ
SS SUBSTATION
ΥΠΟΣΤΑΘΜΟΣ
14074974
BENCHMARK
ΣHMEIO ΑΝΑΦΟΡΑΣS1
G
Drawings are provided to show existing conditions only. They shall not be used for Scope Interpretation.
AutoCAD SHX Text
ELECTRICAL LEGEND/
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION/
AutoCAD SHX Text
ABBREVIATIONS/
AutoCAD SHX Text
AutoCAD SHX Text
ΔΙΑΚΟΠΤΗΣ
AutoCAD SHX Text
ΔΙΑΚΟΠΤΗΣ
AutoCAD SHX Text
ΔΙΑΜΕΤΡΟΣ
AutoCAD SHX Text
ΔΙΑΚΟΠΤΗΣ ΣΦΑΛΜΑΤΟΣ ΓΕΙΩΣΗΣ
AutoCAD SHX Text
(ΧΙΛΙΟ ΑΜΠΕΡ ΣΥΜΜΕΤΡΙΚΑ RMS)
AutoCAD SHX Text
1. PRECISE DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS PRECISE DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS DIMENSIONS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS OF EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT, EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT CONCRETE PADS AND CABLE WELLS EQUIPMENT CONCRETE PADS AND CABLE WELLS CONCRETE PADS AND CABLE WELLS CONCRETE PADS AND CABLE WELLS PADS AND CABLE WELLS PADS AND CABLE WELLS AND CABLE WELLS AND CABLE WELLS CABLE WELLS CABLE WELLS WELLS WELLS IS INDICATIVE AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY INDICATIVE AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY INDICATIVE AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY AND SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY SUBJECT TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY TO EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY EQUIPMENT MANUFACTURER REQUIREMENTS. GEOMETRY MANUFACTURER REQUIREMENTS. GEOMETRY MANUFACTURER REQUIREMENTS. GEOMETRY REQUIREMENTS. GEOMETRY REQUIREMENTS. GEOMETRY GEOMETRY GEOMETRY OF THE CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL THE CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL THE CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL CONCRETE PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL PADS SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL SHOULD BE IN SUCH A WAY TO SERVE ALL ELECTRICAL BE IN SUCH A WAY TO SERVE ALL ELECTRICAL BE IN SUCH A WAY TO SERVE ALL ELECTRICAL IN SUCH A WAY TO SERVE ALL ELECTRICAL IN SUCH A WAY TO SERVE ALL ELECTRICAL SUCH A WAY TO SERVE ALL ELECTRICAL SUCH A WAY TO SERVE ALL ELECTRICAL A WAY TO SERVE ALL ELECTRICAL A WAY TO SERVE ALL ELECTRICAL WAY TO SERVE ALL ELECTRICAL WAY TO SERVE ALL ELECTRICAL TO SERVE ALL ELECTRICAL TO SERVE ALL ELECTRICAL SERVE ALL ELECTRICAL SERVE ALL ELECTRICAL ALL ELECTRICAL ALL ELECTRICAL ELECTRICAL ELECTRICAL EQUIPMENT INSTALLATION AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO INSTALLATION AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO INSTALLATION AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO AND TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO PROVIDE A CONTAINMENT VOLUME CALCULATED TO A CONTAINMENT VOLUME CALCULATED TO A CONTAINMENT VOLUME CALCULATED TO CONTAINMENT VOLUME CALCULATED TO CONTAINMENT VOLUME CALCULATED TO VOLUME CALCULATED TO VOLUME CALCULATED TO CALCULATED TO CALCULATED TO TO TO 125% OF THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT OF THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT OF THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT THE ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT ACTUAL TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT TRANSFORMER'S FURNISHED OIL CAPACITY. EQUIPMENT FURNISHED OIL CAPACITY. EQUIPMENT FURNISHED OIL CAPACITY. EQUIPMENT OIL CAPACITY. EQUIPMENT OIL CAPACITY. EQUIPMENT CAPACITY. EQUIPMENT CAPACITY. EQUIPMENT EQUIPMENT EQUIPMENT ARRANGEMENT SHALL MEET NFPA 70 WORKING SPACE CLEARANCE REQUIREMENTS MANUFACTURER DELEGATED CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH DELEGATED CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH DELEGATED CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH CIVIL ENGINEER TO CONSIDER A SOIL BEARING STRENGTH ENGINEER TO CONSIDER A SOIL BEARING STRENGTH ENGINEER TO CONSIDER A SOIL BEARING STRENGTH TO CONSIDER A SOIL BEARING STRENGTH TO CONSIDER A SOIL BEARING STRENGTH CONSIDER A SOIL BEARING STRENGTH CONSIDER A SOIL BEARING STRENGTH A SOIL BEARING STRENGTH A SOIL BEARING STRENGTH SOIL BEARING STRENGTH SOIL BEARING STRENGTH BEARING STRENGTH BEARING STRENGTH STRENGTH STRENGTH OF 200 KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR 200 KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR 200 KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR KN/M2, CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR CONCRETE C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR C30/37 AND REINFORCEMENT B500C. PAD DESIGNS FOR AND REINFORCEMENT B500C. PAD DESIGNS FOR AND REINFORCEMENT B500C. PAD DESIGNS FOR REINFORCEMENT B500C. PAD DESIGNS FOR REINFORCEMENT B500C. PAD DESIGNS FOR B500C. PAD DESIGNS FOR B500C. PAD DESIGNS FOR PAD DESIGNS FOR PAD DESIGNS FOR DESIGNS FOR DESIGNS FOR FOR FOR EACH SUBSTATION TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBSTATION TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBSTATION TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS TO BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS BE SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS SUBMITTED TO THE GOVERNMENT, AS SHOP DRAWINGS TO THE GOVERNMENT, AS SHOP DRAWINGS TO THE GOVERNMENT, AS SHOP DRAWINGS THE GOVERNMENT, AS SHOP DRAWINGS THE GOVERNMENT, AS SHOP DRAWINGS GOVERNMENT, AS SHOP DRAWINGS GOVERNMENT, AS SHOP DRAWINGS AS SHOP DRAWINGS AS SHOP DRAWINGS SHOP DRAWINGS SHOP DRAWINGS DRAWINGS DRAWINGS SIGNED BY THE DELEGATED ENGINEER, FOR APPROVAL. 2. ALL EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS ALL EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS EQUIPMENT SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS SHALL BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS BE INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS INSTALLED STRIGHTLY WITH MANUFACTURER REQUIREMENTS STRIGHTLY WITH MANUFACTURER REQUIREMENTS STRIGHTLY WITH MANUFACTURER REQUIREMENTS WITH MANUFACTURER REQUIREMENTS WITH MANUFACTURER REQUIREMENTS MANUFACTURER REQUIREMENTS MANUFACTURER REQUIREMENTS REQUIREMENTS REQUIREMENTS AND SPECIFICATIONS. 3. PROVIDE RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED PROVIDE RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED RACK ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED ARMS AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED AND INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED INSULATORS IN EXISTING ELECTRICAL VAULTS LOCATED IN EXISTING ELECTRICAL VAULTS LOCATED IN EXISTING ELECTRICAL VAULTS LOCATED EXISTING ELECTRICAL VAULTS LOCATED EXISTING ELECTRICAL VAULTS LOCATED ELECTRICAL VAULTS LOCATED ELECTRICAL VAULTS LOCATED VAULTS LOCATED VAULTS LOCATED LOCATED LOCATED ADJACENT TO EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE TO EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE TO EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE EACH SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE SUBSTATION, AS SPECIFIED FOR EXISTING AND NEW CABLE AS SPECIFIED FOR EXISTING AND NEW CABLE AS SPECIFIED FOR EXISTING AND NEW CABLE SPECIFIED FOR EXISTING AND NEW CABLE SPECIFIED FOR EXISTING AND NEW CABLE FOR EXISTING AND NEW CABLE FOR EXISTING AND NEW CABLE EXISTING AND NEW CABLE EXISTING AND NEW CABLE AND NEW CABLE AND NEW CABLE NEW CABLE NEW CABLE CABLE CABLE SUPPORT 4. CONSTRUCTION PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY CONSTRUCTION PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY PHASING AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY AND RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY RESTRICTIONS. WORK AT ONE ONLY SUBSTATION AT ANY WORK AT ONE ONLY SUBSTATION AT ANY WORK AT ONE ONLY SUBSTATION AT ANY AT ONE ONLY SUBSTATION AT ANY AT ONE ONLY SUBSTATION AT ANY ONE ONLY SUBSTATION AT ANY ONE ONLY SUBSTATION AT ANY ONLY SUBSTATION AT ANY ONLY SUBSTATION AT ANY SUBSTATION AT ANY SUBSTATION AT ANY AT ANY AT ANY ANY ANY TIME. EACH SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER EACH SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER EACH SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SUBSTATION SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SHALL BE COMPLETED BEFORE WORK START AT ANOTHER SHALL BE COMPLETED BEFORE WORK START AT ANOTHER BE COMPLETED BEFORE WORK START AT ANOTHER BE COMPLETED BEFORE WORK START AT ANOTHER COMPLETED BEFORE WORK START AT ANOTHER COMPLETED BEFORE WORK START AT ANOTHER BEFORE WORK START AT ANOTHER BEFORE WORK START AT ANOTHER WORK START AT ANOTHER WORK START AT ANOTHER START AT ANOTHER START AT ANOTHER AT ANOTHER AT ANOTHER ANOTHER ANOTHER SUBSTATION. PHASING IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE PHASING IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE PHASING IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE IS REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE REQUIRED IN ORDER TO MINIMIZE DOWNTIME TO THE IN ORDER TO MINIMIZE DOWNTIME TO THE IN ORDER TO MINIMIZE DOWNTIME TO THE ORDER TO MINIMIZE DOWNTIME TO THE ORDER TO MINIMIZE DOWNTIME TO THE TO MINIMIZE DOWNTIME TO THE TO MINIMIZE DOWNTIME TO THE MINIMIZE DOWNTIME TO THE MINIMIZE DOWNTIME TO THE DOWNTIME TO THE DOWNTIME TO THE TO THE TO THE THE THE FACILITIES. FIRST, AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE FIRST, AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE FIRST, AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE AT EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE EACH SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE SUBSTATION THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE THE NEW LOW VOLTAGE SWITCHGEAR SHALL BE NEW LOW VOLTAGE SWITCHGEAR SHALL BE NEW LOW VOLTAGE SWITCHGEAR SHALL BE LOW VOLTAGE SWITCHGEAR SHALL BE LOW VOLTAGE SWITCHGEAR SHALL BE VOLTAGE SWITCHGEAR SHALL BE VOLTAGE SWITCHGEAR SHALL BE SWITCHGEAR SHALL BE SWITCHGEAR SHALL BE SHALL BE SHALL BE BE BE INSTALLED. REROUTE ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM REROUTE ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM REROUTE ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM ALL LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM LV CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM CABLES TO NEW SWITCHGEAR AND POWER THE SYSTEM TO NEW SWITCHGEAR AND POWER THE SYSTEM TO NEW SWITCHGEAR AND POWER THE SYSTEM NEW SWITCHGEAR AND POWER THE SYSTEM NEW SWITCHGEAR AND POWER THE SYSTEM SWITCHGEAR AND POWER THE SYSTEM SWITCHGEAR AND POWER THE SYSTEM AND POWER THE SYSTEM AND POWER THE SYSTEM POWER THE SYSTEM POWER THE SYSTEM THE SYSTEM THE SYSTEM SYSTEM SYSTEM THROUGH GOVERNMENT FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GOVERNMENT FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GOVERNMENT FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED FURNISHED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED GENERATOR SET. NEXT INSTALL NEW PAD MOUNTED SET. NEXT INSTALL NEW PAD MOUNTED SET. NEXT INSTALL NEW PAD MOUNTED NEXT INSTALL NEW PAD MOUNTED NEXT INSTALL NEW PAD MOUNTED INSTALL NEW PAD MOUNTED INSTALL NEW PAD MOUNTED NEW PAD MOUNTED NEW PAD MOUNTED PAD MOUNTED PAD MOUNTED MOUNTED MOUNTED MV SWITCH AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR SWITCH AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR SWITCH AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR AND TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR TRANSFORMER. INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR INSTALL NEW WIRING AND CONNECT LV SWITCHGEAR NEW WIRING AND CONNECT LV SWITCHGEAR NEW WIRING AND CONNECT LV SWITCHGEAR WIRING AND CONNECT LV SWITCHGEAR WIRING AND CONNECT LV SWITCHGEAR AND CONNECT LV SWITCHGEAR AND CONNECT LV SWITCHGEAR CONNECT LV SWITCHGEAR CONNECT LV SWITCHGEAR LV SWITCHGEAR LV SWITCHGEAR SWITCHGEAR SWITCHGEAR TO TRANSFORMER. CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH TRANSFORMER. CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH TRANSFORMER. CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH CONTRACTOR SHALL PROVIDE PHASING AND WORK PLAN AT EACH SHALL PROVIDE PHASING AND WORK PLAN AT EACH SHALL PROVIDE PHASING AND WORK PLAN AT EACH PROVIDE PHASING AND WORK PLAN AT EACH PROVIDE PHASING AND WORK PLAN AT EACH PHASING AND WORK PLAN AT EACH PHASING AND WORK PLAN AT EACH AND WORK PLAN AT EACH AND WORK PLAN AT EACH WORK PLAN AT EACH WORK PLAN AT EACH PLAN AT EACH PLAN AT EACH AT EACH AT EACH EACH EACH SUBSTATION TO THE GOVERNEMNT FOR APPROVAL. 5. EXISTING NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND EXISTING NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND NON AMI METER ENCLOSURES SHALL BE REMOVED STORED AND AMI METER ENCLOSURES SHALL BE REMOVED STORED AND AMI METER ENCLOSURES SHALL BE REMOVED STORED AND METER ENCLOSURES SHALL BE REMOVED STORED AND METER ENCLOSURES SHALL BE REMOVED STORED AND ENCLOSURES SHALL BE REMOVED STORED AND ENCLOSURES SHALL BE REMOVED STORED AND SHALL BE REMOVED STORED AND SHALL BE REMOVED STORED AND BE REMOVED STORED AND BE REMOVED STORED AND REMOVED STORED AND REMOVED STORED AND STORED AND STORED AND AND AND REINSTALLED/REWIRED AT NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET AT NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET AT NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET NEW LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET LV SWITCHGEAR AS SHOWN. REWIRING SHALL MEET SWITCHGEAR AS SHOWN. REWIRING SHALL MEET SWITCHGEAR AS SHOWN. REWIRING SHALL MEET AS SHOWN. REWIRING SHALL MEET AS SHOWN. REWIRING SHALL MEET SHOWN. REWIRING SHALL MEET SHOWN. REWIRING SHALL MEET REWIRING SHALL MEET REWIRING SHALL MEET SHALL MEET SHALL MEET MEET MEET EXISTING CONDITIONS. 6. ALL EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE ALL EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE EXISTING AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE AMI METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE METERS SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE BE DISCONNECTED. WHERE INDICATED SHALL BE BE DISCONNECTED. WHERE INDICATED SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE DISCONNECTED. WHERE INDICATED SHALL BE WHERE INDICATED SHALL BE WHERE INDICATED SHALL BE INDICATED SHALL BE INDICATED SHALL BE SHALL BE SHALL BE BE BE REMOVED/STORED AND REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS AND REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS AND REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS REINSTALLED AT NEW LOCATIONS INDICATED. ALL AMI METERS AT NEW LOCATIONS INDICATED. ALL AMI METERS AT NEW LOCATIONS INDICATED. ALL AMI METERS NEW LOCATIONS INDICATED. ALL AMI METERS NEW LOCATIONS INDICATED. ALL AMI METERS LOCATIONS INDICATED. ALL AMI METERS LOCATIONS INDICATED. ALL AMI METERS INDICATED. ALL AMI METERS INDICATED. ALL AMI METERS ALL AMI METERS ALL AMI METERS AMI METERS AMI METERS METERS METERS SHALL BE REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL BE REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL BE REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL REWIRED TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL TESTED, PROGRAMMED AND SET IN OPERATION AFTER ALL PROGRAMMED AND SET IN OPERATION AFTER ALL PROGRAMMED AND SET IN OPERATION AFTER ALL AND SET IN OPERATION AFTER ALL AND SET IN OPERATION AFTER ALL SET IN OPERATION AFTER ALL SET IN OPERATION AFTER ALL IN OPERATION AFTER ALL IN OPERATION AFTER ALL OPERATION AFTER ALL OPERATION AFTER ALL AFTER ALL AFTER ALL ALL ALL SUBSTATIONS HAS BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE HAS BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE HAS BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE BEEN INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE INSTALLED BY A METER CERTIFIED CONTRACTOR. (SEE BY A METER CERTIFIED CONTRACTOR. (SEE BY A METER CERTIFIED CONTRACTOR. (SEE A METER CERTIFIED CONTRACTOR. (SEE A METER CERTIFIED CONTRACTOR. (SEE METER CERTIFIED CONTRACTOR. (SEE METER CERTIFIED CONTRACTOR. (SEE CERTIFIED CONTRACTOR. (SEE CERTIFIED CONTRACTOR. (SEE CONTRACTOR. (SEE CONTRACTOR. (SEE (SEE (SEE SPECIFICATIONS). 7. EXISTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING EXISTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING DIN RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING RAIL EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING EQUIPMENT - PHOTOVOLTAIC REVERSE RELAY, LIGHTING - PHOTOVOLTAIC REVERSE RELAY, LIGHTING - PHOTOVOLTAIC REVERSE RELAY, LIGHTING PHOTOVOLTAIC REVERSE RELAY, LIGHTING PHOTOVOLTAIC REVERSE RELAY, LIGHTING REVERSE RELAY, LIGHTING REVERSE RELAY, LIGHTING RELAY, LIGHTING RELAY, LIGHTING LIGHTING LIGHTING CONTACTOR/PHOTOCELL SWITCH - SHALL BE REMOVED, STORED AND REINSTALLED SWITCH - SHALL BE REMOVED, STORED AND REINSTALLED SWITCH - SHALL BE REMOVED, STORED AND REINSTALLED - SHALL BE REMOVED, STORED AND REINSTALLED - SHALL BE REMOVED, STORED AND REINSTALLED SHALL BE REMOVED, STORED AND REINSTALLED SHALL BE REMOVED, STORED AND REINSTALLED BE REMOVED, STORED AND REINSTALLED BE REMOVED, STORED AND REINSTALLED REMOVED, STORED AND REINSTALLED REMOVED, STORED AND REINSTALLED STORED AND REINSTALLED STORED AND REINSTALLED AND REINSTALLED AND REINSTALLED REINSTALLED REINSTALLED BUILT-IN TO THE NEW SWITCHGEAR. MOUNT PHOTOCELL ON TOP OF SWITCHGEAR 8. EXISTING UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM EXISTING UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM UTILITIES SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM SHOWN OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM OBTAINED FROM FACILITY UTILITY MAPPING PLANS AND FROM FROM FACILITY UTILITY MAPPING PLANS AND FROM FROM FACILITY UTILITY MAPPING PLANS AND FROM FACILITY UTILITY MAPPING PLANS AND FROM FACILITY UTILITY MAPPING PLANS AND FROM UTILITY MAPPING PLANS AND FROM UTILITY MAPPING PLANS AND FROM MAPPING PLANS AND FROM MAPPING PLANS AND FROM PLANS AND FROM PLANS AND FROM AND FROM AND FROM FROM FROM SITE SURVEY. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES PRIOR TO ANY WORK 9. EXISTING EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED EXISTING EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED EQUIPMENT TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED TO BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED BE REMOVED SHALL BE DEMOLISHED UNLESS INDICATED REMOVED SHALL BE DEMOLISHED UNLESS INDICATED REMOVED SHALL BE DEMOLISHED UNLESS INDICATED SHALL BE DEMOLISHED UNLESS INDICATED SHALL BE DEMOLISHED UNLESS INDICATED BE DEMOLISHED UNLESS INDICATED BE DEMOLISHED UNLESS INDICATED DEMOLISHED UNLESS INDICATED DEMOLISHED UNLESS INDICATED UNLESS INDICATED UNLESS INDICATED INDICATED INDICATED OTHERWISE BY THE CONTRACTING OFFICER 10. PAD MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE PAD MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MOUNTED TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE TRANSFORMERS AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE AND MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MV SWITCHGEAR ARE PRODUCTS THAT CAN BE MV SWITCHGEAR ARE PRODUCTS THAT CAN BE SWITCHGEAR ARE PRODUCTS THAT CAN BE SWITCHGEAR ARE PRODUCTS THAT CAN BE ARE PRODUCTS THAT CAN BE ARE PRODUCTS THAT CAN BE PRODUCTS THAT CAN BE PRODUCTS THAT CAN BE THAT CAN BE THAT CAN BE CAN BE CAN BE BE BE FOUND ONLY IN THE US MARKET 11. ALL SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO ALL SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO SURFACES PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO PAVED AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO AND UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO UNPAVED AROUND SUBSTATIONS SHALL BE RESTORED TO AROUND SUBSTATIONS SHALL BE RESTORED TO AROUND SUBSTATIONS SHALL BE RESTORED TO SUBSTATIONS SHALL BE RESTORED TO SUBSTATIONS SHALL BE RESTORED TO SHALL BE RESTORED TO SHALL BE RESTORED TO BE RESTORED TO BE RESTORED TO RESTORED TO RESTORED TO TO TO THEIR ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS AND CONDITION AS PER SPECIFICATIONS UNLESS AND CONDITION AS PER SPECIFICATIONS UNLESS CONDITION AS PER SPECIFICATIONS UNLESS CONDITION AS PER SPECIFICATIONS UNLESS AS PER SPECIFICATIONS UNLESS AS PER SPECIFICATIONS UNLESS PER SPECIFICATIONS UNLESS PER SPECIFICATIONS UNLESS SPECIFICATIONS UNLESS SPECIFICATIONS UNLESS UNLESS UNLESS OTHERWISE NOTED ON THE DRAWINGS. 12. NEW GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A NEW GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A GROUNDING CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A CONDUCTORS AND DUCTS (EXISTING AND NEW) SHOULD KEEP A AND DUCTS (EXISTING AND NEW) SHOULD KEEP A AND DUCTS (EXISTING AND NEW) SHOULD KEEP A DUCTS (EXISTING AND NEW) SHOULD KEEP A DUCTS (EXISTING AND NEW) SHOULD KEEP A (EXISTING AND NEW) SHOULD KEEP A (EXISTING AND NEW) SHOULD KEEP A AND NEW) SHOULD KEEP A AND NEW) SHOULD KEEP A NEW) SHOULD KEEP A NEW) SHOULD KEEP A SHOULD KEEP A SHOULD KEEP A KEEP A KEEP A A A VERTICAL SEPARATION OF 30cm BETWEEN THEM TO AVOID CONFLICTS. 13. ADDITIONAL CLEARING, GRUBBING AND EXCAVATIONS ARE REQUIRED FOR THE ADDITIONAL CLEARING, GRUBBING AND EXCAVATIONS ARE REQUIRED FOR THE INSTALLATION OF THE NEW GROUNDING LINES. ALL SURFACES SHOULD BE RESTORED TO THEIR ORIGINAL ELEVATION AND CONDITION AS PER SPECIFICATIONS UNLESS OTHERWISE NOTED ON THE DRAWINGS. 14. ELEVATIONS SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC ELEVATIONS SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC SHOWN ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC ARE IN METERS AND REFER TO PUBLISHED ORTHOMETRIC IN METERS AND REFER TO PUBLISHED ORTHOMETRIC IN METERS AND REFER TO PUBLISHED ORTHOMETRIC METERS AND REFER TO PUBLISHED ORTHOMETRIC METERS AND REFER TO PUBLISHED ORTHOMETRIC AND REFER TO PUBLISHED ORTHOMETRIC AND REFER TO PUBLISHED ORTHOMETRIC REFER TO PUBLISHED ORTHOMETRIC REFER TO PUBLISHED ORTHOMETRIC TO PUBLISHED ORTHOMETRIC TO PUBLISHED ORTHOMETRIC PUBLISHED ORTHOMETRIC PUBLISHED ORTHOMETRIC ORTHOMETRIC ORTHOMETRIC HEIGHT VALUES. ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA VALUES. ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA VALUES. ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA ELEVATIONS WERE ESTABLISHED FROM PUBLISHED DATA WERE ESTABLISHED FROM PUBLISHED DATA WERE ESTABLISHED FROM PUBLISHED DATA ESTABLISHED FROM PUBLISHED DATA ESTABLISHED FROM PUBLISHED DATA FROM PUBLISHED DATA FROM PUBLISHED DATA PUBLISHED DATA PUBLISHED DATA DATA DATA RELATED TO PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE TO PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE TO PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE PERMANENT MILITARY BENCHMARK MONUMENT DISKS WITH CODE MILITARY BENCHMARK MONUMENT DISKS WITH CODE MILITARY BENCHMARK MONUMENT DISKS WITH CODE BENCHMARK MONUMENT DISKS WITH CODE BENCHMARK MONUMENT DISKS WITH CODE MONUMENT DISKS WITH CODE MONUMENT DISKS WITH CODE DISKS WITH CODE DISKS WITH CODE WITH CODE WITH CODE CODE CODE NAMES "ANEMOMYLOS" AND "VIGLA A". MILITARY PERMANENT BENCHMARK "ANEMOMYLOS" AND "VIGLA A". MILITARY PERMANENT BENCHMARK "ANEMOMYLOS" AND "VIGLA A". MILITARY PERMANENT BENCHMARK AND "VIGLA A". MILITARY PERMANENT BENCHMARK AND "VIGLA A". MILITARY PERMANENT BENCHMARK "VIGLA A". MILITARY PERMANENT BENCHMARK "VIGLA A". MILITARY PERMANENT BENCHMARK A". MILITARY PERMANENT BENCHMARK A".