This solicitation package includes specifications for renovating four schools in Montenegro. The required work includes exterior windows and doors, heating systems, ventilation, testing and regulation of installations, and various construction tasks. Products and services specified include PVC and aluminum windows and doors, boilers, circulating pumps, mixing valves, radiators, piping, insulation, ventilators, ductwork, and electrical work. Construction work involves excavation, drainage, fencing of an underground fuel tank, concrete work, and floor and wall tiles. The solicitation was issued by the Naval Facilities Engineering Command for work on schools in Andrijevica, Golubovci, Niksic, and Zabljak, Montenegro. The response due date and award date are not provided in the documents.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT OF ADAPTATION KINDERGARTEN „BAJO JOJIĆ“, ANDRIJEVICA
TOILETS
A2 .2. TECHNICAL CONDITIONS OF WORKS
GENERAL CONDITIONS OF WORKS EXECUTION
- All paragraphs of bill of quantities imply the execution of every position of work all in accordance with plans, technical description, bills of quantities, details from the design, technical regulations, standards and instructions of the supervisory body and designer, unconditionally professional and precise.
- All works and materials listed in the descriptions of individual positions of the bill of quantities must be included in the bidder's bid price. The offered prices listed in the bill of quantities shall include all expenditures for work, material, external and internal transport, the scaffold for the execution of works if for certain positions of the works it is not specially foreseen, water, lighting, propulsion material and energy for machines, warehouses for storage of materials, temporary site facilities, offices, workspaces, temporary fences around the construction site, protective canopies, protective canvases on the scaffold, warning signs etc., the direction of execution, contributions, all state and municipal duties, the contractor's earnings, as well as all other expenses.
- The Contractor shall not be entitled to claim any surcharges on the offered and contracted prices in the bill of quantities, unless if in some position of the bill of quantities is stated that the particular work will be paid separately and it is not envisaged in another position.
- Also, no fees or surcharges will be recognized on the prices entered in the bill of quantities in the name of increasing the standardized values from "average standards in construction".
- The general description given for one type of work and material is binding for the contractor to perform all such types of work in certain positions according to that description, regardless of whether the general description is recalled in the relevant position, unless it is otherwise specified in that position.
- In all construction and craft works, the use of quality materials is conditioned according to the existing technical regulations, standards and description of the appropriate position of works in the bill of quantities.
Conditions of material quality and installation method
- Embedding/installation of materials must be approved by the supervisory body as a representative of the Investor.
- The material must be first-class, foreseen type, unless the lower quality is specified by the position of the bill of quantities.
- All materials which Investor representative finds that does not correspond to the contracted bill of quantities, the Contractor is obliged to immediately remove from the construction site. If the Contractor attempts to use it, the representative of the Investor will suspend the works, and all the costs resulting from the suspension of works will be borne by the Contractor.
- For each material being embedded/installed, the main Contractor or manufacturers must first submit to the supervisory body an attestation of the competent authorized institution. In disputed cases, the material will be sent to the material testing institute, whose finding is authoritative for both the Investor and the Contractor.
Labour
- In all construction and construction-craft works, the use of the labour of the appropriate professional qualification is conditioned, as it is for certain positions of works stipulated by the norms in the construction industry. The Contractor is obliged, at the request of the supervisory body, to remove from the construction site of any incompetent and unconscious worker.
Obligations of Contractor and Investor
- The site manager shall, prior to the start of each work, promptly ask the representatives of the investors for explanation of the plans and information for all works not sufficiently defined by the design elaborate.
- If the contractor, without consulting the supervisory body, incorrectly performs certain works, or performs them contrary to the instruction received through the construction logbook, i.e. the contrary to the description, plans and given details, no justification will be considered and in this case the contractor is obliged, without taking into account the quantity of performed works, to demolish works at its own expense and remove all construction detritus from the construction site, and again carried out the work on its own expense as provided within the plans, descriptions, details or instructions of the supervisory body.
- If the contractor on his own hand, without obtaining the approval or order of the representative of the investor through the construction logbook, performs some work better and more expensive than the foreseen quality, he does not have the right to request an extra charge for that works.
- The facility and the construction site during the performance of the works must be maintained regularly and cleanly, and at the end of the works, before the handover of the facility, all the holes, toilets, scaffolds and fences etc. the contractor is obliged to cover, well charge to not later notify the settlement, align it and perform the levelling of whole surface.
- For technical inspection and handover contractor must the entire facility and building parcel clear of detritus, surplus materials, all work equipment and ancillary facilities.
- All access to the facility, plateaux, stairways and walkways, stairs in the facility, as well as the floors of all rooms must be completely clean, as well as all joinery, aluminium, wall, glass and roof surface and sanitation in toilets.
- Streets and sidewalks damaged during works or due to transport must be brought into proper condition for technical inspection and handover of the facility.
- Any damage that the contractor during the works on the facility made in the construction site or on the neighbouring objects, contractor shall be obliged to eliminate and bring everything to its original condition at its own expense.
- Special attention is drawn to the Contractor that only he is responsible for all possible damage caused by his careless, irresponsible or incompetent work to adjacent existing facilities.
- In the event that there is a need for works that do not have the agreed price in the bills of quantities, the contractor is obliged to get the approval for this works of the representatives of the investors, to determine the price for them based on the price analysis approved by the representative of the investor and all this to enter in the construction logbook, and according to the price list of all materials and labour, which he is obliged to submit within the offer.
- The investor has the right to require for the special works from the contractor a written guarantee that the performed works are permanent and quality.
- The contractor is obliged to harmonize the work of individual subcontractors who independently carry out certain types of works, so that one would not damage the work of others, and if that is the case, contractor is obliged to immediately regulate the removal and compensation of damages at the expense of the culprit. Otherwise, the costs for removing such damages will be borne by the contractor itself. This also applies to all disadvantages and damages that may arise due to failure to comply with the agreed order and time schedule for the performance of certain works.
- The contractor is obliged to submit to the supervisory body for inspection of samples of new materials on the basis of which the supervisory body will make the selection, which will not be paid separately, but enters the unit price of the position.
- The contractor is obliged to prepare an Elaborate on occupational safety at the site in accordance with the Law on Occupational Safety and Health.
PARTICULAR CONDITIONS OF WORKS EXECUTION
Facade joinery
Joinery shall be delivered properly packed to the site. Any damage that may be caused during the transport or during the installation should be eliminated, if are minor, or replace the element with a new one, and what falls on the contractor’s burden. The contractor is obliged in relation to the joinery until the day of delivery to the contracting authority/Employer.
The calculation shall be done per piece of installed element, complete with glazing, required shackles and final processing.
The contractor will cover all exposed surfaces, etc. during transport and installation by protective layer against damage, stains, abrasion, wet cement and the like.
All parts will, where possible, be delivered to the construction site in plastic covers or other protective sheath.
PVC and Al parts will not be stored in such a way where they scratch one another or on some another surface. Any PVC and AL parts that are damaged during transportation, before or after installation, will be replaced by the contractor at his expense. Prior to putting it to use, the contractor will remove the protective material and clean the windows and doors. Pay special attention to protection against mortar, lime, dispersion paints.
The supplier (contractor) of PVC and AL joinery is obliged to prepare workshop drawings for all elements (doors, windows) with all the nodes and details to be performed, and to harmonize them with the design. It is the responsibility of the bidder to submit characteristic drawings of the corners/angles of standard windows and doors, as well as other catalog and presentation materials. During the joinery manufacturing process it is necessary to enable the supevisory body to inspect it during the manufacturing process.
Preparation of workshop drawings, harmonization with the design, delivery of samples and certificates will not be paid separately, but represent a contractual obligation.
The Contractor is also obliged to, before manufacturing commencement, check all dimensions of the openings on the construction site and make a record thereof and submit it to the supervising engineer.
Upon completion of the works, the Supplier (contractor) will remove from the site all surplus material, temporary auxiliary structures and clean up all detritus and waste material and leave the site in a clean condition. This work will not be paid separately, but will go into the price of the position.
If during the work execution or during the warranty period a defect in the material occurs, the supplier will eliminate it at his own expense.
Calculation is performed per unit of measure of the element finely finished, complete with supporting structure, fill, jointing and sealing material, glazing with ordinary and special glass, transport, protection and other duties.
The price for each individual item includes (separated according to the works description and defined in the bill of quantities):
- careful removal of existing joinery and wooden products with maximum protection of window jambs against damages;
- handing over of dismantled elements to the user or transport to a landfill specified by the contracting authority up to a distance of 15 km;
- procurement of materials, manufacturing, transportation and installation of windows and doors according to the attached scheme, including internal and external sills with necessary shackles and processing as stated in this technical description, DOWN TO FULL USABILITY;
- repairing of damaged jambs and restoring them to their original condition;
- cleaning of the construction site after completion of all works and removal of the remaining material to the landfill of approximately 15 km distance
CHECK ON THE SPOT ALL MEASURES OF WINDOWS AND DOORS FOR EVERY INDIVIDUAL ITEM
BEFORE MANUFACTURING AND INSTALLATION!
* If the situation on the spot does not match the designed one, adjust the facade joinery at spot with the purpose of normal functioning of the newly constructed facade partitions.
FACADE SCAFFOLDING
The facade scaffolding is installed all in accordance with the regulations and measures of the HSE. The scaffolding must be statically stable, anchored to the building and properly grounded. It is used for the entire duration of the works. The platforms or scaffoldings used must ensure primarily the safety of the workers and then enable the quality execution of necessary works.
Depending on the fit-out of the selected contractor with specialized equipment, in principle, different work platforms can be used to perform the works. A large number of construction and montage companies own scaffoldings of different types. In our area, currently the most common are modular scaffoldings with standard elements whose combination can be formed: load-bearing scaffoldings, working platforms, facade scaffoldings, stair towers, etc.
The designer did not want to favor any contractor, and therefore specifically conditioned the way of performing the façade works, except to define precisely the type of works and the way of facility rehabilitation. In addition, being equipped with specialized equipment from our work experience does not guarantee that the contractor will do the job properly and on time.
Since the use of the simplest tubular type scaffolding is at the same time the most expensive, in the description and bill of quantities due to the budgeting of the works price, it is envisaged to set up a scaffolding of this type with the appropriate works, since the use of another type of scaffolding or platform can only financially benefit the Investor.
Note: Prior to the commencement of the facade works, the future contractor is obliged, on the basis of its equipment and work technology, to submit to the supervisory body the design of installation the selected type of scaffolding for verification and approval.
SMOOTHING-PAINTING WORKS
Painting works include the works of smoothing and painting the treated jambs after the installation of a new facade joinery. After finishing, the smoothing and painting the jambs is included in the unit price of the installed joinery.
All positions of smoothing-painting works must be performed in a professional and quality manner, with materials that in all respects meet technical regulations, norms and standards.
Materials may only be installed and applied on surfaces for which they are intended due to their physical, chemical and mechanical characteristic.
The materials must be of the best quality. For these materials, the contractor is obliged to submit a certificate/attest of completed examination.
The Contractor shall be obliged to submit to the Contracting Authority/Emloyer, prior to the commencement of the works, a certificates/attests for all the materials he intends to embed.
Certificates/attests must be issued by the organizations authorized for this type of worky and must not be older than 1 year from the date of issue until the start of construction worky on the facility.
The contracting authority/Employer has the right to check the quality of the materials with which the contractor performs the worka at the expense of the contractor. For this purpose, the contractor is obliged to hand over to the contracting authority the necessary amount of material he wants to examine.
If the examination establishes that the disputed material does not meet the required and contracted quality, the contractor is obliged to remove the poorly performed work and to perform works with quality materials at its own expense.
Only quality executed works will be taken into the calculation.
Factory-made materials must be used according to the manufacturer's instructions.
The beginning and completion of the smoothing-painting works will be done according to the dynamics of the construction site, and the contractor is obliged to participate in the preparation of the same.
The length of the warranty period will be determined by the contract.
After drying of treatment, perform the walls smoothing and apply a semi-dispersive color if the room is previously painted in this color, in a same tone as in the rest of the room.
The smoothing is performed with smoothing mass in two-layers with intermediate grinding
- until the required evenness and smoothness is achieved, but after repairing any cracks and/or removal of the existing smoothing mass and paint, using the necessary scaffolding.
The painting is done in two layers in basic white color or in a slight tone in accordance with the color of the room, over the prepared - smoothed surface with the application of a substrate for a suitable internal coating.
When smoothing and painting, protect all surfaces of interior doors and facade openings, parquet and lighting fixtures.
The painted surfaces must be clean, without traces of brushes and rollers. The color and tone must be of uniform intensity, with no stains. The paint must completely cover the substrate.
All the finishes of the painted surfaces must be straight and regular, as well as the joints with doors, windows, etc.
Coating can be done manually or by compressor spray. For multiple coatings, the previous coat must be completely dry when the next coat is applied.
When performing smoothing and painting works, the contractor is obliged to protect furniture that could be damaged by the negligence of the worker. Spray of paint and other material on floors is prohibited.
CERAMIC WORKS
The Contractor is obliged to perform all works from this standard group, complete, as specified: descriptions of particular positions, general conditions, standards GN.501 TU.IX JUS.U.011. and technical regulations. True to the project. The following works, including material, are included in the price of the respective positions (or arranged), without any special notes in the text: Marking, recording and transfer of measures for the purposes of the works. Making patterns.
Bringing the substrate to proper condition. Design, installation and repositioning of scaffolds required for operation, according to GN.601. Construction site transport. The calculation is made according to the recorded amount of works performed. The price of ceramic works should also include the installation of the basin grid at the planned position. Also include the installation of PVC end angular moldings.
A3 . G R A PH IC D O C UM ENTA TION – S CH EM ES
GSPublisherVersion 0.0.100.100
NAPOMENA/
NOTE
-Sve mjere provjeriti na licu mjesta/ The measures shall be obligatory taken on the site, before fabricating.
-U svemu prema opštem opisu, šemi i izvodjačkim detaljima / In all according to the general description, scheme and performance details -Izvodjač je dužan da sve detalje ovjeri kod projektanta kao i da podnese odgovarajuće sigurnosne ateste/ The contractor is obliged to confirm all details with the designer as well as to submit appropriate safety certificates
575 20
575 20
570 20 570 20
W W
77 10 76 10 77 16 87 10 95 21
250 16 191
40 130 75 25 75 112
14 443
153 3 99 3 99 3 99
14 180 3 261
POSTOJEĆE / EXISTING
za rušenje / for destruction
PLANIRANO / PLANNED
za zidanje / for masonry
5 5 6 prostorija sa umivaonicima / basin room pomoćna prostorija / utility room pretprostor / hall kabina za osobe sa invaliditetom / disabled cabin kabine za djecu / children's cabins kabina za osoblje / staff cabin
OBJEKAT: Organizaciona jedinica predškolskog vaspitanja O.Š."Bajo Jojić", Andrijevica
OBJECT: Organizational unit preschool education Primary School "Bajo Jojić", Andrijevica R=1:50 str/page
ŠEME SPOLJAŠNJE STOLARIJE
SCHEMES OF EXTERNAL JOINERY
POS
R=1:50
OPIS: Nabavka materijala izrada i ugradnja prozora od tvrdih, visokootpornih, šestokomornih PVC profila, ojačanih iznutra čeličnim pocinkovanim U profilom minimalne debljine 1,5mm, sa visoko kvalitetnim mehanizmom, šarkama i okovom za otvaranje. Profili moraju da ispunjavaju RAL-GZ 716/1. Zastakljivanje izvršiti staklom 4+16+4mm sa hermetički zatvorenim gasom argonom u međuprostoru i dihtovati trajno elastičnom EPDM gumom. Jedno staklo mora biti presvučeno slojem sa niskim procentom zračenja. Toplotna provodljivost kompletnog prozora mora biti po EN RAL 10077-1 maksimalno Uw ≤ 1,50 W/m²K. U obzir uzeti skidanje starih prozora sa odnošenjem i slaganjem na deponiju koju odabere investitor. Pozicija obuhvata sva potrebna čišćenja i odnošenje na deponiju kao i sve potrebne radove za ugradnju stolarije (pravilna RAL ugradnja, potrebna štemovanja, potrebna malterisanja i bojanja, ivične lajsne (ako su potrebne), ugradnju spoljnih metalnih okapnica (plastificirani, pocinkovani lim 0,7mm) . Profili su bijele boje.
DESCRIPTION: Purchase of material, production and installation of windows made of solid, high resistant, six-chamber PVC profiles reinforced from the inside with zinc-plated steel U profiles minimum thickness 1,5mm, all in line with schemes and details, with quality mechanisms, hinges and accessories for the opening. The profiles must meet RAL-GZ 716/1. Window shall be double-glazed 4+16+4mm, sealed with hermetically closed argon gas in between, with permanently elastic EPDM rubber. One glass coated with low emissivity coating.
Thermal conductivity shall be in line with EN RAL 10077-1 maximum of U=1,50W/m²K. Take into consideration removing of the old windows with the transportation and disposal on the depot selected by the Employer / Employer's representative. The item includes all the necessary cleaning and removal to depot, as well as all needed works for the installation of windows (proper RAL installation, required chiselling, plastering and painting, edge battens (if needed), installation of external metal window sills (plastic coated, galavanized metal sheet 0,7mm) .
The profiles shall be white colored.
NAPOMENA/
NOTE
str./page
SPOLJNA STOLARIJA / EXTERNAL JOINERY
OBJEKAT: VRTIĆ "Bajo Jojić" Andrijevica
OBJECT: Kindergarten "Bajo Jojić" Andrijevica gotov pod
P1
190.0
90.0
160.0
90.0
OPIS: Nabavka materijala izrada i ugradnja prozora od tvrdih, visokootpornih, šestokomornih PVC profila, ojačanih iznutra čeličnim pocinkovanim U profilom minimalne debljine 1,5mm, sa visoko kvalitetnim mehanizmom, šarkama i okovom za otvaranje. Profili moraju da ispunjavaju RAL-GZ 716/1. Zastakljivanje izvršiti staklom 4+16+4mm sa hermetički zatvorenim gasom argonom u međuprostoru i dihtovati trajno elastičnom EPDM gumom. Jedno staklo mora biti presvučeno slojem sa niskim procentom zračenja. Toplotna provodljivost kompletnog prozora mora biti po EN RAL 10077-1 maksimalno Uw ≤ 1,50 W/m²K. U obzir uzeti skidanje starih prozora sa odnošenjem i slaganjem na deponiju koju odabere investitor. Pozicija obuhvata sva potrebna čišćenja i odnošenje na deponiju kao i sve potrebne radove za ugradnju stolarije (pravilna RAL ugradnja, potrebna štemovanja, potrebna malterisanja i bojanja, ivične lajsne (ako su potrebne), ugradnju spoljnih metalnih okapnica (plastificirani, pocinkovani lim 0,7mm) . Profili su bijele boje.
DESCRIPTION: Purchase of material, production and installation of windows made of solid, high resistant, six-chamber PVC profiles reinforced from the inside with zinc-plated steel U profiles minimum thickness 1,5mm, all in line with schemes and details, with quality mechanisms, hinges and accessories for the opening. The profiles must meet RAL-GZ 716/1. Window shall be double-glazed 4+16+4mm, sealed with hermetically closed argon gas in between, with permanently elastic EPDM rubber. One glass coated with low emissivity coating.
Thermal conductivity shall be in line with EN RAL 10077-1 maximum of U=1,50W/m²K. Take into consideration removing of the old windows with the transportation and disposal on the depot selected by the Employer / Employer's representative. The item includes all the necessary cleaning and removal to depot, as well as all needed works for the installation of windows (proper RAL installation, required chiselling, plastering and painting, edge battens (if needed), installation of external metal window sills (plastic coated, galavanized metal sheet 0,7mm) .
The profiles shall be white colored.
NAPOMENA/
NOTE
str./page
SPOLJNA STOLARIJA / EXTERNAL JOINERY
gotov pod
P2
195.0
90.0
135.0
115.0
OBJEKAT: VRTIĆ "Bajo Jojić" Andrijevica
OBJECT: Kindergarten "Bajo Jojić" Andrijevica
OPIS: Nabavka materijala izrada i ugradnja prozora od tvrdih, visokootpornih, šestokomornih PVC profila, ojačanih iznutra čeličnim pocinkovanim U profilom minimalne debljine 1,5mm, sa visoko kvalitetnim mehanizmom, šarkama i okovom za otvaranje. Profili moraju da ispunjavaju RAL-GZ 716/1. Zastakljivanje izvršiti staklom 4+16+4mm sa hermetički zatvorenim gasom argonom u međuprostoru i dihtovati trajno elastičnom EPDM gumom. Jedno staklo mora biti presvučeno slojem sa niskim procentom zračenja. Toplotna provodljivost kompletnog prozora mora biti po EN RAL 10077-1 maksimalno Uw ≤ 1,50 W/m²K. U obzir uzeti skidanje starih prozora sa odnošenjem i slaganjem na deponiju koju odabere investitor. Pozicija obuhvata sva potrebna čišćenja i odnošenje na deponiju kao i sve potrebne radove za ugradnju stolarije (pravilna RAL ugradnja, potrebna štemovanja, potrebna malterisanja i bojanja, ivične lajsne (ako su potrebne), ugradnju spoljnih metalnih okapnica (plastificirani, pocinkovani lim 0,7mm) . Profili su bijele boje.
DESCRIPTION: Purchase of material, production and installation of windows made of solid, high resistant, six-chamber PVC profiles reinforced from the inside with zinc-plated steel U profiles minimum thickness 1,5mm, all in line with schemes and details, with quality mechanisms, hinges and accessories for the opening. The profiles must meet RAL-GZ 716/1. Window shall be double-glazed 4+16+4mm, sealed with hermetically closed argon gas in between, with permanently elastic EPDM rubber. One glass coated with low emissivity coating.
Thermal conductivity shall be in line with EN RAL 10077-1 maximum of U=1,50W/m²K. Take into consideration removing of the old windows with the transportation and disposal on the depot selected by the Employer / Employer's representative. The item includes all the necessary cleaning and removal to depot, as well as all needed works for the installation of windows (proper RAL installation, required chiselling, plastering and painting, edge battens (if needed), installation of external metal window sills (plastic coated, galavanized metal sheet 0,7mm) .
The profiles shall be white colored.
NAPOMENA/
NOTE
str./page
SPOLJNA STOLARIJA / EXTERNAL JOINERY
gotov pod
P3
190.0 poluga
70.0
240.0
OPIS: Nabavka materijala izrada i ugradnja prozora od tvrdih, visokootpornih, šestokomornih PVC profila, ojačanih iznutra čeličnim pocinkovanim U profilom minimalne debljine 1,5mm, sa visoko kvalitetnim mehanizmom, šarkama i okovom za otvaranje. Profili moraju da ispunjavaju RAL-GZ 716/1. Zastakljivanje izvršiti staklom 4+16+4mm sa hermetički zatvorenim gasom argonom u međuprostoru i dihtovati trajno elastičnom EPDM gumom. Jedno staklo mora biti presvučeno slojem sa niskim procentom zračenja. Toplotna provodljivost kompletnog prozora mora biti po EN RAL 10077-1 maksimalno Uw ≤ 1,50 W/m²K. U obzir uzeti skidanje starih prozora sa odnošenjem i slaganjem na deponiju koju odabere investitor. Pozicija obuhvata sva potrebna čišćenja i odnošenje na deponiju kao i sve potrebne radove za ugradnju stolarije (pravilna RAL ugradnja, potrebna štemovanja, potrebna malterisanja i bojanja, ivične lajsne (ako su potrebne), ugradnju spoljnih metalnih okapnica (plastificirani, pocinkovani lim 0,7mm) . Profili su bijele boje.
DESCRIPTION: Purchase of material, production and installation of windows made of solid, high resistant, six-chamber PVC profiles reinforced from the inside with zinc-plated steel U profiles minimum thickness 1,5mm, all in line with schemes and details, with quality mechanisms, hinges and accessories for the opening. The profiles must meet RAL-GZ 716/1. Window shall be double-glazed 4+16+4mm, sealed with hermetically closed argon gas in between, with permanently elastic EPDM rubber. One glass coated with low emissivity coating.
Thermal conductivity shall be in line with EN RAL 10077-1 maximum of U=1,50W/m²K. Take into consideration removing of the old windows with the transportation and disposal on the depot selected by the Employer / Employer's representative. The item includes all the necessary cleaning and removal to depot, as well as all needed works for the installation of windows (proper RAL installation, required chiselling, plastering and painting, edge battens (if needed), installation of external metal window sills (plastic coated, galavanized metal sheet 0,7mm) .
The profiles shall be white colored.
NAPOMENA/
NOTE
str./page
SPOLJNA STOLARIJA / EXTERNAL JOINERY
OBJEKAT: VRTIĆ "Bajo Jojić" Andrijevica
OBJECT: Kindergarten "Bajo Jojić" Andrijevica
P/V1 str./page
OPIS:Nabavka materijala izrada i ugradnja vrata od plastificiranih aluminijumskih profila sa termoprekidom, prema šemi stolarije i detaljima, sa visoko kvalitetnim mehanizmom, šarkama i okovom za otvaranje. Zastakljivanje izvršiti staklom 4+16+4mm sa hermetički zatvorenim gasom argonom u međuprostoru i dihtovati trajno elastičnom EPDM gumom. Jedno staklo mora biti presvučeno slojem sa niskim procentom zračenja. Dio koji je sa ispunom od aluminijuma mora biti "sendvič" panel debljine 5cm, ispune od poliuretana. Toplotna provodljivost mora biti maksimalno U=2,80W/m²K. Predviđeno je da vrata dodatno budu snabdjevena kvakama za slučaj opasnosti
(antipanik sistem), veoma čvrstim rukohvatima sa obje strane vrata pod uglom od oko 45° da ne ometaju funkcionisanje kvake, dužine ne veće od 60cm, hidrauličkim zatvaračima vrata na glavnom krilu proizvođača "ASSA ABLOY DC 340" sa teleskopskim kliznim mehanizmom ili boljim, sa podnim držačima za javne objekte na oba krila proizvođač "DORMA" ili bolji i cilindar bravom sa tri ključa. Krilo snabdjeti sa ukupno četiri šarke (tri u gornjem i jedna u donjem pojasu vrata). Vrata raditi bez lajsne za prag, a krila sa donje strane snabdjeti visoko kvalitetnim četkicama. U obzir uzeti skidanje starih vrata sa odnošenjem i slaganjem na deponiju koju odabere Investitor. Pozicija obuhvata sva potrebna čišćenja i odnošenje na deponiju kao i sve potrebne radove za ugradnju stolarije (pravilna RAL ugradnja, potrebna štemovanja, potrebna malterisanja i bojanja, ivične lajsne (ako su potrebne)). Obračun po komadu kompletno završene pozicije. Profili su u bijeloj boji . Prije izrade obavezno uzeti mjere na licu mjesta.
DESCRIPTION:Procurement of material, production and installation of partition-doors made of coated aluminium profiles with-thermal break, according to scheme and details, with quality mechanism, hinges and fittings for the opening. Glass part shall be double-glazed
4+16+4mm, sealed with argon gas in between with permanently elastic EDPM rubber. One glass coated with low emissivity coating. The hatched parts are to be made of aluminium "sandwich" panel 5 cm thick with polyurethane filling. Thermal conductivity shall be a maximum of U=2,80W/m²K. The door shall be additionally equipped with emergency door handles (anti-panic system), sturdy push bars from the both sides mounted inclined 45°, no more than 60 cm long, not to disturb functionality of door handle, hydraulic closing mechanism on the main wing made by "ASSA ABLOY DC 340" with telescopic sliding mechanism or better, bolt locks for public buildings on both wings manufacturer "DORMA" or better, and cylinder lock with three keys. Wings shall be equipped by four hinges (three in the upper zone and one in the lower zone of the doors). The doors shall be made without threshold and high quality brush shall be installed on the bottom of the wings. Take into account removing the old doors with the removal and stacking on the disposal site selected by the Engeneer. The item includes all the necessary cleaning and removal to disposal site, as well as all necessary work for the installation of door (proper RAL installation, required chiseling, plastering and painting, edge molding (if needed)). Calculation is for the completely finished item. The profiles shall be white colored. Before fabricating, make sure to take measures on the site.
NAPOMENA/
NOTE
SPOLJNA STOLARIJA / EXTERNAL JOINERY
ULAZNA VRATA / FRONT DOOR
85.0
250.0
190.0
ULAZNA VRATA / FRONT DOOR
POS dim kom
SPOLJNA STOLARIJA / EXTERNAL JOINERY
Num. Description unit quantity
Attentive dismantling of existing facade joinery in everything according to the technical description of the position. Carpentry is removed entirely. Dispose the carpentry in a convenient place for later loading into a suitable means of transport and transport to the city dump up to 15km distance.
Glass walls 5- 10m2 pcs 2 Windows of 3m2 to 5m2 pcs 29
Procurement, transportation and installation of entrance doors from Aluminum.
Profiles with thermal break in all positions defined by the project and carpentry scheme. The doors are installed by dry anchoring for the walls with pur foam sealing and grouting in all according to the technical description. The door is equipped with a hydraulic mechanism for automatic closing.
dim. 190X335 -exterior double door unit 1
Procurement and installation of windows, all from PVC profiles with double glass package, total heat transfer coefficient of not more than 1.5 W/m²K. The frames and wings should be of multi-chamber (at least five-chamber) PVC profile with thermal break (profile wall thickness of 3.5 mm), minimum profile width 70mm, high hardness, resistance on UV, spraying, twisting and other deformations, with stainless steel profiles of appropriate thickness as reinforcement and strengthening, and reinforcement of all corners and connections for permanent preservation of the given window geometry. Glazing is used with a glass insulation package and at 4 + 16 + 4mm (internal Float glass, low emission outside with a solar factor (g) less than 45%), hermetically filled with argon. Provide a minimum of two rubber band seals per frame and wing circumference. The minimum performance that must be produced must be ensured and must be proven by official certification: EN 12207 - CLASS 4; EN 12208 - CLASS 8A; EN 12210 - CLASS C4; Joinery furnish with high quality interchangeable gaskets, high-quality shackles based on nickel and aluminum alloys ("Winkhaus Activ Pilot", "Fapim" or technical equivalent), handles and locks. Envision a minimum of two rubber sealing strips on the extent of frames and wings. It is mandatory for all window openings shackle to be with a brake against wrong handling and sudden gusts of wind. NOTE: All windows are equipped with solvents made of plasticized aluminum in the color of the joinery sheetmetaldim. 190X250 - combined double window pcs 28 dim. 195X225 - combined double window pcs 1 dim. 190X70 - combined window pcs 2 dim. 190X340cm - combined pcs 1
Dismantling of existing wooden doors on wet knots with associated door jambs.
Dispose of the door in a convenient place for later loading into a suitable means of transport and transport to the city landfill (extra charged). Calculation per piece of dismantled door.
single door dim. 70-100x205(210)cm pcs 4
KINDERGARTEN EXTERIOR WINDOWS AND DOORS AND BATHROOM RENOVATION
I Demolition and Dismantling Works
WORKS ON RENOVATING TOILET
Demolition of part of existing partition walls with cladding including penetration of new door opening and extension of existing one. Dispose of the shot at a convenient location for later loading into a suitable means of transport and transport to a municipal landfill (extra charge). NOTE: Disconnect all power and water supply systems from the mains before breaking down the walls.
Calculation per m2 of demolished walls m2 35
Removal of existing wall ceramics from all wet knot positions defined by the project. When removing the ceramics, remove any loose parts of the extension mortar entirely (up to the wall) and clean the wall with a steel brush. Dispose of the shot at a convenient location for later loading into a suitable means of transport and transport to a municipal landfill (extra charge).
Calculation per m2 of wall ceramics removed m2 80
Removal of existing floor ceramics from all positions of wet knots. When removing the ceramics, care should be taken not to cause any major damage to the existing cement liner for later preparation of the surface for the planned floor ceramics.
Dispose of the shot at a convenient location for later loading into a suitable means of transport and transport to a municipal landfill (extra charge).
Calculation per m2 of floor ceramics removed m2 28
Loading is transported to a suitable transport vehicle and transported to a city dump up to 15km away.
Calculation per lump sum l.s. 1
Procurement of materials and masonry of the planned partition walls with a d = 10cm giter block in 1: 3 extension mortar. When masonry, take care to obtain a flat surface with uniform joints. Remove any excess mortar. The position includes all necessary pre-work, the construction of overhead beams, as well as the assembly and disassembly of the required scaffolding.
Calculation per m2 of masonry walls m2 3
Procurement of materials and plastering / repairing of the interior walls after removal of wall ceramics with cement mortar 1: 3. When plastering / repairing the walls, take care to correct possible geometric imperfections of existing walls (curves or vitrified walls).
Calculationper m2 of plastered surface. m2 80
Procurement of materials and plastering of planned walls. The position includes the plastering in two hands (without a fine hand) of the part of the walls on which the ceramics are laid and the final plastering of the part of the walls that are being painted.
Calculation per m2 of plastered surface. m2 4
II Masonry Works
Procurement of materials and plastering of jambs (approx. 10 cm wide) after the installation of the planned Al. interior door dim. 80x205cm and 100x205cm.
Calculation per m1 of processed jamb m1 15
Procurement of materials and repair of damage to the cement screed caused by removal of floor ceramics and the installation of floor installations.
Calculation per m2 m2 28
Procurement of materials and making waterproofing of prepared screeds and repaired wall surfaces with waterproofing based on two- component polymer-cement coating in two layers. All corners - crossings from horizontal to vertical surfaces should be treated with waterproof bands. Insulation shall be done according to the manufacturer's instructions. Waterproofing treats all floors of wet nodes with lifting insulation up to 10 cm along the walls.
Calculation per m2 of developed surface of the installed waterproofing.
Calculation per m2 of installed insulation m2 33
Procurement of materials and installation of the wall ceramic of first class (confirmed by attest documentation, as well as documentation of the manufacturer) over the previously prepared wall surfaces. Ceramics are placed on a ceramic adhesive, with joints d = 2mm. Choose the dimensions, shape, color and texture of the ceramics in accordance with the wishes of the Investor, the User, and in the agreement with the Designer. When choosing the type of ceramics, take care of the final surface treatment for easier maintenance during exploitation.
NOTE: The position includes the processing of all jambs of palnned doors with ceramics, as well as the purchase and installation of corner PVC moldings at all positions - angles. The connection of ceramics and PVC doors (jambs) must be treated with silicone. At the part where the metal suspended ceiling is installed, the ceramics are placed to the ceiling height - 260cm from the floor level. On the part of the rooms where the lower ceiling is not envisaged, the ceramics are placed up to the floor structure.
Calculation per m2 of installed ceramics m2 109
Procurement of materials and installation of floor ceramics of first class with anti-slip properties (confirmed by attest documentation, as well as documentation by the manufacturer) over pre- prepared - repaired cement screeds, as well as installed waterproofing. Ceramics are placed on a ceramic adhesive, with joints d = 2mm. Choose the dimensions, shape, color and texture of the ceramics in accordance with the wishes of the Investor, the User, and in the agreement with the Designer. When choosing the type of ceramics, take care of the final surface treatment for easier maintenance during exploitation.
Calculation per m2 of installed ceramics m2 28
III Insulation Works
IV Ceramic Works
V JOINERY- SHEETMETAL WORKS
Procurement, transport and installation of interior doors made of hard, high-strength Al. profiles with sandwich panel fill in all positions defined by the project and joinery scheme. The door is installed with a dry procedure with anchoring in walls (three anchors - screw with an appropriate creeping anchor on the sides) with pur foam sealing. Remove all excess of pur foam with the previous protection of the door with tape.
dim. 100x205 -single door pcs 2
Procurement and installation of a metal linear suspended ceiling on a metal suspended subframe. The ceiling is formed by metal (steel or aluminum) plastic lamellas in white. The ceiling is placed at the height of the existing suspended ceiling.
Calculation per m2 of installed ceiling m2 29
Procurement and installation of sanitary partitions - cabin for doors with doors, made of compact laminate d = 12-14mm. The cabins are stratified HP laminate, smooth, non-porous, scratch resistant, easy to clean, hygienic, resistant to heat and vandalism (sprays, felt pens, open flames or cigarettes). The door is fitted with scratch-resistant plastic edges, matching locks and self-closing anodized aluminum hinges. At the top is an anodized aluminum profile that connects the entire structure. The cabins are connected to the existing walls by special aluminum connectors. The cabins are mounted on stainless steel legs that lift the panel 150 mm from the floor
Calculation of the number of cabs formed pcs 5
Procurement of materials and preparation of light gypsum-cardboard linings for sewer and ventilation verticals. The lining should be done by boards d = 1.25cm KNAUF system on the BOHOR substructure, and everything according to the project.
Calculation per m1 m1 8
VIII MISCELLANEOUS WORKS
Procurement of materials and installation of floor and wall distribution of plumbing and sewerage installations according to the planned scheme of sanitary elements, with connection to the existing main supply and drainage pipes and roof ventilation. The price includes all the necessary work that involves demolition, refinement, installation and testing.
Calculation per lump sum L.S. 1
Procurement of sanitary elements with accessories. The price includes all necessary basic and auxiliary materials and installation:
* Toilet bowl made of sanitary ceramics I class with flushing cistern, quality plastic cover, paper holder and toilet brush with stand.
Calculation per pcs pcs 1
Calculation per pcs (child toilet bowl) pcs 2
VI INSTALLATION WORKS
VII PLASTER WORKS
* Class I sanitary ware sink, mounted to the wall, complete with siphon and single lever battery.
Calculation per pcs pcs 1
Calculation per pcs (child washbasin) pcs 7
* A set of medium-grade toiletries that make up a 60 / 40cm mirror with chrome holders as well as a liquid soap dispenser, a towel dispenser and a waste bin.
Calculation per pcs pcs 8
* Disabled washbasin, complete with battery, siphon, tilting mirror, liquid soap dispenser, towel dispenser and waste bin.
Calculation per pcs pcs 1
* Disabled toilet, complete with flushing cistern, quality plastic cover, paper holder and toilet brush with stand
Calculation per pcs pcs 1
* Holder - stainless steel handle, not less than 90 cm in length.
Calculation per pcs pcs 1
* Stainless steel movable bracket, not less than 90 cm in length. It is articulated to the wall so that it can be fixed in horizontal or vertical position as needed.
Calculation per pcs pcs 1
Replacement of interior ceiling lighting and wall electrical in toilets. It is planned to replace the existing fluorescent lamps with a new energy- efficient system, with T5 / T16 LED lamps with electronic ballasts and a shiny grid.
Calculation per lump sum L.S. 1
Final rough and fine cleaning of all parts of the facility where the work took place Calculation per lump sum L.S. 1
Attentive dismantling of existing facade joinery in everything according to the technical description of the position. Carpentry is removed entirely. Dispose the carpentry in a convenient place for later loading into a suitable means of transport and transport to the city dump up to 15km distance, which is included in the price.
Calculation per piece of removed position depending on dimension.
Glass walls 5- 10m2 pcs 2 Windows of 3m2 to 5m2 pcs 123 Windows of 1.5m2 to 3m2 pcs 37
Procurement, transportation and installation of entrance glass walls with doors from Al. profiles with thermal break in all positions defined by the project and carpentry scheme. The rocks are installed by dry anchoring for the walls with pur foam sealing and grouting in all according to the technical description. The door is equipped with a hydraulic mechanism for automatic closing.
dim. 275x300 -exterior glass walls with double doors unit 1 dim. 275x300 - inner glass walls with double doors unit 1
Procurement and installation of windows, all from PVC profiles with double glass package, total heat transfer coefficient of not more than 1.5 W/m²K.
The frames and wings should be of multi-chamber (at least five-chamber) PVC profile with thermal break (profile wall thickness of 3.5 mm), minimum profile width 70mm, high hardness, resistance on UV, spraying, twisting and other deformations, with stainless steel profiles of appropriate thickness as reinforcement and strengthening, and reinforcement of all corners and connections for permanent preservation of the given window geometry.
Glazing is used with a glass insulation package and at 4 + 16 + 4mm (internal Float glass, low emission outside with a solar factor (g) less than 45%), hermetically filled with argon.
Provide a minimum of two rubber band seals per frame and wing circumference. The minimum performance that must be produced must be ensured and must be proven by official certification: EN 12207 - CLASS 4; EN 12208 - CLASS 8A; EN 12210 - CLASS C4; Joinery furnish with high quality interchangeable gaskets, high-quality shackles based on nickel and aluminum alloys ("Winkhaus Activ Pilot", "Fapim" or technical equivalent), handles and locks. Envision a minimum of two rubber sealing strips on the extent of frames and wings. It is mandatory for all window openings shackle to be with a brake against wrong handling and sudden gusts of wind. NOTE:
All windows are equipped with solvents made of plasticized aluminum in the color of the joinery-sheetmetal.
dim. 190X250 - combined double window pcs 97 dim. 195X225 - combined double window pcs 5 dim. 190X70 - combined window pcs 10 dim. 190X255 - combined double window pcs 2 dim. 190X150 - double window pcs 8 dim. 190X190 - combined double window pcs 7 dim. 190X80 - combined window pcs 19
PRIMARY SCHOOL EXTERIOR WINDOWS AND DOORS
dim. 410x60cm - window pcs 1
A. BOILERS FOR HEATING AND EQUIPMENT IN SUBSTATION
A.1. The three-pass boiler with CE-marked. For heating systems with pot temperature (safety temperature) up to 120 ° C. Steel boiler for economical drive with sliding water temperature in the boiler. The compact three-pass boiler cylindrical combustion chamber and low combustion chamber loading for clean combustion products of combustion with low nitrogen oxide emissions. The wide walls on the water side and the large volume of boiler water provide self-circulation and safe heat transfer, so no minimum volume flow is required. The boiler body is comprehensively thermally insulated.
Overall dimensions:
Length: 2280 mm Width: 1285 mm Height: 1690 mm Weight with insulation: 1725 kg Fire resistance: 2.7 mbar Flue gas connection: 300 mm With digital boiler and cascade control.
Minimum technical characteristics and boiler design:
Nominal boiler capacity: min. 700 kW Specific boiler water content: min. 1,3 lit / kW Permissible drive pressure: min. 6 bar Normal degree of usefulness: min. 95% Maximum flow temperature (safety temperature): min. 120 [deg.] C Number of boiler changes: min.3 (three-dimensional version) Minimum allowed boiler water temperature when operating at over 60% boiler capacity: max.50 ° C when operating on oil Minimum required flow through boiler: max. 0m3 / h (no request) Minimum technical characteristics of boiler control:
Digital boiler control Possibility of operating a two-stage or modulating burner Integrated diagnostic system Touchdisplay with text and graphic display Operating the boiler in the cascade
Possibility of running two heating circuits with mixed vents to the outside temperature
Possibility of connecting to the remote control system and control via the Internet network Possibility to connect to the central object control and management system Necessary boiler and boiler manufacturer certificates:
The boiler is certified to CE-0085 The boiler manufacturer is certified according to ISO 9001 and ISO 14001 The required characteristics are proved by the official technical documentation of the boiler manufacturer, a copy of the CE certificate of the boiler and a copy of the ISO 9001 and ISO 14001 boiler manufacturer certificate Type Vitoplex 200 SX2A, with boiler and cascade control Vitotronic 300 CM1E, manufacturer Viessmann Germany or similar unit 1
A.2. The three-pass boiler with CE-marked. For heating systems with pot temperature (safety temperature) up to 120 ° C. Steel boiler for economical drive with sliding water temperature in the boiler. The compact three-pass boiler cylindrical combustion chamber and low combustion chamber loading for clean combustion products of combustion with low nitrogen oxide emissions. The wide walls on the water side and the large volume of boiler water provide self-circulation and safe heat transfer, so no minimum volume flow is required. The boiler body is comprehensively thermally insulated.
CENTRAL HEATING SYSTEM
Overall dimensions:
Length: 2280 mm Width: 1285 mm Height: 1690 mm Weight with insulation: 1725 kg Fire resistance: 2.7 mbar Flue gas connection: 300 mm With digital boiler control.
Minimum technical characteristics and…