N32205-16-R-4406.docx
DOCX document 194 KB Posted
- Attached to
- USS FRANK CABLE (AS 40) ROH/DD Federal contract opportunity
- Solicitation number
- N32205-16-R-4406
About this file
Solicitation N32205-16-R-4406 for the USS FRANK CABLE (AS 40) Regular Overhaul/Dry-docking (ROH/DD)
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-16-R-4406
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Supplies/Services - USS FRANK CABLE
FFP
Cateogry "A" Work Items: POP 7 April - 5 August, 2017.
USS FRANK CABLE (AS 40) Category "A" Work Items:
Prepare for and accomplish the Regular Overhaul/Dry-Docking Availability of the USS FRANK CABLE (AS 40)
Total Category "A" Items $_____________________
Proposed Hazardous Waste handling fee rate in accordance with Work Item 023 ______%
Proposed unit price per KWh $_____ in accordance with Work Item 011, 7.1.1.4
Proposed unit price per gallon of potable water $_______ in accordance with Work Item 011, 7.1.3.2
Proposed unit price per gallon of distilled water $_______ in accordance with Work Item 011, 7.1.4.2
Proposed unit price per gallon of bilge water $__________ in accordane with Work Item 011, 7.1.19.3
Proposed unit price per crane usage WI 11 $_________________
FOB: Destination
NET AMT
PSC Code: 1925
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
AGR AND ODC - Growth Cateogry "A" WI
Additional Government Requirements (AGR)
20,000 man-hours @ ________ per man-hour= $______________________
Other Direct Costs (ODC):
Base $___$1,400,000.00______
Proposed G&A Rate %___________ Subtotal: $_______________________
Proposed Profit Rate % ___________ Subtotal: $_______________________
Total $___________________________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0025 Physical Security |
FFP
FFP - Physical Security at a Private Contractor's Facility in Force Protection Conditionsl Bravo - Delta See Paragraph 1.3 for Pricing Format
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0030 Cont of Services |
FFP
FFP - Continuation of Services:
7.1 Submit a unit price per day up to a maximum of thirty (30) days for the continuation services described in parent work item 011” General Services for the Ship”.
7.2 Submit a unit price per day up to a maximum of thirty (30) continuation services described in parent work item 012 “Telephone Services”.
7.3 Submit a unit price per day up to a maximum of thirty (30) days for the continuation services described in parent work item 013 “Project Planning and Monitoring”.
7.4 Submit a unit price per day up to a maximum of thirty (30) days for the continuation services described in parent work item 016 “Fire Protection and Ship’s Safety”.
7.5 Submit a unit price per day up to a maximum of thirty (30) days for the continuation services described in parent work item 018 “Delivery, Care and Redelivery of the Vessel”.
7.6 Submit a unit price per day up to a maximum of thirty (30) days for the continuation services described in parent work item 019 “Shipboard Access and Security”.
7.7 Submit a unit price per day up to a maximum of thirty (30) days for the continuation services described in parent work item 020 “Gas Free Certificates”.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0105 - Misc. Steel |
FFP
FFP - Miscellaneous Steel Replacement
7.1 Provide all labor, material, and services required to remove and install existing deteriorated steel listed in 3.2 as designated by the MSCREP. Evaluation will be based on total price labor and material for this work item.
7.2 For bidding purposes assume 1,000 hrs of labor and $10,000 material to be provided for the removal and installation of Interferences in way of the deteriorated steel listed in 3.2 as designated by the MSCREP.
| STEEL PLATE | QUANTITY UNIT 10.2# ABS Gr. A 1/4" Thk | 2,000 lbs | 40 lbs. |
| 17.85# ABS Gr. A 7/16” Thk | 2,400 lbs | 286 lbs | |
| 20.40# ABS Gr A ½” Thk | 4,000 lbs | 184 lbs | |
| 25.50# ABS Gr. 5/8” Thk | 10,200 lbs | 230 lbs | |
| 30.60# ABS Gr. ¾” Thk | 12,240 lbs | 275 lbs |
Total: 30,850 lbs
| STEEL ANGLE | QUANTITY UNIT | ||
| 2” X 2” X ¼”, 20’ lengths, 49 lbs | 294 lbs | 10 lbs | |
| 3” X 3” X ¼”, 20’ lengths, 98 lbs | 588 lbs | 20 lbs | |
| 4” X 4” X ¼”, 20’ lengths, 132 lbs | 792 lbs | 27 lbs | |
| 4” X 6” X 3/8”, 20’ lengths, 246 lbs | 1,476 lbs | 50 lbs | |
| Total | 3,150 lbs |
Grand Total 34,000 lbs
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0205 Boiler Main Valves |
FFP
#1 and #2 Boiler Main Steam Stop Valves Replacement (ABS) This work item describes the requirement to replace the Main Steam Stops for the #1 And #2 Main Propulsion Boilers.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0507 Fire Main Piping |
FFP
Work Item 0507 - Fire Main Piping Repairs (SPECIAL CONTROL SPACES) This work item describes the requirement to replace additional sections of Fire main piping and fittings in various locations after acid cleaning is to be performed.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0606 CHT & Pump Room |
FFP
Work Item 0606 - CHT and Pump Room Bilge Preservation (SPECIAL CONTROL SPACES) This work item describes the requirements for the contractor to preserve the bilges in 5 CHT Pump Rooms.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0612 Paint Abatement |
FFP
LEAD PAINT ABATEMENT (VR 13-099)
1.1 This work item describes the requirement to identify, test and safely remove lead based paints from various spaces.
3.1 For bidding purposes assume 5,000 sq ft of surfaces to require “Lead Abatement”.
| General location | Unit Quantity |
| Overhead surfaces | 1250 sq ft |
| Horizontal surfaces | 1250 sq ft |
| Vertical surfaces | 1250 sq ft |
Piping of various sizes 1250 sq ft Total 5,000 sq ft
3.2 Evaluation will be based on the exercisable unit price of each “General Location” not the total price.
3.3 Prices proposed in these unit prices will be reasonably similar to the prices negotiated and proposed through the duration of this contract.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0804 Fan Coil Cleaning |
FFP
Work Item 0804 Fan Coil Cleaning, Chill Water (SPECIAL CONTROL SPACES) This work item describes the requirements to inspect and clean various Air Handling Units and Cooling Coils onboard the vessel.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0824 Misc Duct Replace |
FFP
Work Item 0824 Miscellaneous Duct Replacement
| 3.1 | Location: | |
| 3.1.1 | See Table 610-1 in Work Item Specification | |
| ITEM | UNIT SIZE QUANTITY | |
| Chill Water Fan Coil Unit | 4 | 26 |
3.1.2 Evaluation will be based on the total price. Each unit may be exercised, in part, up to total quantity described.
3.1.3 Pricing provided in the unit pricing will be reasonably similar to the prices proposed and negotiated throughout the duration of this contract.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0902 Drydocking/Services |
FFP
Work Item 0902 Drydock, Extension of Services
1.1 This item describes the requirements for additional days in drydock and the extension of services.
7.1 Submit a unit price per day for additional days on the blocks and to perform all work and services required in Work Item 901 for a maximum of 30 days. Evaluation will be based on the exercisable unit price per day not the total price.
8.2 OFFERS MUST PROVIDE BOTH A UNIT PRICE FOR ACCOMPLISHING PARA 7.1 SCOPE OF WORK REQUIREMENTS FOR THE LOCATIONS/QUANTITIES LISTED IN PARA 3.0. FAILURE TO DO SO MAY RENDER YOUR OFFER UNACCEPTABLE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0906 Puopulsion Shafting |
FFP
Work Item 0906 Propulsion Shafting Bearing Bore Realignment
1.1 This work item describes the requirement to crop out and install new steel plate and associated structural members in the Stern Tube., (Frame 130-134).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0908 Stern Tube |
FFP
Work Item 0908 Stern Tube Replacement
1.1 This work item describes the requirement to crop out and install new steel plate and associated structural members in the Stern Tube., (Frame 130-134).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0916 Propulsion Sleeve |
FFP
Work Item 0916 Propulsion Shaft Sleeve Replacement
1.1 The intent of this work item is to provide information with regard to the removal and replacement of bearing journal shaft sleeves. This work item is written on the premise that full cylindrical shrink-fit sleeve bushings are used, not split sleeves that require installation by welding.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Cateogry "B" WI 0919 Rudder Bearings |
FFP
Work Item 0919 Rudder Bearings Change Out This work item describes the requirement to change out the ship’s rudder bearings
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "A" Work Items (WIs)
Prepare for and accomplish the Regular Overhaul/Dry-docking (ROH & DD) of the United States Navy Ship USS FRANK CABLE (AS 40)
Total Category "A" WIs $_____________
Proposed unit price per KWh $_______ in accordance with (IAW) WI 011, 7.1.1.4
Proposed unit price per gallon of potable water $_________ IAW WI 011, 7.1.2.2
Proposed unit price per gallon of distilled water $_________ IAW WI 011, 7.1.3.2
Proposed unit price per gallon of bilge water removal $________ IAW WI 011, 7.1.19.3
Proposed unit price per crane usage $______ IAW WI 11, 7.9.1
Proposed Hazardous Waste handling fee rate IAW WI 023, 7.5.1 ______%
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Additional Government Requirements (AGR) and Other Direct Costs (ODC)
AGR
20,000 man-hours @ $________ per man-hour = $_____________
ODC
Base: $1,400,000.00_____________
Proposed G&A Rate _______________% Subtotal: $_____________
Proposed Profit Rate _______________% Subtotal: $_____________
NET AMT
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0016 $______________
The contractor shall fill-in the total proposed price, above, by calculating the summation of each CLIN Amount.
PART I - THE SCHEDULE
The contractor shall follow the instructions stated below when completing Section B:
CLIN 0001 – The contractor shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2 – Category “A” Work Itemss.
CLIN 0002: Indicate the Fully-Burdended Labor Rate (FBLR) (e.g., General and Administrative (G&A), Profit, Supervision, and/or support functions) and the ODC Profit and G&A rate. These rates will be used in evaluating the contractor’s proposal and shall be the rate for pricing changes negotiated under the H-3 Clause – AGR and H-4 Clause ODC, up to the maximum number of man-hours and ODC base specified herein. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | ||
| Welding | Machinists (inside and outside) | ||
| Burning | Brazing | ||
| Carpentry | Electrical Work | ||
| Electronic Work | Shipfitting | ||
| Lagging | Painting | ||
| Boilermaking | Pipefitting | ||
| Sheetmetal Work | Engineering | ||
| Rigging | Staging/scaffolding | ||
| General Labor | Fire Watch |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's FLBR for direct production man-hours. Examples of support functions include:
| Testing | Quality Assurance | ||
| Planning | Cleaning (except tank cleaning) | ||
| Material handling & Warehousing | Security | ||
| Surveying | Administration | ||
| Transportation | Purchasing staff | ||
| Lofting | Other indirect support | ||
| Supervision |
The rates proposed for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request For Proposal (RFP)s issued under this contract. The KO will apply these rates to the ODCs for each RFP when it is negotiated and settled.
The base cost does not include the profit or G&A rates. Include the final figure that results when proposed profit and G&A rates are applied to the base price of the contractor’s total price for evaluation purposes.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs should be included under CLIN 0001.
CLINs 0003 through 0016 – The offeror shall complete CLIN 0003 through 0016 NET AMT, each of the fill-in items, and complete Attachment J-3 – Category “B” WIs.
Section C - Descriptions and Specifications
C-1 GENERAL
1. The Contractor shall prepare for and accomplish the voyage repairs, overhaul, or alterations of the USS FRANK CABLE (AS 40) ROH/DD as specified herein and IAW the Work Item (WI) package as provided in Attachment J-1 – WI Package (Work Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.
2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):
(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.
(b) Ensuring the timely procurement of Contractor-Furnished Material/Contractor-Furnished Property (CFM/CFP) and the timely reporting, receipt, storage, installation, and accountability of Government-Furnished Material/Government-Furnished Property (GFM/GFP) (IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004).
(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the Contract Data Requirements List (CDRL) and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.
(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variance based on the Time Phased Sequencing Network (TPSN) submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.
(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.
(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.
(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.
(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.
(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and Long Lead Time Material (LLTM) for use in the availabilities from the date of award.
(j) Managing all subcontractors performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.
(k) Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.
3. Contract work shall be performed by an eligible contractor as defined below.
(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR), or International Organization for Standardization (ISO) Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.
This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.
The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:
a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.
b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. They shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package
e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards
h. Safety/security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage and disposal. Appropriate state/federal agency issued hazardous waste generator number. Disposal records which indicate type of material, date and place of disposal.
j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
· Pier, with services in place in which the CLASS size ship can access and be berthed at
· Structural Shop
· Machine Shop
· Pipe Shop
· Electrical/Electronic Shop
· Carpentry Shop
· Rigging Equipment
· Dry-dock – when required for docking of vessel in performance of the specification
(c) The Government reserves the right to perform site survey for verification of policies, procedures, capabilities and facilities prior to award.
C – 2 List of Standard Work Items included for this solicitation:
MILITARY SEALIFTCOMMAND
SPECIFICATIONS
FOR
USS FRANK CABLE (AS-40)
ROH/DD
RFP NO.: N32205-16-R-4406
7 April 2017 – 5 August 2017
PRINCIPAL DIMENSIONS
LENGTH.............................................. 643 ft 8in
BREADTH........................................... 85 ft
MAXIMUM DISPLACEMENT......... 22,802 TONS
SECTION 000 GENERAL REQUIREMENTS
001 Intent, Scope, General Conditions and Definitions NSP
002 Technical and Manufacturer’s Representatives NSP
003 Approach, Berth, and Mooring Requirements NSP
004 Testing and Quality Assurance NSP
005 Electrical Safety Procedure Requirements NSP
006 Heavy Weather Plan NSP
007 Cold Weather Plan NSP
010 Furnish Office for Overhaul Management Team (OMT) A
011 Furnish General Services A
012 Telephone Services A
013 Project Planning and Production Status Monitoring Reports A
014 Preparation of Weight and Moment Report A
015 Integrated Logistics and GFM Support Requirements A
016 Fire Protection and Ship’s Safety Program A
017 Handling Ship Stores A
018 Delivery and Redelivery of the Vessel A
019 Shipboard Access and Security A
020 Gas Free Certificates A
021 Clean and Gas Free Tanks, Voids, Cofferdams and Spaces A
“SPECIAL CONTROL SPACES”
022 Dock Trials and Sea Trial A
023 Hazardous Waste Disposal at a Contractor’s Facility A
024 Physical Security at Private Contractor’s Facility A
| 025 | Physical Security at a Private Contractor’s Facility | |
| In Force Protection Conditions Bravo – Delta | B |
030 Continuation of Services B
| 031 | AS Class Maintenance Controlled Work Spaces, Work | NSP |
| Permit System and Radiation Exposure Requirements |
032 Furnish Office for Ship Management Team A
SECTION 100 HULL STRUCTURE
101 Tank Inspections (ABS) A
“SPECIAL CONTROL SPACES”
| 102 | Ultrasonic Gauging (ABS) | A | |
| “SPECIAL CONTROL SPACES” |
| 103 | Miscellaneous Steel Replacement | B |
| “SPECIAL CONTROL SPACES” |
| 104 | 02 Level Boat Deck Cloverleaf Tie downs Renew (VR12-008) | A |
| “SPECIAL CONTROL SPACES” |
| 105 | Freeboard Preservation | A |
| “SPECIAL CONTROL SPACES” |
106 02 Level Weather Deck Structural Repairs (VR 13-047, 13-049, A
13-051,15-171)“SPECIAL CONTROL SPACES”
| 107 | CHT Tank Preservation (VR16-035) | A |
| “SPECIAL CONTROL SPACES” |
108 Potable Water Tank Preservation A
109 Feed Water Tank Preservation A
110 Pilot House Window Repairs (VR 12-029) A
111 Engine Room Bulkhead 110 Structural Repair (ABS) (VR15-223) A
112 Engine Room Bilge Top Structural Repairs (VR 15-227, 15-228) A
113 Engine Room Side Shell Structural Repairs (VR 15-225) A
114 Engine Room Structural Support Repairs (VR 15-025) A
115 MRG Foundation Structural Repairs (VR 13-112, 15-230 A
| 116 | Engine Room Bulkhead 123 Structural Repairs (VR 15-224, | A |
| 15-226) |
117 Electrical Shop (2-123-3-Q) Deck Repairs (VR 15-133) A
118 Engine Room Bilge Preservation (VR 15-041) A
119 Engine Room Foundation Repairs (VR 15-040) A
120 Engine Room Vertical Stanchion Repairs (VR 15-229) A
| 121 | Fire Room Bilge Top Structural Repairs (VR 15-219, 15-220, | A |
| 15-221 & 15-222) |
122 Fresh Water Drain Collection Tank Replacement (VR 14-033) A
| 123 | Bow, Stern and Bulwark Structural Repairs (VR 14-095, | A | |
| 14-097, 15-154, 16-008) |
124 #1 & 2 Elevator Trunk Structural Repairs (VR 15-037) A
125 #4 CHT Tank Structural Repairs (VR 16-005) A
| 126 | #5 Elevator Pit Structural Repairs (VR 15-018) | A |
| “SPECIAL CONTROL SPACES” |
127 Reefer Box (5-50-1) Structural Bulkhead Repairs (VR 14-050) A
| 128 | Sounding Tube Repairs (VR 12-088, 13-104, 15-003, 15-014, | A |
| 15-155) |
129 Stuffing Tube Replacement (VR 15-005, 15-095) A
130 03 Level Deck and Bulkhead Repairs (VR15-130, VR16-025) A
| 131 | 01-88-1 Weather Deck Bulkhead Repairs (VR 15-159) | A |
| “SPECIAL CONTROL SPACES” |
132 Refrigeration Compressor Room Deck Preservation (VR 14-049) A
133 Main Deck (1-146-1) & Bulkhead Repairs (VR 14-130) A
134 Bulkhead (1-62-1) Repair (VR 15-161) A
135 Bilge Drain Well Inspection and Preservation (ABS)(VR 15-176) A
SECTION 200 PROPULSION MACHINERY
201 #1 and 2 Boiler Dry Layup A
202 #1 Boiler ABS ESDC 2-Year Special Periodic Survey A Inspection (ABS) (VR 16-037)
203 ALOP Piping Alignment A
| 204 | #1 Boiler Safety Valves Open and Inspect and | |
| Certification (ABS) | A |
205 #1 and 2 Boiler Main Steam Stop Valves Replacement (ABS) B
| 206 | Main Reduction Gear and ALOP Open/Inspect (ABS) | A |
| (VR 14-115, VR 14-039) |
207 Main Steam and Soot Blower Piping Testing (ABS) A
208 HP Turbine Inspection (ABS) (VR 15-033, 15-056) A
209 LP Turbine Inspection (ABS) (VR 15-034, 15-057) A
210 Boiler Uptake Piping Repairs (VR 15-113) A
213 Line shaft Bearing Inspection A
| 214 | Main Circ Pump and Scoop Injection Inlet Flange Replace | A |
| (VR 16-132) |
SECTION 300 ELECTRICAL
301 Switchboard Groom and Cleaning and Circuit Breaker Servicing A
302 Group Control Centers Grooming and Circuit Breaker Servicing A
303 # 1,2,3,4 SSTG Generator Electrical End – Open, Inspect, A Megger, Clean, Repair, and Test (VR 15-029, 15-030, 15-031)
304 Dead End Cable Removals (VR 15-168) A
305 Switchboard Modification Industrial Assist A
(T-ALT AS40 12-016)
306 Switchboard Modification Power Panel and Feeder A Cable Replacement (T-ALT AS40 12-016)
307 Switchboard Modification Engine Room Supply A Ventilation Install (T-ALT AS40 12-016)
308 Switchboard Modification Engine Room Ventilation Repairs A
(T-ALT AS40 12-016)
309 Switchboard Modification Engine Room Insulation Repairs A
(T-ALT AS40 12-016)
310 Switchboard Modification Engine Room Vent Inspect A And Repair (T-ALT AS40 12-016)
SECTION 400 COMMUNICATIONS AND NAVIGATION
401 Magnetic Compass Survey and Calibration A
402 Fathometer System PM A
403 Gyrocompass System Maintenance A
404 Doppler Speed Log Preventative Maintenance A
405 Annual GMDSS ABS Cert and Survey A
406 3-CM and 10-CM Radars Service A
407 OE82 Antenna Group PM A
408 AL-7204 TV-DTS (OE-556/U) System Groom A
SECTION 500 AUXILIARY MACHINERY SYSTEMS
501 Steering Gear and Anchor Windlasses Systems Groom A
502 Relief Valves Testing (ABS) (VR15-063) A
| 503 | #1,2,3 & 4 SSTG Turbine Inspection (ABS) (VR 15-131, | A |
| 15-132, 15-133, 15-030, 15-031) |
504 Gauge Calibration A
| 505 | CHT Tank Vent Piping NDT Inspection and Repairs (VR 16-036) | A |
| “SPECIAL CONTROL SPACES” |
| 506 | Mechanical - Fireman Acid Cleaning (VR 15-157) | A |
| “SPECIAL CONTROL SPACES” |
| 507 | Fire Main Piping Repairs | B |
| “SPECIAL CONTROL SPACES” |
508 CHT Tank #1 Piping Repair (VR 16-124) A
509 CHT Tank #2 Piping Repair (VR 16-109) A
510 Evaporator Feed Duplex Strainer Installation (VR 15-175) A
511 A/C Refrigerant System Flush (VR 15-142) A
512 #1 & 3 A/C Condenser Retube (VR15-141) A
513 Mechanical -Tank Vents and Goose Neck Inspection & Repair A
514 Oily Water Separator Servicing (VR15-102) A
515 Sanitary Reducing Station Repairs (VR 13-077) A
516 Potable Water Manifold Overhaul (VR 14-084) A
517 #1 Fire Pump Overhaul (VR 14-076) A
518 #2 Fire Pump Overhaul (VR 16-059) A
519 SCBA Compressor Annual Certification A
520 SCBA Mask and Regulator Annual Certification (VR16-120) A
521 Chill Water Riser Deck Penetration Replacement (VR14-055) A
SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY
601 30-Ton Crane Annual Inspection (VR 16-119) A
602 Port & Starboard 5 Ton Cargo and Sail Crane Repairs A
| 603 | Annual Fire Fighting Inspection and Certification | A |
| “SPECIAL CONTROL SPACES” |
604 RHIB Boat and Davit Annual Inspection A
605 Steam Kettle Hydrostatic Testing (VR 16-039) A
| 606 | CHT and Pump Room Bilge Preservation | B |
| “SPECIAL CONTROL SPACES” |
607 Port and Starboard 5 Ton Crane Cable Transit Repairs A
(VR-15-054)
608 30 Ton Crane Cab Window Repairs (VR 13-008) A
609 Boat Removal & Storage A
610 #5 Cargo Elevator Motor Overhaul (VR 13-076, 15-093) A
611 Terrazzo Deck Repairs (VR15-0164) A
612 Lead Paint Abatement (VR 13-099) B
613 PRC Deck Repair A
614 PRC Deck Replacement A
| 615 | PRC Deck Repair | A |
| “SPECIAL CONTROL SPACES” |
| 616 | PRC Deck Replacement | A |
| “SPECIAL CONTROL SPACES” |
| 617 | Freeze/Chill Boxes Svc Areas Bulkhead Re-Insulation Repairs | A |
| Storeroom Re-Lagging and Misc. Piping/Valve insulation |
(VR 14-073)
618 #1 A/C Plant Insulation Repairs (VR 14-128) A
619 Chill Water Piping Insulation Repairs A
620 Saltwater Piping Insulation Repairs A
621 Steam Piping Insulation Repairs A
SECTION 700 SPONSOR EQUIPMENT
| 701 | Frame 50 Accommodation Ladders Inspection and Testing | A |
| (VR 11-129,13-038, 16-042) |
| 702 | Frame 73 Accommodation Ladders Inspection and Testing | A |
| (VR 11-129,13-038, 16-042) |
| 703 | Frame 122 Accommodation Ladders Inspection and Testing | A |
| (VR 11-129,13-038, 16-042) |
704 SASS Booms Inspection and Testing A
SECTION 800 HEATING, VENTILATION and AIR CONDITIONING
801 Galley Exhaust Duct Cleaning A
802 Laundry HVAC Duct Cleaning A
803 Fan Coil Cleaning, Chill Water A
| 804 | Fan Coil Cleaning, Chill Water | B |
| “SPECIAL CONTROL SPACES” |
| 805 | HVAC SYSTEM CLEANING (VR 16-121) | A |
| “SPECIAL CONTROL SPACES” |
| 806 | NSF Fan Room (1-91-2-Q) Structural Repairs (VR 13-080) | A |
| “SPECIAL CONTROL SPACES” |
807 04 Level Vent Duct Repairs (VR13-090) A
808 SCAC Unit Replacement (VR 13-128, 13-127, 13-121, 13-122) A
809 Fan Room (04-60-0-Q) Deck Repairs (VR 14-081) A
810 Engine Room Starboard Side Vent Duct Repairs (VR13-087) A
811 Navy Stock (4-58-0) Deck Repairs (VR 16-055) A
812 Fan Room (1-35-2-Q) Repairs (VR 14-170) A
813 Fan Room (02-74-2-Q) Repairs (VR 15-027) A
814 Fan Room (01-47-2-Q) Repairs (VR 15-050, 15-051) A
815 Fan Room (2-80-1-Q) Repairs (VR 15-053) A
816 Fan Room (01-101-2-Q) Repairs (VR 15-096) A
817 Fan Room (01-47-3-Q) Repairs (VR 15-148) A
818 Fan Room (01-16-1-Q) Repairs (VR 15-149) A
819 Fan Room (05-38-0-Q) Repairs (VR 15-234) A
| 820 | Planning Office (3-80-1) Vent Duct Repair (VR 15-169) | A |
| “SPECIAL CONTROL SPACES” |
821 11A Weld Shop (3-101-0-Q) Vent Duct Repairs (VR 15-173) A
822 Bridge Passageway (04-41-2) Vent Duct Repairs (VR 15-189) A
823 E3 Storeroom (4-98-0) Vent Duct Repairs (VR 15-231) A
824 Miscellaneous Duct Replacement B
825 R2 Berthing Cooling Coil Replacement (VR16-056) A
826 Weather Deck Vent Duct Repairs (VR 14-087, 14-090) A
827 Deck Berthing Vent Duct Repairs (VR 13-078) A
SECTION 900 DRYDOCKING AND UNDOCKING
| 901 | Dry-Docking and Undocking Vessel | A |
| “SPECIAL CONTROL SPACES” |
902 Drydock, Extension of Services B
| 903 | Sea Chests & Strainer Plates Inspection and Refurbishment (ABS) | A |
| “SPECIAL CONTROL SPACES” |
| 904 | Underwater Hull Preservation (Maintenance Recoat) | A |
| “SPECIAL CONTROL SPACES” |
905 Ground Tackle and Anchor Chains (ABS) A
906 Propulsion Shafting Bearing Bore Realignment B
| 907 | Chain Lockers, Sumps, Hawse Pipes and Spurling Tubes | |
| Preservation (ABS) | A |
908 Stern Tube Replacement (ABS) B
909 Rudder Inspection (ABS)(VR 15-111) A
| 910 | Bilge Keel Inspection (ABS) | A |
| “SPECIAL CONTROL SPACES” |
| 911 | Sea Valves and Waster Sleeve, Inspect & Refurbish (ABS) | A |
| “SPECIAL CONTROL SPACES” |
| 912 | Impressed Current Cathodic Protection System | A |
| Inspection/Repair (ABS) (VR 15-233) | ||
| “SPECIAL CONTROL SPACES” |
913 Propeller Inspection and Polishing (ABS) (VR 13-141) A
914 Propulsion Shafting Alignment A
915 Propulsion Shaft Removal and Inspection A
916 Propulsion Shaft Sleeve Replacement B
917 Propulsion Shaft Bearing Replacement B
918 Stern Tube Seal Removal and Reinstallation A
919 Rudder Bearings Change Out B
920 Scoop Injection and Main Circ Pump Check Valve Repair A
(VR 13-130, 15-078)
011, 7.1.19.3
Section D - Packaging and Marking
Section D - Packaging and Marking
WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS
In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0008 |
| Destination |
| Government |
| Destination |
| Government |
| 0009 |
| Destination |
| Government |
| Destination |
| Government |
| 0010 |
| Destination |
| Government |
| Destination |
| Government |
| 0011 |
| Destination |
| Government |
| Destination |
| Government |
| 0012 |
| Destination |
| Government |
| Destination |
| Government |
| 0013 |
| Destination |
| Government |
| Destination |
| Government |
| 0014 |
| Destination |
| Government |
| Destination |
| Government |
| 0015 |
| Destination |
| Government |
| Destination |
| Government |
| 0016 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 252.217-7005 |
| Inspection and Manner of Doing Work |
| JUL 2009 |
| 252.217-7006 |
| Title |
| DEC 1991 |
| 252.217-7013 |
| Guarantees |
| DEC 1991 |
Section F - Delivery and Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 0001 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0002 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0003 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0004 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0005 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0006 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0007 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0008 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0009 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0010 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0011 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0012 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0013 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0014 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0015 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 0016 |
| POP 07-APR-2017 TO |
05-AUG-2017
| N/A |
| N/A |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEP 2000)
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $153,130.00 per calendar day of delay.
(b) If the Government terminates this contract in whole or in part under the Default--Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default--Fixed-Price Supply and Service clause in this contract.
(End of clause)
F-1 SHIP AVAILABILITY PERIOD
It is anticipated that ship will arrive at Contractor’s yard on or about 7 April 2017. All work shall be completed in no more than 120 calendar days from actual start date designated by the Government at time of contract award.
F-2 PLACE OF PERFORMANCE
The place of performance for this contract shall be at the Contractor’s facility
Section G - Contract Administration data
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7006 |
| Wide Area WorkFlow Payment Instructions |
| MAY 2013 |
ADDENDUM TO 252.232-7006
The following information, at a minimum, must be attached into Wide Area Work Flow (WAWF) and submitted with each and every invoice showing certification with the Onsite Management Team prior to submission:
| CLIN # |
| Contract Price Through Mod P0000x |
| % Complete |
| Contract Completed ($) |
| Less Retainage ($) |
| Less Prev Payments ($) |
| Amount due this Invoice ($) |
| Total Invoiced to Date ($) |
| 0003 |
| Option |
| 0004 |
| Option |
| 0005 |
| Option |
| 0006 |
| Option |
| 0007 |
| Option |
| 0008 |
| Option |
| 0009 |
| Option |
| 0010 |
| Option |
| 0011 |
| Option |
| 0012 |
| Option |
| 0013 |
| Option |
| 0014 |
| Option |
| 0015 |
| Option |
| 0016 |
| Option |
TOTAL:
Military Sealift Command
Administering Contracting Officer
Military Sealift Command
Ship Yard Representative
Port Engineer
(End of instructions)
MSC SPECIFIC WIDE AREA WORKFLOW (WAWF) INSTRUCTIONS (AUG 2012)
The information contained in this instruction is supplemental to DFARS 252.232-7006.
The information contained in the table in DFARS 252.232-7006 is for WAWF purposes only. Information included in DFARS 252.232-7006 and this WAWF instruction apply only to WAWF Invoicing and WAWF Receiving Reports. Contradictory information elsewhere in this contract, e.g. Ship to DoDAAC, shall be followed per the terms and conditions of the contract.
When entering the invoice into WAWF, the Contractor shall fill in the DoDAAC fields or DoDAAC extensions exactly as shown in the table in DFARS 252.232-7006. Fields that should not be filled in when entering the invoice into WAWF will be indicated with the direction, “Leave Blank.”
In some situations the WAWF system will pre-populate the “Pay DoDAAC,” “Admin By DoDAAC” and “Issue By DoDAAC.” The Contractor shall verify that those DoDAACs automatically entered by the WAWF system match the information in the table in DFARS 252.232-7006. If these DoDAACs do not match, then the Contractor shall correct the field(s).
If Receiving Reports are required, ensure that the “Inspection” and “Acceptance” defaults of “destination” for both fields are not changed in the WAWF online interface.
The CLINs on the WAWF invoice shall be entered exactly as set forth in the contract document including CLIN number (e.g. 0001), Quantity (may be adjusted for actual quantity or dollar value delivered and invoiced), and Unit Price (e.g. $1.00). The dollar amounts on each CLIN or SubCLIN on the WAWF invoice shall reflect final performance values, but in no instance can the dollar amount for each CLIN or SubCLIN exceed what is specified in the contract document. The Contractor shall bill to the lowest level, e.g., the SubCLIN level. The Quantity and Unit of Measure fields must be filled out exactly as indicated in the CLINs and SubCLINs to reduce the possibility of the invoice being delayed or rejected during processing.
Before closing out of an invoice session in WAWF, but after submitting the document or documents, the Contractor will be given the option to send additional email notifications by clicking on the “Send More Email Notifications” link that appears on the page. The Contractor shall click on this link and add the Technical Point of Contact’s (TPOC) or Contracting Officer’s Representative’s (COR) email address in the first email address block and add any other additional email addresses desired in the following blocks. This additional notification to the Government is important to ensure the acceptor/receiver is aware that the invoice documents have been submitted into the WAWF system.
(End of instructions)
Section H - Special Contract Requirements
SECTION H CLAUSES
H-1 OPTION FOR INCREASED QUANTITIES
The Government may require the delivery of the numbered line items identified in Section B as option items in any amount up to the unit quantities and at the unit prices stated in the contractor’s Price Breakdown. The Contracting Officer (KO) may exercise the options by giving the contractor written notification or via issuance of standard modification (SF 30). Delivery of option items shall be within the performance period identified in Section F unless the parties otherwise agree.
H-2 PREVENTION OF THE DISCHARGE OF OIL AND HAZARDOUS SUBSTANCES
(a) Policy. In compliance with Executive Order Number 11752 (38 F.R. 34793), the policy of the Department of the Navy (DON) is to conform to the provisions of the Federal Water Pollution Control Act, as amended (Title 33 U.S.C. 1251 et seq), and the Oil Pollution Act of 1990, as amended (Title 33 U.S.C. 2701 et seq), insofar as these Acts prohibit the discharge of oil, oily mixtures, and hazardous substances, and regardless of whether or not these Acts pertain specifically to the Naval vessel and shore activities. The prescribed clause is intended to implement that policy with respect to the ship(s) being constructed or undergoing repair and overhaul under this contract.
(b) Definitions. For the purpose of this clause, the terms "oil," "oily mixtures," "hazardous substance," and "discharge" shall have the meanings as defined in the Acts referred to in paragraph (a) of this clause and other environmental statutes.
(c) Trials. Prior to commencement of any dock or sea trials hereunder, the contractor shall assure the Administrative Contracting Officer (ACO) by demonstrations, completed test memoranda, or other means reasonably acceptable to the ACO that all equipment, the function of which is to prevent the accidental discharge of oil, oily mixtures, or hazardous substances from the ship, that the contractor shall be required by the specifications to install, are fully operable.
(d) Reports. The contractor shall, as soon as it has knowledge of any discharge of oil, oily substance, or hazardous substance from the ship, immediately notify the ACO thereof and shall immediately take all reasonable steps to prevent further discharge. Within 24-hours thereafter, the contractor shall file with the ACO the "Oil or Hazardous Substance Discharge Report.”
(e) Liability. The contractor shall not be liable for the costs incurred by the Government for the removal of such oil, oily mixture, or hazardous substance, except that the contractor shall be liable to the Government for all such costs of removal where such discharge was the result of willful negligence or willful misconduct within the privity and knowledge of the contractor.
H-3 ADDITIONAL GOVERNMENT REQUIREMENTS CONTRACT LINE ITEM NUMBER (CLIN 0002)
(a) The Government may utilize CLIN 0002 for and not limited to, man-hours generated from a discrepancy found between WIs and the current conditions or a needed repair found during the open and inspect phase of the WI. This work may consist of supplemental, emergent, or new work. AGR does not include work performed pursuant to DFARS Clause 252.217-7005 - Inspection and Manner of Doing Work, 252.217-7013 - Guarantees, or other contract clauses relating to the correction of defects. The contractor agrees that CLIN 0002 AGR man-hours, if ordered, shall be performed concurrently with CLIN 0001 and any or all Category “B” WIs exercised, during the contract’s performance period, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned work items (WIs), to any other Government contract, or to any other work in progress for the Government. Work under this CLIN may coincide with ODC, and therefore will be performed concurrently with H-4 (ODC).
(b) As a result of a discrepancy found between the work item and the current conditions or a needed repair found during the open and inspect phase of the work item, the contractor may submit a Condition Found Report (CFR) to the Administrative Contracting Officer (ACO) and the Principle Port Engineer (PPE). As a result of this report submission, the ACO may request a proposal from the contractor. Whenever the Government orders AGR pursuant to this clause, the contractor shall submit a price proposal for such work. This proposal shall be submitted within three (3) days of the receipt of the Government's request for a proposal, or within such additional time provided in writing by the KO. The contractor's failure to submit its proposal within the three (3) days period, or such extended period of time, may be considered a failure of the parties to negotiate a fair and reasonable price for the AGR and will permit the KO to take any of the three options set forth in subparagraph (d) below. AGR proposals shall be priced using the Fully-Burdened Labor Rate (FBLR) set forth in Section B, CLIN 0002. The rate established in CLIN 0002 will be used in evaluating the contractor's proposal and will also be used for negotiating changes as required by this clause. As part of the contractor’s proposal submission for AGR, the following shall be included:
| - Fully Burdened Labor Rate |
| - Proposed Labor Mix/Categories |
| - Proposed Man Hours |
| - Total Proposed AGR |
(c) Considering FBLRs have been pre-approved in CLIN 0002, proposal evaluation may be limited to: (1) evaluating the mix of labor categories and associated man-hours to ensure that they are reasonable to meet the Government’s minimum requirements in addressing these discrepancies or repairs found; and (2) as a result of the mix of labor categories and man-hours, the subsequent AGR price is fair and reasonable IAW FAR 15.404-1(b) – Price analysis for commercial and non-commercial items. In the event that a fair and reasonable price cannot be negotiated, the KO reserves the right to procure these ODCs utilizing alternative means described in subparagraph (d), below.
(d) Upon receipt of the contractor's price proposal for the AGR the contractor and the KO shall negotiate the scope of the effort. If a fair and reasonable price cannot be negotiated between the contractor and the KO, the KO reserves the right to:
(1) Have the work performed by the Government;
(2) Issue a unilateral modification
(3) Cancel the requirement.
(e) The contractor knowingly and voluntarily waives all claims against the Government and/or other third party contractors for delay, disruption, loss of efficiency, or other impact arising out of or based upon the presence of Government or other contractor employees performing the AGR at the contractor's facility. Furthermore, in cases described in sub-paragraphs (d)(1) and (2) above, the contractor waives any right to claims of interference under the DFARS Clause 252.217-7011 - Access to Vessels.
(f) The contractor warrants and hereby certifies that its price for the firm fixed portion of this contract (CLIN 0001) does not include any amount for the "Additional Government Requirements" (CLIN 0002). Settlement of “Additional Government Requirements” (CLIN 0002) will be for the purpose of providing funding. In the event the Government requires additional work, authorization to proceed shall be made only by the KO. The Contractor is to perform and invoice against CLIN 0002 ONLY for work that has been AUTHORIZED through a settled RFP and incorporated into the contract through a contract modification. All funding remaining on CLINs 0001 through 0016 at contract completion shall be de-obligated.
H – 4 OTHER DIRECT COSTS (CLIN 0002)
(a) The Government may utilize CLIN 0002 for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .