Amendment_N32205-16-R-4406-0001.docx
DOCX document 83 KB Posted
- Attached to
- USS FRANK CABLE (AS 40) ROH/DD Federal contract opportunity
- Solicitation number
- N32205-16-R-4406
About this file
Amendment 0001 for Solicitation N32205-16-R-4406
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-16-R-4406
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0005
The CLIN description has changed from Category "B" WI 0105 - Misc. Steel to Category "B" WI 0103 - Misc. Steel.
CLIN 0008
The CLIN extended description has changed from:
Work Item 0606 - CHT and Pump Room Bilge Preservation (SPECIAL CONTROL SPACES)This work item describes the requirements for the contractor to preserve the bilges in 5 CHT Pump Rooms.
To:
Work Item 0606 - CHT and Pump Room Bilge Preservation (SPECIAL CONTROL SPACES) (REV A) per 21 Oct 2016:This work item describes the requirements for the contractor to preserve the bilges in 5 CHT Pump Rooms..
CLIN 0016
This CLIN has been renumbered to CLIN 0017.
CLIN 0016 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" WI 0917 Propulsion Shafting |
FFP
Work Item 0917 Propulsion Shafting Bearing Replacement -
1.1 The intent of this item is to replace the strut and stern tube bearings.
FOB: Destination
NET AMT
PSC Code: 1925
The following have been added by full text:
SUMMARY OF CHANGES
1. This Amendment addresses the following issues for the USS FRANK CABLE (AS 40) ROH/DD Solicitation N32205-16-R-4406:
2. The Period of Performance (POP) is 7 April 2017 through 4 August 2017, a correct period of 120 calendar days.
3. MSC has determined to add three (3) New Work Items as follows:
a. 212 “Main reduction Gear Dehumidifier Modification (T-ALT AS39-14-003)”
b. 622 “Ventilation System Insulation Repairs”
c. 623 “Bulkhead and Overhead Insulation Repairs”
i. See the Revised J-2 Attachment.
4. MSC has made revisions to nine (9) work items, annotated below:
a. WI 606 – Category “B” work item CLIN 0008
b. WIs 610, 615, 616, 621, 806, 910, 911, 912
i. See the Revised J-3 Attachment
See the Zip File marked “New and Revised Work Items for FRANK CABLE” for copies of all of the New and Revised work items.
5. A Revised Work Item Index (Dated 21 Oct 2016) is attached for reference and also annotated in Section C-2.
6. MSC has made revisions to the following reference list:
a. 8496115 Rev A
b. WI 502 Reference 2.2
c. WI 619 Reference 2.1
d. WI 620 Reference 2.1
e. WI 621 Reference 2.1
f. WI 622 Reference 2.1
g. WI 623 Reference 2.1
See the Zip File marked “Updated References for Amendment 0001” for copies of these references and drawing.
7. A Revised Reference List (Dated 21 Oct 2016) is attached for reference to the corresponding work items.
8. CLIN 0004 is corrected to reflect “WI 103” instead of the incorrect number of “WI 105.”
9. CLINs 0016 and 0017 have been corrected to the following:
a. CLIN 0016 is corrected for Category “B” WI 917 Propulsion Shaft Bearing Replacement”
b. CLIN 0017 is added for Category “B” WI 0919 “Rudder Bearings Change Out”
The following have been modified:
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "A" Work Items (WIs)
FFP
Prepare for and accomplish the Regular Overhaul/Dry-docking (ROH & DD) of the United States Navy Ship USS FRANK CABLE (AS 40)
Total Category "A" WIs $_____________
Proposed unit price per KWh $_______ in accordance with (IAW) WI 011, 7.1.1.4
Proposed unit price per gallon of potable water $_________ IAW WI 011, 7.1.2.2
Proposed unit price per gallon of distilled water $_________ IAW WI 011, 7.1.3.2
Proposed unit price per gallon of bilge water removal $________ IAW WI 011, 7.1.19.3
Proposed unit price per crane usage $______ IAW WI 11, 7.9.1
Proposed Hazardous Waste handling fee rate IAW WI 023, 7.5.1 ______%
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Additional Government Requirements (AGR) and Other Direct Costs (ODC)
FFP
AGR
20,000 man-hours @ $________ per man-hour = $_____________
ODC
Base: $1,400,000.00_____________
Proposed G&A Rate _______________% Subtotal: $_____________
Proposed Profit Rate _______________% Subtotal: $_____________
NET AMT
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0017 $______________
The contractor shall fill-in the total proposed price, above, by calculating the summation of each CLIN Amount.
CLAUSES INCORPORATED BY FULL TEXT
Section B - Supplies or Services and Prices
PART I - THE SCHEDULE
The contractor shall follow the instructions stated below when completing Section B:
CLIN 0001 – The contractor shall complete CLIN 0001 NET AMT, each of the fill-in items stated in the extended description, and complete Attachment J-2 – Category “A” Work Itemss.
CLIN 0002: Indicate the Fully-Burdended Labor Rate (FBLR) (e.g., General and Administrative (G&A), Profit, Supervision, and/or support functions) and the ODC Profit and G&A rate. These rates will be used in evaluating the contractor’s proposal and shall be the rate for pricing changes negotiated under the H-3 Clause – AGR and H-4 Clause ODC, up to the maximum number of man-hours and ODC base specified herein. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | ||
| Welding | Machinists (inside and outside) | ||
| Burning | Brazing | ||
| Carpentry | Electrical Work | ||
| Electronic Work | Shipfitting | ||
| Lagging | Painting | ||
| Boilermaking | Pipefitting | ||
| Sheetmetal Work | Engineering | ||
| Rigging | Staging/scaffolding | ||
| General Labor | Fire Watch |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's FLBR for direct production man-hours. Examples of support functions include:
| Testing | Quality Assurance | ||
| Planning | Cleaning (except tank cleaning) | ||
| Material handling & Warehousing | Security | ||
| Surveying | Administration | ||
| Transportation | Purchasing staff | ||
| Lofting | Other indirect support | ||
| Supervision |
The rates proposed for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request For Proposal (RFP)s issued under this contract. The KO will apply these rates to the ODCs for each RFP when it is negotiated and settled.
The base cost does not include the profit or G&A rates. Include the final figure that results when proposed profit and G&A rates are applied to the base price of the contractor’s total price for evaluation purposes.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs should be included under CLIN 0001.
CLINs 0003 through 0017 – The offeror shall complete CLIN 0003 through 0017 NET AMT, each of the fill-in items, and complete Attachment J-3 – Category “B” WIs.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
C – 2 List of Standard Work Items included for this solicitation:
MILITARY SEALIFT COMMAND
SPECIFICATIONS
FOR
USS FRANK CABLE (AS-40)
ROH/DD
RFP NO.: N32205-16-R-4406
7 April 2017 – 4 August 2017
PRINCIPAL DIMENSIONS
LENGTH.............................................. 643 ft 8in
BREADTH........................................... 85 ft
MAXIMUM DISPLACEMENT......... 22,802 TONS
Per AMENDMENT 0001
SECTION 000 GENERAL REQUIREMENTS
001 Intent, Scope, General Conditions and Definitions NSP
002 Technical and Manufacturer’s Representatives NSP
003 Approach, Berth, and Mooring Requirements NSP
004 Testing and Quality Assurance NSP
005 Electrical Safety Procedure Requirements NSP
006 Heavy Weather Plan NSP
007 Cold Weather Plan NSP
010 Furnish Office for Overhaul Management Team (OMT) A
011 Furnish General Services A
012 Telephone Services A
013 Project Planning and Production Status Monitoring Reports A
014 Preparation of Weight and Moment Report A
015 Integrated Logistics and GFM Support Requirements A
016 Fire Protection and Ship’s Safety Program A
017 Handling Ship Stores A
018 Delivery and Redelivery of the Vessel A
019 Shipboard Access and Security A
020 Gas Free Certificates A
021 Clean and Gas Free Tanks, Voids, Cofferdams and Spaces A
“SPECIAL CONTROL SPACES”
022 Dock Trials and Sea Trial A
023 Hazardous Waste Disposal at a Contractor’s Facility A
024 Physical Security at Private Contractor’s Facility A
| 025 | Physical Security at a Private Contractor’s Facility | |
| In Force Protection Conditions Bravo – Delta | B |
030 Continuation of Services B
| 031 | AS Class Maintenance Controlled Work Spaces, Work | NSP |
| Permit System and Radiation Exposure Requirements |
032 Furnish Office for Ship Management Team A
SECTION 100 HULL STRUCTURE
101 Tank Inspections (ABS) A
“SPECIAL CONTROL SPACES”
| 102 | Ultrasonic Gauging (ABS) | A | |
| “SPECIAL CONTROL SPACES” |
| 103 | Miscellaneous Steel Replacement | B |
| “SPECIAL CONTROL SPACES” |
| 104 | 02 Level Boat Deck Cloverleaf Tie downs Renew (VR12-008) | A |
| “SPECIAL CONTROL SPACES” |
| 105 | Freeboard Preservation | A |
| “SPECIAL CONTROL SPACES” |
106 02 Level Weather Deck Structural Repairs (VR 13-047, 13-049, A
13-051,15-171)“SPECIAL CONTROL SPACES”
| 107 | CHT Tank Preservation (VR16-035) | A |
| “SPECIAL CONTROL SPACES” |
108 Potable Water Tank Preservation A
109 Feed Water Tank Preservation A
110 Pilot House Window Repairs (VR 12-029) A
111 Engine Room Bulkhead 110 Structural Repair (ABS) (VR15-223) A
112 Engine Room Bilge Top Structural Repairs (VR 15-227, 15-228) A
113 Engine Room Side Shell Structural Repairs (VR 15-225) A
114 Engine Room Structural Support Repairs (VR 15-025) A
115 MRG Foundation Structural Repairs (VR 13-112, 15-230 A
| 116 | Engine Room Bulkhead 123 Structural Repairs (VR 15-224, | A |
| 15-226) |
117 Electrical Shop (2-123-3-Q) Deck Repairs (VR 15-133) A
118 Engine Room Bilge Preservation (VR 15-041) A
119 Engine Room Foundation Repairs (VR 15-040) A
120 Engine Room Vertical Stanchion Repairs (VR 15-229) A
| 121 | Fire Room Bilge Top Structural Repairs (VR 15-219, 15-220, | A |
| 15-221 & 15-222) |
122 Fresh Water Drain Collection Tank Replacement (VR 14-033) A
| 123 | Bow, Stern and Bulwark Structural Repairs (VR 14-095, | A | |
| 14-097, 15-154, 16-008) |
124 #1 & 2 Elevator Trunk Structural Repairs (VR 15-037) A
125 #4 CHT Tank Structural Repairs (VR 16-005) A
| 126 | #5 Elevator Pit Structural Repairs (VR 15-018) | A |
| “SPECIAL CONTROL SPACES” |
127 Reefer Box (5-50-1) Structural Bulkhead Repairs (VR 14-050) A
| 128 | Sounding Tube Repairs (VR 12-088, 13-104, 15-003, 15-014, | A |
| 15-155) |
129 Stuffing Tube Replacement (VR 15-005, 15-095) A
130 03 Level Deck and Bulkhead Repairs (VR15-130, VR16-025) A
| 131 | 01-88-1 Weather Deck Bulkhead Repairs (VR 15-159) | A |
| “SPECIAL CONTROL SPACES” |
132 Refrigeration Compressor Room Deck Preservation (VR 14-049) A
133 Main Deck (1-146-1) & Bulkhead Repairs (VR 14-130) A
134 Bulkhead (1-62-1) Repair (VR 15-161) A
135 Bilge Drain Well Inspection and Preservation (ABS)(VR 15-176) A
SECTION 200 PROPULSION MACHINERY
201 #1 and 2 Boiler Dry Layup A
202 #1 Boiler ABS ESDC 2-Year Special Periodic Survey A Inspection (ABS) (VR 16-037)
203 ALOP Piping Alignment A
| 204 | #1 Boiler Safety Valves Open and Inspect and | |
| Certification (ABS) | A |
205 #1 and 2 Boiler Main Steam Stop Valves Replacement (ABS) B
| 206 | Main Reduction Gear and ALOP Open/Inspect (ABS) | A |
| (VR 14-115, VR 14-039) |
207 Main Steam and Soot Blower Piping Testing (ABS) A
208 HP Turbine Inspection (ABS) (VR 15-033, 15-056) A
209 LP Turbine Inspection (ABS) (VR 15-034, 15-057) A
210 Boiler Uptake Piping Repairs (VR 15-113) A
212 Main Reduction Gear Dehumidifier Modification A (T-Alt AS39 14-003)
213 Line shaft Bearing Inspection A
| 214 | Main Circ Pump and Scoop Injection Inlet Flange Replace | A |
| (VR 16-132) |
SECTION 300 ELECTRICAL
301 Switchboard Groom and Cleaning and Circuit Breaker Servicing A
302 Group Control Centers Grooming and Circuit Breaker Servicing A
303 # 1,2,3,4 SSTG Generator Electrical End – Open, Inspect, A Megger, Clean, Repair, and Test (VR 15-029, 15-030, 15-031)
304 Dead End Cable Removals (VR 15-168) A
305 Switchboard Modification Industrial Assist A
(T-ALT AS40 12-016)
306 Switchboard Modification Power Panel and Feeder A Cable Replacement (T-ALT AS40 12-016)
307 Switchboard Modification Engine Room Supply A Ventilation Install (T-ALT AS40 12-016)
308 Switchboard Modification Engine Room Ventilation Repairs A
(T-ALT AS40 12-016)
309 Switchboard Modification Engine Room Insulation Repairs A
(T-ALT AS40 12-016)
310 Switchboard Modification Engine Room Vent Inspect A And Repair (T-ALT AS40 12-016)
SECTION 400 COMMUNICATIONS AND NAVIGATION
401 Magnetic Compass Survey and Calibration A
402 Fathometer System PM A
403 Gyrocompass System Maintenance A
404 Doppler Speed Log Preventative Maintenance A
405 Annual GMDSS ABS Cert and Survey A
406 3-CM and 10-CM Radars Service A
407 OE82 Antenna Group PM A
408 AL-7204 TV-DTS (OE-556/U) System Groom A
SECTION 500 AUXILIARY MACHINERY SYSTEMS
501 Steering Gear and Anchor Windlasses Systems Groom A
502 Relief Valves Testing (ABS) (VR15-063) A
| 503 | #1,2,3 & 4 SSTG Turbine Inspection (ABS) (VR 15-131, | A |
| 15-132, 15-133, 15-030, 15-031) |
504 Gauge Calibration A
| 505 | CHT Tank Vent Piping NDT Inspection and Repairs (VR 16-036) | A |
| “SPECIAL CONTROL SPACES” |
| 506 | Mechanical - Fireman Acid Cleaning (VR 15-157) | A |
| “SPECIAL CONTROL SPACES” |
| 507 | Fire Main Piping Repairs | B |
| “SPECIAL CONTROL SPACES” |
508 CHT Tank #1 Piping Repair (VR 16-124) A
509 CHT Tank #2 Piping Repair (VR 16-109) A
510 Evaporator Feed Duplex Strainer Installation (VR 15-175) A
511 A/C Refrigerant System Flush (VR 15-142) A
512 #1 & 3 A/C Condenser Retube (VR15-141) A
513 Mechanical -Tank Vents and Goose Neck Inspection & Repair A
514 Oily Water Separator Servicing (VR15-102) A
515 Sanitary Reducing Station Repairs (VR 13-077) A
516 Potable Water Manifold Overhaul (VR 14-084) A
517 #1 Fire Pump Overhaul (VR 14-076) A
518 #2 Fire Pump Overhaul (VR 16-059) A
519 SCBA Compressor Annual Certification A
520 SCBA Mask and Regulator Annual Certification (VR16-120) A
521 Chill Water Riser Deck Penetration Replacement (VR14-055) A
SECTION 600 OUTFIT, FURNISHINGS and HABITABILITY
601 30-Ton Crane Annual Inspection (VR 16-119) A
602 Port & Starboard 5 Ton Cargo and Sail Crane Repairs A
| 603 | Annual Fire Fighting Inspection and Certification | A |
| “SPECIAL CONTROL SPACES” |
604 RHIB Boat and Davit Annual Inspection A
605 Steam Kettle Hydrostatic Testing (VR 16-039) A
| 606 | CHT and Pump Room Bilge Preservation (REV A) | B |
| “SPECIAL CONTROL SPACES” |
607 Port and Starboard 5 Ton Crane Cable Transit Repairs A
(VR-15-054)
608 30 Ton Crane Cab Window Repairs (VR 13-008) A
609 Boat Removal & Storage A
610 #5 Cargo Elevator Motor Overhaul (VR 13-076, 15-093)(REV A) A
611 Terrazzo Deck Repairs (VR15-0164) A
612 Lead Paint Abatement (VR 13-099) B
613 PRC Deck Repair A
614 PRC Deck Replacement A
| 615 | PRC Deck Repair (REV A) | A |
| “SPECIAL CONTROL SPACES” |
| 616 | PRC Deck Replacement (REV A) | A |
| “SPECIAL CONTROL SPACES” |
| 617 | Freeze/Chill Boxes Svc Areas Bulkhead Re-Insulation Repairs | A |
| Storeroom Re-Lagging and Misc. Piping/Valve insulation |
(VR 14-073)
618 #1 A/C Plant Insulation Repairs (VR 14-128) A
619 Chill Water Piping Insulation Repairs A
620 Saltwater Piping Insulation Repairs A
621 Steam Piping Insulation Repairs (REV A) A
622 Ventilation System Insulation Repairs A
623 Bulkhead and Overhead Insulation Repairs A
SECTION 700 SPONSOR EQUIPMENT
| 701 | Frame 50 Accommodation Ladders Inspection and Testing | A |
| (VR 11-129,13-038, 16-042) |
| 702 | Frame 73 Accommodation Ladders Inspection and Testing | A |
| (VR 11-129,13-038, 16-042) |
| 703 | Frame 122 Accommodation Ladders Inspection and Testing | A |
| (VR 11-129,13-038, 16-042) |
704 SASS Booms Inspection and Testing A
SECTION 800 HEATING, VENTILATION and AIR CONDITIONING
801 Galley Exhaust Duct Cleaning A
802 Laundry HVAC Duct Cleaning A
803 Fan Coil Cleaning, Chill Water A
| 804 | Fan Coil Cleaning, Chill Water | B |
| “SPECIAL CONTROL SPACES” |
| 805 | HVAC SYSTEM CLEANING (VR 16-121) | A |
| “SPECIAL CONTROL SPACES” |
| 806 | NSF Fan Room (1-91-2-Q) Structural Repairs (VR 13-080)(REV A) A |
| “SPECIAL CONTROL SPACES” |
807 04 Level Vent Duct Repairs (VR13-090) A
808 SCAC Unit Replacement (VR 13-128, 13-127, 13-121, 13-122) A
809 Fan Room (04-60-0-Q) Deck Repairs (VR 14-081) A
810 Engine Room Starboard Side Vent Duct Repairs (VR13-087) A
811 Navy Stock (4-58-0) Deck Repairs (VR 16-055) A
812 Fan Room (1-35-2-Q) Repairs (VR 14-170) A
813 Fan Room (02-74-2-Q) Repairs (VR 15-027) A
814 Fan Room (01-47-2-Q) Repairs (VR 15-050, 15-051) A
815 Fan Room (2-80-1-Q) Repairs (VR 15-053) A
816 Fan Room (01-101-2-Q) Repairs (VR 15-096) A
817 Fan Room (01-47-3-Q) Repairs (VR 15-148) A
818 Fan Room (01-16-1-Q) Repairs (VR 15-149) A
819 Fan Room (05-38-0-Q) Repairs (VR 15-234) A
| 820 | Planning Office (3-80-1) Vent Duct Repair (VR 15-169) | A |
| “SPECIAL CONTROL SPACES” |
821 11A Weld Shop (3-101-0-Q) Vent Duct Repairs (VR 15-173) A
822 Bridge Passageway (04-41-2) Vent Duct Repairs (VR 15-189) A
823 E3 Storeroom (4-98-0) Vent Duct Repairs (VR 15-231) A
824 Miscellaneous Duct Replacement B
825 R2 Berthing Cooling Coil Replacement (VR16-056) A
826 Weather Deck Vent Duct Repairs (VR 14-087, 14-090) A
827 Deck Berthing Vent Duct Repairs (VR 13-078) A
SECTION 900 DRYDOCKING AND UNDOCKING
| 901 | Dry-Docking and Undocking Vessel | A |
| “SPECIAL CONTROL SPACES” |
902 Drydock, Extension of Services B
| 903 | Sea Chests & Strainer Plates Inspection and Refurbishment (ABS) | A |
| “SPECIAL CONTROL SPACES” |
| 904 | Underwater Hull Preservation (Maintenance Recoat) | A |
| “SPECIAL CONTROL SPACES” |
905 Ground Tackle and Anchor Chains (ABS) A
906 Propulsion Shafting Bearing Bore Realignment B
| 907 | Chain Lockers, Sumps, Hawse Pipes and Spurling Tubes | |
| Preservation (ABS) | A |
908 Stern Tube Replacement (ABS) B
909 Rudder Inspection (ABS)(VR 15-111) A
| 910 | Bilge Keel Inspection (ABS) | (REV A) | A |
| “SPECIAL CONTROL SPACES” |
| 911 | Sea Valves and Waster Sleeve, Inspect & Refurbish (ABS) (REV A) A |
| “SPECIAL CONTROL SPACES” |
| 912 | Impressed Current Cathodic Protection System (REV A) | A |
| Inspection/Repair (ABS) (VR 15-233) | ||
| “SPECIAL CONTROL SPACES” |
913 Propeller Inspection and Polishing (ABS) (VR 13-141) A
914 Propulsion Shafting Alignment A
915 Propulsion Shaft Removal and Inspection A
916 Propulsion Shaft Sleeve Replacement B
917 Propulsion Shaft Bearing Replacement B
918 Stern Tube Seal Removal and Reinstallation A
919 Rudder Bearings Change Out B
920 Scoop Injection and Main Circ Pump Check Valve Repair A
(VR 13-130, 15-078)
SECTION D - PACKAGING AND MARKING
Section D - Packaging and Marking
CLAUSES INCORPORATED BY FULL TEXT
WOOD PACKAGING MATERIAL (WPM) - ADDITIONAL DELIVERY INSTRUCTIONS
In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved "DUNNAGE" stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0016:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
SECTION F - DELIVERY AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
05-AUG-2017
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
04-AUG-2017
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0002 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0003 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0004 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0005 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0006 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0007 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0008 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0009 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0010 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0011 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0012 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0013 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0014 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item for CLIN 0015 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule Item has been deleted from CLIN 0016:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
The following Delivery Schedule item has been added to CLIN 0016:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
POP 07-APR-2017 TO
| N/A |
| N/A |
F-1 SHIP AVAILABILITY PERIOD
It is anticipated that ship will arrive at Contractor’s yard on or about 7 April 2017. All work shall be completed in no more than 120 calendar days from actual start date designated by the Government at time of contract award. The Period of Performance (POP) is 7 April 2017 – 4 August 2017.
F-2 PLACE OF PERFORMANCE
The place of performance for this contract shall be at the Contractor’s facility
SECTION M - EVALUATION FACTORS FOR AWARD
M-4 EVALUATION FACTORS FOR AWARD
1. Evaluation criteria consist of factors and subfactors. The proposals will be evaluated under the following factors: technical, past performance, and price. The technical factors and subfactors and past performance factors will each receive one of the adjectival ratings defined in section M-3. Ratings of subfactors are used to derive an overall rating for the related factor.
2. Technical Factors include:
Factor 1 – Understanding the Statement of Work (SOW)
| Subfactor 1.1 – Time Phased Sequencing Network |
| Subfactor 1.2 – Problem Areas |
| Subfactor 1.3 – Engineering |
| Subfactor 1.4 – Material Availability |
| Subfactor 1.5 – Material Control and Storage |
| Subfactor 1.6 – Heavy Weather Plans |
| Subfactor 1.7 – Cold Weather Plans |
Factor 2 – Ability to Perform the SOW
| Subfactor 2.1 – Man-hour Chart |
| Subfactor 2.2 – Growth Absorption |
| Subfactor 2.3 – Facilities |
Factor 3 – Management Control and Quality Assurance
| Subfactor 3.1 – Organization and Key Personnel |
| Subfactor 3.2 – Subcontractor Participation |
| Subfactor 3.3 – Quality Control Plan |
| Subfactor 3.4 – Overtime Usage |
| Subfactor 3.5 – Hazardous Waste Management Plan |
| 3. | Past Performance Factors Include: | |
| Factor 1 – Quality of product or service | ||
| Factor 2 – Timeliness or scheduling of service/deliveries |
Factor 3 – Business relations/customer satisfaction Factor 4 – Key personnel and staffing (including subcontractors) Factor 5 – Cost Controls (Cost Contracts Only)
4. Price
Technical Factor 1 – Understanding the Statement of Work
Subfactor 1.1 Time Phased Sequencing Network
Demonstrate in detail, an understanding of the overall scope of work and the plan to accomplish that work by providing a time phased progress sequencing network, including milestones for each work item including Category B items. In addition, develop a Critical Path Analysis by Work Item. The analysis shall clearly identify the primary Critical Path at each point of the availability. In addition, a secondary Critical Path may be presented.
Milestones shall include:
a. MSC Overhaul Management Board office start and end dates.
b. Start of contract/ship arrival date.
c. Crew move off date (if applicable).
d. Dry-dock date (if applicable)
e. Completion of tanks gas freeing date.
f. Turnover of the Engine Room date.
g. Undock date from Dry-dock (if applicable)
h. Light-off start date.
i. Crew move aboard date (if applicable).
j. Dock trial date.
k. Sea trial date.
l. Ship redelivery date.
Subfactor 1.2 Problem Areas
Identify any foreseen potential problem areas in accomplishing the work requirements, e.g., Long Lead Time Material (LLTM), open and inspect items, potential labor disputes, etc.; within the allotted contract period and propose solutions to those problems. If no problems are foreseen, state “No problems are foreseen.”
Subfactor 1.3 Engineering
The Offeror shall demonstrate his understanding of the engineering support requirements (e.g., working drawings, tech/system manuals, selected record plans, inclining requirements, Trim and Stability booklet, and docking and undocking calculation if required) of the work package.
Identify completely the extent of engineering services that you plan to provide for this Work Package.
Describe the methodology to be used for resolving technical engineering problems, including engineering/production interfaces.
Describe the liaison between production and any engineering or design subcontractors (e.g. whether or not specifically dedicated in-house individuals will be assigned liaison).
Describe how regulatory approvals will be obtained for applicable engineering drawings (i.e. use of Professional Engineer review, use of ABS review for ABS approval).
Submit brief but concise resumes of engineering personnel (in-house and subcontractor) assigned to this project.
Subfactor 1.4 Material Availability
Identify materials/sources of materials for any item whose material cost exceeds 25% of the total estimated work item cost.
Identify materials and sources for material costs that exceed $10,000.00 for any single item. Do not list normal stock materials such as fasteners, gaskets, weld rod, etc.
Provide a separate listing of all brand name or equal items pursuant to the Brand Name or Equal provision of this solicitation (FAR 52.211-6). List should identify the product or material by work item number.
Subfactor 1.5 Material Control and Storage
Provide information on the location and size of all storage areas including those available for the receipt and inspection of material. Provide supporting data to demonstrate capability for compliance with the storage requirements identified in the statement of work.
Describe the system to be used for Material Control, providing data for the following areas:
1. Advanced CFM material ordering.
2. Receipt, inspection, and identification of GFM and CFM, including rotatable pool items.
| 3. Control of pilferable and sensitive material. |
| 4. Control of damage and reporting system. |
| 5. Turn-in material, including equipment shipped to subcontractors for work. |
| 6. Scrap material and relative accounting system. |
| 7. Ripout material which is to be reinstalled |
| 8. Procedure for critical material decisions such as substitution. |
| 9. Temporary issue of storeroom repair parts to support overhaul/availability. |
Show how the proposed system satisfies Production and QA Material Control requirements. Describe how material is distributed to the crafts.
Subfactor 1.6 Heavy Weather Plans
A Heavy Weather Plan shall be submitted in accordance with the specification item on heavy weather. The heavy weather plan shall include a description of the protection arrangements available and the preventative measures that will be taken to ensure the safety of the ship from potential heavy weather conditions.
Subfactor 1.7 Cold Weather Plan
A Cold Weather Plan shall be submitted in accordance with the specification item on Cold Weather. The Cold Weather Plan shall include a description of the protection arrangements available and the preventative measures that will be taken to ensure the safety of the ship from potential cold weather conditions.
Technical Factor 2 - Ability to Perform the Statement of Work
Subfactor 2.1 Man-hour Chart
Provide the supervisor/worker ratio for each specification item. Submit man-hour estimates by Hull, Machinery, and Electrical departments, with totals for each specification item and grand totals for all specification items in the format outlined below. The man-hour estimates provided shall reflect the actual man-hours planned to accomplish the work in the specification items.
MAN-HOUR ESTIMATES
| ITEM NO. |
| HULL/ |
STRUCTURAL
PRIME/SUB
MACHINERY
PRIME/SUB
ELECTRICAL
PRIME/SUB
ELECTRONIC
PRIME/SUB
OTHER
PRIME/SUB
TOTAL
PRIME/SUB
GRAND TOTAL
Provide one graphic presentation indicating each of the following items (only one graph to be provided) Note: Left side of graph to indicate “man-days”; bottom of graph to indicate time from award date to redelivery of vessel in daily intervals.
| (a) Total number of personnel required to accomplish all work projected during the period of performance required by the solicitation. |
| (b) Total number of personnel required to accomplish all shipyard work, all other work |
currently scheduled, and all other work projected during the period of performance required by this solicitation.
| (c) Total number of subcontractor personnel used to accomplish work projected during the period of performance required by this solicitation. |
| (d) Projected number of contractor and subcontractor personnel required to accomplish the additional man-hours of growth work as outlined in the Clause “Additional Requirements.” |
For all other work projected to be performed during this availability, list the name of the ship/barge/vessel, the period of performance. Explain if it will impact this availability and, if so, how.
Subfactor 2.2 Growth Absorption
Provide an estimate of the amount of additional work that can be absorbed without impact on the overhaul completion. Assume that most of the additional work is identified during the first 50% of the overhaul, that the work per trade (Hull, Machinery, and Electrical) is proportional to the work in the basic specifications, and that all material for such additional work is available within a reasonable time.
Justify the estimate of the amount of additional work that can be absorbed beyond Additional Requirement hours (AGR) and Category B-items.
Subfactor 2.3 Facilities
1. Complete the enclosed MSC Ship Repair Facility Survey Form (MSC Form 4330/26). Forms must be signed and dated. (See section J for the form). Note the following special instructions when completing the form.
| a. | On sheet 2 of 5, the “Services Available” block should include only those services which are permanently installed. Temporary service capability should be listed on sheet 5 of 5. |
| b. | Photocopies of crane certification data shall be supplied. |
| c. | The following instructions apply to the required submittals list located on sheet 5 of 5. |
(a) Submittal number 1: submit as instructed.
(b) Submittal number 2: submit as instructed.
(c) Submittal number 3: submit as instructed; list only capital equipment. Do not list portable hand-held tools.
(d) Submittal number 4: do not submit, covered elsewhere in RFP.
(e) Submittal number 5: do not submit, covered elsewhere in RFP.
(f) Submittal number 6: submit as instructed, do not list subcontractor locations.
(g) Submittal number 7: do not submit.
Use additional sheets as necessary to give a complete description of your facilities.
Submit the following:
A Berth Chart that complies with the requirements set forth in Specification Item entitled “Berthing and Mooring Requirements”.
An Approach Chart that complies with the requirements set forth in Specification Item entitled “Berthing and Mooring Requirements”. A Mooring Chart that complies with the requirements set forth in Specification Item entitled “Berthing and Mooring Requirements”.
Technical Factor 3 – Management Control and Quality Assurance
Subfactor 3.1 Organization and Key Personnel
Provide an organization chart of the key personnel who will be assigned for this availability. Include upper management, program managers, negotiators, estimators, scheduling personnel, engineering personnel, key production personnel by trade, the shipyard safety program organization, testing organization, the quality assurance organization, and contractor personnel responsible for each subcontractor being used. Identify the 2nd and/or swing shift yard managers/supervisors.
Include the name, title, percentage of time to be devoted to this availability, and years experience in the ship repair industry for each key person.
Subfactor 3.2 Subcontractor Participation
Identify all proposed major (over $25,000.00 aggregate) subcontractors and suppliers by work item. If none, state so. For all major subcontractors identified, advise whether the use of a second-tier subcontractor is proposed. If so, identify the proposed second-tier subcontractor and the specific work that it will be tasked to perform.
If the planned subcontractor work exceeds 50% of the total base contract cost, present a detailed subcontractor management plan that demonstrates established management procedures exist to control multiple subcontractors and to prevent interference and delays that might result. Do not submit cost/ price data with this factor. (Disregard if Small Business Set-Aside).
Contractor shall identify all work items where work required is planned to be accomplished outside of the contractor's primary repair facility. Identify the facility/subcontractor planned to accomplish this work, the location where work will be performed, and contractor intentions for accomplishing regulatory body and MSCREP inspections at the off-site location.
Where a Technical Representative is required, identify each Technical Representative by source and by work item number. If none, state so.
Subfactor 3.3 Quality Control Plan
Describe in detail the Quality Control Plan to be used for this availability. The description should address the method in which you will comply with the provisions of the Testing and Quality Control Clause and specification item entitled "Testing and Quality Assurance".
Submit a Preliminary "Schedule for key Inspection Events" within the contactor's proposal for review; to show the contractor's full understanding of all inspections criteria, call outs, and checkpoints specified within the work item package.
Identify the individuals who will perform the QC function. Discuss other duties, if any, to be performed by QC personnel and the percentage of time that they are to perform other duties. Discuss the documentation of QC activity (e.g., logs, notebooks, records, etc.). Present the test failure recovery plan.
Subfactor 3.4 Overtime Usage
Demonstrate in detail, the planned use of overtime by the offeror and sub-contractors to accomplish the critical path related work/sequences and controlling work items, which are identified on the Offeror's TPSN, during this availability.
The plan should also show when and where 2nd/3rd shift(s) are used, and the number of personnel on 2nd/3rd shift(s) required, to accomplish the critical path related work and controlling work items, during this availability.
Subfactor 3.5 Hazardous Waste Management Plan
Identify key shipyard personnel associated with hazardous waste management including, but not limited to, personnel associated with employee training, hazardous waste identification and manifest documentation.
Identify any subcontractors associated with removal, handling and disposal of hazardous wastes, including but not limited to, subcontractors responsible for removing, storing, transporting, recycling, reclaiming or otherwise disposing of hazardous waste. All permits or other applicable credentials associated with safe and proper disposal of hazardous waste should be included. If a hazardous waste subcontractor is changed for any reason the Hazardous Waste Management Plan shall be amended prior to the new subcontractor beginning work on the vessel.
Identify all local, state and federal agencies associated with the disposal of hazardous waste.
Outline procedures used by the facility to accomplish removal, handling, storage and disposal of hazardous wastes in accordance with local, state and federal requirements.
Describe all steps to be taken to reduce the volume and toxicity of hazardous waste generated during their performance of the contract. This is to include, but not be limited to a description of management of hazardous waste generation, process controls utilized to ensure that effective minimization techniques are maintained and any technological resources available to reduce either the toxicity of the volume of hazardous waste.
Provide a copy of the facility’s Hazardous Waste Spill Response Plan.
4. Past Performance
The past performance evaluation will assess the offeror’s probability of meeting the solicitation requirements. To develop an overall rating, the Government’s evaluation will take into account relevant information submitted by each offeror as part of its proposal and the Government’s assessment and evaluation of other sources of information. Offerors are cautioned that the Government may use data provided in the offerors proposal and data obtained from other sources. Other sources of information for past performance may include, but are not limited to, Past Performance Information Retrieval System (PPIRS) reports, the Federal Awardee performance and Integrity Information System (FAPIIS), Electronic Subcontract Report System (ESRS), other databases, questionnaires and interviews.
(1) The Government will consider the recently and relevancy of past performance information compared to the requirements detailed in the PWS, the source of the information, the context of the data and general trends in the offeror’s performance and any associated risk.
(a) To be considered recent, the effort must be on-going and at least 50% complete or must have been performed during the past three (3) years from the date of issuance of the solicitation. Past performance information that fails this condition will not be evaluated.
(b) To be considered relevant, the recent effort must be similar in terms of size, scope, and magnitude in comparison to the requirement detailed in the SOW. Past performance information that fails this condition will not be evaluated.
(2) The Government will consider the extent of the offeror’s ability to perform a previous contract successfully in the areas of; (a) quality of product or services; (b) timeliness or scheduling of supplies/deliveries; (c) Business relations/customer satisfaction; (d) Key personnel and staffing (including subcontractors); and (e) cost controls (COST CONTRACTS ONLY).
(3) The Government will consider the company itself, predecessor companies, key personnel who have relevant experience and subcontractors who will perform major or critical aspects of the requirement.
(4) For all offerors, the Government will consider historical compliance with the requirements of FAR Part 52.219-8 (Utilization of Small Business Concerns). In addition, for large business, the Government will consider historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan, DOD Requirements).
The Government reserves the right to consider Past Performance Questionnaires received after the due date for receipt of proposals. The Government reserves the right to contact references for verification or additional information and the right to consider other relevant past performance information. The Government may call customers, whether or not provided by the offeror, to inquire about the offerors’ past performance. The government does not assume the duty to search for data to cure the problems it finds with the information provided by the offeror. The burden of providing thorough and complete past performance information remains with the offeror.
In accordance with FAR 15.305(a)(2)(iv), an offeror without a record of relevant past performance or for whom information on past performance is not available, will not be evaluated favorably or unfavorably on past performance.
5. Price Proposal
Price proposals will not be assigned an adjectival rating, but shall be evaluated for completeness and price reasonableness utilizing one or more of the process analysis techniques in FAR 15.404-1(b).. The total evaluated proposal price will consist of Category “A” Items (CLIN 0001), Additional Government Requirements (CLIN 0002), Other Direct Costs (CLIN 0002), Category “B” Items (CLIN 0003 through 0017), and the Interport Differential, if applicable.
| a. | Completeness: All information / data required by the solicitation have been submitted. The price volume will also be evaluated to ensure the completion of the representations and certifications in Section K and the inclusion and submission of other information required by the clause requirements. |
| b. | Price Reasonableness: Prices are considered fair under current market conditions, reasonable to the offeror and reasonable to the government. Reasonableness may also be determined by comparison to the government estimate and / or other offers received. |
6. CONTRACTOR INDUSTRY CERTIFICATIONS
1. Eligible contractors must be capable of performing the full scope of the solicitation within their own facilities, utilizing their own shops and work force or be capable of subcontracting for these elements beyond their managerial, technical, or physical capability or capacity. Contractors must assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.
2. Eligible contractors must be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, MSRA, ABR, or ISO Certifications that would further emphasize the contractor's ability to perform the work. To be determined responsible, a prospective contractor must submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award. The contractors' proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess a Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR) or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.
This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.
The contractors’ proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:
1. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.
1. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.
1. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.
1. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. They shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package
1. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.
1. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.
1. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards
1. Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.
1. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage and disposal. Appropriate state/federal agency issued hazardous waste generator number. Disposal records which indicate type of material, date and place of disposal.
1. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:
0. Pier, with services in place in which the CLASS size ship can access and be berthed at
0. Structural Shop
0. Machine Shop
0. Pipe Shop
0. Electrical/Electronic Shop
0. Carpentry Shop
0. Rigging Equipment
0. Dry-dock – when required for docking of vessel in performance of the specification
4. The government reserves the right to perform site survey for verification of policies, procedures, capabilities and facilities prior to award.
(End of Summary of Changes) image1.wmf