J 2 MCLEAN 21R4014.xls
XLS spreadsheet 79 KB Posted
- Attached to
- USNS WILLIAM MCLEAN ROH/DD Federal contract opportunity
- Solicitation number
- N3220521R4014
About this file
This document provides a contractor price breakdown for Category A items for the solicitation N3220521R4014 for the USNS WILLIAM MCLEAN ROH/DD. The solicitation is seeking pricing for various overhaul, maintenance, and repair items categorized under Hull Structures, Main Propulsion, Electrical, Communication and Navigation Aids, Auxiliary Equipment, Habitability, Heating Ventilation and Air Conditioning, Drydocking and Underwater Hull, and UNREP Equipment. Pricing is required for labor hours and materials for prime contractor and subcontractor costs for each item, as well as totals for Category A. Additionally, the document outlines general requirements for items such as office space, IT services, and safety programs to be provided by the prime contractor during the overhaul period. The solicitation was issued by the Department of the Navy's Military Sealift Command for work to be performed on the East and Gulf Coasts.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 002 | FURNISH GENERAL SERVICES | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 003 | INFORMATION TECHNOLOGY SERVICES | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 004 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 005 | PREPARATION OF WEIGHT AND MOMENT REPORT | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 006 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 007 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | - 0 | $ - 0 | $0 | ||||||||
| 011 | TAKE FURNISH GENERAL SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING | - 0 | $ - 0 | $0 | ||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | - 0 | $ - 0 | $0 | ||||||||
| 015 | INTEGRATED LOGISTICS SUPPORT, GFM | - 0 | $ - 0 | $0 | ||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | - 0 | $ - 0 | $0 | ||||||||
| 017 | HANDLING SHIP'S STORES | - 0 | $ - 0 | $0 | ||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | - 0 | $ - 0 | $0 | ||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | - 0 | $ - 0 | $0 | ||||||||
| 020 | GAS FREE CERTIFICATES | - 0 | $ - 0 | $0 | ||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | - 0 | $ - 0 | $0 | ||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | - 0 | $ - 0 | $0 | ||||||||
| 023 | HAZARDOUR WASTE DISPOSAL | - 0 | $ - 0 | $0 | ||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | - 0 | NSP | NSP | ||
| 090 | DAILY COVID-19 PREVENTION AND CONTROL SERVICES | $0 | ||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | TAKE CSI BALLAST TANK ZINC INSPECTION (2.5 YR) | $0 | ||||||||||
| 102 | TANK COATING PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 103 | EXTERIOR LADDER PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 104 | HANDRAIL REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 105 | RENEWAL OF 03 LEVEL NON-SLIP WALKWAYS | - 0 | $ - 0 | $0 | ||||||||
| 106 | PRESERVATION OF FAN ROOMS | |||||||||||
| 110 | COMPOSITE VENT GRATING REPLACEMENT (T-ALT 524) | - 0 | $ - 0 | $0 | ||||||||
| 151 | TAKE CCSI ULTRASONIC THICKNESS GAUGING | - 0 | $ - 0 | $0 | ||||||||
| 154 | ABS SPECIAL SURVEY SUPPORT - TANK INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 155 | TAKE_CCSI_TANK VENT INSPECTION (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 156 | FLIGHT DECK NON-SKID RENEWAL | - 0 | $ - 0 | $0 | ||||||||
| 163 | T-AKE CCSI FLIGHT DK SAFETY NET INSPECT/TEST | - 0 | $ - 0 | $0 | ||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | TAKE CSI PROPULSION MOTOR & COOLER CLEANING, INSPECTION & MAINT(2.5 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 202 | MDE FLEXIBLE CONNECTORS (Flex Hose) REPLACEMENT (10-YR) (CSI) | - 0 | $ - 0 | $0 | ||||||||
| 204 | TAKE CSI MDE CONTROL SAFETY INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 205 | TAKE CSI AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 206 | TAKE CSI VULKAN COUPLING INSPECTIONS (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 207 | TAKE CSI PROPULSION MOTOR PEDESTAL BEARING INSPECTION (5 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 208 | MDG VULKAN COUPLING RPELACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 210 | MDG NO 1-4 RESILIENT MOUNT REPLACEMENTS | - 0 | $ - 0 | $0 | ||||||||
| 254 | TAKE CCSI THRUST AND LINE SHAFT BEARING INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301B | TAKE CSI CLEANING MAIN GENERATORS & PROPULSION CONTROL SYSTEM (10 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 302 | EATON TIME DELAYS REPACEMENT TALT 496 | - 0 | $ - 0 | $0 | ||||||||
| 303 | TAKE CSI HIGH VOLTAGE, SHIP'S SERVICE, AND EMERGENCY SWITCHBOARD INSPECTION AND CLEANING (2.5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 304 | CARGO HOLD LED LIGHT RETROFIT (T-ALT 493) | - 0 | $ - 0 | $0 | ||||||||
| 305 | PLC SURVEY (2 YR) | - 0 | $ - 0 | $0 | ||||||||
| 350 | TAKE CSI OVERHAUL AND TEST CIRCUIT BREAKERS (10 YR) | - 0 | $ - 0 | $0 | ||||||||
| 353 | TAKE CCSI THERMOGRAPHY SURVEY (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAV AIDS | |||||||||||
| 401 | INSTALL SEATEL DIRECT TO SAILOR SATELLITE SYST (T-ALT 452) | - 0 | $ - 0 | $0 | ||||||||
| 402 | TAKE CSI ANTENNA PREVENTATIVE MAINTENANCE (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 403 | COMMS SYS PM REV - | - 0 | $ - 0 | $0 | ||||||||
| 405 | TAKE CSI ANTENNA RIGGING PHOTOS (10 YR) | - 0 | $ - 0 | $0 | ||||||||
| 412 | AFT STEERING RUDDER ANGLE INDICATOR (T-ALT 502) | - 0 | $ - 0 | $0 | ||||||||
| 451 | TAKE CCSI ANNUAL RADAR SERVICE | - 0 | $ - 0 | $0 | ||||||||
| 452 | TAKE CCSI ANNUAL ECDIS SERVICE (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 453 | TAKE CCSI ANNUAL GYRO SYSTEM | - 0 | $ - 0 | $0 | ||||||||
| 454 | TAKE CCSI ANNUAL VDR RECERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 455 | TAKE CCSI ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 456 | TAKE CCSI MAGNETIC COMPASS SERVICE (2 YR) | - 0 | $ - 0 | $0 | ||||||||
| 457 | TAKE CCSI EPIRB SERVICE (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 459 | ECHO SOUNDER SERVICE (1YR) TAKE CCSI | - 0 | $ - 0 | $0 | ||||||||
| 460 | T1 FIBER LINE REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 461 | NETWORK MGMT SYST UPGRADE - INDUSTRIAL SUPPORT | - 0 | $ - 0 | $0 | ||||||||
| 500 | AUXILIARY EQUIPMENT | |||||||||||
| 501 | EDG FUEL STOP SOLENOID VALVE (T-ALT 519) | - 0 | $ - 0 | $0 | ||||||||
| 502 | EDG QUICK CLOSING FUEL AND LUBE OIL VALVES (T-ALT 471) | - 0 | $ - 0 | $0 | ||||||||
| 503 | EDG SUPPLEMENTAL LUBE OIL COOLER INSTALL (T-ALT 359 | - 0 | $ - 0 | $0 | ||||||||
| 504B | TAKE CSI CARGO CRANE MAINTENANCE AND RETESTING (10 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 506 | TAKE CSI EMERGENCY DIESEL GENERATOR -ANNUAL TESTING AND INSPECTION (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 509 | TAKE CSI DISTILLING PLANT MAINTENANCE (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 510 | OWS AND OCM INSPECTION (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 512B | TAKE CSI MAGAZINE SPRINKLER GAUGE SPRINKLER CALIBRATION - T11-14 | - 0 | $ - 0 | $0 | ||||||||
| 516 | TAKE CSI SEWAGE SYSTEM PIPING CLEANING (2.5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 517A | TAKE CSI LTFW COOLER CLEANING AND INSPECTION (2.5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 518B | T-AKE CSI HTFW COOLER REGASKETING | - 0 | $ - 0 | $0 | ||||||||
| 519 | REFRIGERATION COMPRESSOR SAFETY VALVE TEST (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 527 | TAKE CSI BRINE SYSTEM FLUSH (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 528B | TAKE CSI Magazine Sprinkler Valve Overhaul Montreal | - 0 | $ - 0 | $0 | ||||||||
| 530 | TAKE CSI MAIN DIESEL GENERATOR PEDESTAL BEARING INSPECTION (5 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 531 | TAKE CSI SCBA CASCADE FILL STATION HYDRO TEST (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 546 | TAKE CSI STEERING GEAR PREVENTIVE MAINTENANCE (10 YR) | - 0 | $ - 0 | $0 | ||||||||
| 551 | TAKE CCSI OVERHAUL PLATE COOLERS | - 0 | $ - 0 | $0 | ||||||||
| 552 | TAKE CCSI HOSE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 553 | TAKE CCSI PRESSURE VESSELS AND RELIEF VALVES | - 0 | $ - 0 | $0 | ||||||||
| 562 | TAKE CCSI SCBA ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 563 | TAKE CCSI SCBA AIR COMPRESSOR AND FILLING STATION INSPECTION & MAINTENANCE (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 565 | TAKE CCSI FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 567 | TAKE CCSI FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 569 | TAKE CCSI FIRE AND SMOKE DETECTION ALARM SYSTEM (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 570 | TAKE CCSI PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | - 0 | $ - 0 | $0 | ||||||||
| 571 | TAKE CCSI FIRE AND SMOKE DAMPER SERVICE (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 572 | TAKE CCSI DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 573 | TAKE CCSI FIRE HOSES (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 574 | TAKE CSI FIRE SHUTTERS AND DOORS | - 0 | $ - 0 | $0 | ||||||||
| 575 | TAKE CSI WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR) (SCSI) | - 0 | $ - 0 | $0 | ||||||||
| 576 | BOW THRUSTER COOLING REGULATOR (T-ALT 277) | - 0 | $ - 0 | $0 | ||||||||
| 577 | CHAIN LOCKER VALVE AND FLEXIBLE LINK REPLACEMENT (TALT 318) | - 0 | $ - 0 | $0 | ||||||||
| 578 | AFT STEERING MOTOR CONTROLLER INDICATOR LIGHT RELOCATION (T-ALT 503) | - 0 | $ - 0 | $0 | ||||||||
| 579 | POTABLE WATER VALVE REPAIR (VRR-19-031) | - 0 | $ - 0 | $0 | ||||||||
| 580 | MSD TANK AND PIPING REPAIRS (VRR-19-018/109/020) | - 0 | $ - 0 | $0 | ||||||||
| 581 | ANCHOR WINDLASS ANNUAL INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | FOOD WASTE AND GREY WATER TANK BLAST AND PAINT | - 0 | $ - 0 | $0 | ||||||||
| 602 | REFRIGERATION CARGO DOOR REPAIRS (VRR-20-0014) | - 0 | $ - 0 | $0 | ||||||||
| 603 | CHROMALOX HEAT TRACE SYST REPAIRS (VRR-20-001) | - 0 | $ - 0 | $0 | ||||||||
| 604 | STAEROOM DECK HEAD RENEWALS | - 0 | $ - 0 | $0 | ||||||||
| 610 | GALLEY AND MSO EQUIPMENT CALIBRATION | - 0 | $ - 0 | $0 | ||||||||
| 652 | TAKE CCSI LIFEBOAT DAVIT SERVICE AND INSPECTION (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 654 | TAKE CCSI RESCUE BOAT AND DAVIT SERVICE (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 656 | TAKE CCSI ANNUAL LIFE RAFT CERTIFICATION | - 0 | $ - 0 | $0 | ||||||||
| 658 | TAKE CCSI ACCOMMODATION LADDER MAINTENANCE AND TESTING (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 660 | LIFE BOAT AND RHIB GEL COAT PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 665 | TAKE CSI JETTISON READY SERVICE LOCKERS - CLEAN AND PAINT | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | AC940 HEATING ELEMENT REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 802 | TAKE CSI AIR CONDITIONING PLANT COMPRESSOR OVERHAUL (30K HRS) | - 0 | $ - 0 | $0 | ||||||||
| 803 | TAKE CARGO AND AC PLANT ANNUAL INSPECTIONS | - 0 | $ - 0 | $0 | ||||||||
| 804 | VANE AXIAL FAN MOTOR OVERHAULS | |||||||||||
| 851 | TAKE CCSI ANNUAL GALLEY VENTILATION AND GAYLORD HOOD CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 852 | TAKE CCSI ANNUAL LAUNDRY VENT CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 853 | TAKE CCSI ACCOMMODATION VENT SYSTEM CLEANING (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRY-DOCKING AND UNDERWATER HULL | |||||||||||
| 901 | TAKE CCSI DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YRS) | - 0 | $ - 0 | $0 | ||||||||
| 903 | PROPELLER SHAFT AND STERN TUBE INSPECTION WAFT SEAL | - 0 | $ - 0 | $0 | ||||||||
| 904 | TAKE CSI STERN TUBE SEAL INSPECTION (FW SYSTEM) (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 905B | TAKE CSI BOW THRUSTER MAINTENANCE (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 908 | TAKE CSI RENEW SEACHEST, ROPE GUARD, AND BOW THRUSTER ZINCS (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 912 | SHAFT GROUNDING SYSTEM MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 913 | TAKE CSI RENEW WASTER PIECES (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 917 | FREEBOARD CLEANING AND PAINTING (NEAR WHITE B | - 0 | $ - 0 | $0 | ||||||||
| 953 | TAKE CCSI ANCHOR CHAINS AND LOCKERS (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 956 | TAKE CCSI OVERHAULING SEA VALVES (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 957 | TAKE CCSI POP POLISH AND CLEAN - ON DOCK (2.5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 960 | TAKE CCSI UNDERWATER HULL CLEANING AND PAINTING - NEAR WHITE BLAST (10YR) | - 0 | $ - 0 | $0 | ||||||||
| 962 | TAKE CCSI CATHODIC PROTECTION SYSTEM (2.5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 963 | TAKE CCSI SEA CHEST MARINE GROWTH PREVENTION SYST | - 0 | $ - 0 | $0 | ||||||||
| 966 | SHAFT ALIGNMENT AND BEARING REACTION CHECKS TAKE CCSI | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | SLIDING BLOCK BUMPER UPGRDE | - 0 | $ - 0 | $0 | ||||||||
| 1050 | TAKE CCSI SLIDING BLOCK CHAIN REPLACEMENT (5 YR) | - 0 | $ - 0 | $0 | ||||||||
| 1051 | HP AIR RELIEF VALVE CALIBRATION | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
&L&"Arial,Bold"USNS WILLIAM MCLEAN (T-AKE 12) N3220521R4014&C&"Arial,Bold"CONTRACTOR PRICE BREAKDOWN&"Arial,Regular" &"Arial,Bold"CATEGORY "A" ITEMS&R&"Arial,Bold"N3220520R4077
&CATTACHMENT J-2
Sheet1
File details come from the government source that posted it. Updated .