This is an amendment to a solicitation for the overhaul and dry-docking of the USNS PATUXENT (T-AO 201). The amendment extends the required response date from March 9, 2020 to May 1, 2020. It also extends the anticipated ship availability period from June 5 to August 22, 2020 to June 29 to October 26, 2020. The amendment removes one optional work item and modifies pricing instructions and terms. The Military Sealift Command seeks overhaul and repair services at the contractor's facility for the auxiliary oiler USNS PATUXENT, involving work on hull structure, machinery, electrical systems, communications and navigation equipment, auxiliary systems, outfitting and more. Offerors should submit revised proposals by the new deadline of May 1, 2020.

View the file

Other files

File Type Posted
J-10 Interport Differential REV-A.doc DOC document
Conformed Copy Amendment N3220520R4003-00006.docx DOCX document
J-3 Category B Items REV-D.xlsx XLSX spreadsheet
J-10 Interport Differential REV-A.doc DOC document
J-2 Category A Items REV-E.xlsx XLSX spreadsheet
Amendment N3220520R4003-0005.docx DOCX document
Confromed Copy N3220520R4003-00005.docx DOCX document
J-2 Category A Items REV-D.xlsx XLSX spreadsheet
Amendment N3220520R4003-00004.docx DOCX document
Amendment N3220520R4003-00003.docx DOCX document
J-3 Category B Items REV-C.xlsx XLSX spreadsheet
J-2 Category A Items REV-C.xlsx XLSX spreadsheet
J-3 Category B Items REV-B.xlsx XLSX spreadsheet
J-2 Category A Items REV-B.xlsx XLSX spreadsheet
Amendment N3220520R4003-00002.docx DOCX document
J-2 Category A Items REV-A.xlsx XLSX spreadsheet
Amendment N3220520R4003-00001.docx DOCX document
J-3 Category B Items REV-A.xlsx XLSX spreadsheet
Redacted J&A PATUXENT N32205204003.pdf PDF
J-11 Dry Dock Evaluation Form.docx DOCX document
CDRL, SWI-0018.pdf PDF
CDRL, SWI-004.pdf PDF
CDRL, SWI-0016.pdf PDF
CDRL, SWI-005.pdf PDF
J-12 Past Perf Data.docx DOCX document
J-4 GFM PATUXENT.pdf PDF
J-3 Category B Items.xlsx XLSX spreadsheet
J-10 Interport Differential.doc DOC document
CDRL, SWI-0024.pdf PDF
CDRL, SWI-0017.pdf PDF
J-7 MSC Ship Repair Facility Survey.pdf PDF
CDRL, SWI-001.pdf PDF
CDRL, SWI-0020.pdf PDF
J-14 Technical NDA.pdf PDF
CDRL, SWI-0013.pdf PDF
J-13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J-8 RFC.doc DOC document
CDRL, SWI-0021.pdf PDF
Solicitation N3220520R4003.pdf PDF
J-2 Category A Items.xlsx XLSX spreadsheet
CDRL, SWI-0014.pdf PDF
CDRL, SWI-0015.pdf PDF
CDRL, SWI-006.pdf PDF
J-9 Disclsr Lobbying Activities SF-LLL.pdf PDF
CDRL, SWI-0023.pdf PDF
CDRL, SWI-0011.pdf PDF
CDRL, SWI-0012.pdf PDF
CDRL, SWI-0019.pdf PDF
CDRL, SWI-0022.pdf PDF
CDRL, SWI-0010.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R4003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION / CONTRACT FORM

The required response date/time has changed from 09-Mar-2020 02:00 PM to 01-May-2020 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0006

The CLIN extended description has changed from:

WI 0103 - ULTRASONIC THICKNESS GAUGING – SPECIAL PERIODIC SURVEY NO.5Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.

To:

REMOVED

The following have been modified:

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0014 $______________

The contractor shall enter the total proposed price of all CLINs.

PART I - THE SCHEDULE

Section B, Price Schedule, detailed information

CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.

CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.

The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

The base cost, stated in this CLIN does not include the profit or G&A rates.

NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

CLINs 0003 through 0014 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0014 pricing.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

C – 2 List of Standard WIs included for this solicitation:

DESCRIPTION CATEGORY

SECTION 000 – GENERAL REQUIREMENTS

001SCOPE GENERAL REQUIREMENTS AND DEFINITIONS -REV 16Jul18NSP
002TECHNICAL AND MANUFACTURERS REPRESENTATIVES -REV 01May18NSP
003APPROACH BERTH AND MOORING REQUIREMENTS -REV 14Jan19 -RevANSP
004TESTING AND QUALITY ASSURANCE -REV 08Nov17NSP
005ELECTRICAL SAFETY PROCEDURE REQUIREMENTS -REV 03Aug19NSP
006HEAVY WEATHER PLAN -REV 03Aug19NSP
007COLD WEATHER PLAN -REV 03Aug19NSP
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM -REV 03Aug19 -RevAA
011GENERAL SERVICES FOR SHIP T-AO -REV FEB 14 -RevAA
012INFORMATION TECHNOLOGY SERVICES -REV 03Aug19 -RevAA
013PROJECT PLANNING AND PRODUCTION STATUS MONITORING - 1May18 -RevAA
014WEIGHT AND MOMENT REPORT -REV 03Aug19A
015ILS GFM -REV 28Oct18A
016FIRE PROTECTION AND SHIPS SAFETY PROGRAM -REV 28Sep17A
017HANDLING SHIPS STORES -REV FEB 14A
018DELIVERY AND REDELIVERY OF THE VESSEL -REV 03Aug19 -RevAA
019SHIPBOARD ACCESS AND SECURITY -REV 28Nov18A
020GAS FREE CERTIFICATES -REV 03Aug19A
021CLEAN AND GF TANKS, VOIDS, COFFERDAMS, & SPACES -REV 03Aug19 -RevAA
022MACHINERY SPACE TURN-OVER, DOCK TRL & SEA TRL -REV 28Sept17A
023HAZ WASTE DISPOSAL AT CONTRACTOR'S FACILITY -REV 03Aug19A
024PHYS SECURITY AT PRIVATE CONTRACTOR FACILITY -REV 28Nov18 NSP
025PHYS SECURITY AT PRIVATE CONTRACTOR FACILITY -REV 28Nov18B
030CONTINUATION OF SERVICES -REV 03Aug19 -RevBB

SECTION 100 – HULL STRUCTURE

101NDT KINGPOST AREAS (ABS & USCG)A
102TANK INSPECTION FOR ABS SPECIAL PERIODIC SURVEY NO. 5 -RevBB
103DELETEDB
106FOREPEAK TANK STRUCTURAL REPAIRS -RevBA
107BALLAST TANK STRUCTURAL REPAIRS -RevBA
108CONTAM TANKS DECK REPLACEMENT -RevAA
109DELETEDA
111DELETEDA
113MISCELLANEOUS STEEL REPAIRS -RevAA
115MISCELLANEOUS TANK REPAIRSA
116CONTAINMENT ENCLOSURE PIPE & STEEL REPLACEMENTA
117ALLIED DAVIT PRESERVATION -RevAA
119DELETEDA
122DELETEDA
123FAS STATION MAINTENANCE PLATFORM REPAIRS -RevBA
124RAM TENSIONER & PLATFORM PRESERVATION -RevBA
127RAS & FAS KINGPOST SUPPORT BRACKETS (T-ALT 0819)-RevAB
128STABILITY TESTA
146FOREPEAK TANK ADDITIONAL STRUCTURAL REPAIRS -RevAB
147BALLAST TANK ADDITIONAL STRUCTURAL REPAIRS -RevAB
155INSPECTION OF PV VALVESA
158TANK PRESERVATION -RevAA
159DELETEDA
160WATERTIGHT CLOSURE REPAIRA
162WATERTIGHT CLOSURE INSPECTIONA
196ER SIDE SHELL REPLACEMENTA
197CENTRAL FRESH WATER ROOM STEEL RENEWAL -RevAA
198JACKET WATER ROOM STEEL RENEWAL -RevAA
199ENGINE ROOM DECK PLATE REPLACEMENT -RevAA

SECTION 200 – MACHINERY, PROPULSION

201ME INDUSTRIAL ASSISTANCE & SERVICESA
208PROPULSION SHAFT BRAKE OVERHAULA
252MAIN REDUCTION GEAR INSPECTION (5YR)A
254DELETEDA

SECTION 300 - ELECTRICAL

304ANNUAL GENERATOR INSPECTIONA
305ANNUAL PTO CONTROLS GROOMA
306BULKHEAD CABLE COLLAR MAGNAROCK REPLACEMENT -RevAA
311DELETEDA
351SWITCHBOARD CLEANINGA
352MOTOR CONTROL CENTER CLEANINGA
353THERMOGRAPHIC SURVEYA

SECTION 400 – COMMUNICATION AND NAVIGATION

402TVDTS SYSTEM AND DISTRIBUTION GROOM -RevAA
405UHF SATCOM AND LOS TRANSCEIVER GROOMA
406URT-23(D) URR-2368A HF SET GROOMA
409DOPPLER SPEED LOG PREVENTATIVE MAINTENANCEA
411AVAYA TELEPHONE SYSTEM GROOMA
414ANNUAL SERVICE AND ADJUST MAGNETIC COMPASSA
415DELETEDA
451ANNUAL RADAR SERVICEA
452ANNUAL ECDIS SERVICEA
453ANNUAL GYRO SYSTEM PMA
454ANNUAL VDR RECERTIFICATIONA
455ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATIONA
457EPIRB SERVICE (5 YEAR)A
459ECHO SOUNDER SERVICEA

SECTION 500 - MACHINERY, AUXILIARY SYSTEM

504NO.3 SSDG 60,000 HOUR OVERHAUL -RevAA
507VACUUM SEWAGE COLLECTION SYSTEM PIPING ACID CLEANINGA
508MISCELLANEOUS PIPE REPAIRS -RevAA
510AUXILIARY BOILER STEAM VALVES MAINTENANCE & TESTINGA
514PUMP OVERHAUL -RevAA
515REFRIGERATION & AC SYSTEM PREVENTATIVE MAINTENANCEA
517ANNUAL INCINERATOR SERVICEA
518STBD ANCHOR WINDLASS CAPSTAN REPAIR -RevAA
520OVERHAUL BALANCED FAIRLEADS -RevBA
521PURIFIER MAINTENANCE, FO (WESTFALIA) -RevBA
522PURIFIER MAINTENANCE, LO (WESTFALIA) -RevAA
524ER OWS & CARGO OCM GROOM -RevAA
527DELETEDA
528STEERING GEAR MAINTENANCE (5YR)A
535ABS AUXILIARY BOILER SURVEY AND HYDROA
537CONSTANT TENSION WINCHES No.5 and No.6A
538GAYLORD BOOSTER HEATER REPLACEMENT (T-ALT 06-34) -RevAA
550OVERHAUL JW PLATE COOLERS -RevAA
551OVERHAUL CFW PLATE COOLERS -RevAA
552HOSE REPLACEMENT (5YR)A
553PRESSURE VESSELS & RELIEF VALVES (5YR) -RevBA
555INSPECT, TEST & CERTIFY MACHINERY SPACE CRANES & HOISTS (5YR)A
560PERSONNEL ELEVATOR INSPECTION & TEST (5YR)A
561GAGE CALIBRATION -RevAA
562SCBA ANNUAL INSPECTION -RevAA
563SCBA AIR COMPRESSOR & FILL STATION INSPECTION (1YR)A
565FIXED GAS FIREFIGHTING SYSTEM INSPECTION & TEST (1 YR) -RevAA
567FIXED FOAM FIREFIGHTING SYSTEM INSPECTION & TESTA
569FIRE & SMOKE DETECTION & ALARM SYSTEMA
570PORTABLE FIRE EXTINGUISHER SERVICE -RevBA
571FIRE & SMOKE DAMPER SERVICEA
572DEEP FAT FRYER, GRILL & RANGE HOOD FIRE EXTING SYSTEM -RevAA
573FIRE HOSESA
574FIRE DOORS & SHUTTERS (1YR) -RevAA
575DELETEDA
576THERMOSTATIC SWITCH REACTION TIME TESTA

SECTION 600 - OUTFITTING, FURNISHING AND HABITABILITY

602NEW LIFEBOAT INSTALLATIONA
605RESCUE BOAT DAVIT REPAIRS -RevAA
611STATEROOM HEAD FLOOR COVERING RENEWALA
615SHOWER STALL BULKHEAD PANEL RENEWALSA
619WINDOW REGASKETING AND STEEL REPAIRA
652LIFEBOAT & DAVIT SERVICE (5 YEAR) -RevAA
654RIB/RESCUE BOAT/FAST RESCUE BOAT&DAVIT SERVICE(5 YEAR) -RevAA
655IMMERSION SUIT SERVICE (3 YEAR)A
656ANNUAL LIFERAFT CERTIFICATION (ABS)A
657ACCOMMODATION LADDER INSPECTION (1YR)A
659PILOT BOARDING EQPT & EMBARKATION LADDERS (5YR)A
660DECK TILE REPLACEMENTA
661CARPET REPLACEMENTA
662DEEP FAT FRYER INSPECTIONA

SECTION 800 – HEATING VENTILATION AND AIR CONDITIONING

801VENT DUCT REPAIR & PRESERVATIONA
803MISC. LAGGING AND INSULATION RENEWALSA
851ANNUAL GALLEY VENTILATION AND GAYLORD HOODA
852ANNUAL LAUNDRY VENT CLEANINGA
853ACCOMODATION VENT SYSTEM CLEANINGA

SECTION 900 – DRYDOCKING AND UNDOCKING

901DRYDOCKING AND UNDOCKING VESSELA
903INSPECTION OF BILGE KEELS, BOW VOID & SKEGSA
905PROPELLER SHAFT WEARDOWN READINGSA
911PROPELLER SYSTEM MAINTENANCE (30 MONTHS)A
912STERN TUBE SEAL MAINTENANCEA
913SPURS LINE AND NET CUTTER MAINTENANCEA
915ROPE GUARD ZINC ANODE REPLACEMENTA
917DRYDOCKING AND UNDOCKING SHIP – ADDITIONAL DAYSB
918RUDDER BEARING REPLACEMENT -RevAB
953ANCHORS, CHAINS, & LOCKERS (5YR)A
954RUDDER AND STERN FRAME EXAM (5YR)A
956OVERHAULING SEA VALVES (5YR)A
960UNDERWATER HULL CLEANING & PAINTING – SPOT BLAST -RevAA
961FREEBOARD PRESERVATION -RevAA
962CATHODIC PROTECTION SYSTEM -RevAA
963SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5YR) -RevBA
965STEEL RENEWAL -RevAB
966SHAFT ALIGNMENT & BEARING REACTION CHECKS (2.5YR)A
967SHAFT ALIGNMENT & BEARING REACTION CHECKS (SETS 3&4) -RevAB
968SHAFT ALIGNMENT & BEARING REACTION CHECKS (POST ST) -RevAB

SECTION 1000 – UNREP GEAR

1001SPANWIRE WINCH CONTROLLEX CABLE AND HANGERS -RevAA
1002ASD COOLING FAN MOTOR OVERHAUL AND SHROUD FABRICATIONA
1003TRANSM REPLEN PUMP ELECTRIC MOTOR BEARING REFURBISHMENTA
1004HYDRAULIC TRANSMISSION HEAT EXCHANGER FRAMEA
1005SADDLE WINCH GEARBOX REPAIR AND SHAFT REPLACMENT-REPAIRA
1006ASD FRAME AND FOUNDATION REFURBISHMENT -RevAA
1007LEAD ANGLE COMPENSATOR REPAIRS -RevAA
1008REFURB OF RAM ARC UNIT INCLUDING BRACKETS & MOUNTS -RevBA
1010CARGO GEAR QUADRENNIAL RECERTIFICATIONA
1016UNREP STRUCTURAL STEEL REPLACEMENT -RevAA
1025REFURBISH HAULING WINCH ASSBLY & RECONDITION MACHINERY -RevBA
1031UNREP STATION No.1 STEEL REPAIRSA
1032UNREP STATION No.2 STEEL REPAIRSA
1036UNREP STATION No.6 STEEL REPAIRSA
1037UNREP STATION No.7 STEEL REPAIRSA
1038UNREP STATION No.8 STEEL REPAIRSA

SECTION F - DELIVERY AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

22-AUG-2020

N/A
N/A

FOB: Destination

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

26-OCT-2020

N/A
N/A

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0003 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0004 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0005 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0006 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0007 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0008 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0009 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0010 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0011 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0012 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0013 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

The following Delivery Schedule item for CLIN 0014 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 05-JUN-2020 TO

N/A
N/A
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE

POP 29-JUN-2020 TO

N/A
N/A

F-1 SHIP AVAILABILITY PERIOD

It is anticipated the ship will arrive at contractor’s yard on or about 29 June 2020. All work shall be completed in no more than one-hundred and twenty (120) calendar days from actual start date designated by the Government at time of contract award.

F-2 PLACE OF PERFORMANCE

The place of performance for this contract shall be the contractor’s facility.