N3220521R4014 Amendment 0004.docx

DOCX document 51 KB Posted

Attached to
USNS WILLIAM MCLEAN ROH/DD Federal contract opportunity
Solicitation number
N3220521R4014
Issued by
Department of the Navy Military Sealift Command

About this file

This document package includes a government file related to a federal solicitation for repair and maintenance work on the USNS WILLIAM MCLEAN. The solicitation seeks bids for the Regular Overhaul/Dry-Docking availability of the vessel at a contractor's shipyard. Work items include preservation and replacement of exterior ladders, installation of a satellite entertainment system, stateroom deck head renewals, hose replacement, antenna inspection photographs, and various inspections and maintenance of mechanical and electrical systems. The document provides responses to contractor questions on work item details, clarifies quantities and specifications, and removes one infeasible work item. The place of performance is the contractor's facility, with an anticipated period of performance of 76 calendar days from vessel arrival on or about August 9, 2021. The soliciting agency is the Department of the Navy's Military Sealift Command.

View the file

Other files for this federal contract opportunity

Other files attached to USNS WILLIAM MCLEAN ROH/DD, newest first.
File Type Posted
Amendment 0012 USNS MCLEAN N3220521R4014.docx DOCX document
Revised J-2 MCLEAN N3220521R4014 5-24-21 (4).xls XLS spreadsheet
WI 0451 A TAKE-CCSI ANNUAL RADAR SERVICE - Revised 5-24-21.doc DOC document
REVISED WI INDEX USNS MCLEAN FY21 ROH-DD - REV MAR 29 2021.doc DOC document
Amendment 0011 USNS MCLEAN ROH DD N3220521R4014.docx DOCX document
Amendment 0010 USNS MCLEAN N3220521R4014.docx DOCX document
Revised J - 3 Category B Items MCLEAN.xls XLS spreadsheet
WI 0090 A LEVEL I DAILY COVID-19 PREVENTION AND CONTROL SERVICES REV CV 03-23-21.docx DOCX document
Amendment 0009 MCLEAN N3220521R4014.docx DOCX document
Revised Work Item 0110 A COMPOSITE EXTERIOR HULL VENT REPLACEMENT (TALT-425)3-29-21.docx DOCX document
Amendment 0007 USNS MCLEAN N3220521R4014.docx DOCX document
Amendment 0006 USNS MCLEAN N3220521R4014.docx DOCX document
Amendment 00005 MCLEAN N3220521R4014.docx DOCX document
Amendment 0004 J 2 MCLEAN 21R4014.xls XLS spreadsheet
J 2 MCLEAN 21R4014.xls XLS spreadsheet
N3220521R4014 Amendment 0003.docx DOCX document
N3220521R4014 Amend 0002.docx DOCX document
N3220521R4014 Amendment 0002.docx DOCX document
N3220521R4014 Amendment 0001.docx DOCX document
J - 2 Category A Items MCLEAN 21R4014.xls XLS spreadsheet
J-Attachments.zip ZIP file
N3220521R4014.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220521R4014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard WIs included for this solicitation:

CATEGORY “A” WORK ITEMS

001FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
002FURNISH GENERAL SERVICES
003INFORMATION TECHNOLOGY SERVICES
004PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT
005PREPARATION OF WEIGHT AND MOMENT REPORT
006INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
007FIRE PROTECTION AND SHIP'S SAFETY PROGRAM
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
011T-AKE FURNISH GENERAL SERVICES
012INFORMATION TECHNOLOGY SERVICES
013PROJECT PLANNING AND PRODUCTION STATUS MONITORING
014PREPARATION OF WEIGHT AND MOMENT REPORT
015INTEGRATED LOGISTICS SUPPORT, GFM
016FIRE PROTECTION AND SHIP’S SAFETY PROGRAM
017HANDLING SHIP’S STORES
018DELIVERY AND REDELIVERY OF THE VESSEL
019SHIPBOARD ACCESS AND SECURITY
020GAS FREE CERTIFICATES
021CLEAN AND GAS FREE TANKS, VOIDS, AND COFFERDAMS
022MACHINERY SPACE TURNOVER,DOCK TRIALS AND SEA TRIALS
023HAZARDOUS WASTE DISPOSAL
024PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY
090LEVEL 1 DAILY COVID-19 PREVENTION AND CONTROL SERVICES – REV M
101TAKE CSI BALLAST TANK ZINC INSPECTION (2.5 YR)
102TANK COATING PRESERVATION
103EXTERIOR LADDER PRESERVATION
104HANDRAIL REPLACEMENT
105RENEWAL OF 03 LEVEL NON-SLIP WALKWAYS
106PRESERVATION OF FAN ROOMS
110COMPOSITE VENT GRATING REPLACEMENT (T-ALT 524)
151TAKE CCSI ULTRASONIC THICKNESS GAUGING
154ABS SPECIAL SURVEY SUPPORT - TANK INSPECTION
155TAKE_CCSI_TANK VENT INSPECTION (5 YR)
156FLIGHT DECK NON-SKID RENEWAL
163T-AKE CCSI FLIGHT DK SAFETY NET INSPECT/TEST
201TAKE CSI PROPULSION MOTOR & COOLER CLEANING, INSPECTION & MAINT(2.5 YR) (SCSI)
202MDE FLEXIBLE CONNECTORS (FLEX HOSE) REPLACEMENT (10-YR) (CSI)
204TAKE CSI MDE CONTROL SAFETY INSPECTION AND TEST (1 YR) (SCSI)
205TAKE CSI AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST (1 YR) (SCSI)
206TAKE CSI VULKAN COUPLING INSPECTIONS (1 YR) (SCSI)
207TAKE CSI PROPULSION MOTOR PEDESTAL BEARING INSPECTION (5 YR) (SCSI)
208MDG VULKAN COUPLING RPELACEMENT
210MDG NO 1-4 RESILIENT MOUNT REPLACEMENTS
254TAKE CCSI THRUST AND LINE SHAFT BEARING INSPECTION
301BTAKE CSI CLEANING MAIN GENERATORS & PROPULSION CONTROL SYSTEM (10 YR) (SCSI)
302EATON TIME DELAYS REPACEMENT TALT 496
303TAKE CSI HIGH VOLTAGE, SHIP'S SERVICE, AND EMERGENCY SWBRD INSP AND CLEANING
305PLC SURVEY (2 YR)
350TAKE CSI OVERHAUL AND TEST CIRCUIT BREAKERS (10 YR)
353TAKE CCSI THERMOGRAPHY SURVEY (1 YR)
401INSTALL SEATEL DIRECT TO SAILOR SATELLITE SYST (T-ALT 452)
402TAKE CSI ANTENNA PREVENTATIVE MAINTENANCE (5 YR)
403COMMS SYS PM REV -
405TAKE CSI ANTENNA RIGGING PHOTOS (10 YR)
412AFT STEERING RUDDER ANGLE INDICATOR (T-ALT 502)
451TAKE CCSI ANNUAL RADAR SERVICE
452TAKE CCSI ANNUAL ECDIS SERVICE (SCSI)
453TAKE CCSI ANNUAL GYRO SYSTEM
454TAKE CCSI ANNUAL VDR RECERTIFICATION
455TAKE CCSI ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION
456TAKE CCSI MAGNETIC COMPASS SERVICE (2 YR)
457TAKE CCSI EPIRB SERVICE (5 YR)
459ECHO SOUNDER SERVICE (1YR) TAKE CCSI
460T1 FIBER LINE REPAIRS
461NETWORK MGMT SYST UPGRADE - INDUSTRIAL SUPPORT
501EDG FUEL STOP SOLENOID VALVE (T-ALT 519)
502EDG QUICK CLOSING FUEL AND LUBE OIL VALVES (T-ALT 471)
503EDG SUPPLEMENTAL LUBE OIL COOLER INSTALL (T-ALT 359
504BTAKE CSI CARGO CRANE MAINTENANCE AND RETESTING (10 YR) (SCSI)
505TAKE_CSI_FLEXIBLE HOSE REPLACEMENT
506TAKE CSI EMERGENCY DIESEL GENERATOR -ANNUAL TESTING AND INSPECTION (1 YR) (SCSI)
509TAKE CSI DISTILLING PLANT MAINTENANCE (5 YR)
510OWS AND OCM INSPECTION (5 YR)
512BTAKE CSI MAGAZINE SPRINKLER GAUGE SPRINKLER CALIBRATION - T11-14
516TAKE CSI SEWAGE SYSTEM PIPING CLEANING (2.5 YR)
517ATAKE CSI LTFW COOLER CLEANING AND INSPECTION (2.5 YR)
518BT-AKE CSI HTFW COOLER REGASKETING
519REFRIGERATION COMPRESSOR SAFETY VALVE TEST (5 YR)
527TAKE CSI BRINE SYSTEM FLUSH (5 YR)
528BTAKE CSI MAGAZINE SPRINKLER VALVE OVERHAUL MONTREAL
530TAKE CSI MAIN DIESEL GENERATOR PEDESTAL BEARING INSPECTION (5 YR) (SCSI)
531TAKE CSI SCBA CASCADE FILL STATION HYDRO TEST (5 YR)
546TAKE CSI STEERING GEAR PREVENTIVE MAINTENANCE (10 YR)
551TAKE CCSI OVERHAUL PLATE COOLERS
552TAKE CCSI HOSE REPLACEMENT
553TAKE CCSI PRESSURE VESSELS AND RELIEF VALVES
562TAKE CCSI SCBA ANNUAL INSPECTION
563TAKE CCSI SCBA AIR COMPRESSOR AND FILLING STATION INSPECTION & MAINTENANCE (1 YR)
565TAKE CCSI FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI)
567TAKE CCSI FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI)
569TAKE CCSI FIRE AND SMOKE DETECTION ALARM SYSTEM (1 YR) (SCSI)
570TAKE CCSI PORTABLE FIRE EXTINGUISHER SERVICE (1 YR)
571TAKE CCSI FIRE AND SMOKE DAMPER SERVICE (1 YR) (SCSI)
572TAKE CCSI DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI)
573TAKE CCSI FIRE HOSES (1 YR) (SCSI)
574TAKE CSI FIRE SHUTTERS AND DOORS
575TAKE CSI WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR) (SCSI)
576BOW THRUSTER COOLING REGULATOR (T-ALT 277)
577CHAIN LOCKER VALVE AND FLEXIBLE LINK REPLACEMENT (TALT 318)
578AFT STEERING MOTOR CONTROLLER INDICATOR LIGHT RELOCATION (T-ALT 503)
579POTABLE WATER VALVE REPAIR (VRR-19-031)
580MSD TANK AND PIPING REPAIRS (VRR-19-018/109/020)
581ANCHOR WINDLASS ANNUAL INSPECTION
601FOOD WASTE AND GREY WATER TANK BLAST AND PAINT
602REFRIGERATION CARGO DOOR REPAIRS (VRR-20-0014)
603CHROMALOX HEAT TRACE SYST REPAIRS (VRR-20-001)
604STAEROOM DECK HEAD RENEWALS
610GALLEY AND MSO EQUIPMENT CALIBRATION
652TAKE CCSI LIFEBOAT DAVIT SERVICE AND INSPECTION (5 YR)
654TAKE CCSI RESCUE BOAT AND DAVIT SERVICE (5 YR)
656TAKE CCSI ANNUAL LIFE RAFT CERTIFICATION
658TAKE CCSI ACCOMMODATION LADDER MAINTENANCE AND TESTING (5 YR)
660LIFE BOAT AND RHIB GEL COAT PRESERVATION
665TAKE CSI JETTISON READY SERVICE LOCKERS - CLEAN AND PAINT
801AC940 HEATING ELEMENT REPLACEMENT
802TAKE CSI AIR CONDITIONING PLANT COMPRESSOR OVERHAUL (30K HRS)
803TAKE CARGO AND AC PLANT ANNUAL INSPECTIONS
804VANE AXIAL FAN MOTOR OVERHAULS
851TAKE CCSI ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING
852TAKE CCSI ANNUAL LAUNDRY VENT CLEANING
853TAKE CCSI ACCOMMODATION VENT SYSTEM CLEANING (5 YR)
901TAKE CCSI DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YRS)
903PROPELLER SHAFT AND STERN TUBE INSPECTION WAFT SEAL
904TAKE CSI STERN TUBE SEAL INSPECTION (FW SYSTEM) (5 YR)
905BTAKE CSI BOW THRUSTER MAINTENANCE (5 YR)
908TAKE CSI RENEW SEACHEST, ROPE GUARD, AND BOW THRUSTER ZINCS (5 YR)
912SHAFT GROUNDING SYSTEM MAINTENANCE
913TAKE CSI RENEW WASTER PIECES (5 YR)
917FREEBOARD CLEANING AND PAINTING (NEAR WHITE B
953TAKE CCSI ANCHOR CHAINS AND LOCKERS (5 YR)
956TAKE CCSI OVERHAULING SEA VALVES (5 YR)
957TAKE CCSI POP POLISH AND CLEAN - ON DOCK (2.5 YR)
960TAKE CCSI UNDERWATER HULL CLEANING AND PAINTING - NEAR WHITE BLAST (10YR)
962TAKE CCSI CATHODIC PROTECTION SYSTEM (2.5 YR)
963TAKE CCSI SEA CHEST MARINE GROWTH PREVENTION SYST
966SHAFT ALIGNMENT AND BEARING REACTION CHECKS TAKE CCSI1001SLIDING BLOCK BUMP UPGRADE
1001SLIDING BLOCK BUMPER UPGRDE
1050TAKE CCSI SLIDING BLOCK CHAIN REPLACEMENT (5 YR)
1051HP AIR RELIEF VALVE CALIBRATION

CATEGORY “B” WORK ITEMS

025PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY IN
FORCE CONDITION BRAVO – DELTA
026FINAL VESSEL CLEANING – COVID-19 REV A
030CONTINUATION OF SERVICES
902DRY DOCKING AND UNDOCKING VESSEL

ACRONYM TABLE

ABIH
American Board of Industrial Hygiene
ABR
Agreement for Boat Repair
ABS
American Bureau of Shipping
ACO
Administrative Contracting Officer
AGR
Additional Government Requirements
AIHA
American Industrial Hygiene Association
ALT
Alternate
AMT
Amount
BLDG
Building
CCO
Contract Change Order
CD
Compact Disc
CDRL
Contract Data Requirements List
CD-ROM
Compact Disc Read-Only Memory
CFM
Contractor Furnished Material
CFP
Contractor Furnished Property
CFR
Condition Found Report
CHENG
Chief Engineer
CFR
Code of Federal Regulations
CIH
Certified Industrial Hygienist
CLIN
Contract Line Item Number

CONUS

CPARS

Contiguous United States Contractor Performance Assessment Reporting System

DBIDS
Defense Biometric Identification Systems
DFARS
Defense Federal Acquisition Regulation Supplement
DOD
Department of Defense
DOD SAFE
Department of Defense Secure Access File Exchange
DON
Department of the Navy
EMAIL
Electronic Mail
ESRS
Electronic Subcontract Report System
FAPIIS
Federal Awardee Performance and Integrity Information System
FAR
Federal Acquisition Regulation
FBLR
Fully-Burdened Labor Rate
F/CC
Fibers Per Cubic Centimeter
FPCON
Force Protection Condition
FTR
Federal Travel Regulations
G&A
General and Administrative
GFI-TD
Government Furnished Information – Technical Data
GFM
Government Furnished Material
GFP
Government Furnished Property
GPE
Governmentwide Point of Entry
IAW
In Accordance With
ID
Identification
ISO
International Organization for Standardization
JTR
Joint Travel Regulations
KO
Contracting Officer
KWh
Kilowatt Hour
LLTM
Long Lead Time Material
LPTA
Lowest Price Technically Acceptable
M&IE
Meals and Incidental Expenses
MSC
Military Sealift Command
MSCREP
Military Sealift Command Representative
MM
Millimeter
MSRA
Master Ship Repair Agreement
MTA
Mid-Term Availability
N/A
Not Applicable
NCACS
Navy Commercial Access Control System
NDA
Non-Disclosure Agreement
NO
Number
NSP
Not Separately Priced
ODC
Other Direct Costs
PAT
Proficiency in Analytical Testing

PDF

PII

Portable Document Format Personally Identifiable Information

PM
Program Manager
PPE
Principle Port Engineer
PRIME
Prime Contractor
QA
Quality Assurance
QC
Quality Control
REV
Revision
RFC
Request for Specification Clarification
RFP
Request for Proposal
ROH/DD
Regular Overhaul/Dry-Docking
SECNAV
Secretary of the Navy
SF
Standard Form
SUB
Subcontractor
TPSN
Time Phased Sequencing Network
TWA
Time-Weighted Average
USC
United States Code
USCG
United States Coast Guard
USNS
United States Naval Ship
VR
Voyage Repair
WAWF
Wide Area Workflow
WI
Work Item

SCOPE OF WORK

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS WILLIAM MCLEAN (TAKE-12) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for berthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

7. It is anticipated the ship will arrive at the contractor’s yard on or about 09 August 2021. All work shall be completed in no more than 76 calendar days from the actual start date designated by the Government at the time of contract award.

8. The place of performance for this contract shall be the contractor’s facility.

9. This award consummates the contract, which consists of the following documents: (a) the Government’s solicitation and your final proposal revision submitted on {date} inclusive of all discussion and clarification responses and (b) this award/contract.

SECTION J - LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS

The following have been added by full text:

REQUEST FOR CLARIFICATION #3

MILITARY SEALIFT COMMAND

N3220521R4014

Request for Clarification

SPECIFICATION ITEM NO.: 0103

PARAGRAPH / SECTION NO: 3.2.2, 3.2.3, 3.2.6 + 7.3

TITLE: EXTERIOR LADDER PRESERVATION

QUESTION: Paragraph 3.2.2 gives a quantity of 120’ of 1” pipe. Paragraph 7.3 gives a quantity of 120” of handrail to be replaced. Please confirm that the quantity of 1” pipe handrail to be replaced is 120’ versus 120”? Paragraph 3.2.3 and 3.2.6 identify bolt and nut threads as 3/4" x 11UNC. Standard 3/4" coarse thread bolts are 10 UNC and fine thread 3/4" bolts are 16 UNF. Please confirm that the intention to provide 3/4" x 11 UNC bolts and nuts?

ANSWER: Para 7.3 is a typo. Contractors shall assume 120 ft of ladder handrail shall require replacement, for estimating purposes. Contractor shall provide ¾” x 10 UNC SST nuts/bolt combination for quantities listed in Para 3.2

SPECIFICATION ITEM NO.: 0401

PARAGRAPH / SECTION NO: 7.3.1 a.

TITLE: INSTALLATION OF SEATEL TV-DTS SATELLITE ENTERTAINMENT SYSTEM

QUESTION: Paragraph 7.3.1, sub-paragraph a. states to modify the existing DTS foundation plate to accommodate the new antenna and dome using Item 435. What is Item 435?

ANSWER: Reference to Item #435 was a grammatical error. Item refers to its own references 2.3 & 2.8

SPECIFICATION ITEM NO.: 604

PARAGRAPH / SECTION NO:

TITLE: STATEROOM DECK HEAD RENEWALS

QUESTION: Is there any Cove Base to be removed and installed in these deck heads? If so, how tall and how many linear feet?

ANSWER: No cove base/vinyl replacement is required by this work item.

SPECIFICATION ITEM NO.: 552

PARAGRAPH / SECTION NO: 4.0

TITLE: TAKE-CCSI HOSE REPLACEMENT (5 YR)

QUESTION: Paragraph 4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL / SERVICE subparagraph 4.1 lists ENCLOSURE 2.2.1 – FME MDG HOSES. Does this mean that the MDG hoses listed in ENCLOSURE 2.2.1 are Government furnished or does it mean that only the ENCLOSURE 2.2.1 is Government furnished?

ANSWER: Enclosure 2.2.1 is a listing of hoses due for replacement (para 7.3.2) which are government furnished material (FME – Main Diesel Flexible Hoses). Enclosure 2.2.2 is contractor furnished (para 7.3.1).

SPECIFICATION ITEM NO.: 405

PARAGRAPH / SECTION NO: 7.1

TITLE: TAKE-CSI ANTENNA RIGGING PHOTOS (10 YR)

QUESTION: Please advise if drone would be allowed to take photos for WI 405 in lieu of a helicopter as stated in paragraph 7.1.

ANSWER: Contractors can arrange drone or another variant of aerial photography to accomplish the work scope, as noted in para 7.3

SPECIFICATION ITEM NO.: 552

PARAGRAPH / SECTION NO: 4.1

TITLE: TAKE-CCSI HOSE REPLACEMENT (5 YR)

QUESTION: PARAGRAPH 4.1 ENCLOSURE 2.2.1 hoses: If the hoses are to be GFM will the shipyard be required to execute PARAGRAPH 7.3.3 subparagraphs a - j?

ANSWER: Contractor shall perform Para 7.3.3 in its entirety for GFM and CFM hoses.

SPECIFICATION ITEM NO.: 304

PARAGRAPH / SECTION NO: 2.2, 2.3

TITLE: CARGO HOLD LED LIGHT RETROFIT (T-ALT 493)

QUESTION: References 2.2 and 2.3 lighting info contact number is no longer in business. Please provide contact info for light manufacturer we can procure lights from as listed in specification.

ANSWER: OEM recommended source is no longer in business. Work item cannot be completed in its original form and no alternate part exists. Work item shall be removed from work package proposal.

SPECIFICATION ITEM NO.: 577

PARAGRAPH / SECTION NO: Enclosure 2.1

TITLE: CHAIN LOCKER VALVE & FLEXIBLE LINK REPLACEMENT (T-ALT 318)

QUESTION: It seems there is misunderstanding as to what a Flexible Shaft consists of. The adapters are actually integral to a complete flexible shaft, not separate items. The correct way to measure a flexible shaft is to measure the overall length INCLUDING the adapters. We can calculate that from the measurement taken over the thrust washers, but our quote will show the correct shaft length, NOT the length measured that way. Since the adapters are integral to the flexible shafts, and the number of adapters requested are One (1) more each than what are used for the flexible shafts requested, our quote would be for the flexible shafts plus one (1) of each adapter as separate lines. Also, the adapters are available in several sizes, but no size was specified for any of them. The price is the same for all standard sizes available, but we need the correct sizes to generate the correct part number for the flexible shaft. This is because the part number includes adapter size info within it.

ANSWER: Bidders shall use the following OEM/designed parts to renew the flexible cabling found on the TAKE class for valves (2) found in the Forepeak Ballast Tank;

System 1: VCFX-4200-UW-145.5-M075-F075

VCFX-4200-UW-246.0-F075-F075

System 2: VCFX-4200-UW-145.5-M075-F075

VCFX-4200-UW-301.0-F075-F075

SPECIFICATION ITEM NO.: 0503

PARAGRAPH / SECTION NO: 4.0.

TITLE: EDG SUPPLEMENTAL LUBEOIL COOLER

QUESTION: On previous installations of this same T-ALT some materials were provided as Government Furnished Materials. Specifically, Item Numbers 1, 1A and 1B on Reference 2.2.

Reference 2.1 lists Item Number 1 as GFE.

Please confirm what materials are GFE?

ANSWER: Per paragraph 4.0, GFM/GFE/GFS : None. All material is contractor furnished to complete the work specification.

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .