0305_A_(REV_B)_SWBD_Mods_Industrial_Assist_(TA12-016).docx

DOCX document 39 KB Posted

Attached to
USS FRANK CABLE (AS 40) ROH/DD
Solicitation number
N32205-16-R-4406
Issued by

About this file

Revised Work Item 305 (A)

View the file

Other files

File Type Posted
N32205-17-R-4406-P0006.docx DOCX document
J-3_Category_B_Work_Items_Revised_1-31-17.xlsx XLSX spreadsheet
0310_A_(REV_A)_SWBD_Mods_Engine_Room_Vent_Inspect_and_Repair.doc DOC document
J-2__Category_A_Work_Items_Revised_1-31-17.xlsx XLSX spreadsheet
0025_B_Physical_Security_at_Private_Contractor's_Facility_CAT-B-REV.doc DOC document
302-8389031_Rev_C _Power_Dist_Sys_One-Line_Dia_95005769.pdf PDF
RFQ_Q_and_A_-_No._1.docx DOCX document
DPMA_Item_Index_(11-18-16).doc DOC document
4792402_E.pdf PDF
0304_A_(REV_A)_O2N2_Plant_Dead_End_Cable_Removal_(VR15-168).docx DOCX document
N32205-16-R-4406-0005.docx DOCX document
4792403_K.pdf PDF
Revised_Work_Items_-_Amend_0004.zip ZIP file
References_for_Amend_0004.zip ZIP file
DPMA_Item_Index_(11-10-16).doc DOC document
J-3_Category_B_Work_Items_-_FC.xlsx XLSX spreadsheet
N32205-16-R-4406-0004.docx DOCX document
DPMA_Item_Index_(11-7-16).doc DOC document
N32205-16-R-4406-0003.docx DOCX document
Revised_WI_Amendment_0003.zip ZIP file
References_for_Amendment_0003.zip ZIP file
0705_B_Calibration_Lab_Vent_Mods.doc DOC document
J-3_Category_B_Work_Items_-_FC.xlsx XLSX spreadsheet
WI_705_References_.zip ZIP file
Frank_Cable_Reference_List__RFP_N32205-16-R-4406_Nov_7.doc DOC document
Amend_0002_References.zip ZIP file
Updated_References_for_Amendment_0001.zip ZIP file
Amend_0002_Revised_Work_Items.zip ZIP file
New_and_Revised_WI_for_FC_ROH_DD.zip ZIP file
Current_EPIC_FORM_-_L_5.xlsx XLSX spreadsheet
CNIC_3-page_Access_Registration_Form.pdf PDF
N32205-16-R-4406-0002.docx DOCX document
J-2__Category_A_Work_Items_-_FC.xlsx XLSX spreadsheet
DPMA_Item_Index_10-21-16.doc DOC document
J-3_Category_B_Work_Items_-_FC.xlsx XLSX spreadsheet
Amendment_N32205-16-R-4406-0001.docx DOCX document
J-2__Category_A_Work_Items_-_FC.xlsx XLSX spreadsheet
RFQ_Q_and_A_-_No._1.docx DOCX document
Frank_Cable_Reference_List__N32205-16-R-4406_21_Oct_16.doc DOC document
J-Attachments_for_Solicitation_16-R-4406.zip ZIP file
J A_16-R-4406.pdf PDF
J-6_FRANK_CABLE_CDRLs.zip ZIP file
N32205-16-R-4406.docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS FRANK CABLE

(AS-40)

ELECTRICALN32205-16-R-4406
ITEM NO.305 (REV B)Category “A”18 November 2016

TMMG/REAGAN/DNG

SWITCHBOARD MODIFICATION INDUSTRIAL ASSIST (T/A AS40 12-016)

1.0 ABSTRACT:

This item describes the requirements to provide support to a Government Furnished Contractor for upgrades to Ship Service (1S and 2S) and Ship Along Side (1SAS and 2SAS) switchboards.

2.0 REFERENCES

2.1 MSC Drawing 803-7081122, General Technical Requirements (GTRs)

2.2 NAVSEA Drawing AS40-845-7362894 (AS-40 NUCLEAR/NON-NUCLEAR INTERFACE BOOKLET – FOUO)

2.3 LIST OF POSSIBLE LOADS THAT MAY REQUIRE TEMPORARY POWER.

3.0 ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity:

3.1.1 Location

a. Various, as requested by the Government Furnished Contractor

3.1.2 Quantity: None

3.2 Item Description/Manufacturer’s Data

3.2.1 Bill of Material: None

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Equipment (GFE): None

4.2 Government Furnished Material (GFM): NONE

4.3 Government Furnished Services: (GFS):

4.3.1 ABS surveyor onsite services will be provided and funded by MSC under separate contract.

4.3.2 A Switchboard Manufacturer’s Representative will be provided and funded by MSC under separate contract.

4.4 Government Furnished Information (GFI): None

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTRs, including but not limited to GTRs 1-7, 21, 22, 25, 26, and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review other work items under this contract, including but not limited to Work Items 306 through 310, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL CONTACT THE RADIOLOGICAL CONTROLS OFFICER (RCO) OR HIS DESIGNATED REPRESENTATIVE PRIOR TO PERFORMING ANY REPAIRS IN NAVSEA 08 AREAS OF CONCERN AS OUTLINED IN REFERENCE 2.2. THE RADIOLOGICAL CONTROLS OFFICER (RCO) WILL DETERMINE IF THERE ARE SPECIAL REQUIREMENTS ASSOCIATED WITH THIS REPAIR BASED ON ITS LOCATION AND WORK REQUIRED. THE RADIOLOGICAL CONTROL OFFICER (RCO) SHALL ENSURE ALL RADIOLOGICAL REQUIREMENTS AND PRECAUTIONS OF NAVSEA 0989-058-8000 FIGURE 1A-24 OR 1B-24 (AS APPLICABLE) ARE MET.
5.4The load bank requirement in paragraph 7.1.5.c will be necessary two times to accomplish final testing of switchboard modifications. The switchboard modifications to the 1S and 1SAS Switchboards will be accomplished concurrently, tested using the load bank and returned to service prior to starting the modifications to the 2S and 2SAS Switchboards. Once the 1S and 1SAS switchboards are returned to service the modifications to the 2S and 2SAS switchboards can proceed concurrently, tested using the load bank and returned to service.

6.0 QUALITY ASSURANCE REQUIREMENTS

6.1 All work shall be performed to the satisfaction of the onsite MSC representative (MSCREP), Port Engineer, and ship’s Chief Engineer.

6.2 All rigging is to be in accordance with shipyard policies. No material shall be transported by crane without the shipyard providing proper cradles and securing the material. Any equipment or material damaged during this evolution shall be replaced by the shipyard.

7.0 STATEMENT OF WORK REQUIRED

7.1 Arrangements/Outfitting

7.1.1 Prior to start of work conduct a separate “Coordination Kick off” meeting to discuss specific support required. Required attendees to include Switchboard Manufacturer’s Representative, Contractor, CHENG and PPE.

7.1.2 Coordinate all support with the Switchboard Manufacturer’s Representative and the MSCREP.

7.1.3 Remove interferences in way of temporary services. Retain removed interferences for reinstallation upon completion of work.

7.1.4 Provide temporary services for the vessel as requested by the Switchboard Manufacturer’s Representative provided in Section 4.3 for the duration of the contract performance period. (For estimating purposes assume 1000 hours and $5,000 material for providing temporary services.)

a. Ensure that all temporary power and lighting services are connected, operational, and ready for use within 24 hours after request by the Switchboard Manufacturer’s Representative. Make connections at the locations specified by the Switchboard Manufacturer’s Representative and approved by the MSCREP.

b. Notify the Switchboard Manufacturer’s Representative and MSCREP 24 hours before scheduled disruptions of temporary power and lighting services. The Contractor may disconnect required temporary power and lighting services only when securing an associated system for authorized work. If a provided service is unexpectedly disrupted, notify the Switchboard Manufacturer’s Representative and MSCREP of the disruption and provide an estimated time until it will be restored.

7.1.5 Furnish the following temporary services:

a. Provide temporary power and lighting for systems and equipment impacted by the securing of individual switchboards and power panels using Reference 2.3 for guidance. Coordinate with the Switchboard Manufacturer’s Representative, MSCREP and ship’s force and maintain power throughout the ship, including during berth shifts and “turn ship” evolutions. Provide flexible cables, necessary terminal connections, and 60-cycle 3-phase electrical power to the vessel at locations specified by the Switchboard Manufacturer’s Representative in accordance with NFPA 70. Except for those vessels with an onboard shore power isolation transformer, only a single ungrounded shore power source shall be used for supplying electrical power, i.e. the generator or the transformer secondary supplying the shore tie must have all phases and any neutral insulated from earth with the frame of such equipment bonded to ground. Parallel transformers or generators shall not be used. The voltage and current capacities shall be as specified by the Switchboard Manufacturer’s Representative

b. Provide temporary ventilation as requested by the Switchboard Manufacturer’s Representative, including fans and flexible ducting.

c. Provide, install and operate a load bank with the following minimum characteristics: 450VAC, 2,500KW resistive and 2,180 KVAR reactive power charge, for three (3) days of switchboard testing at the request of the Switchboard Manufacturer’s Representative. Provide and install ten each, temporary LSTSGU-400 cables to connect the load bank directly to the individual SAS receptacles. Coordinate all tests between Switchboard Modifications and Work Item 306. (SEE 5.1.4)

d. Provide heavy-lift equipment services (cranes and forklift trucks, with operators and riggers) in minimum, 15-minute increments, for use by the Switchboard Manufacturer’s Representative, with maximum, four working-hour notices. Ensure cranes and associated weight handling gear and equipment have a minimum two-ton lift capacity and an outreach sufficient to reach an offload point on the forecastle, fantail, or other deck, as applicable. For estimating purposes, assume 100 crane lifts and 100 forklift truck services.

e. Provide the services of heavy-lift laborers for use by the Switchboard Manufacturer’s Representative, with maximum, four working-hour notices, and lift, carry, and move articles from exposed deck areas on the vessel to spaces where the articles are to be installed or utilized. Lift, carry and move removed articles to pallets on exposed deck areas on the vessel for removal via cranes. For estimating purposes, assume heavy-lift laborer services for 200 trips.

f. Provide an appropriate lay down area and rigging/cranes services of same for two (2), forty (40) foot containers within the vicinity of each other and the ship.

g. Disconnect and remove all temporary services when requested by the Switchboard Manufacturer’s Representative.

7.1.6 Reinstall interferences removed and retained for reinstallation. Provide new and install interferences rendered unusable during removals.

7.1.7 Clean all areas affected by this work item.

a. Remove all dirt, dust, foreign objects and fabrication debris upon completion of each temporary service.

7.2 Structural: None additional

7.3 Mechanical/Fluids: None additional

7.4 Electrical: None additional

7.5 Electronics: None additional

7.6 Preparation of Drawings/Documentation: None additional

7.7 Inspection/Test: None additional

7.8 Painting

7.8.1 Touch up all surfaces where paint was damaged in the conduct of work identified in this work item to match surrounding surfaces.

7.9 Marking: None additional

7.10 Manufacturer’s Representative: None additional

8.0 GENERAL REQUIREMENTS: None additional

305-5