Amendment N3220520R4003-00006.docx
DOCX document 42 KB Posted
- Attached to
- USNS PATUXENT (T-AO 201) ROH/DD
- Solicitation number
- N3220520R4003
About this file
This is an amendment to a solicitation for the overhaul and dry-docking of the USNS PATUXENT (T-AO 201). The amendment extends the required response date from March 9, 2020 to May 1, 2020. It also extends the anticipated ship availability period from June 5 to August 22, 2020 to June 29 to October 26, 2020. The amendment removes one optional work item and modifies pricing instructions and terms. The Military Sealift Command seeks overhaul and repair services at the contractor's facility for the auxiliary oiler USNS PATUXENT, involving work on hull structure, machinery, electrical systems, communications and navigation equipment, auxiliary systems, outfitting and more. Offerors should submit revised proposals by the new deadline of May 1, 2020.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220520R4003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION / CONTRACT FORM
The required response date/time has changed from 09-Mar-2020 02:00 PM to 01-May-2020 02:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0006
The CLIN extended description has changed from:
WI 0103 - ULTRASONIC THICKNESS GAUGING – SPECIAL PERIODIC SURVEY NO.5Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
To:
REMOVED
The following have been modified:
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0014 $______________
The contractor shall enter the total proposed price of all CLINs.
PART I - THE SCHEDULE
Section B, Price Schedule, detailed information
CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.
CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | ||
| Welding | Machinists (inside and outside) | ||
| Burning | Brazing | ||
| Carpentry | Electrical work | ||
| Electronic work | Shipfitting | ||
| Lagging | Painting | ||
| Boilermaking | Pipefitting | ||
| Sheetmetal work | Engineering | ||
| Rigging | Staging/scaffolding | ||
| General labor | Fire Watch |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
| Testing | Quality Assurance | ||
| Planning | Cleaning (except tank cleaning) | ||
| Material handling & warehousing | Security | ||
| Surveying | Administration | ||
| Transportation | Purchasing staff | ||
| Lofting | Other indirect support | ||
| Supervision |
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.
The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost, stated in this CLIN does not include the profit or G&A rates.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.
CLINs 0003 through 0014 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0014 pricing.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
C – 2 List of Standard WIs included for this solicitation:
DESCRIPTION CATEGORY
SECTION 000 – GENERAL REQUIREMENTS
| 001 | SCOPE GENERAL REQUIREMENTS AND DEFINITIONS -REV 16Jul18 | NSP |
| 002 | TECHNICAL AND MANUFACTURERS REPRESENTATIVES -REV 01May18 | NSP |
| 003 | APPROACH BERTH AND MOORING REQUIREMENTS -REV 14Jan19 -RevA | NSP |
| 004 | TESTING AND QUALITY ASSURANCE -REV 08Nov17 | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS -REV 03Aug19 | NSP |
| 006 | HEAVY WEATHER PLAN -REV 03Aug19 | NSP |
| 007 | COLD WEATHER PLAN -REV 03Aug19 | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM -REV 03Aug19 -RevA | A |
| 011 | GENERAL SERVICES FOR SHIP T-AO -REV FEB 14 -RevA | A |
| 012 | INFORMATION TECHNOLOGY SERVICES -REV 03Aug19 -RevA | A |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING - 1May18 -RevA | A |
| 014 | WEIGHT AND MOMENT REPORT -REV 03Aug19 | A |
| 015 | ILS GFM -REV 28Oct18 | A |
| 016 | FIRE PROTECTION AND SHIPS SAFETY PROGRAM -REV 28Sep17 | A |
| 017 | HANDLING SHIPS STORES -REV FEB 14 | A |
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL -REV 03Aug19 -RevA | A |
| 019 | SHIPBOARD ACCESS AND SECURITY -REV 28Nov18 | A |
| 020 | GAS FREE CERTIFICATES -REV 03Aug19 | A |
| 021 | CLEAN AND GF TANKS, VOIDS, COFFERDAMS, & SPACES -REV 03Aug19 -RevA | A |
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRL & SEA TRL -REV 28Sept17 | A |
| 023 | HAZ WASTE DISPOSAL AT CONTRACTOR'S FACILITY -REV 03Aug19 | A |
| 024 | PHYS SECURITY AT PRIVATE CONTRACTOR FACILITY -REV 28Nov18 NSP | |
| 025 | PHYS SECURITY AT PRIVATE CONTRACTOR FACILITY -REV 28Nov18 | B |
| 030 | CONTINUATION OF SERVICES -REV 03Aug19 -RevB | B |
SECTION 100 – HULL STRUCTURE
| 101 | NDT KINGPOST AREAS (ABS & USCG) | A |
| 102 | TANK INSPECTION FOR ABS SPECIAL PERIODIC SURVEY NO. 5 -RevB | B |
| 103 | DELETED | B |
| 106 | FOREPEAK TANK STRUCTURAL REPAIRS -RevB | A |
| 107 | BALLAST TANK STRUCTURAL REPAIRS -RevB | A |
| 108 | CONTAM TANKS DECK REPLACEMENT -RevA | A |
| 109 | DELETED | A |
| 111 | DELETED | A |
| 113 | MISCELLANEOUS STEEL REPAIRS -RevA | A |
| 115 | MISCELLANEOUS TANK REPAIRS | A |
| 116 | CONTAINMENT ENCLOSURE PIPE & STEEL REPLACEMENT | A |
| 117 | ALLIED DAVIT PRESERVATION -RevA | A |
| 119 | DELETED | A |
| 122 | DELETED | A |
| 123 | FAS STATION MAINTENANCE PLATFORM REPAIRS -RevB | A |
| 124 | RAM TENSIONER & PLATFORM PRESERVATION -RevB | A |
| 127 | RAS & FAS KINGPOST SUPPORT BRACKETS (T-ALT 0819)-RevA | B |
| 128 | STABILITY TEST | A |
| 146 | FOREPEAK TANK ADDITIONAL STRUCTURAL REPAIRS -RevA | B |
| 147 | BALLAST TANK ADDITIONAL STRUCTURAL REPAIRS -RevA | B |
| 155 | INSPECTION OF PV VALVES | A |
| 158 | TANK PRESERVATION -RevA | A |
| 159 | DELETED | A |
| 160 | WATERTIGHT CLOSURE REPAIR | A |
| 162 | WATERTIGHT CLOSURE INSPECTION | A |
| 196 | ER SIDE SHELL REPLACEMENT | A |
| 197 | CENTRAL FRESH WATER ROOM STEEL RENEWAL -RevA | A |
| 198 | JACKET WATER ROOM STEEL RENEWAL -RevA | A |
| 199 | ENGINE ROOM DECK PLATE REPLACEMENT -RevA | A |
SECTION 200 – MACHINERY, PROPULSION
| 201 | ME INDUSTRIAL ASSISTANCE & SERVICES | A |
| 208 | PROPULSION SHAFT BRAKE OVERHAUL | A |
| 252 | MAIN REDUCTION GEAR INSPECTION (5YR) | A |
| 254 | DELETED | A |
SECTION 300 - ELECTRICAL
| 304 | ANNUAL GENERATOR INSPECTION | A |
| 305 | ANNUAL PTO CONTROLS GROOM | A |
| 306 | BULKHEAD CABLE COLLAR MAGNAROCK REPLACEMENT -RevA | A |
| 311 | DELETED | A |
| 351 | SWITCHBOARD CLEANING | A |
| 352 | MOTOR CONTROL CENTER CLEANING | A |
| 353 | THERMOGRAPHIC SURVEY | A |
SECTION 400 – COMMUNICATION AND NAVIGATION
| 402 | TVDTS SYSTEM AND DISTRIBUTION GROOM -RevA | A |
| 405 | UHF SATCOM AND LOS TRANSCEIVER GROOM | A |
| 406 | URT-23(D) URR-2368A HF SET GROOM | A |
| 409 | DOPPLER SPEED LOG PREVENTATIVE MAINTENANCE | A |
| 411 | AVAYA TELEPHONE SYSTEM GROOM | A |
| 414 | ANNUAL SERVICE AND ADJUST MAGNETIC COMPASS | A |
| 415 | DELETED | A |
| 451 | ANNUAL RADAR SERVICE | A |
| 452 | ANNUAL ECDIS SERVICE | A |
| 453 | ANNUAL GYRO SYSTEM PM | A |
| 454 | ANNUAL VDR RECERTIFICATION | A |
| 455 | ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | A |
| 457 | EPIRB SERVICE (5 YEAR) | A |
| 459 | ECHO SOUNDER SERVICE | A |
SECTION 500 - MACHINERY, AUXILIARY SYSTEM
| 504 | NO.3 SSDG 60,000 HOUR OVERHAUL -RevA | A |
| 507 | VACUUM SEWAGE COLLECTION SYSTEM PIPING ACID CLEANING | A |
| 508 | MISCELLANEOUS PIPE REPAIRS -RevA | A |
| 510 | AUXILIARY BOILER STEAM VALVES MAINTENANCE & TESTING | A |
| 514 | PUMP OVERHAUL -RevA | A |
| 515 | REFRIGERATION & AC SYSTEM PREVENTATIVE MAINTENANCE | A |
| 517 | ANNUAL INCINERATOR SERVICE | A |
| 518 | STBD ANCHOR WINDLASS CAPSTAN REPAIR -RevA | A |
| 520 | OVERHAUL BALANCED FAIRLEADS -RevB | A |
| 521 | PURIFIER MAINTENANCE, FO (WESTFALIA) -RevB | A |
| 522 | PURIFIER MAINTENANCE, LO (WESTFALIA) -RevA | A |
| 524 | ER OWS & CARGO OCM GROOM -RevA | A |
| 527 | DELETED | A |
| 528 | STEERING GEAR MAINTENANCE (5YR) | A |
| 535 | ABS AUXILIARY BOILER SURVEY AND HYDRO | A |
| 537 | CONSTANT TENSION WINCHES No.5 and No.6 | A |
| 538 | GAYLORD BOOSTER HEATER REPLACEMENT (T-ALT 06-34) -RevA | A |
| 550 | OVERHAUL JW PLATE COOLERS -RevA | A |
| 551 | OVERHAUL CFW PLATE COOLERS -RevA | A |
| 552 | HOSE REPLACEMENT (5YR) | A |
| 553 | PRESSURE VESSELS & RELIEF VALVES (5YR) -RevB | A |
| 555 | INSPECT, TEST & CERTIFY MACHINERY SPACE CRANES & HOISTS (5YR) | A |
| 560 | PERSONNEL ELEVATOR INSPECTION & TEST (5YR) | A |
| 561 | GAGE CALIBRATION -RevA | A |
| 562 | SCBA ANNUAL INSPECTION -RevA | A |
| 563 | SCBA AIR COMPRESSOR & FILL STATION INSPECTION (1YR) | A |
| 565 | FIXED GAS FIREFIGHTING SYSTEM INSPECTION & TEST (1 YR) -RevA | A |
| 567 | FIXED FOAM FIREFIGHTING SYSTEM INSPECTION & TEST | A |
| 569 | FIRE & SMOKE DETECTION & ALARM SYSTEM | A |
| 570 | PORTABLE FIRE EXTINGUISHER SERVICE -RevB | A |
| 571 | FIRE & SMOKE DAMPER SERVICE | A |
| 572 | DEEP FAT FRYER, GRILL & RANGE HOOD FIRE EXTING SYSTEM -RevA | A |
| 573 | FIRE HOSES | A |
| 574 | FIRE DOORS & SHUTTERS (1YR) -RevA | A |
| 575 | DELETED | A |
| 576 | THERMOSTATIC SWITCH REACTION TIME TEST | A |
SECTION 600 - OUTFITTING, FURNISHING AND HABITABILITY
| 602 | NEW LIFEBOAT INSTALLATION | A |
| 605 | RESCUE BOAT DAVIT REPAIRS -RevA | A |
| 611 | STATEROOM HEAD FLOOR COVERING RENEWAL | A |
| 615 | SHOWER STALL BULKHEAD PANEL RENEWALS | A |
| 619 | WINDOW REGASKETING AND STEEL REPAIR | A |
| 652 | LIFEBOAT & DAVIT SERVICE (5 YEAR) -RevA | A |
| 654 | RIB/RESCUE BOAT/FAST RESCUE BOAT&DAVIT SERVICE(5 YEAR) -RevA | A |
| 655 | IMMERSION SUIT SERVICE (3 YEAR) | A |
| 656 | ANNUAL LIFERAFT CERTIFICATION (ABS) | A |
| 657 | ACCOMMODATION LADDER INSPECTION (1YR) | A |
| 659 | PILOT BOARDING EQPT & EMBARKATION LADDERS (5YR) | A |
| 660 | DECK TILE REPLACEMENT | A |
| 661 | CARPET REPLACEMENT | A |
| 662 | DEEP FAT FRYER INSPECTION | A |
SECTION 800 – HEATING VENTILATION AND AIR CONDITIONING
| 801 | VENT DUCT REPAIR & PRESERVATION | A |
| 803 | MISC. LAGGING AND INSULATION RENEWALS | A |
| 851 | ANNUAL GALLEY VENTILATION AND GAYLORD HOOD | A |
| 852 | ANNUAL LAUNDRY VENT CLEANING | A |
| 853 | ACCOMODATION VENT SYSTEM CLEANING | A |
SECTION 900 – DRYDOCKING AND UNDOCKING
| 901 | DRYDOCKING AND UNDOCKING VESSEL | A |
| 903 | INSPECTION OF BILGE KEELS, BOW VOID & SKEGS | A |
| 905 | PROPELLER SHAFT WEARDOWN READINGS | A |
| 911 | PROPELLER SYSTEM MAINTENANCE (30 MONTHS) | A |
| 912 | STERN TUBE SEAL MAINTENANCE | A |
| 913 | SPURS LINE AND NET CUTTER MAINTENANCE | A |
| 915 | ROPE GUARD ZINC ANODE REPLACEMENT | A |
| 917 | DRYDOCKING AND UNDOCKING SHIP – ADDITIONAL DAYS | B |
| 918 | RUDDER BEARING REPLACEMENT -RevA | B |
| 953 | ANCHORS, CHAINS, & LOCKERS (5YR) | A |
| 954 | RUDDER AND STERN FRAME EXAM (5YR) | A |
| 956 | OVERHAULING SEA VALVES (5YR) | A |
| 960 | UNDERWATER HULL CLEANING & PAINTING – SPOT BLAST -RevA | A |
| 961 | FREEBOARD PRESERVATION -RevA | A |
| 962 | CATHODIC PROTECTION SYSTEM -RevA | A |
| 963 | SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5YR) -RevB | A |
| 965 | STEEL RENEWAL -RevA | B |
| 966 | SHAFT ALIGNMENT & BEARING REACTION CHECKS (2.5YR) | A |
| 967 | SHAFT ALIGNMENT & BEARING REACTION CHECKS (SETS 3&4) -RevA | B |
| 968 | SHAFT ALIGNMENT & BEARING REACTION CHECKS (POST ST) -RevA | B |
SECTION 1000 – UNREP GEAR
| 1001 | SPANWIRE WINCH CONTROLLEX CABLE AND HANGERS -RevA | A |
| 1002 | ASD COOLING FAN MOTOR OVERHAUL AND SHROUD FABRICATION | A |
| 1003 | TRANSM REPLEN PUMP ELECTRIC MOTOR BEARING REFURBISHMENT | A |
| 1004 | HYDRAULIC TRANSMISSION HEAT EXCHANGER FRAME | A |
| 1005 | SADDLE WINCH GEARBOX REPAIR AND SHAFT REPLACMENT-REPAIR | A |
| 1006 | ASD FRAME AND FOUNDATION REFURBISHMENT -RevA | A |
| 1007 | LEAD ANGLE COMPENSATOR REPAIRS -RevA | A |
| 1008 | REFURB OF RAM ARC UNIT INCLUDING BRACKETS & MOUNTS -RevB | A |
| 1010 | CARGO GEAR QUADRENNIAL RECERTIFICATION | A |
| 1016 | UNREP STRUCTURAL STEEL REPLACEMENT -RevA | A |
| 1025 | REFURBISH HAULING WINCH ASSBLY & RECONDITION MACHINERY -RevB | A |
| 1031 | UNREP STATION No.1 STEEL REPAIRS | A |
| 1032 | UNREP STATION No.2 STEEL REPAIRS | A |
| 1036 | UNREP STATION No.6 STEEL REPAIRS | A |
| 1037 | UNREP STATION No.7 STEEL REPAIRS | A |
| 1038 | UNREP STATION No.8 STEEL REPAIRS | A |
SECTION F - DELIVERY AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
22-AUG-2020
| N/A |
| N/A |
FOB: Destination
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
26-OCT-2020
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0002 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0003 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0004 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0005 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0006 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0007 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0008 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0009 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0010 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0011 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0012 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0013 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0014 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 05-JUN-2020 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 29-JUN-2020 TO
| N/A |
| N/A |
F-1 SHIP AVAILABILITY PERIOD
It is anticipated the ship will arrive at contractor’s yard on or about 29 June 2020. All work shall be completed in no more than one-hundred and twenty (120) calendar days from actual start date designated by the Government at time of contract award.
F-2 PLACE OF PERFORMANCE
The place of performance for this contract shall be the contractor’s facility.
(End of Summary of Changes) image1.wmf