N3319120R4019 Montenegro Schools Attach 5 - Safety Checklist.docx

DOCX document 17 KB Posted

Attached to
D-B Renovate Four Schools, Andrijevica, Golubovci, Niksic, and Zabljak, Montenegro
Solicitation number
N3319120R4019
Issued by

About this file

This document contains an attachment to a federal contract solicitation for renovations to four schools in Montenegro. The attachment outlines safety checklist requirements for the contract. The contractor must provide a site safety and health officer who has five years of continuous safety experience and a 30-hour OSHA construction safety class certification within 30 days of award. The contractor and any subcontractors must comply with the U.S. Army Corps of Engineers Safety and Health Requirements Manual and develop a safety plan to monitor personnel performance during construction. Personal protective equipment requirements include steel-toed shoes, helmets, vests, gloves, and eye and ear protection. Five new hard hats must also be provided for any authorized visitors to the job site. The contractor's price must account for all safety requirements and by signing the checklist, the contractor acknowledges and agrees to the safety provisions.

View the file

Other files

File Type Posted
N3319120R4019 Amend 5 (1).pdf PDF
N3319120R4019 Amendment 0004.pdf PDF
N3319120R4019 Amendment 0003.pdf PDF
N3319120R4019 PTS Annex 3-Part2of2 (Total 6 of 9) Updated.pdf PDF
N3319120R4019 Amendment 0002.pdf PDF
N3319120R4019 PTS Annex 2-Part2of4 (Total 2 of 9).pdf PDF
N3319120R4019 PTS Annex 4- Part2of2 (Total 8 of 9).pdf PDF
N3319120R4019 Montenegro Schools Attach 1 - PTS Updated.pdf PDF
N3319120R4019 Solicitation Amendment 0001.pdf PDF
N3319120R4019 PTS Annex 4- Part1of2 (Total 7 of 9).pdf PDF
N3319120R4019 PTS Annex 2-Part3of4 (Total 3 of 9).pdf PDF
N3319120R4019 PTS Annex 5-Part1of1 (Total 9 of 9).pdf PDF
N3319120R4019 PTS Annex 2-Part1of4 (Total 1 of 9).pdf PDF
N3319120R4019 PTS Annex 3-Part1of2 (Total 5 of 9).pdf PDF
N3319120R4019 PTS Annex 2-Part4of4 (Total 4 of 9).pdf PDF
N3319120R4019 PTS Annex 3-Part2of2 (Total 6 of 9).pdf PDF
N3319120R4019 Montenegro Schools Attach 1 - PTS.pdf PDF
N3319120R4019 Montenegro Schools Attach 4 - Data Sheet.docx DOCX document
N3319120R4019 Montenegro Schools Attach 2 - PPI.docx DOCX document
N3319120R4019 Montenegro Schools Solicitation.pdf PDF
N3319120R4019 Montenegro Schools Attach 3 - Price Schedule.doc DOC document
N3319120R4019 Montenegro Schools Attach 6 - PPQ.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 Safety Checklist Form

The contractor shall comply with local safety regulations, unless the U.S. Safety Regulations included in the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) are more strict and not in conflict with the local regulations. In this case, U.S Safety Regulations shall apply. The EM 385-1-1 can be downloaded from the following website: http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_English_2003.pdf

Safety Checklist Requirements

Within 30 days of award of the contract, the contractor will provide a safety plan to monitor personnel performance during construction, and identify one competent employee in accordance with EM 385-1-1 to ensure execution of the safety plan.

The contractor will provide a full-time, on-site Site Safety and Health Officer (SSHO) that meets the requirements of the EM 385 Section 01.A.17, specifically:

- Five (5) years of continuous general industry or construction safety experience in supervising/managing general industry or construction (managing safety programs or processes or conducting hazard analyses and developing controls). Documentation for validation is required within 30 days of contract award.

- Completion of 30-hour OSHA Construction Industry safety class (may be web-based training if the student is able to directly ask questions of the instructor by internet or phone). Documentation for validation and proof of completed training is required within 30 days of contract award.

The contractor will provide a plan to monitor all subcontractor performance during construction if subcontractors will be used. The contractor and subcontractors must also comply with EM 385-1-1.

The contractor shall provide all necessary and required Personal Protective Equipment (PPE), which shall be used as required by the specific risk.

Steel toed shoes

Helmets

Vests and gloves

Eye and ear protection

Shoring for excavation, as needed

The use of helmets or "hard hats" is absolutely required for all personnel entering the job site. In addition the contractor shall have a minimum of 5 new hard hats to be used by any authorized visitor to the job site.

The contractor's price shall include the cost for any and all safety requirements for this project.

As a certified agent of this Company, I acknowledge and agree to the safety factor requirements.

Company Name:

Contractor's Printed Name:

Contractor's Signature:

Date: