J-2__Category_A_Work_Items_-_FC.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- USS FRANK CABLE (AS 40) ROH/DD Federal contract opportunity
- Solicitation number
- N32205-16-R-4406
About this file
Updated J-2 Attachment for Category A work items
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-2 CAT A WI Items
| ITEM NO. | GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE | ||||
| TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | |||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Requirements Definitions | - | NSP | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - | NSP | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - | NSP | $0 | ||||||||
| 004 | Testing and Quality Assurance | - | NSP | $0 | ||||||||
| 005 | Electrical Safety Procedures Requirements | - | NSP | $0 | ||||||||
| 006 | Heavy Weather Plan | - | NSP | $0 | ||||||||
| 007 | Cold Weather Plan | NSP | $0 | |||||||||
| 010 | Furnish Office for Overhaul Management Team (OMT) | - | $ - 0 | $ - 0 | ||||||||
| 011 | Furnish General Services | - | $ - 0 | $ - 0 | ||||||||
| 012 | Telephone Services | - | $ - 0 | $ - 0 | ||||||||
| 013 | Project Planning and Production Status Monitoring Reports | - | $ - 0 | $ - 0 | ||||||||
| 014 | Preparation of Weight and Moment Report | - | $ - 0 | $ - 0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - | $ - 0 | $ - 0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program | - | $ - 0 | $ - 0 | ||||||||
| 017 | Handling Ship's Stores | - | $ - 0 | $ - 0 | ||||||||
| 018 | Delivery and Redelivery of the Vessel | - | $ - 0 | $ - 0 | ||||||||
| 019 | Shipboard Access and Security | - | $ - 0 | $ - 0 | ||||||||
| 020 | Gas Free Certificates | - | $ - 0 | $ - 0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 022 | Dock Trials and Sea Trials | - | $ - 0 | $ - 0 | ||||||||
| 023 | Hazardous Waste Disposal at a Contractor's Facility | - | $ - 0 | $ - 0 | ||||||||
| 024 | Physical Security at Private Contractor’s Facility - Alpha | NSP | NSP | |||||||||
| 031 | AS Class Maintenance Controlled Work Spaces | NSP | NSP | |||||||||
| 032 | Furnish Office for Ship Management Team (SMT) | - | $ - 0 | $ - 0 | ||||||||
| - | $ - 0 | $ - 0 | ||||||||||
| Subtotal 000 - 032 | - 0 | $ - | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 100 | HULL STRUCTURE | |||||||||||
| 101 | Tank Inspections (ABS) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 102 | Ultrasonic Gauging (ABS) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 104 | 02 Level Boat Deck Cloverleaf Tidowns Renew (VR12-008) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 105 | Freeboard Preservation (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 106 | 02 Level Weather Deck Structural Repairs (VR 13-047, 13-049, 13-051, 15-171) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 107 | CHT Tank Preservation (VR 16-035) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 108 | Potable Water Tank Preservation | - | $ - 0 | $ - 0 | ||||||||
| 109 | Feed Water Tank Preservation | - | $ - 0 | $ - 0 | ||||||||
| 110 | Pilot House Window Repairs (VR 12-029) | - | $ - 0 | $ - 0 | ||||||||
| 111 | Engine Room Bulkhead 110 Structural Repairs (ABS) (VR 15-227, 15-228) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 112 | Engine Rooom Bilge Top Structural repairs (VR 15-227, 15-228) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 113 | Engine Room Side Shell Sructural Repairs (VR 15-225) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 114 | Engine Room Structrual Support Repairs (VR 15-025) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 115 | MRG Foundation Structural Repairs (VR 13-112, 15-230) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 116 | Engine Room Bulkhead 123 Structural Repairs (VR 15-224, 15-226) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 117 | Electrical Shop (2-123-3-Q) Deck Repairs (VR 15-133) | - | $ - 0 | $ - 0 | ||||||||
| 118 | Engine Room Bilge Preservation (VR 15-041) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 119 | Engine Room Foundation Repairs (VR 15-040) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 120 | Engine Room Verticle Stanchion Repairs (VR 15-229) | - | $ - 0 | $ - 0 | ||||||||
| 121 | Fire Room Bilge Top Structural Repairs (VR 15-219, 15-220, 15-221, & 15-222) | - | $ - 0 | $ - 0 | ||||||||
| 122 | Fresh Water Drain Collection Tank Replacement (VR 14-033) | - | $ - 0 | $ - 0 | ||||||||
| 123 | Bow, Stern and Bulwark Structural Repairs (VR 14-095, 14-097, 15-154, 16-008) | - | $ - 0 | $ - 0 | ||||||||
| 124 | #1 & #2 Elevator Trunk Structural Repairs (VR 15-037) | - | $ - 0 | $ - 0 | ||||||||
| 125 | #4 CHT Tank Structural Repairs (VR 16-005) | - | $ - 0 | $ - 0 | ||||||||
| 126 | #5 Elevator Pit Structural Repairs (VR 15-018) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 127 | Reefer Box (5-50-1) Structural Bulkhead Repairs (VR 14-050) | - | $ - 0 | $ - 0 | ||||||||
| 128 | Sounding Tube Repairs (VR 12-088, 13-104, 15-003, 15-014, 15-155) | - | $ - 0 | $ - 0 | ||||||||
| 129 | Stuffing Tube Replacement (VR 15-005, 15-095) | - | $ - 0 | $ - 0 | ||||||||
| 130 | 03 Level Deck and Bulkhead Repairs (VR 15-130, VR 16-025) | - | $ - 0 | $ - 0 | ||||||||
| 131 | Frame 01-88-1 Weather Deck Bulkhead Repairs (VR 15-159) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 132 | Refrigeration Compressor Room Deck Preservation (VR 14-049) | - | $ - 0 | $ - 0 | ||||||||
| 133 | Main Deck (1-146-1) & Bulkhead Repairs (VR 14-130) | - | $ - 0 | $ - 0 | ||||||||
| 134 | Bulkhead (1-62-1) Repair (VR 15-161) | - | $ - 0 | $ - 0 | ||||||||
| 135 | Bilge Drain Well Inspection and Preservation (ABS) (VR 15-176) | - | $ - 0 | $ - 0 |
| Subtotal 101 - 135 | - 0 | $ - | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | #1 and #2 Boiler Dry Layup | - | $ - 0 | $ - 0 | ||||||||
| 202 | #1 Boiler ABS ESDC 2-Year Special Periodic Survey Inspection (ABS) (VR 16-037) | - | $ - 0 | $ - 0 | ||||||||
| 203 | ALOP Piping Alignment | - | $ - 0 | $ - 0 | ||||||||
| 204 | #1 Boiler Safety Valves Open and Inspect and Certification (ABS) | - | $ - 0 | $ - 0 | ||||||||
| 206 | Main Reduction Gear and ALOP Open/Inspect (ABS) (VR 14-115, VR 14-039) | - | $ - 0 | $ - 0 | ||||||||
| 207 | Main Steam and Soot Blower Piping Testing (ABS) | - | $ - 0 | $ - 0 | ||||||||
| 208 | HP Turbine Inspection (ABS) (VR 15-033, 15-056) | - | $ - 0 | $ - 0 | ||||||||
| 209 | LP Turbine Inspection (ABS) (VR 15-034, 15-057) | - | $ - 0 | $ - 0 | ||||||||
| 210 | Boiler Uptake Piping Repairs (VR 15-113) | - | $ - 0 | $ - 0 | ||||||||
| 211 | Forced Draft Blower Overhaul (VR 15-052) | - | $ - 0 | $ - 0 | ||||||||
| 212 | Main Reduction Gear Dehumidifier Modifications (T/ALT AS40 14-003) | - | $ - 0 | $ - 0 | ||||||||
| 213 | Lineshaft Bearing Inspection | - | $ - 0 | $ - 0 | ||||||||
| 214 | Main Circulating Pump and Scoop Injection Inlet Flange Replace (VR 16-132) | - | $ - 0 | $ - 0 |
| Subtotal 201 - 214 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 300 | ELECTRICAL | |||||||||||
| 301 | Switchboard Groom and Cleaning and Circuit Breaker Servicing | - | $ - 0 | $ - 0 | ||||||||
| 302 | Group Control Centers Grooming and Circuit Breaker Servicing | - | $ - 0 | $ - 0 | ||||||||
| 303 | #1, 2, 3, 4 SSTG Generator Electrical End - Open, Inspect, Megger, Clean, Repair, and Test (VR 15-029, 15-030, 15-031) | - | $ - 0 | $ - 0 | ||||||||
| 304 | Dead End Cable Removals (VR 15-168) | - | $ - 0 | $ - 0 | ||||||||
| 305 | Switchboard Modification Industrial Assist (T-ALT AS40 12-016) | - | $ - 0 | $ - 0 | ||||||||
| 306 | Switchboard Modification Power Panel and Feeder Cable Replacement (T-ALT AS40 12-016) | - | $ - 0 | $ - 0 | ||||||||
| 307 | Switchboard Modification Engine Room Supply Ventilation Install (T-ALT AS40 12-016) | - | $ - 0 | $ - 0 | ||||||||
| 308 | Switchboard Modification Engine Room Ventilation Repairs (T-ALT AS40 12-016) | - | $ - 0 | $ - 0 | ||||||||
| 309 | Switchboard Modification Engine Room Insulation Repairs (T-ALT AS40 12-016) | - | $ - 0 | $ - 0 | ||||||||
| 310 | Switchboard Modification Engine Room Vent Inspect and Repair (T-ALT AS40 12-016) | - | $ - 0 | $ - 0 |
| Subtotal 301 - 310 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 400 | COMMUNICATION & NAVIGATION | |||||||||||
| 401 | Magnetic Compass Survey and Calibration | - | $ - 0 | $ - 0 | ||||||||
| 402 | Fathometer System PM | - | $ - 0 | $ - 0 | ||||||||
| 403 | Gyrocompass System Maintenance | - | $ - 0 | $ - 0 | ||||||||
| 404 | Doppler Speed Log Preventative Maintenance | - | $ - 0 | $ - 0 | ||||||||
| 405 | Annual GMDSS ABS Certification and Survey | - | $ - 0 | $ - 0 | ||||||||
| 406 | 3-CM and 10-CM Radar Service | - | $ - 0 | $ - 0 | ||||||||
| 407 | OE82 Antenna Group PM | - | $ - 0 | $ - 0 | ||||||||
| 408 | AL-7204 TV-DTS (OE-556/U) System Groom | - | $ - 0 | $ - 0 |
| Subtotal 401 - 408 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 500 | MACHINERY, AUXILIARY SYSTEM | |||||||||||
| 501 | Steering Gear and Anchor Windlasses Systems Groom | - | $ - 0 | $ - 0 | ||||||||
| 502 | Relief Valve Testing (ABS) (VR 15-063) | - | $ - 0 | $ - 0 | ||||||||
| 503 | #1, 2, 3, 4 SSTG Turbine Inspection (ABS) (VR 15-131, 15-132, 15-133, 15-030, 15-031) | - | $ - 0 | $ - 0 | ||||||||
| 504 | Gauge Calibration | - | $ - 0 | $ - 0 | ||||||||
| 505 | CHT Tank Vent Piping NDT Inspection and Repairs (VR 16-036) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 506 | Mechanical - Firemain Acid Cleaning (VR 15-157) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 508 | CHT Tank #1 Piping Repair (VR 16-124) | - | $ - 0 | $ - 0 | ||||||||
| 509 | CHT Tank #2 Piping Repair (VR 16-109) | - | $ - 0 | $ - 0 | ||||||||
| 510 | Evaporator Feed Duplex Strainer Installation (VR 15-175) | - | $ - 0 | $ - 0 | ||||||||
| 511 | A/C Refrigerent System Flush (VR 15-142) | - | $ - 0 | $ - 0 | ||||||||
| 512 | #1 & #3 A/C Condenser Retube (VR 15-141) | - | $ - 0 | $ - 0 | ||||||||
| 513 | Mechanical - Tank Vents and Goose Neck Inspection & Repair | - | $ - 0 | $ - 0 | ||||||||
| 514 | Oily Water Separator Servicing (VR 15-102) | - | $ - 0 | $ - 0 | ||||||||
| 515 | Sanitary Reducing Station Repairs (VR 13-077) | - | $ - 0 | $ - 0 | ||||||||
| 516 | Potable Water Manifold Overhaul (VR 14-084) | - | $ - 0 | $ - 0 | ||||||||
| 517 | #1 Fire Pump Overhaul (VR 14-076) | - | $ - 0 | $ - 0 | ||||||||
| 518 | #2 Fire Pump Overhaul (VR 16-059) | - | $ - 0 | $ - 0 | ||||||||
| 519 | SCBA Compressor Annual Certification | - | $ - 0 | $ - 0 | ||||||||
| 520 | SCBA and Regulator Annual Certification (VR 16-120) | - | $ - 0 | $ - 0 | ||||||||
| 521 | Chill Water Riser Deck Penetration Replacement (VR 14-055) | - | $ - 0 | $ - 0 |
| Subtotal 501 - 521 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 600 | OUTFIT, FURNISHING AND HABITABILITY | |||||||||||
| 601 | 30-Ton Crane Annual Inspection (VR 16-119) | - | $ - 0 | $ - 0 | ||||||||
| 602 | Port & Starboard 5-Ton Cargo and Sail Crane Repairs | - | $ - 0 | $ - 0 | ||||||||
| 603 | Annual Fire Fighting Inspection and Ceritification (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 604 | RHIB Boat and Davit Annual Inspection | - | $ - 0 | $ - 0 | ||||||||
| 605 | Steam Kettle Hydrostatic Testing (VR 13-008) | - | $ - 0 | $ - 0 | ||||||||
| 607 | Port and Starboard 5-Ton Crane Cable Tansit Repairs (VR 15-054) | - | $ - 0 | $ - 0 | ||||||||
| 608 | 30-Ton Crane Cab Window Repairs (VR 13-008) | - | $ - 0 | $ - 0 | ||||||||
| 609 | Boat Removal & Storage | - | $ - 0 | $ - 0 | ||||||||
| 610 | #5 Cargo Elevator Motor Overhaul (VR 13-076, 15-093) | - | $ - 0 | $ - 0 | ||||||||
| 611 | Terrazzo Deck Repairs (VR 15-0164) | - | $ - 0 | $ - 0 | ||||||||
| 612 | Lead Paint Abatement (VR 13-099) | - | $ - 0 | $ - 0 | ||||||||
| 613 | PRC Deck Repair (VR ) | - | $ - 0 | $ - 0 | ||||||||
| 614 | PRC Deck Replacement (VR ) | - | $ - 0 | $ - 0 | ||||||||
| 615 | PRC Deck Repair (VR ) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 616 | PRC Deck Replacement (VR ) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 617 | Freeze/Chill Boxes Service Areas Bulkhead Re-Insulation Engine Strm Re-Lagging and Misc Piping/Valve Insulation (VR 14-073) | - | $ - 0 | $ - 0 | ||||||||
| 618 | #1 A/C Plant Insulation Repairs (VR 14-128) | - | $ - 0 | $ - 0 | ||||||||
| 619 | Chill Water Piping Insulation Repairs (VR- ) | - | $ - 0 | $ - 0 | ||||||||
| 620 | Saltwater Piping Insulation Repairs (VR- ) | - | $ - 0 | $ - 0 | ||||||||
| 621 | Steam Piping Insulaton Repairs (VR- ) | - | $ - 0 | $ - 0 | ||||||||
| 622 | Ventilation System Insulation Repiars | - | $ - 0 | $ - 0 | ||||||||
| 623 | Bulkhead and Overhead Insulation Repairs | - | $ - 0 | $ - 0 |
| Subtotal 601 - 623 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 700 | SPONSOR EQUIPMENT | |||||||||||
| 701 | Frame 50 Accommodation Ladders Inspection and Testing (VR 11-129, 13-038, 16-042) | - | $ - 0 | $ - 0 | ||||||||
| 702 | Frame 73 Accommodation Ladders Inspection and Testing (VR 11-129, 13-038, 16-042) | - | $ - 0 | $ - 0 | ||||||||
| 703 | Frame 122 Accommodation Ladders Inspection and Testing (VR 11-129, 13-038, 16-042) | - | $ - 0 | $ - 0 | ||||||||
| 704 | SASS BOOMS Inspection and Testing | - | $ - 0 | $ - 0 |
| Subtotal 701 - 704 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 800 | HEATING, VENTILATION and AIR CONDITIONING | |||||||||||
| 801 | Galley Exhaust Duct Cleaning | - | $ - 0 | $ - 0 | ||||||||
| 802 | Laundry HVAC Duct Cleaning | - | $ - 0 | $ - 0 | ||||||||
| 803 | Fan Coil Cleaning, Chill Water | - | $ - 0 | $ - 0 | ||||||||
| 805 | HVAC System Cleaning (VR 16-121) | - | $ - 0 | $ - 0 | ||||||||
| 806 | NSF FAN Room (1-91-2-Q) Structural Repairs (VR 13-080) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 807 | 04 Level Vent Duct Repairs (VR 13-090) | - | $ - 0 | $ - 0 | ||||||||
| 808 | SCAC Unit Replacement (VR 13-128, 13-127, 13-121, 13-122) | - | $ - 0 | $ - 0 | ||||||||
| 809 | Fan Room (04-60-0-Q) Deck Repairs (VR 14-081) | - | $ - 0 | $ - 0 | ||||||||
| 810 | Engine Room Starboard Side Vent Duct Repairs (VR 13-087) | - | $ - 0 | $ - 0 | ||||||||
| 811 | Navy Stock (4-58-0) Deck Repairs (VR 16-055) | - | $ - 0 | $ - 0 | ||||||||
| 812 | Fan Room (1-35-2-Q) Repairs (VR 14-170) | - | $ - 0 | $ - 0 | ||||||||
| 813 | Fan Room (02-74-2-Q) Repairs (VR 15-027) | - | $ - 0 | $ - 0 | ||||||||
| 814 | Fan Room (01-47-2-Q) Repairs (VR 15-050, 15-051) | - | $ - 0 | $ - 0 | ||||||||
| 815 | Fan Room (2-80-1-Q) Repairs (VR 15-053) | - | $ - 0 | $ - 0 | ||||||||
| 816 | Fan Room (01-101-2-Q) Repairs (VR 15-096) | - | $ - 0 | $ - 0 | ||||||||
| 817 | Fan Room (01-47-3-Q) Repairs (VR 15-148) | - | $ - 0 | $ - 0 | ||||||||
| 818 | Fan Room (01-16-1-Q) Repairs (VR 15-149) | - | $ - 0 | $ - 0 | ||||||||
| 819 | Fan Room (05-38-0-Q) Repairs (VR 15-234) | - | $ - 0 | $ - 0 | ||||||||
| 820 | Planning Office (3-80-1) Vent Duct Repair (VR 15-169) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 821 | 11A Weld Shop (3-101-0-Q) Vent Duct Repairs (VR 15-173) | - | $ - 0 | $ - 0 | ||||||||
| 822 | Bridge Passageway (04-41-2) Vent Duct Repairs (VR 15-189) | - | $ - 0 | $ - 0 | ||||||||
| 823 | E3 Storeroom (4-98-0) Vent Duct Repairs (VR 15-231) | - | $ - 0 | $ - 0 | ||||||||
| 825 | R2 Berthing Cooling Coil Replacement (VR 16-056) | - | $ - 0 | $ - 0 | ||||||||
| 826 | Weather Deck Vent Duct Repairs (VR 14-087, 14-090) | - | $ - 0 | $ - 0 | ||||||||
| 827 | Deck Berthing Vent Duct Repairs (VR 13-078) | - | $ - 0 | $ - 0 |
| Subtotal 801-827 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 | |
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | Dry Docking and UnDocking | - | $ - 0 | $ - 0 | ||||||||
| 903 | Sea Chests & Strainer Plates Inspection and Refurbishment (ABS) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 904 | Underwater Hull Preservation (Maintenance Recoat) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 905 | Ground Tackle and Anchor Chains (ABS) | - | $ - 0 | $ - 0 | ||||||||
| 907 | Chain Lockers, Sumps, Hawse Pipes and Spurling Tubes Preservation (ABS) | - | $ - 0 | $ - 0 | ||||||||
| 909 | Rudder Inspection (ABS) (VR 15-111) | - | $ - 0 | $ - 0 | ||||||||
| 910 | Bilge Keel Inspection (ABS) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 911 | Sea Valves and Waster Sleeve, Inspect & Refurbish (ABS) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 912 | Impressed Current Cathodic Protection System Inspection/Repair (ABS) (VR 15-233) (SPECIAL CONTROL SPACES) | - | $ - 0 | $ - 0 | ||||||||
| 913 | Propeller Inspection and Polishing (ABS) (VR 13-141) | - | $ - 0 | $ - 0 | ||||||||
| 914 | Propulsion Shafting Alingment | - | $ - 0 | $ - 0 | ||||||||
| 915 | Propulsion Shaft Removal and Inspection | - | $ - 0 | $ - 0 | ||||||||
| 917 | Propulsion Shaft Bearing Replacement | - | $ - 0 | $ - 0 | ||||||||
| 918 | Stern Tube Seal Removal and Reinstallation | - | $ - 0 | $ - 0 | ||||||||
| 920 | Scoop Injection and Main Circulating Pump Check Valve Repair (VR 13-130, 15-078) | - | $ - 0 | $ - 0 | ||||||||
| $ - 0 | $ - 0 | |||||||||||
| Subtotal 901-920 | - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - | $ - 0 | $ - 0 |
TOTAL CAT "A" - 0 $ - 0 $ - 0 - 0 $ - 0 $ - 0 $ - 0 $ - 0 - $ - 0 $ - 0
| PRIME/SUB Breakdown | % |
| PRIME Percentage | - |
| SUB Percentage | - |
USS FRANK CABLE (AS 40)
| CONTRACTOR PRICE BREAKDOWN | |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-16-R-4406 |
CATEGORY "A" ITEMS ONLY J-2 Attachment
File details come from the government source that posted it. Updated .