J-2 Category A Items.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
USNS PATUXENT (T-AO 201) ROH/DD
Solicitation number
N3220520R4003
Issued by

About this file

This document contains a contractor price breakdown for Category A items required for the USNS PATUXENT (T-AO 201) FY20 Regular Overhaul/Dry-Docking (ROH/DD). The Military Sealift Command (Norfolk) solicitation N3220520R4003 requires various hull, machinery, electrical, auxiliary, outfitting and drydocking services. Key Category A products and services include NDT of kingpost areas, forepeak tank repairs, ballast tank structural repairs, cargo tie down replacement, preservation and painting of various deck areas, tank repairs, preservation of cargo and ballast swing lids, machinery space turn-over and trials, hazardous waste disposal, and underwater hull cleaning and painting. Pricing is provided by line item number for prime contractor and subcontractor labor and materials. The total estimated price will be determined upon proposal submission in response to this solicitation.

View the file

Other files

File Type Posted
J-10 Interport Differential REV-A.doc DOC document
Amendment N3220520R4003-00006.docx DOCX document
Conformed Copy Amendment N3220520R4003-00006.docx DOCX document
J-3 Category B Items REV-D.xlsx XLSX spreadsheet
J-10 Interport Differential REV-A.doc DOC document
J-2 Category A Items REV-E.xlsx XLSX spreadsheet
Amendment N3220520R4003-0005.docx DOCX document
Confromed Copy N3220520R4003-00005.docx DOCX document
J-2 Category A Items REV-D.xlsx XLSX spreadsheet
Amendment N3220520R4003-00004.docx DOCX document
Amendment N3220520R4003-00003.docx DOCX document
J-3 Category B Items REV-C.xlsx XLSX spreadsheet
J-2 Category A Items REV-C.xlsx XLSX spreadsheet
J-3 Category B Items REV-B.xlsx XLSX spreadsheet
J-2 Category A Items REV-B.xlsx XLSX spreadsheet
Amendment N3220520R4003-00002.docx DOCX document
J-2 Category A Items REV-A.xlsx XLSX spreadsheet
Amendment N3220520R4003-00001.docx DOCX document
J-3 Category B Items REV-A.xlsx XLSX spreadsheet
Redacted J&A PATUXENT N32205204003.pdf PDF
J-11 Dry Dock Evaluation Form.docx DOCX document
CDRL, SWI-0018.pdf PDF
CDRL, SWI-004.pdf PDF
CDRL, SWI-0016.pdf PDF
CDRL, SWI-005.pdf PDF
J-12 Past Perf Data.docx DOCX document
J-4 GFM PATUXENT.pdf PDF
J-3 Category B Items.xlsx XLSX spreadsheet
J-10 Interport Differential.doc DOC document
CDRL, SWI-0024.pdf PDF
CDRL, SWI-0017.pdf PDF
J-7 MSC Ship Repair Facility Survey.pdf PDF
CDRL, SWI-001.pdf PDF
CDRL, SWI-0020.pdf PDF
J-14 Technical NDA.pdf PDF
CDRL, SWI-0013.pdf PDF
J-13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J-8 RFC.doc DOC document
CDRL, SWI-0021.pdf PDF
Solicitation N3220520R4003.pdf PDF
CDRL, SWI-0014.pdf PDF
CDRL, SWI-0015.pdf PDF
CDRL, SWI-006.pdf PDF
J-9 Disclsr Lobbying Activities SF-LLL.pdf PDF
CDRL, SWI-0023.pdf PDF
CDRL, SWI-0011.pdf PDF
CDRL, SWI-0012.pdf PDF
CDRL, SWI-0019.pdf PDF
CDRL, SWI-0022.pdf PDF
CDRL, SWI-0010.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorGovt Mandated Tech Rep/SubOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPRICETOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
000GENERAL REQUIREMENTS
001INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONSNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
002TECHNICAL AND MANUFACTURER’S REPRESENTATIVESNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
003APPROACH, BERTH, AND MOORING REQUIREMENTSNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
004TESTING AND QUALITY ASSURANCENSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
005ELECTRICAL SAFETY PROCEDURES REQUIREMENTSNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
006HEAVY WEATHER PLANNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
007COLD WEATHE PLANNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM
011GENERAL SERVICES FOR SHIP (T-AO)
012INFORMATION TECHNOLOGY SERVICES
013PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT
014WEIGHT AND MOMENT REPORT
015ILS GFM
016FIRE PROTECTION AND SHIP'S SAFETY PROGRAM
017HANDLING SHIP'S STORES
018DELIVERY AND REDELIVERY OF VESSEL
019SHIPBOARD ACCESS AND SECURITY
020GAS FREE CERTIFICATES
021CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES
022MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS
023HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY
024PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITYNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP
100HULL STRUCTURES
101NDT KINGPOST AREAS (ABS & USCG)
106FOREPEAK TANK REPAIRS
107BALLAST TANK STRUCTURAL REPAIRS
108CONTAM TANKS DECK REPLACEMENT
109CARGO TIE DOWN REPLACEMENT
111PREP & PAINT VARIOUS DECK AREAS
113MISCELLANEOUS STEEL REPAIRS
115MISCELLANEOUS TANK REPAIRS
116CONTAINMENT ENCLOSURE PIPE & STEEL REPLACEMENT
117ALLIED DAVIT PRESERVATION
119CARGO AND BALLAST TANK SWING LID PRESERVATION
122FAS &RAS STATION PRESERVATION
123FAS STATION MAINTENANCE PLATFORM REPAIRS
124RAM TENSIONER & PLATFORM PRESERVATION
127RAS & FAS KINGPOST SUPPORT BRACKETS (TALT 0819)
128STABILITY TEST
155INSPECTION OF PV VALVES
158TANK PRESERVATION
159DECKHOUSE PRESERVATION
160WATERTIGHT CLOSURE REPAIR
162WATERTIGHT CLOSURE INSPECTION
196ER SIDE SHELL REPLACEMENT
197CENTRAL FRESH WATER ROOM STEEL RENEWAL
198JACKET WATER ROOM STEEL RENEWAL
199ENGINE ROOM DECK PLATE REPLACEMENT
200MACHINERY, PROPULSION
201ME INDUSTRUAL ASSISTANCE AND SERVICE
208PROPULSION SHAFT BRAKE OVERHAUL
252MAIN REDUCTION GEAR INSPECTION
254THRUST & LINESHAFT BEARING INSPECTION
300ELECTRICAL
304ANNUAL GENERATOR INSPECTION
305ANNUAL PTO CONTROLS GROOM
306BULKHEAD CABLE COLLAR MAGNAROCK REPLACEMENT
311THERMOCOUPLE & WIRE REPLACEMENT ON SSDG
351SWITCHBOARD CLEANING
352MOTOR CONTROL CENTER CLEANING
353THERMOGRAPHIC SURVEY
400COMMUNICATION & NAV AIDS
402TVDTS SYSTEM AND DISTRIBUTION GROOM
405UHF SATCOM AND LOS TRANSCEIVER GROOM
406AN/URT-23(D) AN/URR-2368A HF SET GROOM
409DOPPLER SPEED LOG PREVENTATIVE MAINTENANCE
411AVAYA TELEPHONE SYSTEM GROOM
414ANNUAL SERVICE AND ADJUST MAGNETIC COMPASS
415OVERHAUL ENGINE ORDER TELEGRAPH SYSTEM
451ANNUAL RADAR SERVICE
452ANNUAL ECDIS SERVICE
453ANNUAL GYRO SYSTEM PM
454ANNUAL VDR RECERTIFICATION
455ANNAUL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION
457EPIRB SERVICE
459ECHO SOUNDER SERVICE
500AUXILIARY MACHINERY
504NO.3 SSDG 60,000 HOUR OVERHAUL
508MISCELLANEOUS PIPE REPAIRS
510AUXILIARY BOILER VALVES MAINTENANCE & TESTING
514PUMP OVERHAUL -PTX
515REFRIGERATION & AC SYSTEM PREVENTATIVE MAINTENANCE
517ANNUAL INCINERATOR SERVICE
518STBD ANCHOR WINDLASS CAPSTAN REPAIR
520OVERHAUL BALANCED FAIRLEADS
521PURIFIER MAINTENANCE, FO (WESTFALIA)
522PURIFIER MAINTENANCE, LO (WESTFALIA)
524ER OWS & CARGO OCM GROOM
527HIGH PRESSURE AIR COMPRESSOR (HPAC) OVERHAULS
528STEERING GEAR MAINTENANCE
535ABS AUXILLARY BOILER SURVEY AND HYDRO
537CONSTANT TENSION WINCHES No.5 and No.6
538GAYLORD BOOSTER HEATER REPLACEMENT (T-ALT 06-34)
550OVERHAUL JW PLATE COOLERS
551OVERHAUL CFW PLATE COOLERS
552HOSE REPLACEMENT
553PRESSURE VESSELS & RELIEF VALVES
555INSPECT, TEST, & CERTIFY MACHINERY SPACE CRANES & HOISTS
560PERSONNEL ELEVATOR INSPECTION & TEST
561GAUGE CALIBRATION
562SCBA ANNUAL INSPECTION
563SCBA AIR COMPRESSOR & FILL STATION INSPECTIONS
565FIXED GAS FIREFIGHTING SYSTEM INSPECTION & TEST
567FIXED FOAM FIREFIGHTING SYSTEM INSPECTION & TEST
569FIRE & SMOKE DETECTION & ALRAM SERVICE
570PORTABLE FIRE EXTINGUISHER SERVICE
571FIRE AND SMOKE DAMPER SERVICE
572DEEP FAT FRYER & RANGE HOOD FIRE EXTINGUISHING SYSTEM
573FIRE HOSES
574FIRE DOORS & SHUTTERS
575FIRE DETECTION SYSTEM REPLACEMENT (T-ALT 872)
576THERMOSTATIC SWITCH REACTION TIME TEST
600OUTFIT, FURNISHING & HABITABILITY
602NEW LIFEBOAT INSTALLATION
605RESCUE BOAT DAVIT REPAIRS
611STATEROOM HEAD FLOOR COVERING RENEWAL
615SHOWER STALL BULKHEAD PANEL RENEWALS
619WINDOW REGASKETING AND STEEL REPAIR
652LIFEBOAT & DAVIT SERVICE
654RHIB/RESCUE BOAT/ FAST RESCUE BOAT & DAVIT SERVICE
655IMMERSION SUIT SERVICE
656ANNUAL LIFERAFT CERTIFICATION
657ACCOMMODATION LADDER INSPECTION
659PILOT BOARDING EQPT & EMBARKATION LADDERS
660DECK TILE REPLACEMENT
661CARPET REPLACEMENT
662DEEP FAT FRYER INSPECTION
800HVAC
801VENT DUCT REPAIR & PRESERVATION
803MISC. LAGGING AND INSULATION RENEWALS
851ANNUAL GALLEY VENTILATION AND GAYLORD HOOD
852ANNUAL LAUNDRY VENT CLEANING
853ACCOMMODATION VENT SYSTEM CLEANING
900DRYDOCKING
901DRY-DOCKING AND UNDOCKING VESSEL
903INSPECTION OF BILGE KEELS, BOW VOID & SKEGS
905PROPELLER SHAFT WEARDOWN READINGS
911PROPELLER SYSTEM MAINTENANCE
912STERN TUBE SEAL MAINTENANCE
913SPURS LINE AND NET CUTTER MAINTENANCE
915ROPE GUARD ZINC ANODE REPLACEMENT
953ANCHORS, CHAINS, & LOCKERS
954RUDDER AND STERN FRAME EXAMINATION
956OVERHAULING SEA VALVES
960UNDERWATER HULL CLEANING & PAINTING - SPOT BLAST
961FREEBOARD PRESERVATION
962CATHODIC PROTECTION SYSTEM
963SEA CHEST MARINE GROWTH PREVENTION SYSTEM
966SHAFT ALIGNMENT & BEARING REACTION CHECKS
1000UNREP EQUIPMENT
1001SPANWIRE WINCH CONTROLLEX CABLE AND HANGERS
1002ASD COOLING FAN MOTOR OVERHUAL AND SHROUD FABRICATION
1003TRANSM REPLEN PUMP ELECTRIC MOTOR BEARING REFURBISHMENT
1004HYDRUALIC TRANSMISSION HEAT EXCHANGERS FRAME
1005SADDLE WINCH GEARBOX REPAIR AND SHAFT REPLACEMENT- REPAIR
1006ASD FRAME AND FOUNDATION REFURBISHMENT
1007LEAD ANGLE COMPENSATOR REPAIRS
1008REFURB OF RAM (ARC) UNIT INCLUDING BRACKETS AND MOUNTS
1010CARGO GEAR QUADRENNIAL RECERTIFICATION
1016UNREP STRUCTURAL STEEL REPLACEMENT
1025REFURB HAULING WINCH ASSEMBLY & RECONDITION MACHINERY
TOTAL
&"Times New Roman,Regular"USNS PATUXENT (T-AO 201)&"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN
&"Times New Roman,Bold"CATEGORY "A" ITEMS&"Times New Roman,Regular"N3220520R4003

ATTACHMENT J-2

File details come from the government source that posted it. Updated .