J-3 Category B Items REV-D.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
USNS PATUXENT (T-AO 201) ROH/DD
Solicitation number
N3220520R4003
Issued by

About this file

This document contains a price breakdown template for a contractor responding to solicitation N32205-18-R-4007 for Category B items required to support the USNS LARAMIE (T-AO 203). The price breakdown template requires unit pricing for various labor hours, materials, and total costs associated with items like physical security, ship services continuation, tank inspections, structural repairs, drydocking additional days, rudder bearing replacement, steel renewal, and shaft alignment checks. Pricing is to be provided by line item number for prime contractor labor and materials, subcontractor labor and materials, and total pricing. The related solicitation N3220520R4003 is for the USNS PATUXENT (T-AO 201) FY20 Regular Overhaul/Dry-Docking and is issued by the Department of the Navy Military Sealift Command in Norfolk. Offerors are required to submit pricing in accordance with the template for the Category B contractor-furnished items needed for the overhaul and drydocking.

View the file

Other files

File Type Posted
J-10 Interport Differential REV-A.doc DOC document
Amendment N3220520R4003-00006.docx DOCX document
Conformed Copy Amendment N3220520R4003-00006.docx DOCX document
J-10 Interport Differential REV-A.doc DOC document
J-2 Category A Items REV-E.xlsx XLSX spreadsheet
Amendment N3220520R4003-0005.docx DOCX document
Confromed Copy N3220520R4003-00005.docx DOCX document
J-2 Category A Items REV-D.xlsx XLSX spreadsheet
Amendment N3220520R4003-00004.docx DOCX document
Amendment N3220520R4003-00003.docx DOCX document
J-3 Category B Items REV-C.xlsx XLSX spreadsheet
J-2 Category A Items REV-C.xlsx XLSX spreadsheet
J-3 Category B Items REV-B.xlsx XLSX spreadsheet
J-2 Category A Items REV-B.xlsx XLSX spreadsheet
Amendment N3220520R4003-00002.docx DOCX document
J-2 Category A Items REV-A.xlsx XLSX spreadsheet
Amendment N3220520R4003-00001.docx DOCX document
J-3 Category B Items REV-A.xlsx XLSX spreadsheet
Redacted J&A PATUXENT N32205204003.pdf PDF
J-11 Dry Dock Evaluation Form.docx DOCX document
CDRL, SWI-0018.pdf PDF
CDRL, SWI-004.pdf PDF
CDRL, SWI-0016.pdf PDF
CDRL, SWI-005.pdf PDF
J-12 Past Perf Data.docx DOCX document
J-4 GFM PATUXENT.pdf PDF
J-3 Category B Items.xlsx XLSX spreadsheet
J-10 Interport Differential.doc DOC document
CDRL, SWI-0024.pdf PDF
CDRL, SWI-0017.pdf PDF
J-7 MSC Ship Repair Facility Survey.pdf PDF
CDRL, SWI-001.pdf PDF
CDRL, SWI-0020.pdf PDF
J-14 Technical NDA.pdf PDF
CDRL, SWI-0013.pdf PDF
J-13 PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
J-8 RFC.doc DOC document
CDRL, SWI-0021.pdf PDF
Solicitation N3220520R4003.pdf PDF
J-2 Category A Items.xlsx XLSX spreadsheet
CDRL, SWI-0014.pdf PDF
CDRL, SWI-0015.pdf PDF
CDRL, SWI-006.pdf PDF
J-9 Disclsr Lobbying Activities SF-LLL.pdf PDF
CDRL, SWI-0023.pdf PDF
CDRL, SWI-0011.pdf PDF
CDRL, SWI-0012.pdf PDF
CDRL, SWI-0019.pdf PDF
CDRL, SWI-0022.pdf PDF
CDRL, SWI-0010.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat B Items

Contractor's price will be broken down for each item of the specification, as follows:
CATEGORY “B” ITEMS REV-D
GENERAL REQUIREMENTPrice / TankQTYUIUnit PriceTotalPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
CATEGORY "B"
025PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA
7.11COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
7.11COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
WI 025 SUBTOTAL
030CONTINUATION OF SERVICES REV-A
7.1Overhaul Management Team30DAY
7.2General Services For The Ship30DAY
7.3Information Technology Services30DAY
7.4Project Planning and Monitoring30DAY
7.5Fire Protection and Ship's Safety30DAY
7.6Shipboard Access and Security30DAY
7.7Gas Free Certificates30DAY
WI 030 SUBTOTAL
102TANK INSPECTION FOR ABS INTERMEDIATE SURVEY NO. 5 REV-B
7.17.1 Provide all labor, material, equipment and services required to test and support inspection/survey and gauging of tanks, voids and cofferdams as required by ABS annual inspection and Intermediate Survey No.5 IAW reference 2.1.11 and 2.1.10 (ABS Rules Part 7, Chapter 3, section 2, 1.13 and 5.14) using Reference 2.1.1 through 2.1.9 for guidance.
WI 102 SUBTOTAL
127RAS & FAS KINGPOST SUPPORT BRACKETS (T-ALT 0819) REV-A
7.1.1RAS STATION1STATION
7.1.2FAS STATION1STATION
WI 127 SUBTOTAL
146FOREPEAK TANK ADDITIONAL STRUCTURAL REPAIRS REV-A
7.3.1.1Eight (8) 15’ sections of MC 12 x31 C/L AH-32 Channel.8EA
7.3.1.2Eight (8) 15’ sections of 8”x 4”x ½” angle.8EA
7.3.1.3Twenty-five (25) sections of 5’ x8’ (40 sqft) each of 0.43 deck and bulkhead plating.25EA
7.3.1.4Twenty (20) 48” sections of 5” x 5/8” flat bar bulkhead stiffener20EA
7.3.1.5Twenty (20) 60” sections of 5” x 3” x 3/8” angle bulkhead stiffeners.20EA
7.3.1.6Ten (10) 1 sqft sections of clad welding.10EA
7.3.1.7Five (5) 10’ sections of 6” x4” x 3/8” (AH-32) bulkhead stiffeners.5EA
7.3.1.8Five (5) 15’ sections of 7” x 4” x ½” (AH-32) bulkhead angle stiffeners.5EA
WI 146 SUBTOTAL
147BALLAST TANK ADDITIONAL STRUCTURAL REPAIRS REV-A
SALTWATER BALLAST WING TANK 6 STBD
7.2.1.1Five (5) 6’ sections of 7” x 4” x 1/2” bulkhead stiffeners.5EA
7.2.1.2Three (3) 3’ x 4’ sections of 7/16” deck plating.3EA
7.2.1.3Five (5) 18” sections of 5” x ½” Flat bar bulkhead stiffeners5EA
7.2.1.4Clad weld three (3) 1 sqft sections3EA
7.2.1.5Five (5) 48” sections of MC 12 x31# C/L bulkhead channel5EA
SALTWATER BALLAST DEEP TANK 6 PORT
7.2.2.1Five (5) 6’ sections of 7” x 4” x 1/2” bulkhead stiffeners.5EA
7.2.2.2Three (3) 3’ x 4’ sections of 7/16” deck plating.3EA
7.2.2.3Five (5) 18” sections of 5” x ½” Flat bar bulkhead stiffeners5EA
7.2.2.4Clad weld three (3) 1 sqft sections3EA
7.2.2.5Five (5) 48” sections of MC 12 x31# C/L bulkhead channel5EA
SALTWATER BALLAST DEEP TANK 8 STBD
7.2.3.1Five (5) 6’ sections of 7” x 4” x 1/2” bulkhead stiffeners.5EA
7.2.3.2Three (3) 3’ x 4’ sections of 7/16” deck plating.3EA
7.2.3.3Five (5) 18” sections of 5” x ½” Flat bar bulkhead stiffeners5EA
7.2.3.4Clad weld three (3) 1 sqft sections3EA
7.2.3.5Five (5) 48” sections of MC 12 x31# C/L bulkhead channel5EA
WI 147 SUBTOTAL
917DRYDOCKING AND UNDOCKING SHIP- ADDITIONAL DAYS
7.17.1. Submit unit price per day up to a maximum of TEN (10) days to continue all services in accordance with parent item if directed10DAYS
WI 917 SUBTOTAL
918RUDDER BEARINGS REPLACEMENT REV-A
This item describes the replacement of the existing micarta lower rudder stock bearings and pintle bearings with Thordon SXL bearing material, and the replacement of the carrier bearings on both the port and starboard rudders
WI 918 SUBTOTAL
965STEEL RENEWAL
7.3.1FLAT STEEL PLATING10,000LBS
7.3.2SHAPED STEEL PLATING10,000LBS
7.3.3TANK BULKHEAD5,000LBS
7.3.4TANK INTERNAL STRUCTURE10,000LBS
7.3.5MISC. BULKHEADS AND DECKS10,000LBS
7.3.6CLAD WELDING100SQFT
7.4.1DRYDOCK BLOCK REMOVAL25EA
WI 965 SUBTOTAL
967Shaft Alignment and Bearing Reaction Check (Set3 and 4) REV-A
7.8.ca) Set No.3: On Drydock - after the re-installation of all shafting components and reestablishment of the “dry dock” internal load condition recorded in Step No.2 and prior to water entering the dry dock. If the vessel is dry docked on a floating dock the dock trim and load condition must be similar to that at the time of the second set of measurements including positions of wing-wall mounted cranes. Record strain gage readings, jack-up readings and bearing clearances.
7.8.da) Set No.4: Waterborne - after the vessel is afloat and reestablishment of the “original waterborne” internal load condition as recorded in Step No.1. The final alignment of the main propulsion shafting of a vessel should always be accomplished when the vessel is waterborne. Per ref 2.1.4, when coming out of drydock, the ship’s hull should be given time to stabilize in the water (up to two days) prior to performing the final alignment checks. Record strain gage readings.
WI 967 SUBTOTAL
968Shaft Alignment and Bearing Reaction Check (Post Sea Trials) REV-A
7.8.dSet No.5: Immediately after the sea trial high speed run. Record strain gage readings.
WI 968 SUBTOTAL
Total CAT "B"
&14USNS LARAMIE (T-AO 203)&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS&14N32205-18-R-4007

ATTACHMENT J-3

File details come from the government source that posted it. Updated .