N3319120R4019 PTS Annex 3-Part1of2 (Total 5 of 9).pdf
PDF 6 MB Posted
- Solicitation number
- N3319120R4019
About this file
This solicitation package seeks design-build proposals to renovate four schools in Montenegro. The Naval Facilities Engineering Command is soliciting proposals to renovate schools in the cities of Andrijevica, Golubovci, Niksic, and Zabljak. The solicitation includes design and construction of facility improvements, replacement of joinery, roofing, ceilings and other renovations. Proposals are due by a specified date in December 2021, with contract award anticipated in early 2022. Pricing is to be provided in U.S. dollars. Standard clauses for design-build contracts administered by the Navy are included.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Arhitektonika d.o.o.
adresa: Bulevar 13. jul br. 96, 81400 Nikšić tel/fax: +382 40 251 867 mob: +382 69 309 590 mob: +382 69 347 395 e-mail: arhitektonika.nk@gmail.com
TECHNICAL DESCRIPTION
of Works on adaptation of the school building through
Three phases of works
Primary School „Milan Vukotić“ Golubovci
Location:
C.P. 12964, C.M. Golubovci
Golubovci, Montenegro
Nikšić, December 2019.
mailto:arhitektonika.nk@gmail.com
Adaptation of Primary School „Milan Vukotić“ Golubovci
I INTRODUCTION
Considering the size of school building and large scope of planned interventions on the adaptation, all the adaptation works is foreseen through four parts of building and three phases of works in accordance to priority.
Photo 1 / Front facade – Old building (part „A“)
Photo 2 / Side facade – Old building (part „A“) Photo 3 / Yard side – Old building & Gym
Three phases of works should be performed as:
Phase 1 / priority No1
- Replacing of external joinery (windows and doors) / building part „A“ and
- Facade reparing and painting / building parts „A“, „B“ and „C“.
Phase 2 / Priority No2
- Replacing of demaged part of roof and ceiling structure (wooden elements) / building part „C“ – gym and
- Replacing of ceiling linings with lamps / building part „C“ - gym.
Phase 3 / Priority No3
- Replacing of roofing (tile) / building part „A“ – old building;
- Replacing of demaged part of roof and ceiling structure (wooden elements) / building part „A“ – old building and
- Replacing of ceiling lining with lamps / building part „A“ – old building.
II DESCRIPTION OF WORKS ON ADAPTATION – Phase 1
1.1 REPLACING OF EXT. JOINERY (WINDOWS AND DOORS) / BUILDING PART „A“
PVC – windows
External doors and windows are removed entirely from building part „A“ (excluding already replaced windows on toilets, with sills and internal boards, and replaced with new positions of doors and windows made of PVC profiles - same scheme (dimensions). All existing windows and doors are made of wood.
When disassembling take care not to damage the jambs for easyer installation of planned PVC doors and windows and repairing the jumbs after instalation. Removed doors and windows is required to leave the object, load the appropriate transport vehicle, and drive to the city dump.
New windows and doors are designed from high-quality PVC -five chamber profiles, which must be of suitable thickness (thickness of profile external wall of min. 3.5 mm ) and reinforced with galvanized steel profiles.
Profile in all according to the quality of RAL. The coefficient of thermal conductivity package with a metal reinforcement profile (according to DIN EN 12,412-2 ) of less than 1.4 W / m² K).
Doors and windows are glassed with the double-layer glass IZO / 20 mm / (double flat clear glass with a vacuum in between, d = 4 +16 +4 mm ) .
The inner glass is a low emission - Low E - 1.1 W/m2K, and the external classical - FLOAT. Sealing is the epoxy rubber (according to EN410 and EN 673, Ug = up to 2.0 W / m² K).
Locksmiths provide high quality removable gaskets, high-quality bonds on nickel and aluminum alloys, handles, locks and keys.
All PVC joinery is made according to the schemes of joinery, in basic -white colour.
It is mandatory that the natural flow of air in a closed window position, through special inserted elements in the frame of the window - type " Regel air" or similar, in accordance with DIN and EU standards. Number and size of the elements depends on the window size min. 2 units . The fixed windows and skylights do not need above mentioned elements.
Windows are fixed with anchors on depth of 50mm in the wall.
Between the wall and the window / door frame apply sealing polyurethane foam.
An approved quality of fittings should allow opening of windows as in scheme of joinery. Accent is to fitting in "ventus" windows to be a quality and long lasting with an appropriate number of " lifts" in relation to the size of the leafs .
The outside of the outer bench set of prefabricated aluminum profile. They can be positioned across the width of the window and skylight with declared overhang over existing walls including future intervention on the façade -making insulating facades - the sill leaves 6cm more than the required overhang . When installing the boards, the sides must be leaning against the wall, and part of the damaged facade restored. Sills has to be fixed with at least two anchors in the field. Anchors can be direct or indirect.
On the inner side set the parapet - board made of PVC profiles in basic -white colour, and everything according to specification and joinery scheme.
Choosing of color of exterior joinery or possible changes of detail can do the Investor or Supervisory authority with the permission of the Investor (client's requirements) .
Attests that the bidder has to submit to all the windows / doors are:
• System testing for window, according to 14351-1 and B 5300
• Certificate for air permeability - EN 12207 - Class 4
• Certificate of water resistance - EN 12208 - Class E 900 A
• Resistance to wind - EN 12210 - Class C5
• Mechanical requirements EN 12400 - Class 2
• Certificate for sound protection - to class 5
• Certificate of the heat transfer coefficient DIN EN 12412-2
• Certificate of glass EN 673
• Certificate of locksmithing / locks V ENV 1627-1630 , resistance class 3
In the evaluation process, the obligation of the bidder is to submit drawings of the characteristic corners (anchors) of standard windows and doors, as well as other presentation material. By making workshop documentation for specific facilities, provided the consent of the Designer .
In the process of woodwork , metalwork , etc., It is necessary to enable the supervisory authority inspection during manufacture.
Before starting the production of joinery (doors and windows) that it is a larger series, is necessary to develop and build a complete standard - typical window / door, which, after elimination of all possible objections, will be verified and accepted by Investors and Architects.
The price of each individual item includes (separated according to the description of work and defined in the Bill of Quantity):
- Removing of existing facade joinery should be carefully executed with maximum preservation of existing window jambs;
- Disassembled elements - doors and windows should be leaved to User or transported to the city landfill designated about 15 km;
- Procurement of materials, manufacturing, transportation and installation of windows and doors according according the following scheme, including inner and outer sills / board with the necessary fittings and treatment as specified in this technical description, should be performed to final act -handover ;
- Repair damaged jambs and reconditioning;
- Cleaning the site after completion of all works and removal of the remaining material in the landfill.
All measures of windows and doors should be checked for each individual item before fabrication and installation!
Aluminum external doors
The profiles are similar to the "Alumil M11500 Alutherm Plus" - with a broken thermostat over a polyamide insert that physically separates the outer and inner aluminum profiles. Finishing of the profile of the facade locksmith is anodizing or plasticizing in the color of natural aluminum (RAL 9006). Glazing is done with a thermal insulation package of glass, 6 + 16 + 6mm (inside the Float glass, and outside low emission with a solar factor (g) less than 45%).
The characteristics of the aluminum profile are the following (the values and classes given are the minimum that must be met):
1. Thermal insulation (profile) according to EN ISO 10077-2, Uf ≤ 2,3 W / m2K;
2. Thermal insulation of profile + glass together / products in accordance with EN 1077Uw ≤ 1.8W / m²K;
3. Air leakage in accordance with EN 12207 - Class 4; EN 12208 - CLASS E750;
EN 12210 - CLASS C4;
4. Watertight according to EN 12208 - Class 9A;
5. Wind test resistance (blow test) according to EN 12210 - Class C5;
6. Mechanical requirements EN 12400 - Class 2;
7. Wing mechanism load capacity min. 130kg;
8. Glass Certificate EN 673;
All positions should be equipped with high quality nickel and AL alloy fittings ("Winkhaus Activ Pilot", "Fapim" or technical equivalent), handles, or locks and keys. It is compulsory for all window openings to have the bracket with the brake against mis-handling and sudden gust of wind.
1.2 SANATION OF FACADE WALLS AND JAMBS
AFTER REPLACING OF FACADE JOINERY - descritpion
Facade sanation should be performed by folowing procedure:
1. Impregnation coat in two layers applied by brush;
2. Adhesive (reinforced mortar) with mesh (glue + mesh + glue);
3. Contact coating - emulsion of artificial resins and water glass and impregnating agent for dried reinforced mortar and
4. Finishing layer of mineral decorative plaster - "bavalite" or 2mm granulation equivalent. The mortar must have additives to improve elasticity, resistance to algae and mold.
The item includes all supporting work and material as well as the assembly and disassembly of the required scaffold. Use „bavalite“ granules of 2mm aggregate, in light beige RAL 1013 (Bead white) - "Baumit 0159" or visual equivalent. The surface of the façade is calculated with excluded window and door surfaces, and the jambs are calculated separately.
The material used for plastering must be good quality under the applicable technical regulations and JUS (if it is a classic - manual plastering).
- Lime according to JUS B.C8.042-1970s.
- Cement according to JUS B.C8-024th
- Sand according to JUS B.B8-039th
Existing stone wall should be cleaned using sandblasting (a mixture of water, quartz sand, and optionally a chemical agent for a particular type of stone).
Water pressure and quartz sand granulation must be carefully selected not to cause damage to rock and joint. Calculation per m2 of treated stone facade.
III DESCRIPTION OF WORKS ON ADAPTATION – Phase 2
2.1 REPLACING OF DEMAGED PART OF ROOF AND CEILING STRUCTURE
(WOODEN ELEMENTS) / BUILDING PART „C“ – GYM
Existing roof cover – trapezoidal galvanized metal sheet from the gym (building part „C“) with wooden planks 2,5cm thicks should be temporarely removed. The position includes pre-marking, careful disposal and sorting to a convenient location in the school yard for later reassembly, while transverse laths are removed to the landfill.
Wooden roof structure above the gym - object "C" should be partially replaced. The existing roof is designed with a double straight hangers with slopes, spreaders, shutters and pans, in a slope of 34º. After inspecting the condition of the existing roof structure, it was concluded that part of the roof structure was damaged by insects.
It is envisaged to replace all wooden structural elements of the roof and joists:
30% of the total surface of the roof structure and
100% of the total surface of the attic structure (beams and joists).
The position includes all necessary supporting material, tools and fasteners, as well as protecting the wood from the effects of moisture and insects in accordance with the regulation. Also, the structure must be coated with a fire-proof water-based expandable coating that must meet the fire resistance class of min. 45min as evidenced by the attestation.
Position includes procurement of materials and installation of plank floor d = min.3cm - walking lines within the attic space. The walkway is 1.2m wide and is installed over the joist beams along the longitudinal axis of the roof / ceiling.
2.2 REPLACING OF CEILING LININGS WITH LAMPS / BUILDING PART „C“ – GYM
Existing wooden boards ceiling should be replaced by installation of a metal linear suspended ceiling. The ceiling is with a visible subframe "knauf metal linear" or equivalent, and is installed in everything according to the graphical annexes of the project and the technical specification of the manufacturer.
Existing ceiling lamp should be replaced with adequate reflector lamps similar to the type "omnistar 2261asim / 144led / 1000ma / 461w" in the gym. The price includes the installation and connection of the power supply unit near each lamp, as well as the lamps themselves on the metal-lattice roof structure. All set. The lamp comes complete with a light source, all the necessary work equipment and the associated cable distribution.
IV DESCRIPTION OF WORKS ON ADAPTATION – Phase 3
3.1 REPLACING OF ROOFING – TILES / BUILDING PART „A“ – old building
First phase of roof sanation works is removing of complete roof covering -grooved tile with associated cross sections dim. 4x5cm nailed to wooden rafters. Position includes careful disposal and sorting of tiles at a convenient location in the school yard, while transverse laths are removed to the landfill.
Note:
The tile is attached to the subframe. The position includes the removal of existing ridges, as well as lightning rod installations with disposal to a convenient location in the school yard.
Removal of the entire existing plaster reed ceiling - hull from object "a". The position involves the removal of the log as a whole with its associated substructure - transverse wood slats dim. 5x5cm. Disassemble all lighting prior to removal of the wiring while providing cables of accidental touch and short circuit.
3.2 REPLACING OF DEMAGED PART OF ROOF AND CEILING STRUCTURE
(WOODEN ELEMENTS) / BUILDING PART „A“ – old building
Wooden roof structure above the gym - object "A" should be partially replaced. The existing roof is designed with a double straight hangers with slopes, spreaders, shutters and pans, in a slope of 34º. After inspecting the condition of the existing roof structure, it was concluded that part of the roof structure was damaged by insects.
It is envisaged to replace all wooden structural elements of the roof and joists:
30% of the total surface of the roof structure and
60% of the total surface of the attic / ceiling structure (beams and joists).
The position includes all necessary supporting material, tools and fasteners, as well as protecting the wood from the effects of moisture and insects in accordance with the regulation.
Also, the structure must be coated with a fire-proof water-based expandable coating that must meet the fire resistance class of min. 45min as evidenced by the attestation.
Position includes procurement of materials and installation of plank floor d = min.3cm - walking lines within the attic space. The walkway is 1.2m wide and is installed over the joist beams along the longitudinal axis of the roof / ceiling.
Roof should be covered with new tiles - "mediterranean" type of tiles. The tile must be fastened to the transverse laths. Pay particular attention to the horizontalness of the rows of the planes themselves. Position includes:
1. Lining the rafters with „OSB“ boards, d = 18-20mm;
2. Installation of backup waterproofing - vapor permeable film with folds under the longitudinal slats;
3. Installation of longitudinal wooden laths (counter-flanges) for roof ventilation, dim. 4x5cm at axial distance according to horn position;
4. Installation of transverse timber slats. 4x5cm at axial distance of 36cm (35.5
- 36.5cm);
5. Fitting the tile vents in the second row from the eaves and the second row from the ridge, every fourth tile and
7. Placing ridge / gutter tiles over the wooden ridge-fixing slats (ridge positions and roof humps).
General description for metal - sheet works:
For all sheet metal work is used steel galvanized plastic sheet dmin = 0.6mm, white (ral9002) or visual equivalent. When delivering the sheet to the construction site, a complete attestation document must be attached. As well as manufacturer’s instructions and recommendations.
Roofing fittings are suitable self-tapping screws with anti-corrosion protection by galvanizing, m8mm head, with ø14mm steel coated washer with EPDM UV-resistant synthetic rubber membrane, ozone impact, aging at high temperatures (min. -50 to + 1200c) as and dilatation.
Displacement of tin roofing for min. 1cm by 10m. The color of the washer and the head of the screw must be in accordance with the color of the sheet.
All sheet metal used must meet the standards iso 9001: 2008 and iso 14001:
2004 as well as the criteria set by eu standard en14782 for sheet metal products.
3.3 REPLACING OF CEILING LINING WITH LAMPS / BUILDING PART „A“ – old building
Existing ceiling should be replaced with new one - cassette / modular suspended ceiling 60x60cm over a metal suspended sub-structure at all positions defined by the project. The ceiling tiles are mineral "Fine stratos" or technical-visual equivalent, and in all according to the project and the technical specification of the manufacturer.
All existing ceiling lamps should be replaced with new ones in LED technology.
Depending on the position in the object (classrooms, corriors, toliets...), all the lamps can be classified into:
Classrooms Ceiling built-in lamp in LED technology, sm120v led34s / 840 psu w20l120 var- PC type lamp, manufactured by philips lighting or equivalent, designated s1.
Classrooms - above school board Hanging lamp, with integrated led light source, made of sheet steel, with asymmetrical reflector in matt anodized aluminum, white color, ral 9003, power 37w, 4000k, 3800lm, cri 80. The luminaire is protected ip20, measuring 1223 x 151 x 84 mm. Suspension kit is supplied complete with light source, all necessary operating equipment, suspension accessories and associated cable distribution.
Toilets Ceiling built-in lamp made in led technology intended for ceiling mounting for illumination of sanitary fixtures, with direct light beam distribution. The lamp is basically square. The housing is made of composite materials while the diffuser is made of polypropylene. The lamp is painted white. The degree of mechanical protection is ip43 / 44, and the degree of impact resistance is ik06, while the current class is i. The lamp is supplied complete with 4000k light color led modules and electronic pre-connectors. Efficiency min 71lm / w, total system flux is 1500lm.
Panic light / EXIT sign in LED tecnology
All lamps must comply with the european standard for safe and proper operation, have an enec mark, as well as comply with the european directives applicable to products and have a ce mark. The lamp manufacturer shall operate in accordance with the iso 9001: 2008 quality management system, the iso 14001: 2004 environmental management system and the ohsas 18001: 2007 occupational health and safety management system. The bidder must submit the above mentioned manufacturer's certificates. The lamp comes complete with a light source, all the necessary work equipment and the associated cable distribution.
ARHITEKTONIKA d.o.o. Nikšić
Responsible engineer / designer:
Nikola Bulajić, architect
Arhitektonika d.o.o.
adresa:Bulevar13.julbr.96,81400Nikšić tel/fax: +382 40 251 867 mob:+38269309590 e-mail: arhitektonika.nk@gmail.com
3.GRAFIČKA DOKUMENTACIJA
mailto:arhitektonika.nk@gmail.com
H=3.17m p:
cm ex ist in g el ec tri ca l b oi le r x
/1
5.
5x
0/ p:
3x
/3 0c m
K L
370 1121
10 O16 betonska klupica h=35cm / concrete bench h=35cm
O18
L E G E N D A / N O T E
B C A STARI OBJEKAT / OLD BUILDING
B NOVO KRILO ŠKOLE / NEW SCHOOL WING
H=3.65m
± 0.00
20 350 60
D
A
FAZE / PHASES :
C FISKULTURNA SALA SA ANEKSOM / GYM WITH ANNEX
D KOTLARNICA / BOILER ROOM
50 20 300 60
- 0.28
20 92 14 90 14 90 60
- 0.62
H=5.60m
- 0.45
FAZA 1. / PHASE 1.
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
-ZAMJENA VERTIKALNIH OLUKA NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD DOWNPIPES FROM OLD SHOOL BUILDING - PART ''A'';
-FASADERSKI RADOVI - DEKORATIVNI FASADNI MALTER NA SVIM
DJELOVMA ŠKOLE - ''A'', ''B'', ''C'', ''D''; /
-PLACING NEW FACADE FINAL LAYER ON ALL SCHOOL PARTS -
''A'', ''B'', ''C'', ''D'';
FAZA 2. / PHASE 2.
6 H=3.25m
- 0.8050 320 60
10 10 10 10 10
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE; -ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
10 10
510 60
NA DIJELU ŠKOLE ''C'';
O15
20 350 60 1001 60
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
-REPLACING ALL OF CEILING CONSTRUCTION AND CEILING;
SCHOOL GYM - PART ''C'';
± 0.00 13
O14
O13
O19
FAZA 3. / PHASE 3.
O9 O10 150 26 -ZAMJENA CJELOKUPNOG KROVNOG POKRIVAČA I
5 H=3.25m
170 136 145 O8
- 0.64 p:100cm 7 H=2.65m
- 0.85 p:100cm p:165cm p:165cm p:180cm p:85cm
H=3.85m
H=3.85m HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
25 275 25 1225 25 425 60 136 14 148 30 247 55 201 56 121 14 136 55
60 1611 60 405 26 570 60
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
60 270 57 247 55 201 56 271 60 p:165cm H=3.85m
64 341 p:215cm
O7
5 6
-REPLACING A PART OF ROOF CONSTRUCTION;
-REPLACING ALL OF CEILING CONSTRUCTION AND CEILING;
OLD SCHOOL BUILDING - PART ''A'';
230 A 140 23
1675 1611 150 p:180cm H=3.85m A X STARA FASADNA STOLARIJA - (uklanja se) /
113 127 198 127 194 127 194 127 194 127 147 60 1157 60 122 127 194 127 194 127 194 127 189 127 83 60 405 96 405 95 60 Y OLD JOINERY - (to be replaced)
4 O25
O5 O6 O11 O12 O20
O25 STARE OLUČNE VERTIKALE - (uklanja se) / OLD DOWNPIPES - (to be replaced) p:95cm p:95cm p:95cm p:95cm p:95cm p:95cm p:95cm p:95cm p:95cm p:95cm
220 12
H=3.40m ± 0.00 ± 0.00 8
H=3.40m
± 0.00
H=3.80m
H=3.40m
± 0.00 22
60 605 20 2055 60 270 57 502 57 271 60 2076 26 570 60
NAPOMENA / REMARK:
- Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
60 934 60 860 60 826 60 1157 60 831 60 836 60 885 60 - Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
PROJEKTANT / DESIGNER: INVESTITOR / CLIENT:
11 10 60 270 40 538 40 270 60 9 Arhitektonika d .o .o . Nikšić
Bulevar " 13 jul " br . 96 , 81400 Nikšić JU OŠ " MILAN VUKOTIĆ", 2 p:95cm 1 3 19 20 21 Te l/ fax : + 3 8 2 ( 0 ) 40 2 5 1 867
H=3.40m ± 0.00 H=3.40m ± 0.00 H=3.40m ± 0.00 H=3.80m 70 p:90cm
H=3.80m H=3.80m p:90cm
H=3.40m ± 0.00 H=3.40m ± 0.00 H=3.40m ± 0.00 Mo b : + 382 ( 0 ) 69 347 395 + 382 ( 0 ) 69 309 590
Objekat / Building: JU OŠ " Milan Vukotić", Golubovci, Opština Podgorica /
School ''Milan Vukotić'', Golubovci, Montenegro
Opština Podgorica
Lokacija / Location: K.P. 12964, K.O. GOLUBOVCI, OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI p:90cm
O24 p:90cm p:90cm p:90cm p:90cm p:90cm
O23 p:90cm p:90cm p:90cm
O22 p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm
O21
Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije / Main design of adaptation
Nikola Bulajić, d. i. a. Dio tehničke dokumentacije / Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100 Jelena Međedović, spec.sci.arh Prilog / Page title: Osnova prizemlja (postojeće stanje) Br. priloga /
Br. strane /
788 617 Nemanja Jokić, b.sc.arh sa planom intervencija / Document no.: Page no.:
60 874
60 860
60 828
60 268 57
57 271 60
831 60
836 60
885 60
Boris Radunović, spec.sci.arh Ground floor layout (existing situation) with interventions plan
128 177 105 177 105 177 197 177 104 177 104 177 125 177 100 177 104 177 77 134 127 156 63 68 177 68 63 156 127 74 62 75 177 104 177 104 177 98 177 106 177 106 177 203 177 104 177 108 177 131
Datum izrade i M.P. / Date and stamp
Datum revizije i M.P. / Revision date and stamp
A B C D E F G H I J
DECEMBAR / DECEMBER 2019 . god.
p:
5x
0/
7 30
0 12
0 17 p:
p:
p:
p:
p:
p:
8 O29
O1
60 1001 60
B C
10 O16 O17 O18
H=3.75m
A STARI OBJEKAT / OLD BUILDING
D C FISKULTURNA SALA SA ANEKSOM / GYM WITH ANNEX
7 O28
O2
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
H=3.75m + 4.02
6 O27 O3
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
H=3.75m + 4.02
240 57 195 122 49 122 195 297
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
5 O26
O4
60 298
O9
O8 p:100cm
+ 2.01
O10
+ 4.02
630 60
-ZAMJENA CJELOKUPNOG KROVNOG POKRIVAČA I
HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
60 270
57 247 34 222 56 271 60
-REPLACING A PART OF ROOF CONSTRUCTION;
OLD SCHOOL BUILDING - PART ''A'';
190 23 230 22
X STARA FASADNA STOLARIJA - (uklanja se) / Y OLD JOINERY - (to be replaced)
113 127 198 127 194 127 194 127 194 127 147 60 307 20 503 27 300 60 122 127 194 127 194 127 194 127 189 127 83
4 O25
O5 O6 p:100cm p:100cm p:100cm p:100cm p:100cm
O11 O12 p:95cm p:95cm p:95cm p:95cm p:95cm
O20
O25
STARE OLUČNE VERTIKALE - (uklanja se) / OLD DOWNPIPES - (to be replaced)
H=3.50m
H=3.50m
+ 4.02
H=3.50m + 4.02
60 565 20 2095 60 1157 60 2076 26 570 60
NAPOMENA / REMARK:
- Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
PROJEKTANT / DESIGNER:
INVESTITOR / CLIENT:
8 4 5
18 19 20 H=3.50m H=3.50m H=3.50m
+ 4.02 + 4.02 + 4.02
Arhitektonika d .o .o . Nikšić
Bulevar " 13 jul " br . 96 , 81400 Nikšić
Te l/ fax : + 3 8 2 ( 0 ) 40 2 5 1 867 Mo b : + 382 ( 0 ) 69 347 395
JU OŠ " MILAN VUKOTIĆ",
Opština Podgorica
Lokacija / Location: K.P. 12964, K.O. GOLUBOVCI, 60 874 60 860 60 826 60 495 28 634 60 831 60 836 60 885 60 Opština Podgorica / School ''Milan Vukotić'', Golubovci, Montenegro OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije / Main design of adaptation
O24 O23 ravan lim
O22 O21 Odgovorni inženjer / Authorized designer:
Nikola Bulajić, d. i. a. Dio tehničke dokumentacije / Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
flat metal sheet Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100 Jelena Međedović, spec.sci.arh
Prilog / Page title: Osnova sprata Br. priloga /
Nemanja Jokić, b.sc.arh (postojeće stanje) sa planom intervencija / Document no.: Page no.:
934 920
946 Boris Radunović, spec.sci.arh
First floor layout (existing situation) with interventions plan
60 874 60 860 60 826 60 495 28 634 60 831 60 836 60 885 60 Datum izrade i M.P. / Datum revizije i M.P. / 128 177 105 177 105 177 197 177 104 177 104 177 125 177 100 177 104 177 217 117 164 117 75 117 68
117 134 117 184 177 104 177 104 177 98 177 106 177 106 177 203 177 104 177 108 177 131 Date and stamp Revision date and stamp x
/1
5.
7% x
/1
5.
0 12
0 17
A
A p:100cm p:100cm
8 O29 O1
+ 5.88 L E G E N D A / N O T E
10 O16 O17 O18
B
390 561
+ 9.41 FAZE / PHASES :
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
TRAPEZASTI LIM - 340
TRAPEZOIDAL
METAL SHEET - 340
2189 70
6 O27 O3
+ 2.57
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA DIJELU ŠKOLE ''C'';
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
CRIJEP - 340
ROOF TILES - 340
+ 12.04
674 674 327 559 327
9 O13
O9 O10 -ZAMJENA CJELOKUPNOG KROVNOG POKRIVAČA I
1137 514 674 674 1539 1193
568 568 514 674 674 1539 596 596
+ 3.55
+ 12.22
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
CRIJEP - 340
ROOF TILES - 340
CRIJEP - 340
ROOF TILES - 340
4 O25
568 1603
O5 O6
674 674 1539 597 596
O11 O12
KROVNA OBLOGA (TRAPEZASTI LIM) /
TRAPEZOIDAL METAL SHEET
OBJEKAT ''C'' - FAZA 2 / PART ''C'' - PHASE 2
O25 STARE OLUČNE VERTIKALE - (uklanja se) / OLD DOWNPIPES - (to be replaced)
KROVNA OBLOGA (CRIJEP) - (uklanja se) / OLD ROOF TILES - (to be replaced)
OBJEKAT ''A'' - FAZA 3 / PART ''A'' - PHASE 3
568 3414 2782 28 596
- Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
Lokacija / Location:
K.P. 12964, K.O. GOLUBOVCI,
School ''Milan Vukotić'', Golubovci, Montenegro
Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije / Main design of adaptation
O24 O23 ravan lim flat metal sheet 1387 O22 O21 Nikola Bulajić, d. i. a. Dio tehničke dokumentacije /
Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100
Prilog / Page title: Osnova krovne ravni Br. priloga /
Nemanja Jokić, b.sc.arh (postojeće stanje) sa planom intervencija / Document no.: Page no.:
934 920
Boris Radunović, spec.sci.arh
Datum izrade i M.P. / Date and stamp
Roof layout (existing situation) with interventions plan
C
RI
JE
P
- 3
RO
O
F
TIL
ES
C
RI
JE
P
- 3
RO
O
F
TIL
ES
C
RI
JE
P
- 3
RO
O
F
TIL
ES
x
/1
5.
x
/1
5.
C
RI
JE
P
- 3
RO
O
F
TIL
ES
C
RI
JE
P
- 3
RO
O
F
TIL
ES
+ 7.76
A A A
A A A A A
A A A A A A
+ 7.76 FAZA 1. / PHASE 1.
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
+ 3.60
A A A A A A
O23 O22
- 0.85
O21 O20
- 0.89
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
JUŽNA FASADA / SOUTH FACADE
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
A A
-ZAMJENA CJELOKUPNOG KROVNOG POKRIVAČA I
HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
+ 5.01
O12
KROVNA OBLOGA (TRAPEZASTI LIM) - privremeno uklanjanje / TRAPEZOIDAL METAL SHEET - temporarily dismount
OBJEKAT ''C'' - FAZA 2 / PART ''C'' - PHASE 2
O17
+ 3.57
POSTOJEĆI ELMENTI KOJI SE DEMONTIRAJU
(LIMENI OPŠAVI, HORIZONTALNI I VERTIKALNI
OLUCI, DIMNJACI ITD.) /
EXISTING ELEMENTS WHICH SHALL BE
DISMOUNTED (METAL SHEET FLASHINGS,
GUTTERS, DOWNPIPES, CHIMNES ETC.)
KROVNA OBLOGA (CRIJEP) - (uklanja se) /
O11
A A A A
O9
- Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
- 0.87 O18 O16
O10 O8 O1 O29
- 0.90 PROJEKTANT / DESIGNER:
J I H
G F E D C L
School ''Milan Vukotić'', Golubovci, Montenegro
Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije / Main design of adaptation
Nikola Bulajić, d. i. a. Dio tehničke dokumentacije / Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100 SJEVERNA FASADA / NORTH FACADE Jelena Međedović, spec.sci.arh
Prilog / Page title:
Južna i sjeverna fasada Br. priloga /
Nemanja Jokić, b.sc.arh
Boris Radunović, spec.sci.arh
Datum izrade i M.P. / Date and stamp
(postojeće stanje) sa planom intervencija / Document no.: Page no.:
South and north facade
(existing situation) with interventions plan
K
+ 9.27
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
- 0.92
O18
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
1 2 3 4 9 10
ISTOČNA FASADA / EAST FACADE
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
(LIMENI OPŠAVI, HORIZONTALNI I VERTIKALNI
OLUCI, DIMNJACI ITD.) /
A EXISTING ELEMENTS WHICH SHALL BE
DISMOUNTED (METAL SHEET FLASHINGS,
GUTTERS, DOWNPIPES, CHIMNES ETC.)
KROVNA OBLOGA (CRIJEP) - (uklanja se) /
± 0.00 ± 0.00
- 0.85 - 0.85 - Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
Te l/ f a x : + 3 8 2 ( 0 ) 4 0 2 5 1 8 6 7 Mob : + 382 ( 0 ) 69 347 395
8 7 6
5 4 3 2 1
Opština Podgorica /
School ''Milan Vukotić'', Golubovci, Montenegro Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Lokacija / Location:
K.P. 12964, K.O. GOLUBOVCI,
OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije /
ZAPADNA FASADA / WEST FACADE
Odgovorni inženjer / Authorized designer:
Nikola Bulajić, d. i. a.
Main design of adaptation Dio tehničke dokumentacije / RAZMJERA / SCALE: Design discipline: faza - ARHITEKTURA
Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100
Istočna i zapadna fasada Br. priloga /
Nemanja Jokić, b.sc.arh
Boris Radunović, spec.sci.arh
Datum izrade i M.P. / Date and stamp
(postojeće stanje) sa planom intervencija / Document no.: Page no.:
East and west facade
(existing situation) with interventions plan
Datum revizije i M.P. /
A A A A
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
+ 2.24
O12
- 0.90
DJELOVMA ŠKOLE - ''A'', ''B'', ''C'', ''D''; /
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
10 9
4 3 2 1
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
-REPLACING ALL OF CEILING CONSTRUCTION AND CEILING;
UNUTRAŠNJA FASADA 1 / INNER YARD FACADE 1
HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
OLUCI, DIMNJACI ITD.) /
EXISTING ELEMENTS WHICH SHALL BE
- Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
- 0.88
School ''Milan Vukotić'', Golubovci, Montenegro Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
Lokacija / Location:
K.P. 12964, K.O. GOLUBOVCI,
OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije / Main design of adaptation
Nikola Bulajić, d. i. a. Dio tehničke dokumentacije / Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
1 2 3 4 5 6 7 8 Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100
Unutrašnje fasade Br. priloga /
Br. strane / UNUTRAŠNJA FASADA 2 / INNER YARD FACADE 2 Nemanja Jokić, b.sc.arh (postojeće stanje) sa planom intervencija / Document no.: Page no.:
(existing situation) with interventions plan Boris Radunović, spec.sci.arh
Datum izrade i M.P. / Inner yard facade 6
Datum revizije i M.P. / Date and stamp Revision date and stamp
O3 O2 O1
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
- 0.88 - 0.85
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
1 2 3 4
6 7 8
UNUTRAŠNJA FASADA 3 / INNER YARD FACADE 3
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
+ 9.27
HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
+ 1.82
O17
+ 3.55 A
+ 3.55
OLUCI, DIMNJACI ITD.) /
EXISTING ELEMENTS WHICH SHALL BE
O9 O8
- 0.64 O7 O6
- Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
- 0.85 O16 O15 O14 - 0.92 PROJEKTANT / DESIGNER:
School ''Milan Vukotić'', Golubovci, Montenegro Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
Lokacija / Location:
K.P. 12964, K.O. GOLUBOVCI,
OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije / Main design of adaptation
10 9 4 3 2 1 Nikola Bulajić, d. i. a. Dio tehničke dokumentacije / Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100 Jelena Međedović, spec.sci.arh Prilog / Page title: Unutrašnje fasade Br. priloga / Br. strane / UNUTRAŠNJA FASADA 4 / INNER YARD FACADE 4 Nemanja Jokić, b.sc.arh (postojeće stanje) sa planom intervencija / Document no.: Page no.:
Boris Radunović, spec.sci.arh
Datum izrade i M.P. / Date and stamp
Inner yard facade (existing situation) with interventions plan
7 25
8 25
9 25 p:9 5c p:9 x 3
0/1 5.4
6c m
5x
0/1 6c
6 23
3x
/3
O16
O18 B C A STARI OBJEKAT / OLD BUILDING
10 20 350 60
17 D C
FISKULTURNA SALA SA ANEKSOM / GYM WITH ANNEX
± 0.00 D KOTLARNICA / BOILER ROOM
50 20 300 60
32 - 0.28
10 20 92 14 90 14 90 60
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
29 - 0.62
6 O27
O3 H=3.25m
10 10 10 10
- 0.80 50 320 60
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
1020 350 60 1001 60 10
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
O15 betonska klupica h=35cm / concrete bench h=35cm p:160cm
± 0.00 13
10 327
H=3.25m
170 136 145
7 H=2.65m p:180cm p:85cm
H=3.85m
-ZAMJENA CJELOKUPNOG KROVNOG POKRIVAČA I
HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
33 715 25 275 25 10 25 425 60 13670 14 148 30 247 55 201 56 121 14 136 70 1595 68 405 26 570 70
210 NA STAROM DIJELU DIJELU SKOLE - ''A'';
64 341 p:215cm
5 60 270 57 247 55 201 56 271 60 10 5 6
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
-REPLACING ALL OF CEILING CONSTRUCTION AND CEILING;
OLD SCHOOL BUILDING - PART ''A'';
1655 1591 150 H=3.85m
113 127 198 127 194 127 194 127 194 127 147 60 1157 60 122 127 194 127 194 127 194 127 189 127 83 60 p:180cm 405 96 405 95 60 10 O25
O5 O6 O11 O12 O20 X NOVA PVC STOLARIJA / NEW PVC JOINERY
Y
X NOVA ALUMINIJUMSKA STOLARIJA / NEW ALUMINIUM JOINERY
p:95cm
H=3.80m ± 0.00
FINALNI DEKORATIVNI FASADNI SLOJ / FINAL DECORATIVE FACADE
NOVE OLUČNE VERTIKALE / NEW DOWNPIPES
H=3.40m H=3.40m H=3.40m 60 605 20 2055 60 270 57 502 57 271 60 2076 26 570 60 10
10 60 874 60 860 60 826 60 1157 60 831 60 836 60 885 60 10 - Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
60 270 40 538 40 270 60 PROJEKTANT / DESIGNER:
11 10 9 2 p:95cm 1 3 19 20 21 Arhitektonika d .o .o . Nikšić H=3.40m ± 0.00 H=3.40m ± 0.00 H=3.40m ± 0.00 H=3.80m p:90cm p:90cm
H=3.40m ± 0.00 H=3.40m ± 0.00 H=3.40m ± 0.00 Bulevar " 13 jul " br . 96 , 81400 Nikšić
+ 382 ( 0 ) 69 309 590 p:90cm
491 62 362
School ''Milan Vukotić'', Golubovci, Montenegro
Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
Glavni projekat adaptacije / Main design of adaptation
Nikola Bulajić, d. i. a. Dio tehničke dokumentacije / Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100 788 915 Jelena Međedović, spec.sci.arh
Br. priloga /
Nemanja Jokić, b.sc.arh Osnova prizemlja (planirano stanje) Document no.: Page no.:
60 874
60 860
60 828
60 268 57
57 271 60
831 60
836 60
885 60
Boris Radunović, spec.sci.arh
Datum izrade i M.P. / Date and stamp
Ground floor layout (designed situation) 8 Datum revizije i M.P. / Revision date and stamp
128 177 105 177 105 177 197 177 104 177 104 177 125 177 100 177 104 177 77 134 127 156 63 68 177 68 63 156 127 74 62 75 177 104 177 104 177 98 177 106 177 106 177 203 177 104 177 108 177 131
DECEMBAR / DECEMBER 2019 . god.
A B C D E F G H J 54
H=3.65m
H=3.65m
H=5.60m
H=3.17m
7 29
3 60
2 14
2 14
2 14
0 7
5 19
5x
0/1 6c
6 14 so kla h
=1 pa ra pe t h
=1
D_
0 12
0 17
3 60
7 25
8 25
9 25
5 65
0 p:9
0c m
A STARI OBJEKAT / OLD BUILDING
O16 O17 O18
C FISKULTURNA SALA SA ANEKSOM / GYM WITH ANNEX
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
O3
D_08
10 60 1001 60 10
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
240 57 195 122 49 122 195 297
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
60 298
O8
6 6
+ 2.01
405 26
60 10
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
10 60 270 57 247 34 222 56 60 10
190 -REPLACING A PART OF ROOF CONSTRUCTION;
H=3.75m
O7a
+ 4.02 230 -REPLACING ALL OF CEILING CONSTRUCTION AND CEILING;
105 127 198 127 194 127 194 127 194 127 139
3 307 20
27 300
70 114 127 194 127 194 127 194 127 189 127 75
190 23 230 22
X NOVA PVC STOLARIJA / NEW PVC JOINERY
4 O25
O5 O6 6a O11
O12 O20
X NOVA ALUMINIJUMSKA STOLARIJA / NEW ALUMINIUM JOINERY
FINALNI DEKORATIVNI FASADNI SLOJ / FINAL DECORATIVE FACADE
p:100cm p:100cm p:100cm p:100cm p:100cm p:95cm p:95cm p:95cm p:95cm p:95cm
NOVE OLUČNE VERTIKALE / NEW DOWNPIPES
H=3.50m
10 60 565 20 2095 60 1157 60 2076 26 570 60 10
- Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
10 9
8 4 5
18 19 20
H=3.50m H=3.50m H=3.50m H=3.50m H=3.50m H=3.50m Mo b : + 382 ( 0 ) 69 347 395 Opština Podgorica + 4.02 + 4.02 + 4.02 + 4.02 + 4.02 + 4.02 + 382 ( 0 ) 69 309 590
10 60 874 60 860 60 826 60 495 28 634 60 831 60 836 60 885 60 10
School ''Milan Vukotić'', Golubovci, Montenegro
Lokacija / Location: K.P. 12964, K.O. GOLUBOVCI, OPŠTINA U OKVIRU GLAVNOG GRADA GOLUBOVCI
O30
O31 p:90cm p:90cm p:90cm p:90cm p:90cm p:90cm
Glavni inženjer / Leading designer:
Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
Nikola Bulajić, d. i. a.
Vrsta tehničke dokumentacije / Design phase:
Glavni projekat adaptacije / Main design of adaptation
Dio tehničke dokumentacije / RAZMJERA / SCALE : Design discipline: faza - ARHITEKTURA Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100
Nemanja Jokić, b.sc.arh Osnova plafona prizemlja (planirano stanje) Document no.: Page no.:
934 920 887 327 559 327 893 896 946 Boris Radunović, spec.sci.arh First floor layout (designed situation) 9 60 874 60 860 60 826 60 495 28 634 60 831 60 836 60 885 60
128 177 105 177 105 177 197 177 104 177 104 177 125 177 100 177 104 177 217 117 164 117 75 117
68 117 134 117 184 177 104 177 104 177 98 177 106 177 106 177 203 177 104 177 108 177 131 Datum izrade i M.P. / Date and stamp
Datum revizije i M.P. / Revision date and stamp
A B C D E F G H DECEMBAR / DECEMBER 2019 . god.
H J 55
H=3.75m
H=3.75m
H=3.75m
D_06
7 29 p:1
2 14
2 14
2 14 p:9 p:9 x 3
0/1 5.4
6c m p:9 x 3
0/1 5.4
6c p:9 p:9 p:9
0 12
0 17
B C
D
Rog 12/16 Rafter
Rožnjača 14/20
Novi crijep / New roof tiles Poprečne letve - 4x5cm / Roff battens - 4x5cm Daščana oplata d=2,5cm / Wooden revetment - 2,5cm Rog - 12x16cm / Rafter - 12x16cm
Daščana oplata d=2,5cm / Wooden revetment - 2,5cm Rog - 12x16cm / Rafter - 12x16cm
14/20
Postojeći trapezni lim / Existing trapezoidal metal sheet
Daščana oplata d=2,5cm / Wooden revetment - 2,5cm Rog - 12x16cm / Rafter - 12x16cm
Underpurlin
K L
Kosnik 14/14 Scissor beam
Vjenčanica 12/12 Cantilevered top plate
Stolica 14/14 Purlin
Raspinjača 14/16
Straining beam 10/10 Pajanta
Brace 14/14 Kosnik
Scissor beam Kosnik
Scissor beam
14/14
Underpurlin
Kosnik 14/14
Vjenčanica 12/12 Cantilevered top plate
10/10 Pajanta Brace
14/14 Kosa stolica
Strut
12/16
12/12
Kosnik 14/14
Raspinjača 14/16
Straining beam 10/10 Pajanta
Brace
Stolica 14/14 Purlin
18/20 Okagača Hanging beam
335 333 335
PRESJEK 1-1 / CROSS SECTION 1-1
Tavanjača18/20 Ceiling joist
Modularni spušteni kasetirani plafon
335 389Modular cassatte suspended3c3e5iling
PRESJEK 3-3 / CROSS SECTION 3-3
335 333
Modularni spušten3i m35etalni plafon Modular metal suspended ceiling
PRESEK 4-4 / CROSS SECTION 4-4 B C A STARI OBJEKAT / OLD BUILDING
D C FISKULTURNA SALA SA ANEKSOM / GYM WITH ANNEX
7 Rožnjača 14/20
2 x 6/14 Kliješta Collar tie
12/16
14/20
Daščana oplata d=2,5cm / Wooden revetment - 2,5cm Rog - 12x16cm / Rafter - 12x16cm
FAZA 1. / PHASE 1.
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
Tavanjača 18/20 Ceiling joist
Modularni spušteni kasetirani plafon
Modular cassatte suspended ceiling
PRESEK 2-2 / CROSS SECTION 2-2
12/12
Modularni spušteni kasetirani plafon 4 Modular cassatte suspended ceiling
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA DIJELU ŠKOLE ''C'';
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
9 FAZA 3. / PHASE 3.
334 334 334 334 334
2 3 391 391 391 391
-ZAMJENA CJELOKUPNOG KROVNOG POKRIVAČA I
HORIZONTALNIH OLUKA;
-SANIRANJE KROVNE KONSTRUKCIJE;
-ZAMJENA DIJELA KROVNE KONSTRUKCIJE;
-ZAMJENA CJELOKUPNE TAVANSKE KONSTRUKCIJE I PLAFONA;
NA STAROM DIJELU DIJELU SKOLE - ''A'';
-REPLACING OLD ROOF TILES AND OLD HORIZONTAL GUTTERS;
-REPAIRING ROOF CONSTRUCTION;
-REPLACING A PART OF ROOF CONSTRUCTION;
-REPLACING ALL OF CEILING CONSTRUCTION AND CEILING;
OLD SCHOOL BUILDING - PART ''A'';
84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84
78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 NOVA TAVANSKA KONSTRUKCIJA /
NEW CEILING CONSTRUCTION
POSTOJEĆA SANIRANA TAVANSKA KONSTRUKCIJA /
REPAIRED CEILING CONTRUCTION
2 - Grafički prilozi su preuzeti iz projekta ''Glavni projekat adaptacije Osnovne škole ''Milan Vukotić'', Golubovci - Program energetske efikasnosti u javnim objektima u Crnoj Gori - faza 2'' - projektant: ''KOPRING PMC d.o.o., Podgorica'' ; /
- Graphical documentation is taken from project '' Final Adaptation Design of the Centre for Primary School ''Milan Vukotić'', Golubovci, Energy Efficiancy Programme in Public Buildings - Phase II (EEPPB II) - designer: ''KOPRING PMC d.o.o., Podgorica'' ;
School ''Milan Vukotić'', Golubovci, Montenegro Glavni inženjer / Leading designer:
1 Nikola Bulajić, d. i. a.
Odgovorni inženjer / Authorized designer:
Main design of adaptation
Nikola Bulajić, d. i. a. Dio tehničke dokumentacije / Design discipline: faza - ARHITEKTURA RAZMJERA / SCALE:
Saradnici / Assistant designers: phase - ARCHITECTURE R=1:100 83 83 83 83 83 83 83 83 83 87 87 87 87 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 84 78 78 78 78 78 83 83 83 46 83 83 83 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 101 Jelena Međedović, spec.sci.arh
83 333 333 346 334 334 334 334 334 391 295 250 391 391 391 391 391 391 389 311 101
Nemanja Jokić, b.sc.arh
Boris Radunović, spec.sci.arh
Datum izrade i M.P. / Date and stamp
Osnova krovne konstrukcije (planirano stanje) Document no.: Page no.:
Roof construction layout (designed situation) 10 Datum revizije i M.P. / Revision date and stamp
A B C D E F G H H J DECEMBAR / DECEMBER 2019 . god.
6 87
C
RI
JE
P
- 3
RO
O
F
TIL
ES
C
RI
JE
P
- 3
RO
O
F
TIL
ES
8 O29 O1
359 1159
O16 O17 O18
359 579 579
-ZAMJENA FASADNE STOLARIJE NA DIJELU ŠKOLE ''A''; /
-REPLACING OLD JOINERY FROM OLD SHOOL BUILDING - PART ''A'';
O3
2189 70
-ZAMJENA DIJELA KROVNE…