N3220521R4014
Section B - Supplies or Services and Prices
CLAUSES INCORPORATED BY FULL TEXT
ITEM NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
Category "A" WIs
FFP
Prepare for and accomplish the ROH/DD of the USNS MCLEAN (T-AKE 12)
Total Category "A" WIs $_____________
Proposed unit price per KWh $_____ IAW WI 011, 7.1.1.
Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3
Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4
Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.18
Proposed unit price per crane usage $______ IAW WI 011, 7.9.2
Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.1 ______%
FOB: Destination
AMOUNT
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
AGR and ODC
FFP
AGR
(10,000) man-hours @ $________ per man-hour = $_____________
ODC
Base $___1,000,000.00____________
Proposed G&A Rate _______________% Subtotal: $_____________
Proposed Profit Rate _______________% Subtotal: $_____________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0025
WI 0025 - Physical Security at Private Contractor's Facility in FPCON Charlie - Delta
Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0026
WI 0026 - Vessel Final Clean
Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0030
WI 0030 - Continuation of Services
Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES | |
| QUANTITY | |
| UNIT | |
| UNIT PRICE | |
| AMOUNT | |
Category "B" WI 0902
WI 0902- Drydocking and Undocking
Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.
NET AMT
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0006 $_______________________
The contractor shall enter the total proposed price of all CLINs.
PART I - THE SCHEDULE
Section B, Price Schedule, detailed information
CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.
CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | | |
| Welding | | | Machinists (inside and outside) |
| Burning | | | Brazing |
| Carpentry | | Electrical work | |
| Electronic work | | Shipfitting | |
| Lagging | | | Painting |
| Boilermaking | | Pipefitting | |
| Sheetmetal work | | Engineering | |
| Rigging | | | Staging/scaffolding |
| General labor | | Fire Watch | |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
| Testing | | | Quality Assurance |
| Planning | | | Cleaning (except tank cleaning) |
| Material handling & warehousing | Security | | |
| Surveying | | Administration | |
| Transportation | | Purchasing staff | |
| Lofting | | | Other indirect support |
| Supervision | | | |
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.
The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost, stated in this CLIN does not include the profit or G&A rates.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.
CLINs 0003 through 0006 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0006 pricing.
Section C - Descriptions and Specifications
C – 2 List of Standard WIs included for this solicitation:
CATEGORY “A” WORK ITEMS
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS |
| 004 | TESTING AND QUALITY ASSURANCE |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS |
| 006 | HEAVY WEATHER PLAN |
| 007 | COLD WEATHER PLAN |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM |
| 011 | T-AKE CSI-FURNISH GENERAL SERVICES |
| 012 | INFORMATION TECHNOLOGY |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS |
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT |
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS |
| 016 | FIRE PROTECTION AND SHIP’S SAFETY PROGRAM |
| 017 | HANDLING SHIP’S STORES |
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL |
| 019 | SHIPBOARD ACCESS AND SECURITY |
| 020 | GAS FREE CERTIFICATES |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES |
| 022 | DOCK TRIALS AND SEA TRIAL |
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY |
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY |
| 090 | LEVEL 1 DAILY COVID-19 PREVENTION AND CONTROL SERVICES – REV M |
| 101 | T-AKE CSI-BALLAST TANK ZINC INSPECTIONS |
| 102 | TANK COATING PRESERVATION (VRR-19-0010 & 19-0011) |
| 103 | EXTERIOR LADDER PRESERVATION |
| 104 | HANDRAIL REPLACEMENT |
| 105 | RENEWAL OF 03 LEVEL NON=SLIP WALKWAYS |
| 110 | COMPOSITE VENT GRATING REPLACEMENT (T-ALT 524) (VRR-29-0012) |
| 151 | T-AKE CCSI – ULTRASONIC THICKNESS GAUGING |
| 154 | T-AKE CSI-SPECIAL SURVEY – TANK INSPECTION (ABS) |
| 155 | T-AKE CSI-TANK VENT INSPECTIONS (5 YR) |
| 156 | T-AKE CCSI-FLIGHT DECK PRESERVATION (3 YR) |
| 163 | T-AKE CCSI-FLIGHT DECK SAFETY NET INSPECTION AND TEST (3 YR) |
| 201 | T-AKE CSI-PROPULSION MOTOR AND COOLER CLEANING AND INSPECTION |
| 202 | T-AKE CSI-MAIN ENGINE FLEX HOSE REPLACEMENT 10 YR |
| 204 | T-AKE CSI-MDE CONTROL SAFETY INSPECTION AND TEST 1-YR (SCSI) |
| 205 | T-AKE CSI-AUTOMATION AND PROPULSION CONTROLS INSPECTION AND TEST-1 YR (SCSI) |
| 206 | T-AKE CSI-VULKAN COUPLING ANNUAL INSPECTION (SCSI) |
| 207 | T-AKE CSI-PROPULSION MOTOR PEDESTAL BEARING INSPECTION 5 YR |
| 208 | MDG VULKAN COUPLING REPLACEMENT (10 YR) |
| 210 | MDG NO 1-4 RESILIENT MOUNT REPLACEMENTS (10 YR) |
| 254 | T-AKE CCSI THRUST AND LINE SHAFT BEARING INSPECTION (5 YR) |
| 301B | T-AKE CSI-CLEAN MAIN GENERATOR AND PROPULSION CONTROL SYSTEM (10YR) REV |
| 302 | EATON TIME DELAY REPLACEMENT (T-ALT 496) |
| 303 | T-AKE CSI-HV-SS-E, SWITCHBOARD INSPECTION AND CLEANING 2.5YR |
| 304 | CARGO HOLD LED LIGHT RETROFIT (T-ALT 493) |
| 305 | T-AKE CSI PLC SURVEY (2.5 YR) |
| 306 | MODIFY CAPABILITY TO PARALLEL EDG (T-ALT 406) |
| 350 | T-AKE CSI OVERHAUL AND TEST BREAKERS (10 YR) |
| 353 | ANNUAL THERMOGRAPHIC SURVEY (CCSI) |
| 401 | INSTALLATION OF SEATEL TV-DTS ENTERTAINMENT SYSTEM (T-ALT 452) |
| 402 | T-AKE CSI-ANTENNA PREVENTATIVE MAINTENANCE 5 YR |
| 403 | T-AKE CSI-COMMUNICATIONS SYSTEM ANNUAL PREVENTATIVE MAINTENANCE 5 YR |
| 404 | T-AKE CSI-OE-570 WSC ANTENNA SYSTEM MAINTENANCE 2.5YR |
| 405 | T-AKE CSI-ANTENNA RIGGING PHOTOS 10YR |
| 412 | AFT STEERING RUDDER ANGLE INDICATOR (T-ALT 502) |
| 451 | T-AKE CCSI-ANNUAL RADAR SERVICE |
| 452 | T-AKE CCSI-ANNUAL ECDIS SERVICE (SCSI) |
| 453 | T-AKE CCSI-ANNUAL GYRO SERVICE |
| 454 | T-AKE CCSI-ANNUAL VDR RECERTIFICATION |
| 456 | T-AKE CCSI-MAGNETIC COMPASS SERVICE 2.5YR |
| 457 | T-AKE CCSI-EPIRB SERVICE (5 YR) |
| 459 | T-AKE CCSI-ECHO SOUNDER SERVICE 1YR |
| 460 | T1 FIBER LINE REPAIRS |
| 461 | NETWORK MGMT SYSTEM INDUSTRIAL SUPPORT |
| 501 | EDG STOP SOLENOID FUEL VALVE (T-ALT 519) |
| 502 | EDG QUICK CLOSING FUEL AND LUBE OIL VALVES (T-ALT 471) |
| 503 | EDG SUPPLEMENTAL LUBE OIL COOLER INSTALL (T-ALT 359) |
| 504B | T-AKE CSI-CARGO CRANE MAINTENANCE AND RETESTING (10 YR) (SCSI) |
| 506 | T-AKE CSI-EDG ANNUAL TESTING AND INSPECTION |
| 509 | T-AKE CSI-DISTILLING PLANT MAINTENANCE (5 YR) |
| 510 | T-AKE CSI - OILY WATER SEPARATORS & OCM INSPECTIONS (5 YR) |
| 512B | T-AKE CSI-MAGAZINE SPRINKLER GAUGE CALIBRATION |
| 516 | T-AKE CSI-SEWAGE PIPING SYSTEN CLEANING |
| 517A | T-AKE CSI-LTFW COOLER CLEANING AND INSPECTION 2.5YR |
| 518A | T-AKE CSI-HTFW COOLER CLEANING AND INSPECTION 2.5YR |
| 519 | T-AKE CSI-CARGO REEFER SAFETY VALVE TEST 5YR |
| 527 | T-AKE CSI-BRINE SYSTEM FLUSH 5YR |
| 528B | T-AKE CSI-MAGAZINE SPRINKLER VALVE OVERHAUL (SCSI) |
| 530 | T-AKE MAIN DIESEL GENERATOR PEDESTAL BEARING INSPECTION 5 YR (SCSI) |
| 531 | T-AKE CSI-SCBA CASCADE FILL STATION AND HYDRO TEST 5YR |
| 546 | T-AKE CSI-STEERING GEAR PREVENTATIVE MAINTENANCE (10 YR) |
| 551 | T-AKE CCSI-OVERHAUL PLATE COOLERS 10YR |
| 552 | HOSE REPLACEMENT (5 YR) |
| 553 | T-AKE CCSI-PRESSURE VESSELS AND RELIEF VALVES 5YR |
| 562 | T-AKE CCSI –SCBA ANNUAL INSPECTION |
| 563 | T-AKE CCSI-ANNUAL SCBA AIR COMPRESSOR AND REFILLING STATION INSPECTION AND MAINTENANCE |
| 565 | T-AKECCSI-FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) |
| 567 | T-AKE CCSI-FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) |
| 569 | T-AKE CCSI-FIRE AND SMOKE DETECTOR ALARM SYSTEM (1 YR) |
| 570 | T-AKE CCSI-PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) |
| 571 | T-AKE CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR) (SCSI) |
| 572 | T-AKE CCSI-DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI) |
| 573 | T-AKE CCSI-FIRE HOSES (1 YR) (SCSI) |
| 574 | T-AKE CCSI-FIRE DOORS AND SHUTTERS (1 YR) (SCSI) |
| 575 | T-AKE CSI-WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR) (SCSI) |
| 576 | BOW THRUSTER COOLING REGULATOR (T-ALT 227) |
| 577 | CHAIN LOCKER VALVE AND FLEXIBLE LINK REPLACEMENT (T-ALT 318) |
| 578 | AFT STEERING MOTOR CONTROLLER INDICATOR LIGHT RELOCATION (T-ALT 503) |
| 579 | POTABLE WATER VALVE REPAIRS (VRR-19-031) |
| 580 | MSD TANK AND PIPE REPAIRS (VRR-19-18/19/22) |
| 581 | ANNUAL ANCHOR WINDLASS INSPECTIONS |
| 601 | FOOD WASTE AND GREY WATER TANK BLAST AND PAINT |
| 602 | REFRIGERATION CARGO DOOR REPAIRS (VRR-20-0014) |
| 603 | CHROMALOX HEAT TRACE SYSTEM REPAIRS (VRR-20-001) |
| 604 | STATEROOM DECK HEAD RENEWALS |
| 610 | T-AKE CSI-GALLEY AND MSO EQUIPMENT CALIBRATION (2.5 YR) |
| 652 | T-AKE CCSI-LIFEBOAT DAVIT SERVICE AND INSPECTION (5 YR) |
| 654 | T-AKE CCSI-RESCUE BOAT AND DAVIT SERVICE (5 YR) |
| 656 | T-AKE CCSI-ANNUAL LIFE RAFT CERTIFICATION |
| 658 | T-AKE CCSI-ACCOMMODATION LADDER MAINTENANCE AND TESTING (5 YR) |
| 660 | LIFEBOAT AND RHIB GEL COAT PRESERVATION |
| 665 | T-AKE CSI-JETTISON READY SERVC LKRS CLEAN AND PAINT (5 YR) |
| 801 | AC 940 HEATING ELEMENT INSTALL (VRR-20-039) |
| 802 | T-AKE CSI-AIR CONDITIONING COMPRESSOR OVHL 30K HRS |
| 803 | CARGO AND AC PLANT ANNUAL INSPECTIONS |
| 851 | T-AKE CCSI-ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING |
| 852 | T-AKE CCSI-ANNUAL LAUNDRY VENT CLEANING |
| 853 | T-AKE CCSI-ACCOMMODATION VENT SYSTEM CLEANING (5 YR) |
| 901 | T-AKE CCSI-DRYDOCKING AND UNDOCKING THE VESSEL (5 YRS) |
| 903 | T-AKE CSI-PROPELLER SHAFT AND STERN TUBE INSPECTION (5 YR) |
| 904 | T-AKE CSI-STERN TUBE SEAL INSPECTION (FW SYSTEM) (5 YR) |
| 905B | T-AKE CSI-BOW THRUSTER MAINTENANCE (5 YR) |
| 907 | T-AKE CSI POLISH BOW THRUSTER PROPELLER |
| 908 | T-AKE CSI-RENEW SEACHEST, ROPE GUARD, AND BOW THRUSTER ZINCS (5 YR) |
| 912 | T-AKE CSI-SHAFT GROUNDING SYSTEM MAINTENANCE (5 YR) |
| 913 | T-AKE CSI-RENEW WASTER PIECES (5 YR) |
| 917 | T-AKE CSI_FREEBOARD CLEANING AND PAINTING - NEAR WHITE BLAST (10 YR) |
| 953 | T-AKE CCSI-ANCHOR CHAINS AND LOCKERS (5 YR) |
| 956 | T-AKE CCSI-OVERHAULING SEA VALVES (5 YR) |
| 957 | T-AKE CCSI-PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR) |
| 960 | T-AKE CCSI-UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (5 YR) |
| 962 | T-AKE CCSI-CATHODIC PROTECTION SYSTEM (2.5 YR) |
| 963 | T-AKE CCSI-SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5 YR) |
| 966 | T-AKE CCSI-SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR) |
| 1001 | SLIDING BLOCK BUMP UPGRADE |
| 1050 | T-AKE CCSI-SLIDING BLOCK CHAIN REPLACEMENT 5YR |
| 1051 | T-AKE CCSI-HP RELIEF VALVE TESTING 2.5YR |
CATEGORY “B” WORK ITEMS
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY IN |
| FORCE CONDITION BRAVO – DELTA |
| 026 | FINAL VESSEL CLEANING – COVID-19 REV A |
| 030 | CONTINUATION OF SERVICES |
| 902 | DRY DOCKING AND UNDOCKING VESSEL |
ACRONYM TABLE
| ABIH |
| American Board of Industrial Hygiene |
| ABR |
| Agreement for Boat Repair |
| ABS |
| American Bureau of Shipping |
| ACO |
| Administrative Contracting Officer |
| AGR |
| Additional Government Requirements |
| AIHA |
| American Industrial Hygiene Association |
| CCO |
| Contract Change Order |
| CDRL |
| Contract Data Requirements List |
| CD-ROM |
| Compact Disc Read-Only Memory |
| CFM |
| Contractor Furnished Material |
| CFP |
| Contractor Furnished Property |
| CFR |
| Condition Found Report |
| CFR |
| Code of Federal Regulations |
| CIH |
| Certified Industrial Hygienist |
| CLIN |
| Contract Line Item Number |
CONUS
CPARS
Contiguous United States Contractor Performance Assessment Reporting System
| DBIDS |
| Defense Biometric Identification Systems |
| DFARS |
| Defense Federal Acquisition Regulation Supplement |
| DOD |
| Department of Defense |
| DOD SAFE |
| Department of Defense Secure Access File Exchange |
| DON |
| Department of the Navy |
| ESRS |
| Electronic Subcontract Report System |
| FAPIIS |
| Federal Awardee Performance and Integrity Information System |
| FAR |
| Federal Acquisition Regulation |
| FBLR |
| Fully-Burdened Labor Rate |
| F/CC |
| Fibers Per Cubic Centimeter |
| FPCON |
| Force Protection Condition |
| FTR |
| Federal Travel Regulations |
| G&A |
| General and Administrative |
| GFI-TD |
| Government Furnished Information – Technical Data |
| GFM |
| Government Furnished Material |
| GFP |
| Government Furnished Property |
| GPE |
| Governmentwide Point of Entry |
| ISO |
| International Organization for Standardization |
| JTR |
| Joint Travel Regulations |
| LLTM |
| Long Lead Time Material |
| LPTA |
| Lowest Price Technically Acceptable |
| M&IE |
| Meals and Incidental Expenses |
| MSC |
| Military Sealift Command |
| MSCREP |
| Military Sealift Command Representative |
| MSRA |
| Master Ship Repair Agreement |
| MTA |
| Mid-Term Availability |
| NCACS |
| Navy Commercial Access Control System |
| NDA |
| Non-Disclosure Agreement |
| NSP |
| Not Separately Priced |
| PAT |
| Proficiency in Analytical Testing |
PDF
PII
Portable Document Format Personally Identifiable Information
| PPE |
| Principle Port Engineer |
| RFC |
| Request for Specification Clarification |
| ROH/DD |
| Regular Overhaul/Dry-Docking |
| SECNAV |
| Secretary of the Navy |
| TPSN |
| Time Phased Sequencing Network |
| TWA |
| Time-Weighted Average |
| USCG |
| United States Coast Guard |
| USNS |
| United States Naval Ship |
SCOPE OF WORK
1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS WILLIAM MCLEAN (TAKE-12) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.
2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):
a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.
b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.
c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.
f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.
g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.
j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.
k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.
3. Contract work shall be performed by an eligible contractor as defined below.
a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:
1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.
2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.
5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.
8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.
10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
· Pier, with services in place, accessible to the CLASS size ship for berthing
· Structural Shop
· Machine Shop
· Pipe Shop
· Electrical/Electronic Shop
· Carpentry Shop
· Rigging Equipment
· Dry-dock – when required for docking of vessel in performance of the specification
11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.
c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.
4. Asbestos removal requirements.
a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.
b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.
c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).
d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.
e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.
f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:
1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.
2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.
3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.
4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.
g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).
h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.
i. The contractor shall insert this instruction in all subcontracts entered into under this contract.
5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.
6. Substitution of key personnel.
a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.
b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.
c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.
7. It is anticipated the ship will arrive at the contractor’s yard on or about 09 August 2021. All work shall be completed in no more than 76 calendar days from the actual start date designated by the Government at the time of contract award.
8. The place of performance for this contract shall be the contractor’s facility.
9. This award consummates the contract, which consists of the following documents: (a) the Government’s solicitation and your final proposal revision submitted on {date} inclusive of all discussion and clarification responses and (b) this award/contract.
Section D - Packaging and Marking
WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS
In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.
(end of instructions)
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
| 252.217-7005 |
| Inspection and Manner of Doing Work |
| JUL 2009 |
| 252.217-7006 |
| Title |
| DEC 1991 |
| 252.217-7013 |
| Guarantees |
| DEC 1991 |
Section F - Delivery and Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-55 |
| F.O.B. Point For Delivery Of Government-Furnished Property |
| JUN 2003 |
Section G - Contract Administration data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
___NOT APPLICABLE_________________________________________________________
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
_INVOICE COMBO___________________________________________________________
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| N68732 |
| Service Approver (DoDAAC) |
| N62387 |
| Service Acceptor (DoDAAC) |
| N62387 |
| Accept at Other DoDAAC |
| ____ |
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
MSCHQ_WAWF@NAVY.MIL
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)
The information contained in this instruction is supplemental to DFARS 252.232-7006.
The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.
When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”
In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).
If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.
The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.
Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.
(End of instructions)
Section I - Contract Clauses
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements |
| JAN 2017 |
| 52.204-1 |
| Approval of Contract |
| DEC 1989 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2018 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2018 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| JUL 2016 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.204-21 |
| Basic Safeguarding of Covered Contractor Information Systems |
| JUN 2016 |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. |
| JUL 2018 |
| 52.204-25 |
| Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. |
| AUG 2019 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-9 |
| Updates of Publicly Available Information Regarding Responsibility Matters |
| OCT 2018 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.211-5 |
| Material Requirements |
| AUG 2000 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-10 |
| Price Reduction for Defective Certified Cost or Pricing Data |
| AUG 2011 |
| 52.215-12 (Dev) |
| Subcontractor Certified Cost or Pricing Data (Deviation 2018-O0015) |
| JUL 2018 |
| 52.215-14 |
| Integrity of Unit Prices |
| OCT 2010 |
| 52.215-17 |
| Waiver of Facilities Capital Cost of Money |
| OCT 1997 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications |
| OCT 2010 |
| 52.215-21 Alt IV |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010) - Alternate IV |
| OCT 2010 |
| 52.219-6 (Dev) |
| Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003). |
| JAN 2019 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| OCT 2018 |
| 52.219-14 (Dev) |
| Limitations on Subcontracting (DEVIATION 2019-O0003). |
| JAN 2019 |
| 52.219-28 |
| Post-Award Small Business Program Rerepresentation |
| JUL 2013 |
| 52.222-1 |
| Notice To The Government Of Labor Disputes |
| FEB 1997 |
| 52.222-19 (Dev) |
| Child Labor - Cooperation with Authorities and Remedies (DEVIATION 2020-O0019) |
| JUL 2020 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| OCT 2015 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-37 |
| Employment Reports on Veterans |
| FEB 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| JAN 2019 |
| 52.223-3 |
| Hazardous Material Identification And Material Safety Data |
| JAN 1997 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-12 |
| Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners. |
| JUN 2016 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.223-20 |
| Aerosols |
| JUN 2016 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.226-1 |
| Utilization Of Indian Organizations And Indian-Owned Economic Enterprises |
| JUN 2000 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.227-3 |
| Patent Indemnity |
| APR 1984 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.229-12 |
| Tax on Certain Foreign Procurements |
| JUN 2020 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-9 |
| Limitation On Withholding Of Payments |
| APR 1984 |
| 52.232-11 |
| Extras |
| APR 1984 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-23 Alt I |
| Assignment of Claims (May 2014) - Alternate I |
| APR 1984 |
| 52.232-25 |
| Prompt Payment |
| JAN 2017 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| OCT 2018 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 Alt I |
| Disputes (May 2014) - Alternate I |
| DEC 1991 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.242-2 |
| Production Progress Reports |
| APR 1991 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.244-2 |
| Subcontracts |
| OCT 2010 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| AUG 2019 |
| 52.245-1 |
| Government Property |
| JAN 2017 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.247-63 |
| Preference For U.S. Flag Air Carriers |
| JUN 2003 |
| 52.248-1 |
| Value Engineering |
| OCT 2010 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7003 |
| Agency Office of the Inspector General |
| AUG 2019 |
| 252.203-7004 |
| Display of Hotline Posters |
| AUG 2019 |
| 252.204-7000 |
| Disclosure Of Information |
| OCT 2016 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| DEC 2019 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.204-7018 |
| Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services |
| DEC 2019 |
| 252.204-7020 |
| NIST SP 800-171 DoD Assessment Requirements |
| NOV 2020 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| MAY 2019 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.217-7003 |
| Changes |
| DEC 1991 |
| 252.217-7004 |
| Job Orders and Compensation |
| MAY 2006 |
| 252.217-7007 |
| Payments |
| DEC 1991 |
| 252.217-7008 |
| Bonds |
| DEC 1991 |
| 252.217-7009 |
| Default |
| DEC 1991 |
| 252.217-7010 |
| Performance |
| JUL 2009 |
| 252.217-7011 |
| Access to Vessel |
| DEC 1991 |
| 252.217-7012 |
| Liability and Insurance |
| AUG 2003 |
| 252.217-7014 |
| Discharge of Liens |
| DEC 1991 |
| 252.217-7015 |
| Safety and Health |
| DEC 1991 |
| 252.217-7016 |
| Plant Protection |
| DEC 1991 |
| 252.217-7028 |
| Over And Above Work |
| DEC 1991 |
| 252.222-7006 |
| Restrictions on the Use of Mandatory Arbitration Agreements |
| DEC 2010 |
| 252.222-7999 (Dev) |
| Combating Race and Sex Stereotyping (Deviation 2021-O0001) |
| NOV 2020 |
| 252.223-7002 |
| Safety Precautions For Ammunition And Explosives |
| MAY 1994 |
| 252.223-7004 |
| Drug Free Work Force |
| SEP 1988 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program-- Basic |
| DEC 2017 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2017 |
| 252.225-7008 |
| Restriction on Acquisition of Specialty Metals |
| MAR 2013 |
| 252.225-7009 |
| Restriction on Acquisition of Certain Articles Containing Specialty Metals |
| DEC 2019 |
| 252.225-7013 (Dev) |
| Duty-Free Entry (DEVIATION 2020-O0019) |
| JUL 2020 |
| 252.225-7015 |
| Restriction on Acquisition of Hand Or Measuring Tools |
| JUN 2005 |
| 252.225-7016 |
| Restriction On Acquisition Of Ball and Roller Bearings |
| JUN 2011 |
| 252.225-7038 |
| Restriction on Acquisition of Air Circuit Breakers |
| DEC 2018 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.225-7972 (Dev) |
| Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2020-O0015) |
| MAY 2020 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| APR 2019 |
| 252.227-7013 |
| Rights in Technical Data--Noncommercial Items |
| FEB 2014 |
| 252.227-7015 |
| Technical Data--Commercial Items |
| FEB 2014 |
| 252.227-7016 |
| Rights in Bid or Proposal Information |
| JAN 2011 |
| 252.227-7017 |
| Identification and Assertion of Use, Release, or Disclosure Restrictions |
| JAN 2011 |
| 252.227-7025 |
| Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends |
| MAY 2013 |
| 252.227-7027 |
| Deferred Ordering Of Technical Data Or Computer Software |
| APR 1988 |
| 252.227-7030 |
| Technical Data--Withholding Of Payment |
| MAR 2000 |
| 252.227-7037 |
| Validation of Restrictive Markings on Technical Data |
| SEP 2016 |
| 252.231-7000 |
| Supplemental Cost Principles |
| DEC 1991 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| DEC 2018 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.232-7017 |
| Accelerating Payments to Small Business Subcontractors--Prohibition on Fees and Consideration |
| APR 2020 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.244-7001 |
| Contractor Purchasing System Administration |
| MAY 2014 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 (Dev) |
| Reporting Loss of Government Property (DEVIATION 2020-O0004) |
| FEB 2020 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.245-7004 |
| Reporting, Reutilization, and Disposal |
| DEC 2017 |
| 252.246-7003 |
| Notification of Potential Safety Issues |
| JUN 2013 |
| 252.246-7008 |
| Sources of Electronic Parts |
| MAY 2018 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| FEB 2019 |
52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages not exceeding $139,776 per calendar day of delay. Total liquidated damages shall not exceed 50% of the contract value.
(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in…