J-2 Category A Items REV-E.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- USNS PATUXENT (T-AO 201) ROH/DD
- Solicitation number
- N3220520R4003
About this file
This document contains a contractor price breakdown for category "A" items required for the USNS PATUXENT (T-AO 201) FY20 Regular Overhaul/Dry-Docking (ROH/DD). The Military Sealift Command (Norfolk) solicitation N3220520R4003 requires various hull, machinery, electrical, auxiliary and drydocking services. Key requirements include nuclear density testing of kingposts, ballast tank and forepeak structural repairs, deck replacements, steel renewals, generator inspections, pump overhauls, purifier maintenance, anchor windlass repairs, drydocking services and underwater hull cleaning. The breakdown lists over 1000 line items with pricing for labor, materials and subcontractors. The total estimated price is at the bottom. This contractor submission appears to be in response to the Navy's solicitation for the overhaul and maintenance of the USNS PATUXENT.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHE PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | GENERAL SERVICES FOR SHIP (T-AO) | |||||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT REV-A | |||||||||||
| 014 | WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | ILS GFM | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT KINGPOST AREAS (ABS & USCG) | |||||||||||
| 106 | FOREPEAK TANK STRUCTURAL REPAIRS REV-B | |||||||||||
| 107 | BALLAST TANK STRUCTURAL REPAIRS REV-B | |||||||||||
| 108 | CONTAM TANKS DECK REPLACEMENT REV-A | |||||||||||
| 113 | MISCELLANEOUS STEEL REPAIRS REV-A | |||||||||||
| 115 | MISCELLANEOUS TANK REPAIRS | |||||||||||
| 116 | CONTAINMENT ENCLOSURE PIPE & STEEL REPLACEMENT | |||||||||||
| 117 | ALLIED DAVIT PRESERVATION REV-A | |||||||||||
| 123 | FAS STATION MAINTENANCE PLATFORM REPAIRS REV-B | |||||||||||
| 124 | RAM TENSIONER & PLATFORM PRESERVATION REV-B | |||||||||||
| 128 | STABILITY TEST | |||||||||||
| 155 | INSPECTION OF PV VALVES | |||||||||||
| 158 | TANK PRESERVATION REV-A | |||||||||||
| 160 | WATERTIGHT CLOSURE REPAIR | |||||||||||
| 162 | WATERTIGHT CLOSURE INSPECTION | |||||||||||
| 196 | ER SIDE SHELL REPLACEMENT | |||||||||||
| 197 | CENTRAL FRESH WATER ROOM STEEL RENEWAL REV-A | |||||||||||
| 198 | JACKET WATER ROOM STEEL RENEWAL REV-A | |||||||||||
| 199 | ENGINE ROOM DECK PLATE REPLACEMENT REV-A | |||||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | ME INDUSTRUAL ASSISTANCE AND SERVICE | |||||||||||
| 208 | PROPULSION SHAFT BRAKE OVERHAUL | |||||||||||
| 252 | MAIN REDUCTION GEAR INSPECTION (5 YR) | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 304 | ANNUAL GENERATOR INSPECTION | |||||||||||
| 305 | ANNUAL PTO CONTROLS GROOM | |||||||||||
| 306 | BULKHEAD CABLE COLLAR MAGNAROCK REPLACEMENT REV-A | |||||||||||
| 351 | SWITCHBOARD CLEANING | |||||||||||
| 352 | MOTOR CONTROL CENTER CLEANING | |||||||||||
| 353 | THERMOGRAPHIC SURVEY | |||||||||||
| 400 | COMMUNICATION & NAV AIDS | |||||||||||
| 402 | TVDTS SYSTEM AND DISTRIBUTION GROOM REV-A | |||||||||||
| 405 | UHF SATCOM AND LOS TRANSCEIVER GROOM | |||||||||||
| 406 | URT-23(D) URR-2368A HF SET GROOM | |||||||||||
| 409 | DOPPLER SPEED LOG PREVENTATIVE MAINTENANCE | |||||||||||
| 411 | AVAYA TELEPHONE SYSTEM GROOM | |||||||||||
| 414 | ANNUAL SERVICE AND ADJUST MAGNETIC COMPASS | |||||||||||
| 451 | ANNUAL RADAR SERVICE | |||||||||||
| 452 | ANNUAL ECDIS SERVICE | |||||||||||
| 453 | ANNUAL GYRO SYSTEM PM | |||||||||||
| 454 | ANNUAL VDR RECERTIFICATION | |||||||||||
| 455 | ANNAUL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | |||||||||||
| 457 | EPIRB SERVICE (5 YR) | |||||||||||
| 459 | ECHO SOUNDER SERVICE | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 504 | NO.3 SSDG 60,000 HOUR OVERHAUL (STD) REV-A | |||||||||||
| 507 | VACUUM SEWAGE COLLECTION SYSTEM PIPING ACID CLEANING | |||||||||||
| 508 | MISCELLANEOUS PIPE REPAIRS REV-A | |||||||||||
| 510 | AUXILIARY BOILER VALVES MAINTENANCE & TESTING | |||||||||||
| 514 | PUMP OVERHAUL -PTX REV-A | |||||||||||
| 515 | REFRIGERATION & AC SYSTEM PREVENTATIVE MAINTENANCE | |||||||||||
| 517 | ANNUAL INCINERATOR SERVICE | |||||||||||
| 518 | STBD ANCHOR WINDLASS CAPSTAN REPAIR REV-A | |||||||||||
| 520 | OVERHAUL BALANCED FAIRLEADS REV-B | |||||||||||
| 521 | PURIFIER MAINTENANCE, FO (WESTFALIA) REV-B | |||||||||||
| 522 | PURIFIER MAINTENANCE, LO (WESTFALIA) REV-A | |||||||||||
| 524 | ER OWS & CARGO OCM GROOM REV-A | |||||||||||
| 528 | STEERING GEAR MAINTENANCE (5 YR) | |||||||||||
| 535 | ABS AUXILLARY BOILER SURVEY AND HYDRO | |||||||||||
| 537 | CONSTANT TENSION WINCHES No.5 and No.6 | |||||||||||
| 538 | GAYLORD BOOSTER HEATER REPLACEMENT (T-ALT 06-34) REV-A | |||||||||||
| 550 | OVERHAUL JW PLATE COOLERS REV-A | |||||||||||
| 551 | OVERHAUL CFW PLATE COOLERS REV-A | |||||||||||
| 552 | HOSE REPLACEMENT (5 YR) | |||||||||||
| 553 | PRESSURE VESSELS & RELIEF VALVES (5 YR) REV-B | |||||||||||
| 555 | INSPECT, TEST, & CERTIFY MACHINERY SPACE CRANES & HOISTS (5 YR) | |||||||||||
| 560 | PERSONNEL ELEVATOR INSPECTION & TEST (5 YR) | |||||||||||
| 561 | GAUGE CALIBRATION REV-A | |||||||||||
| 562 | SCBA ANNUAL INSPECTION REV-A | |||||||||||
| 563 | SCBA AIR COMPRESSOR & FILL STATION INSPECTIONS (1 YR) | |||||||||||
| 565 | FIXED GAS FIREFIGHTING SYSTEM INSPECTION & TEST (1 YR) REV-A | |||||||||||
| 567 | FIXED FOAM FIREFIGHTING SYSTEM INSPECTION & TEST | |||||||||||
| 569 | FIRE & SMOKE DETECTION & ALARM SERVICE | |||||||||||
| 570 | PORTABLE FIRE EXTINGUISHER SERVICE REV-B | |||||||||||
| 571 | FIRE AND SMOKE DAMPER SERVICE | |||||||||||
| 572 | DEEP FAT FRYER & RANGE HOOD FIRE EXTINGUISHING SYSTEM REV-A | |||||||||||
| 573 | FIRE HOSES | |||||||||||
| 574 | FIRE DOORS & SHUTTERS (I YR) REV-A | |||||||||||
| 576 | THERMOSTATIC SWITCH REACTION TIME TEST | |||||||||||
| 600 | OUTFIT, FURNISHING & HABITABILITY | |||||||||||
| 602 | NEW LIFEBOAT INSTALLATION | |||||||||||
| 605 | RESCUE BOAT DAVIT REPAIRS REV-A | |||||||||||
| 611 | STATEROOM HEAD FLOOR COVERING RENEWAL | |||||||||||
| 615 | SHOWER STALL BULKHEAD PANEL RENEWALS | |||||||||||
| 619 | WINDOW REGASKETING AND STEEL REPAIR | |||||||||||
| 652 | LIFEBOAT & DAVIT SERVICE (5 YR) REV-A | |||||||||||
| 654 | RHIB/RESCUE BOAT/ FAST RESCUE BOAT & DAVIT SERVICE 95 YR) REV-A | |||||||||||
| 655 | IMMERSION SUIT SERVICE (3 YR) | |||||||||||
| 656 | ANNUAL LIFERAFT CERTIFICATION (ABS) | |||||||||||
| 657 | ACCOMMODATION LADDER INSPECTION (1 YR) | |||||||||||
| 659 | PILOT BOARDING EQPT & EMBARKATION LADDERS (5 YR) | |||||||||||
| 660 | DECK TILE REPLACEMENT | |||||||||||
| 661 | CARPET REPLACEMENT | |||||||||||
| 662 | DEEP FAT FRYER INSPECTION | |||||||||||
| 800 | HVAC | |||||||||||
| 801 | VENT DUCT REPAIR & PRESERVATION | |||||||||||
| 803 | MISC. LAGGING AND INSULATION RENEWALS | |||||||||||
| 851 | ANNUAL GALLEY VENTILATION AND GAYLORD HOOD | |||||||||||
| 852 | ANNUAL LAUNDRY VENT CLEANING | |||||||||||
| 853 | ACCOMMODATION VENT SYSTEM CLEANING | |||||||||||
| 900 | DRYDOCKING | |||||||||||
| 901 | DRY-DOCKING AND UNDOCKING VESSEL | |||||||||||
| 903 | INSPECTION OF BILGE KEELS, BOW VOID & SKEGS | |||||||||||
| 905 | PROPELLER SHAFT WEARDOWN READINGS | |||||||||||
| 911 | PROPELLER SYSTEM MAINTENANCE (30 MONTHS) | |||||||||||
| 912 | STERN TUBE SEAL MAINTENANCE | |||||||||||
| 913 | SPURS LINE AND NET CUTTER MAINTENANCE | |||||||||||
| 915 | ROPE GUARD ZINC ANODE REPLACEMENT | |||||||||||
| 953 | ANCHORS, CHAINS, & LOCKERS (5 YR) | |||||||||||
| 954 | RUDDER AND STERN FRAME EXAMINATION (5 YR) | |||||||||||
| 956 | OVERHAULING SEA VALVES (5 YR) | |||||||||||
| 960 | UNDERWATER HULL CLEANING & PAINTING - SPOT BLAST REV-A | |||||||||||
| 961 | FREEBOARD PRESERVATION REV-A | |||||||||||
| 962 | CATHODIC PROTECTION SYSTEM REV-A | |||||||||||
| 963 | SEA CHEST MARINE GROWTH PREVENTION SYSTEM (2.5 YR) REV-B | |||||||||||
| 966 | SHAFT ALIGNMENT & BEARING REACTION CHECKS (2.5 YR) | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | SPANWIRE WINCH CONTROLLEX CABLE AND HANGERS REV-A | |||||||||||
| 1002 | ASD COOLING FAN MOTOR OVERHUAL AND SHROUD FABRICATION | |||||||||||
| 1003 | TRANSM REPLEN PUMP ELECTRIC MOTOR BEARING REFURBISHMENT | |||||||||||
| 1004 | HYDRUALIC TRANSMISSION HEAT EXCHANGERS FRAME | |||||||||||
| 1005 | SADDLE WINCH GEARBOX REPAIR AND SHAFT REPLACEMENT- REPAIR | |||||||||||
| 1006 | ASD FRAME AND FOUNDATION REFURBISHMENT REV-A | |||||||||||
| 1007 | LEAD ANGLE COMPENSATOR REPAIRS REV-A | |||||||||||
| 1008 | REFURB OF RAM ARC UNIT INCLUDING BRACKETS AND MOUNTS REV-B | |||||||||||
| 1010 | CARGO GEAR QUADRENNIAL RECERTIFICATION | |||||||||||
| 1016 | UNREP STRUCTURAL STEEL REPLACEMENT REV-A | |||||||||||
| 1025 | REFURB HAULING WINCH ASSEMBLY & RECONDITION MACHINERY REV-B | |||||||||||
| 1031 | UNREP STATION NO. 1 STEEL REPAIRS | |||||||||||
| 1032 | UNREP STATION NO. 2 STEEL REPAIRS | |||||||||||
| 1036 | UNREP STATION NO. 6 STEEL REPAIRS | |||||||||||
| 1037 | UNREP STATION NO. 7 STEEL REPAIRS | |||||||||||
| 1038 | UNREP STATION NO. 8 STEEL REPAIRS | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS PATUXENT (T-AO 201) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS REV-E | &"Times New Roman,Regular"N3220520R4003 |
ATTACHMENT J-2