J-3_Category_B_Work_Items_-_FC.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
USS FRANK CABLE (AS 40) ROH/DD Federal contract opportunity
Solicitation number
N32205-16-R-4406
Issued by
Department of the Navy Military Sealift Command

About this file

Updated J-3 Category B pricing spreadsheet to include WI 804

View the file

Other files for this federal contract opportunity

Other files attached to USS FRANK CABLE (AS 40) ROH/DD, newest first.
File Type Posted
J-3_Category_B_Work_Items_Revised_1-31-17.xlsx XLSX spreadsheet
0025_B_Physical_Security_at_Private_Contractor's_Facility_CAT-B-REV.doc DOC document
N32205-17-R-4406-P0006.docx DOCX document
0310_A_(REV_A)_SWBD_Mods_Engine_Room_Vent_Inspect_and_Repair.doc DOC document
J-2__Category_A_Work_Items_Revised_1-31-17.xlsx XLSX spreadsheet
302-8389031_Rev_C _Power_Dist_Sys_One-Line_Dia_95005769.pdf PDF
RFQ_Q_and_A_-_No._1.docx DOCX document
0304_A_(REV_A)_O2N2_Plant_Dead_End_Cable_Removal_(VR15-168).docx DOCX document
N32205-16-R-4406-0005.docx DOCX document
4792403_K.pdf PDF
DPMA_Item_Index_(11-18-16).doc DOC document
4792402_E.pdf PDF
0305_A_(REV_B)_SWBD_Mods_Industrial_Assist_(TA12-016).docx DOCX document
References_for_Amend_0004.zip ZIP file
Revised_Work_Items_-_Amend_0004.zip ZIP file
DPMA_Item_Index_(11-10-16).doc DOC document
N32205-16-R-4406-0004.docx DOCX document
References_for_Amendment_0003.zip ZIP file
0705_B_Calibration_Lab_Vent_Mods.doc DOC document
DPMA_Item_Index_(11-7-16).doc DOC document
J-3_Category_B_Work_Items_-_FC.xlsx XLSX spreadsheet
WI_705_References_.zip ZIP file
Frank_Cable_Reference_List__RFP_N32205-16-R-4406_Nov_7.doc DOC document
Revised_WI_Amendment_0003.zip ZIP file
N32205-16-R-4406-0003.docx DOCX document
Amend_0002_References.zip ZIP file
Amend_0002_Revised_Work_Items.zip ZIP file
New_and_Revised_WI_for_FC_ROH_DD.zip ZIP file
Updated_References_for_Amendment_0001.zip ZIP file
N32205-16-R-4406-0002.docx DOCX document
CNIC_3-page_Access_Registration_Form.pdf PDF
J-2__Category_A_Work_Items_-_FC.xlsx XLSX spreadsheet
Current_EPIC_FORM_-_L_5.xlsx XLSX spreadsheet
J-2__Category_A_Work_Items_-_FC.xlsx XLSX spreadsheet
RFQ_Q_and_A_-_No._1.docx DOCX document
Frank_Cable_Reference_List__N32205-16-R-4406_21_Oct_16.doc DOC document
DPMA_Item_Index_10-21-16.doc DOC document
J-3_Category_B_Work_Items_-_FC.xlsx XLSX spreadsheet
Amendment_N32205-16-R-4406-0001.docx DOCX document
J A_16-R-4406.pdf PDF
J-6_FRANK_CABLE_CDRLs.zip ZIP file
J-Attachments_for_Solicitation_16-R-4406.zip ZIP file
N32205-16-R-4406.docx DOCX document
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-3 Cat B WI

Contractor's price will be broken down for each item of the specification, as follows:
CATEGORY “B” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorOther CostsTOTAL PRICE
ITEM NO.TITLEQTYU/IUNIT PRICETOTALPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETOTAL L/HTOTAL LABOR PRICETOTAL MATERIAL PRICE
0GENERAL REQUIREMENTS
25Physical Security at Private Contractor’s Facility in Force Protection Condition (FPCON) Bravo, Charlie, and Delta
7.11Cost to Establish physical security at private contractors facility from Alpha to FPCON Bravo1Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.12Cost to Establish physical security at private contractors facility from Alpha to FPCON Charlie1Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.13Cost to Establish physical security at private contractors facility from Alpha to FPCON Delta1Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.11Cost to Maintain physical security at private contractors facility from Alpha to FPCON Bravo1Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.12Cost to Maintain physical security at private contractors facility from Alpha to FPCON Charlie1Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.13Cost to Maintain physical security at private contractors facility from Alpha to FPCON Delta1Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
WI 025 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30CONTINUATION OF SERVICES
7.1Overhaul Management Team Services30Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.2General Services for the Ship30Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.3Telephone Services30Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.4Project Planning and Monitoring30Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.5Fire Protection and Ship's Safety30Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.6Shipboard Access and Security30Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.7Gas Free Certificates30Day$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
WI 030 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
103Misc Structural Steel Repairs
7.2Interference Removal
To Include 1,000 hrs & $10,000 Material$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
7.6Description:UNITUNIT BID PRICETOTAL BID PRICE
10.2# ABS Gr A 1/4" - Quantity 2,000 lbs40LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
17.85# ABS Gr A 7/16" Thk - Quantity 2,574 lbs286LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20.40# ABS Gr A 1/2" Thk- Quantity 4,048 lbs200LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
20.50# ABS Gr A 5/82" Thk- Quantity 10,350 lbs230LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
30.60# ABS Gr A 3/4" Thk- Quantity 12,375 lbs275LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL: 31,347 lbs$ - 0
STEEL ANGLESUNIT BID PRICETOTAL BID PRICE$ - 0
2” X 2” X ¼” 20' Length - Quantity 300 lbs10LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3” X 3” X ¼” 20' Length - Quantity 600 lbs20LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4” X 4” X ¼” 20' Length - Quantity 810 lbs27LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4” X 6” X 3/8” Length 20' - Quantity 1,500 lbs50LBS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL: 3,210$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GRAND TOTAL: 34,557 lbs
WI 103 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
205#1 Boiler Main Steam Stop Valves Replacement (ABS)
1.1Replace the Main Steam Stops for the #1 And #2 Main Propulsion Boilers

WI 205 Sub-Total $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

507Fire Main Piping Repairs (SPECIAL CONTROL SPACES)
1.1Replace Additional Sections of Fire Main Piping & Fittings$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3.2.1Description:UNIT
4 Inch, 90/10 CUNI Pipe25LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8 Inch, 90/10 CUNI Pipe25LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2 Inch, 90/10 CUNI Pipe25LF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0
4 Inch, 90 Deg (SB), Bronze Elbow6PES$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4 Inch, (SB) Bronze Flanges12PES$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8 Inch, 90 Deg (SB) Bronze Elbow6PES$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
8 Inch, (SB) Bronze Flanges12PES$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2 Inch 90 Deg (SB) Bronze Elbow6PES$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2 Inch, (SB) Bronze Flanges12PES$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0
WI 507 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
606CHT Pump Room Bilge Preservation (SPECIAL CONTROL SPACES)
1.1Preserve Bilges in Five (5) CHT Pump Rooms$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
WI 606 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0
612Lead Paint Abatement$ - 0$ - 0
1.1Identify, Test and Safely Remove Lead Based Paints from Various Spaces1,250SqFt$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead Surface1,250SqFt$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Horizontal Surface1,250SqFt$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Vertical Surface1,250SqFt$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Piping of Various Sizes5,000SqFt$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL:
$ - 0$ - 0$0.00$ - 0$ - 0$ - 0$ - 0
WI 612 Sub-Total
705Overhaul & Upgrade of Calibration Laboratory Complex HVAC (SPECIAL CONTROL SPACE)
1.1Work item is for the Modifications to the CAL LAB’s HVAC on the O-1 and Main decks between Frames 84-92.

WI 705 Sub-Total $ - 0 $0.00 $0.00 $0.00 $ - 0 $ - 0 $0

804AIR HANDLING UNIT & FAN COIL UNIT CLEANING (SPECIAL CONTROL SPACES)
1.1Requirement to inspect and clean various Air Handling Units and Cooling Coils onboard the vesselUNITSUNIT BID PRICETOTAL BID PRICE
27EA.$ - 0$ - 0
8.0Chill Water Fan Coil Unit - Unit size 4$ - 0$0.00$0.00
TOTAL:
WI 804 Sub-Total$ - 0$0.00$0.00$0.00$ - 0$ - 0$0
824Miscellaneous Duct Replacement (SPECIAL CONTROL SPACES)
1.1Price List for the Replacement of Various Ductwork and Fittings
Table 824-1
Interior Duct Size:60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 25 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 50 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 100 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 200 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 400 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 600 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 900 Inch Squared (2) - 5 Linear Feet
TRUNKS/DUCTS EXPOSED TO WEATHER SIZE60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 100 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 200 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 400 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 600 Inch Squared (2) - 5 Linear Feet60Qty$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Metal Duct, 900 Inch Squared (2) - 5 Linear Feet

WI 824 Sub-Total $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

902Dry-Dock, Extension of Services
1.1Additional Days in Drydock and Extension of Services.Price Per DayTotal Price
7.1Price Per Day - TOTAL 30 Days1Days$ - 0$ - 0$ - 0$ - 0$ - 0

WI 902 Sub-Total $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

906Propulsion Shafting Bearing Bore Realignment
1.1Modify the Bearing Bore of the Strut and Stern Tube to Facilitate Repositioning of the Respective Bearing

WI 906 Sub-Total $ - 0 $0.00 $0.00 $0.00 $ - 0 $ - 0 $ - 0

908Stern Tube Replacement (ABS)
1.1Crop Out & Install New Steel Plate & Associated Structural Members in the Stern Tube (Frame 130-134)
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
WI 908 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
916Propulsion Shafting Sleeve Replacement
1.1Provide Information with Regard to the Removal & Replacement of Bearing Journal Shaft Sleeves
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
WI 916 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
917Propulsion Shafting Bearing Replacement
1.1Replace the Strut and Stern Tube Bearings
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
WI 917 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
919Rudder Bearing Change Out
1.1Change out ship’s Rudder Bearings
$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
WI 919 Sub-Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL: $ - 0 $ - 0 $ - 0

&"Times New Roman,Regular"&14USS FRANK CABLE (AS 40) ROH/DD&12

&"Times New Roman,Regular"&14CONTRACTOR PRICE BREAKDOWN
&"Times New Roman,Regular"&14N32205-16-R-4406

&"Times New Roman,Regular"&12Attachment J-3