USNS WILLIAM MCLEAN ROH/DD Federal contract opportunity
Solicitation number
N3220521R4014
Issued by
Department of the Navy Military Sealift Command

About this file

This document is a solicitation for ship repair and overhaul services for the USNS WILLIAM MCLEAN. The solicitation is seeking a firm fixed price contract to accomplish regular overhaul and dry docking of the vessel at the contractor's shipyard no later than 76 calendar days from award. Key services required include project planning, quality assurance, material handling, and work specified in attachment J-1. The Navy is seeking pricing for categories A and B work items as defined in attachments J-2 through J-3. The solicitation also requires the contractor to possess ship repair capabilities and certifications as described in the document. The closing date for proposals and intended award date are not specified.

View the file

Other files for this federal contract opportunity

Other files attached to USNS WILLIAM MCLEAN ROH/DD, newest first.
File Type Posted
Amendment 0012 USNS MCLEAN N3220521R4014.docx DOCX document
WI 0451 A TAKE-CCSI ANNUAL RADAR SERVICE - Revised 5-24-21.doc DOC document
Revised J-2 MCLEAN N3220521R4014 5-24-21 (4).xls XLS spreadsheet
Revised J - 3 Category B Items MCLEAN.xls XLS spreadsheet
WI 0090 A LEVEL I DAILY COVID-19 PREVENTION AND CONTROL SERVICES REV CV 03-23-21.docx DOCX document
Amendment 0009 MCLEAN N3220521R4014.docx DOCX document
Revised Work Item 0110 A COMPOSITE EXTERIOR HULL VENT REPLACEMENT (TALT-425)3-29-21.docx DOCX document
REVISED WI INDEX USNS MCLEAN FY21 ROH-DD - REV MAR 29 2021.doc DOC document
Amendment 0011 USNS MCLEAN ROH DD N3220521R4014.docx DOCX document
Amendment 0010 USNS MCLEAN N3220521R4014.docx DOCX document
Amendment 0007 USNS MCLEAN N3220521R4014.docx DOCX document
Amendment 0006 USNS MCLEAN N3220521R4014.docx DOCX document
Amendment 00005 MCLEAN N3220521R4014.docx DOCX document
Amendment 0004 J 2 MCLEAN 21R4014.xls XLS spreadsheet
N3220521R4014 Amendment 0004.docx DOCX document
N3220521R4014 Amend 0002.docx DOCX document
J 2 MCLEAN 21R4014.xls XLS spreadsheet
N3220521R4014 Amendment 0003.docx DOCX document
N3220521R4014 Amendment 0002.docx DOCX document
N3220521R4014 Amendment 0001.docx DOCX document
J - 2 Category A Items MCLEAN 21R4014.xls XLS spreadsheet
J-Attachments.zip ZIP file
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220521R4014

Section B - Supplies or Services and Prices

CLAUSES INCORPORATED BY FULL TEXT

ITEM NO

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE

Category "A" WIs

FFP

Prepare for and accomplish the ROH/DD of the USNS MCLEAN (T-AKE 12)

Total Category "A" WIs $_____________

Proposed unit price per KWh $_____ IAW WI 011, 7.1.1.

Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3

Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4

Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.18

Proposed unit price per crane usage $______ IAW WI 011, 7.9.2

Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.1 ______%

FOB: Destination

AMOUNT

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

AGR and ODC

FFP

AGR

(10,000) man-hours @ $________ per man-hour = $_____________

ODC

Base $___1,000,000.00____________

Proposed G&A Rate _______________% Subtotal: $_____________

Proposed Profit Rate _______________% Subtotal: $_____________

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0025

WI 0025 - Physical Security at Private Contractor's Facility in FPCON Charlie - Delta

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0026

WI 0026 - Vessel Final Clean

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0030

WI 0030 - Continuation of Services

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Category "B" WI 0902

WI 0902- Drydocking and Undocking

Category “B” WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category “B” WIs by exercising the option via written notice to the contractor.

NET AMT

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0006 $_______________________

The contractor shall enter the total proposed price of all CLINs.

PART I - THE SCHEDULE

Section B, Price Schedule, detailed information

CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.

CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.

The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

The base cost, stated in this CLIN does not include the profit or G&A rates.

NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

CLINs 0003 through 0006 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0006 pricing.

Section C - Descriptions and Specifications

C – 2 List of Standard WIs included for this solicitation:

CATEGORY “A” WORK ITEMS

001INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS
002TECHNICAL AND MANUFACTURER’S REPRESENTATIVES
003APPROACH, BERTH, AND MOORING REQUIREMENTS
004TESTING AND QUALITY ASSURANCE
005ELECTRICAL SAFETY PROCEDURE REQUIREMENTS
006HEAVY WEATHER PLAN
007COLD WEATHER PLAN
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
011T-AKE CSI-FURNISH GENERAL SERVICES
012INFORMATION TECHNOLOGY
013PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS
014PREPARATION OF WEIGHT AND MOMENT REPORT
015INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS
016FIRE PROTECTION AND SHIP’S SAFETY PROGRAM
017HANDLING SHIP’S STORES
018DELIVERY AND REDELIVERY OF THE VESSEL
019SHIPBOARD ACCESS AND SECURITY
020GAS FREE CERTIFICATES
021CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES
022DOCK TRIALS AND SEA TRIAL
023HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY
024PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY
090LEVEL 1 DAILY COVID-19 PREVENTION AND CONTROL SERVICES – REV M
101T-AKE CSI-BALLAST TANK ZINC INSPECTIONS
102TANK COATING PRESERVATION (VRR-19-0010 & 19-0011)
103EXTERIOR LADDER PRESERVATION
104HANDRAIL REPLACEMENT
105RENEWAL OF 03 LEVEL NON=SLIP WALKWAYS
110COMPOSITE VENT GRATING REPLACEMENT (T-ALT 524) (VRR-29-0012)
151T-AKE CCSI – ULTRASONIC THICKNESS GAUGING
154T-AKE CSI-SPECIAL SURVEY – TANK INSPECTION (ABS)
155T-AKE CSI-TANK VENT INSPECTIONS (5 YR)
156T-AKE CCSI-FLIGHT DECK PRESERVATION (3 YR)
163T-AKE CCSI-FLIGHT DECK SAFETY NET INSPECTION AND TEST (3 YR)
201T-AKE CSI-PROPULSION MOTOR AND COOLER CLEANING AND INSPECTION
202T-AKE CSI-MAIN ENGINE FLEX HOSE REPLACEMENT 10 YR
204T-AKE CSI-MDE CONTROL SAFETY INSPECTION AND TEST 1-YR (SCSI)
205T-AKE CSI-AUTOMATION AND PROPULSION CONTROLS INSPECTION AND TEST-1 YR (SCSI)
206T-AKE CSI-VULKAN COUPLING ANNUAL INSPECTION (SCSI)
207T-AKE CSI-PROPULSION MOTOR PEDESTAL BEARING INSPECTION 5 YR
208MDG VULKAN COUPLING REPLACEMENT (10 YR)
210MDG NO 1-4 RESILIENT MOUNT REPLACEMENTS (10 YR)
254T-AKE CCSI THRUST AND LINE SHAFT BEARING INSPECTION (5 YR)
301BT-AKE CSI-CLEAN MAIN GENERATOR AND PROPULSION CONTROL SYSTEM (10YR) REV
302EATON TIME DELAY REPLACEMENT (T-ALT 496)
303T-AKE CSI-HV-SS-E, SWITCHBOARD INSPECTION AND CLEANING 2.5YR
304CARGO HOLD LED LIGHT RETROFIT (T-ALT 493)
305T-AKE CSI PLC SURVEY (2.5 YR)
306MODIFY CAPABILITY TO PARALLEL EDG (T-ALT 406)
350T-AKE CSI OVERHAUL AND TEST BREAKERS (10 YR)
353ANNUAL THERMOGRAPHIC SURVEY (CCSI)
401INSTALLATION OF SEATEL TV-DTS ENTERTAINMENT SYSTEM (T-ALT 452)
402T-AKE CSI-ANTENNA PREVENTATIVE MAINTENANCE 5 YR
403T-AKE CSI-COMMUNICATIONS SYSTEM ANNUAL PREVENTATIVE MAINTENANCE 5 YR
404T-AKE CSI-OE-570 WSC ANTENNA SYSTEM MAINTENANCE 2.5YR
405T-AKE CSI-ANTENNA RIGGING PHOTOS 10YR
412AFT STEERING RUDDER ANGLE INDICATOR (T-ALT 502)
451T-AKE CCSI-ANNUAL RADAR SERVICE
452T-AKE CCSI-ANNUAL ECDIS SERVICE (SCSI)
453T-AKE CCSI-ANNUAL GYRO SERVICE
454T-AKE CCSI-ANNUAL VDR RECERTIFICATION
456T-AKE CCSI-MAGNETIC COMPASS SERVICE 2.5YR
457T-AKE CCSI-EPIRB SERVICE (5 YR)
459T-AKE CCSI-ECHO SOUNDER SERVICE 1YR
460T1 FIBER LINE REPAIRS
461NETWORK MGMT SYSTEM INDUSTRIAL SUPPORT
501EDG STOP SOLENOID FUEL VALVE (T-ALT 519)
502EDG QUICK CLOSING FUEL AND LUBE OIL VALVES (T-ALT 471)
503EDG SUPPLEMENTAL LUBE OIL COOLER INSTALL (T-ALT 359)
504BT-AKE CSI-CARGO CRANE MAINTENANCE AND RETESTING (10 YR) (SCSI)
506T-AKE CSI-EDG ANNUAL TESTING AND INSPECTION
509T-AKE CSI-DISTILLING PLANT MAINTENANCE (5 YR)
510T-AKE CSI - OILY WATER SEPARATORS & OCM INSPECTIONS (5 YR)
512BT-AKE CSI-MAGAZINE SPRINKLER GAUGE CALIBRATION
516T-AKE CSI-SEWAGE PIPING SYSTEN CLEANING
517AT-AKE CSI-LTFW COOLER CLEANING AND INSPECTION 2.5YR
518AT-AKE CSI-HTFW COOLER CLEANING AND INSPECTION 2.5YR
519T-AKE CSI-CARGO REEFER SAFETY VALVE TEST 5YR
527T-AKE CSI-BRINE SYSTEM FLUSH 5YR
528BT-AKE CSI-MAGAZINE SPRINKLER VALVE OVERHAUL (SCSI)
530T-AKE MAIN DIESEL GENERATOR PEDESTAL BEARING INSPECTION 5 YR (SCSI)
531T-AKE CSI-SCBA CASCADE FILL STATION AND HYDRO TEST 5YR
546T-AKE CSI-STEERING GEAR PREVENTATIVE MAINTENANCE (10 YR)
551T-AKE CCSI-OVERHAUL PLATE COOLERS 10YR
552HOSE REPLACEMENT (5 YR)
553T-AKE CCSI-PRESSURE VESSELS AND RELIEF VALVES 5YR
562T-AKE CCSI –SCBA ANNUAL INSPECTION
563T-AKE CCSI-ANNUAL SCBA AIR COMPRESSOR AND REFILLING STATION INSPECTION AND MAINTENANCE
565T-AKECCSI-FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI)
567T-AKE CCSI-FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI)
569T-AKE CCSI-FIRE AND SMOKE DETECTOR ALARM SYSTEM (1 YR)
570T-AKE CCSI-PORTABLE FIRE EXTINGUISHER SERVICE (1 YR)
571T-AKE CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR) (SCSI)
572T-AKE CCSI-DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI)
573T-AKE CCSI-FIRE HOSES (1 YR) (SCSI)
574T-AKE CCSI-FIRE DOORS AND SHUTTERS (1 YR) (SCSI)
575T-AKE CSI-WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR) (SCSI)
576BOW THRUSTER COOLING REGULATOR (T-ALT 227)
577CHAIN LOCKER VALVE AND FLEXIBLE LINK REPLACEMENT (T-ALT 318)
578AFT STEERING MOTOR CONTROLLER INDICATOR LIGHT RELOCATION (T-ALT 503)
579POTABLE WATER VALVE REPAIRS (VRR-19-031)
580MSD TANK AND PIPE REPAIRS (VRR-19-18/19/22)
581ANNUAL ANCHOR WINDLASS INSPECTIONS
601FOOD WASTE AND GREY WATER TANK BLAST AND PAINT
602REFRIGERATION CARGO DOOR REPAIRS (VRR-20-0014)
603CHROMALOX HEAT TRACE SYSTEM REPAIRS (VRR-20-001)
604STATEROOM DECK HEAD RENEWALS
610T-AKE CSI-GALLEY AND MSO EQUIPMENT CALIBRATION (2.5 YR)
652T-AKE CCSI-LIFEBOAT DAVIT SERVICE AND INSPECTION (5 YR)
654T-AKE CCSI-RESCUE BOAT AND DAVIT SERVICE (5 YR)
656T-AKE CCSI-ANNUAL LIFE RAFT CERTIFICATION
658T-AKE CCSI-ACCOMMODATION LADDER MAINTENANCE AND TESTING (5 YR)
660LIFEBOAT AND RHIB GEL COAT PRESERVATION
665T-AKE CSI-JETTISON READY SERVC LKRS CLEAN AND PAINT (5 YR)
801AC 940 HEATING ELEMENT INSTALL (VRR-20-039)
802T-AKE CSI-AIR CONDITIONING COMPRESSOR OVHL 30K HRS
803CARGO AND AC PLANT ANNUAL INSPECTIONS
851T-AKE CCSI-ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING
852T-AKE CCSI-ANNUAL LAUNDRY VENT CLEANING
853T-AKE CCSI-ACCOMMODATION VENT SYSTEM CLEANING (5 YR)
901T-AKE CCSI-DRYDOCKING AND UNDOCKING THE VESSEL (5 YRS)
903T-AKE CSI-PROPELLER SHAFT AND STERN TUBE INSPECTION (5 YR)
904T-AKE CSI-STERN TUBE SEAL INSPECTION (FW SYSTEM) (5 YR)
905BT-AKE CSI-BOW THRUSTER MAINTENANCE (5 YR)
907T-AKE CSI POLISH BOW THRUSTER PROPELLER
908T-AKE CSI-RENEW SEACHEST, ROPE GUARD, AND BOW THRUSTER ZINCS (5 YR)
912T-AKE CSI-SHAFT GROUNDING SYSTEM MAINTENANCE (5 YR)
913T-AKE CSI-RENEW WASTER PIECES (5 YR)
917T-AKE CSI_FREEBOARD CLEANING AND PAINTING - NEAR WHITE BLAST (10 YR)
953T-AKE CCSI-ANCHOR CHAINS AND LOCKERS (5 YR)
956T-AKE CCSI-OVERHAULING SEA VALVES (5 YR)
957T-AKE CCSI-PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR)
960T-AKE CCSI-UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (5 YR)
962T-AKE CCSI-CATHODIC PROTECTION SYSTEM (2.5 YR)
963T-AKE CCSI-SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5 YR)
966T-AKE CCSI-SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR)
1001SLIDING BLOCK BUMP UPGRADE
1050T-AKE CCSI-SLIDING BLOCK CHAIN REPLACEMENT 5YR
1051T-AKE CCSI-HP RELIEF VALVE TESTING 2.5YR

CATEGORY “B” WORK ITEMS

025PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY IN
FORCE CONDITION BRAVO – DELTA
026FINAL VESSEL CLEANING – COVID-19 REV A
030CONTINUATION OF SERVICES
902DRY DOCKING AND UNDOCKING VESSEL

ACRONYM TABLE

ABIH
American Board of Industrial Hygiene
ABR
Agreement for Boat Repair
ABS
American Bureau of Shipping
ACO
Administrative Contracting Officer
AGR
Additional Government Requirements
AIHA
American Industrial Hygiene Association
ALT
Alternate
AMT
Amount
BLDG
Building
CCO
Contract Change Order
CD
Compact Disc
CDRL
Contract Data Requirements List
CD-ROM
Compact Disc Read-Only Memory
CFM
Contractor Furnished Material
CFP
Contractor Furnished Property
CFR
Condition Found Report
CHENG
Chief Engineer
CFR
Code of Federal Regulations
CIH
Certified Industrial Hygienist
CLIN
Contract Line Item Number

CONUS

CPARS

Contiguous United States Contractor Performance Assessment Reporting System

DBIDS
Defense Biometric Identification Systems
DFARS
Defense Federal Acquisition Regulation Supplement
DOD
Department of Defense
DOD SAFE
Department of Defense Secure Access File Exchange
DON
Department of the Navy
EMAIL
Electronic Mail
ESRS
Electronic Subcontract Report System
FAPIIS
Federal Awardee Performance and Integrity Information System
FAR
Federal Acquisition Regulation
FBLR
Fully-Burdened Labor Rate
F/CC
Fibers Per Cubic Centimeter
FPCON
Force Protection Condition
FTR
Federal Travel Regulations
G&A
General and Administrative
GFI-TD
Government Furnished Information – Technical Data
GFM
Government Furnished Material
GFP
Government Furnished Property
GPE
Governmentwide Point of Entry
IAW
In Accordance With
ID
Identification
ISO
International Organization for Standardization
JTR
Joint Travel Regulations
KO
Contracting Officer
KWh
Kilowatt Hour
LLTM
Long Lead Time Material
LPTA
Lowest Price Technically Acceptable
M&IE
Meals and Incidental Expenses
MSC
Military Sealift Command
MSCREP
Military Sealift Command Representative
MM
Millimeter
MSRA
Master Ship Repair Agreement
MTA
Mid-Term Availability
N/A
Not Applicable
NCACS
Navy Commercial Access Control System
NDA
Non-Disclosure Agreement
NO
Number
NSP
Not Separately Priced
ODC
Other Direct Costs
PAT
Proficiency in Analytical Testing

PDF

PII

Portable Document Format Personally Identifiable Information

PM
Program Manager
PPE
Principle Port Engineer
PRIME
Prime Contractor
QA
Quality Assurance
QC
Quality Control
REV
Revision
RFC
Request for Specification Clarification
RFP
Request for Proposal
ROH/DD
Regular Overhaul/Dry-Docking
SECNAV
Secretary of the Navy
SF
Standard Form
SUB
Subcontractor
TPSN
Time Phased Sequencing Network
TWA
Time-Weighted Average
USC
United States Code
USCG
United States Coast Guard
USNS
United States Naval Ship
VR
Voyage Repair
WAWF
Wide Area Workflow
WI
Work Item

SCOPE OF WORK

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS WILLIAM MCLEAN (TAKE-12) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

a. Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

b. Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR 52.245-1 and DFARS 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

c. Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

d. Using management procedures and systems to identify behind-schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

e. Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 0013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted IAW the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 0013.

f. Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

g. Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

h. Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

i. Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

j. Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

k. Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

a. The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

b. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

1) Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

2) Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

3) Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

4) Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

5) Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

6) Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

7) Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

8) Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

9) Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

10) Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for berthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

11) Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

c. The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

4. Asbestos removal requirements.

a. During the performance of this contract the contractor and subcontractors may be required to perform work which involves the removal or disturbance of asbestos or asbestos-containing products. This requirement applies to each instance of asbestos removal or disturbance.

b. The contractor shall comply with the precautions required in 29 CFR 1910.1001, 29 CFR 1926.58 and 40 CFR Part 61 and all other applicable Federal, state, and local restrictions. The contractor shall forward a copy of all required notices, licenses and permits to the KO immediately upon issuance or receipt.

c. The latest change to the Federal, state, and local regulations in effect at the time of issuance of the contract shall govern. Compliance with these regulations is mandatory and is necessary to protect the employees of the contractor and Naval personnel from exposure to asbestos fibers in excess of the OSHA Action level airborne concentration (currently 0.1 f/cc of air).

d. During removal or disturbance, the contractor shall control airborne asbestos concentrations outside the removal boundary to less than 0.1 f/cc at all times.

e. After removal or disturbance is complete, the areas within the removal boundary shall not be released for re-occupancy until clearance air sampling demonstrates these spaces have concentrations of asbestos less than 0.1 f/cc.

f. In all respects, the performance of air sampling and analysis shall be performed IAW the OSHA Reference Method (Appendix A of 29 CFR 1910.1001), with the following additional specifications:

1) Aggressive clearance sampling shall be performed on 25 mm cassettes at 2.0 liters per minute for a minimum of four (4) hours.

2) In performing the clearance sampling, the pump shall be placed within the compartment where the removal or disturbance occurred. When this operation is conducted in a multilevel space, at least one pump shall be placed on each level.

3) Air sampling shall be performed by a person competent in sampling procedures and overseen by a CIH by the ABIH.

4) Laboratory analysis of samples shall be performed by a participant in the AIHA PAT Program rated proficient for asbestos and air.

g. Personal sampling shall be conducted using breathing zone air samples which are representative of the 8-hour TWA exposure of each individual. Samples shall be collected and analyzed using the OSHA Reference Method contained in either 29 CFR 1910.1001 (as amended) or 29 CFR 1926.58 (as amended).

h. The contractor agrees to indemnify MSC for any fines assessed by Federal, state, or local agencies, for the contractor's failure to properly follow applicable regulations.

i. The contractor shall insert this instruction in all subcontracts entered into under this contract.

5. Post-award substitution of any major subcontractor should not be effected unless the proposed substitution is submitted to the KO and official approval is obtained. The post-award substitution or insertion of a second-tier subcontractor will be treated in the same manner as the substitution of a major subcontractor and requires specific approval by the KO.

6. Substitution of key personnel.

a. The contractor agrees to assign to this contract those persons identified as key personnel who are necessary to fulfill the requirements of this contract and whose resumes were submitted with the proposal. No substitution of key personnel shall be made except IAW these instructions.

b. All proposed substitutions must be submitted, in writing, at least seven (7) days in advance of the proposed substitutions to the KO and must provide the information required by paragraph “c” below.

c. All requests for substitution must provide a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information as requested by the KO. All proposed substitutes must have qualifications equal to or higher than the qualifications of the person to be replaced. The KO or his authorized representative will evaluate such requests and promptly notify the contractor of the approval or disapproval thereof.

7. It is anticipated the ship will arrive at the contractor’s yard on or about 09 August 2021. All work shall be completed in no more than 76 calendar days from the actual start date designated by the Government at the time of contract award.

8. The place of performance for this contract shall be the contractor’s facility.

9. This award consummates the contract, which consists of the following documents: (a) the Government’s solicitation and your final proposal revision submitted on {date} inclusive of all discussion and clarification responses and (b) this award/contract.

Section D - Packaging and Marking

WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS

In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

(end of instructions)

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

252.217-7005
Inspection and Manner of Doing Work
JUL 2009
252.217-7006
Title
DEC 1991
252.217-7013
Guarantees
DEC 1991

Section F - Delivery and Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-55
F.O.B. Point For Delivery Of Government-Furnished Property
JUN 2003

Section G - Contract Administration data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

___NOT APPLICABLE_________________________________________________________

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

_INVOICE COMBO___________________________________________________________

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
N68732
Issue By DoDAAC
____
Admin DoDAAC**
____
Inspect By DoDAAC
____
Ship To Code
N62387
Ship From Code
____
Mark For Code
____
Service Approver (DoDAAC)
N62387
Service Acceptor (DoDAAC)
N62387
Accept at Other DoDAAC
____
LPO DoDAAC
N62387
DCAA Auditor DoDAAC
____
Other DoDAAC(s)
____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

MSCHQ_WAWF@NAVY.MIL

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)

The information contained in this instruction is supplemental to DFARS 252.232-7006.

The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.

When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”

In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).

If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.

The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.

Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.

(End of instructions)

Section I - Contract Clauses

52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
MAY 2014
52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-7
Anti-Kickback Procedures
MAY 2014
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
MAY 2014
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
MAY 2014
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-17
Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights
APR 2014
52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-1
Approval of Contract
DEC 1989
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-10
Reporting Executive Compensation and First-Tier Subcontract Awards
OCT 2018
52.204-13
System for Award Management Maintenance
OCT 2018
52.204-18
Commercial and Government Entity Code Maintenance
JUL 2016
52.204-19
Incorporation by Reference of Representations and Certifications.
DEC 2014
52.204-21
Basic Safeguarding of Covered Contractor Information Systems
JUN 2016
52.204-23
Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
JUL 2018
52.204-25
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-9
Updates of Publicly Available Information Regarding Responsibility Matters
OCT 2018
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.210-1
Market Research
APR 2011
52.211-5
Material Requirements
AUG 2000
52.215-2
Audit and Records--Negotiation
OCT 2010
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-10
Price Reduction for Defective Certified Cost or Pricing Data
AUG 2011
52.215-12 (Dev)
Subcontractor Certified Cost or Pricing Data (Deviation 2018-O0015)
JUL 2018
52.215-14
Integrity of Unit Prices
OCT 2010
52.215-17
Waiver of Facilities Capital Cost of Money
OCT 1997
52.215-21
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications
OCT 2010
52.215-21 Alt IV
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications (Oct 2010) - Alternate IV
OCT 2010
52.219-6 (Dev)
Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003).
JAN 2019
52.219-8
Utilization of Small Business Concerns
OCT 2018
52.219-14 (Dev)
Limitations on Subcontracting (DEVIATION 2019-O0003).
JAN 2019
52.219-28
Post-Award Small Business Program Rerepresentation
JUL 2013
52.222-1
Notice To The Government Of Labor Disputes
FEB 1997
52.222-19 (Dev)
Child Labor - Cooperation with Authorities and Remedies (DEVIATION 2020-O0019)
JUL 2020
52.222-20
Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
MAY 2014
52.222-21
Prohibition Of Segregated Facilities
APR 2015
52.222-26
Equal Opportunity
SEP 2016
52.222-35
Equal Opportunity for Veterans
OCT 2015
52.222-36
Equal Opportunity for Workers with Disabilities
JUL 2014
52.222-37
Employment Reports on Veterans
FEB 2016
52.222-40
Notification of Employee Rights Under the National Labor Relations Act
DEC 2010
52.222-50
Combating Trafficking in Persons
JAN 2019
52.223-3
Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-6
Drug-Free Workplace
MAY 2001
52.223-12
Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.
JUN 2016
52.223-18
Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.223-20
Aerosols
JUN 2016
52.223-21
Foams
JUN 2016
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.226-1
Utilization Of Indian Organizations And Indian-Owned Economic Enterprises
JUN 2000
52.227-1
Authorization and Consent
DEC 2007
52.227-2
Notice And Assistance Regarding Patent And Copyright Infringement
DEC 2007
52.227-3
Patent Indemnity
APR 1984
52.229-3
Federal, State And Local Taxes
FEB 2013
52.229-12
Tax on Certain Foreign Procurements
JUN 2020
52.232-1
Payments
APR 1984
52.232-8
Discounts For Prompt Payment
FEB 2002
52.232-9
Limitation On Withholding Of Payments
APR 1984
52.232-11
Extras
APR 1984
52.232-17
Interest
MAY 2014
52.232-23 Alt I
Assignment of Claims (May 2014) - Alternate I
APR 1984
52.232-25
Prompt Payment
JAN 2017
52.232-33
Payment by Electronic Funds Transfer--System for Award Management
OCT 2018
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-1 Alt I
Disputes (May 2014) - Alternate I
DEC 1991
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.242-2
Production Progress Reports
APR 1991
52.242-13
Bankruptcy
JUL 1995
52.244-2
Subcontracts
OCT 2010
52.244-6
Subcontracts for Commercial Items
AUG 2019
52.245-1
Government Property
JAN 2017
52.245-9
Use And Charges
APR 2012
52.247-63
Preference For U.S. Flag Air Carriers
JUN 2003
52.248-1
Value Engineering
OCT 2010
52.249-2
Termination For Convenience Of The Government (Fixed-Price)
APR 2012
52.249-8
Default (Fixed-Price Supply & Service)
APR 1984
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.203-7003
Agency Office of the Inspector General
AUG 2019
252.203-7004
Display of Hotline Posters
AUG 2019
252.204-7000
Disclosure Of Information
OCT 2016
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015
Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7018
Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
DEC 2019
252.204-7020
NIST SP 800-171 DoD Assessment Requirements
NOV 2020
252.205-7000
Provision Of Information To Cooperative Agreement Holders
DEC 1991
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
MAY 2019
252.211-7007
Reporting of Government-Furnished Property
AUG 2012
252.217-7003
Changes
DEC 1991
252.217-7004
Job Orders and Compensation
MAY 2006
252.217-7007
Payments
DEC 1991
252.217-7008
Bonds
DEC 1991
252.217-7009
Default
DEC 1991
252.217-7010
Performance
JUL 2009
252.217-7011
Access to Vessel
DEC 1991
252.217-7012
Liability and Insurance
AUG 2003
252.217-7014
Discharge of Liens
DEC 1991
252.217-7015
Safety and Health
DEC 1991
252.217-7016
Plant Protection
DEC 1991
252.217-7028
Over And Above Work
DEC 1991
252.222-7006
Restrictions on the Use of Mandatory Arbitration Agreements
DEC 2010
252.222-7999 (Dev)
Combating Race and Sex Stereotyping (Deviation 2021-O0001)
NOV 2020
252.223-7002
Safety Precautions For Ammunition And Explosives
MAY 1994
252.223-7004
Drug Free Work Force
SEP 1988
252.223-7008
Prohibition of Hexavalent Chromium
JUN 2013
252.225-7001
Buy American And Balance Of Payments Program-- Basic
DEC 2017
252.225-7002
Qualifying Country Sources As Subcontractors
DEC 2017
252.225-7008
Restriction on Acquisition of Specialty Metals
MAR 2013
252.225-7009
Restriction on Acquisition of Certain Articles Containing Specialty Metals
DEC 2019
252.225-7013 (Dev)
Duty-Free Entry (DEVIATION 2020-O0019)
JUL 2020
252.225-7015
Restriction on Acquisition of Hand Or Measuring Tools
JUN 2005
252.225-7016
Restriction On Acquisition Of Ball and Roller Bearings
JUN 2011
252.225-7038
Restriction on Acquisition of Air Circuit Breakers
DEC 2018
252.225-7048
Export-Controlled Items
JUN 2013
252.225-7972 (Dev)
Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2020-O0015)
MAY 2020
252.226-7001
Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
APR 2019
252.227-7013
Rights in Technical Data--Noncommercial Items
FEB 2014
252.227-7015
Technical Data--Commercial Items
FEB 2014
252.227-7016
Rights in Bid or Proposal Information
JAN 2011
252.227-7017
Identification and Assertion of Use, Release, or Disclosure Restrictions
JAN 2011
252.227-7025
Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends
MAY 2013
252.227-7027
Deferred Ordering Of Technical Data Or Computer Software
APR 1988
252.227-7030
Technical Data--Withholding Of Payment
MAR 2000
252.227-7037
Validation of Restrictive Markings on Technical Data
SEP 2016
252.231-7000
Supplemental Cost Principles
DEC 1991
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7010
Levies on Contract Payments
DEC 2006
252.232-7017
Accelerating Payments to Small Business Subcontractors--Prohibition on Fees and Consideration
APR 2020
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
DEC 2012
252.244-7000
Subcontracts for Commercial Items
JUN 2013
252.244-7001
Contractor Purchasing System Administration
MAY 2014
252.245-7001
Tagging, Labeling, and Marking of Government-Furnished Property
APR 2012
252.245-7002 (Dev)
Reporting Loss of Government Property (DEVIATION 2020-O0004)
FEB 2020
252.245-7003
Contractor Property Management System Administration
APR 2012
252.245-7004
Reporting, Reutilization, and Disposal
DEC 2017
252.246-7003
Notification of Potential Safety Issues
JUN 2013
252.246-7008
Sources of Electronic Parts
MAY 2018
252.247-7023
Transportation of Supplies by Sea
FEB 2019

52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages not exceeding $139,776 per calendar day of delay. Total liquidated damages shall not exceed 50% of the contract value.

(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in…