J-7 MSC Ship Repair Facility Survey.pdf
PDF 564 KB Posted
- Attached to
- USNS PATUXENT (T-AO 201) ROH/DD
- Solicitation number
- N3220520R4003
About this file
This document contains a ship repair facility survey form and details of a related federal contract opportunity for repair and dry-docking of the USNS PATUXENT (T-AO 201). The survey form requests extensive information from shipyards regarding their facilities, equipment, certifications, and capabilities to perform ship repairs. Specific information is solicited on dry docks, building ways, cranes, shops, material storage, and employment levels. The related solicitation is for the Military Sealift Command's requirement for the regular overhaul and dry-docking of the USNS PATUXENT to be performed at a shipyard with the qualifications and capacities outlined in the survey form. The work is to be completed prior to the end of FY2020. Relevant details of shipyard capabilities and past performance must be submitted along with the completed survey form for consideration under this opportunity.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R4003
ATTACHMENT J - 7 MSC Form 4330/26
SHEET 1 OF 5
MSC SHIP REPAIR FACILITY SURVEY
USNS PATUXENT (T-AO 201)
NOTE: If survey form has been previously submitted, then enter changes only.
DATE:
Commander (Code M-4E3) Military Sealift Command Norfolk, VA 23511
SHIPYARD AND ADDRESS SHIPYARD DATA
Telephone No:
Telex No:
Date Found:
BUILDING WAYS (M. I. W.)
NO. LAUNCHING DIMENSIONS MAXIMUM SHIP SIZE
OF (check one) (ton 2,240 lbs)
WAY
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.
DEPTH OF WATER
OVER
WAY END
AT DROP
OFF NO.
CRANES SERVING WAY
TYPE
LIFT CAPACITY
(std. tons)
CERTIFICATION DATE &
CERTIFIED BY WHOM
TIDAL RANGE (DIFF. OF M.L. M.H) IS FIRE PROTECTION AVAILABLE
ON BUILDING WAY?
YES NO
IS SNUBBING NECESSARY?
YES NO
N3220520R4003 USNS PATUXENT (T-AO 201)
MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:
BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (means high water)
NO. TYPE LENGTH
(actual & usable)
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
ACT:
USE:
WATER DEPTH
(M. L. W.)
IN-
BOARD
OUT-
BOARD
HEIGHT
OF
DOCK
(M.L.W.)
USE
REPAIR/
OUTFIT-
ING
SERVICES AVAILABLE
(use abbreviation of service below)
DOCK
NO.
MATERIAL TYPE
Floating--(FD) Graving--(GD) Marine Railway (MR)
DRY DOCKS (continued)
DOCK
NO.
MAXIMUM SHIP SIZE
ACCOMMODATED
LENGTH OA-BEAM
LENGTH
at coping (GD), at keel blocks OVERALL on cradle (MR), on PONTOON
(FD)
CLEAR WIDTH
at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height
DEPTH/DRAFT
OVER OVER OVER
SILL FLOOR KEEL
(GD) BLOCKS
LIFTING CAPACITY
(ton 2,240)
DATE CERTIFIED, CERTIFIED BY WHOM, &
DATE CERTIFICATION EXPIRES
LEGEND (abbreviation of services) Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.
Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO
MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:
BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)
MAX REACH HEIGHT OF HOOK
NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM &
(STD TONS) (BRIDGE) AT REACH LENGTH HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES
NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)
MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES
DISTANCE TO NEAREST DISTANCE TO NEAREST AIRPORT
RAILROAD CONNECTION (identify)
LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)
SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)
PRINCIPAL SHOPS AND BUILDINGS
STORAGE SPACE FOR COMPONENTS AND MATERIALS
(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)
NAME OF SHOP
OR BUILDING
FABRICATING
PLATE
SHEET METAL
SUBASSEMBLY
WOOD WORKING
BOAT ASSEMBLY
OR MOLDING
BOILER
MACHINE
ELECTRICAL
ELECTRONIC
PIPE
FOUNDRY
RIGGER
DIMENSIONS OF
SHOP OR BUILDING
LARGEST EXIT
WIDTH HEIGHT
ALL OTHER SHOPS
(LIST NAMES AND DIMENSIONS)
RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________
WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________
LIST TYPES OF WORK NORMALLY SUBCONTRACTED ACREAGE LEGALLY CONTROLLED
IN USE DEVELOPED TOTAL
ARE YOU CERTIFIED AS A SMALL BUSINESS ? YES NO
SHIPYARD:
MSC SHIP REPAIR FACILITY SURVEY (continued)
LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM
EMPLOYMENT
MANAGEMENT, ADMINISTRATION
PROFESSIONAL ENGINEERING
PRODUCTION SKILLED
PRODUCTION UNSKILLED
NONPRODUCTION
TOTAL:
CURRENT
CURRENT
SHIFTS POTENTIAL MAXIMUM
MAXIMUM
SHIFTS NORMAL
NORMAL
SHIFTS
REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:
1. PLOT PLAN OF YARD.
2. CERTIFIED DEPTH OF WATER PLOT
3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND
EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.
4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND
DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN
ACCOMPLISHED BY THE APPLICANT.
5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP
REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE
LINE
6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN
LIST EACH FACILITY AND ITS LOCATION.
7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM
(NAME/TITLE/PHONE NUMBER).
NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED
File details come from the government source that posted it. Updated .