Attachment_M_-_PP_Questionnaire.doc

DOC document 667 KB Posted

Attached to
Operation & Maintenance of T-AGS Vessels
Solicitation number
N32205-16-R-3100
Issued by

About this file

Attachment M - Past Performance Questionnaire

View the file

Other files

File Type Posted
Forms_A_thru_D-2_TAGS_Rev_4.xlsx XLSX spreadsheet
Amend_7.pdf PDF
RFP_N3220516R3100_Amend_6.pdf PDF
RFP_N3220516R3100_Amend_6_Conformed.pdf PDF
Forms_A_thru_D-2_TAGS_Rev_3.xlsx XLSX spreadsheet
QA7_TAGS_RFP_16R3100.pdf PDF
Attachment_K_Past_Performance_Narrative_Rev-1.docx DOCX document
Attach_F-7_WATERS_T-AGS_45_GFP.xlsx XLSX spreadsheet
Attach_F-4_HEEZEN_T-AGS_64_GFP.pdf PDF
Attach_F-2_BOWDITCH_T-AGS_62_GFP.pdf PDF
Attach_F-1_PATHFINDER_T-AGS_60_GFP.pdf PDF
Attach_F-5_MARY_SEARS_T-AGS_65_GFP.pdf PDF
Attach_F-3_HENSON_T-AGS_63_GFP.pdf PDF
Attach_F-6_MAURY_T-AGS_66_GFP.pdf PDF
16R3100_Amend_5.pdf PDF
QA6_TAGS_RFP_16R3100.pdf PDF
16R3100_Amend_5_Conformed.pdf PDF
Forms_A_thru_D-2_TAGS_Rev_2.xlsx XLSX spreadsheet
N32205-16-R-3100_Amend_4_FBO.pdf PDF
QA5_TAGS_RFP_16R3100.pdf PDF
N32205-16-R-3100_Amend_3.doc DOC document
QA4_TAGS_RFP_16R3100.pdf PDF
QA3_TAGS_RFP_16R3100.pdf PDF
Attachment_B-4_WD_CBA-2016-8779_MEBA.pdf PDF
Attachment_B-3_WD_CBA-2016-8778_SIUPD.pdf PDF
16-R-3100_Conformed_thru_Amend_0002.doc DOC document
Attachment_B-2_WD_CBA-2016-8436_TAGS_SIU.pdf PDF
Attachment_B-5_WD_CBA-2016-8780_MMP.pdf PDF
N32205-16-R-3100_Amend_0002.doc DOC document
QA2_TAGS_RFP_16R3100.pdf PDF
N32205-16-R-3100_Amend_1.doc DOC document
QA1_TAGS_RFP_16R3100.pdf PDF
Attachment_J_-_MECSP_Worksheet.doc DOC document
Attachment_K_Past_Performance_Narrative.docx DOCX document
Attachment_H_OVERSIGHT_AND_METRICS.pdf PDF
Attachment_L_Award-Fee_Plan_T-AGS_030916.doc DOC document
N32205-16-R-3100.doc DOC document
ATTACHMENT_D_P I_Guidelines.pdf PDF
Attachment_C_DD_254_TAGS.pdf PDF
Attachment_G_-_SF_LLL.pdf PDF
Forms_A_thru_D-2_TAGS.xlsx XLSX spreadsheet
ATTACHMENT_I_Inv_Req.pdf PDF
Attachment_B-1_WD_CBA-2016-8437_FBO.PDF PDF
Attachment_A_TECH_MANUAL.pdf PDF
Attachment_E_HullClauses2009.pdf PDF
Attachment_A_TECH_MANUAL_Draft.pdf PDF
N32205-16-R-3100_TAGS_Draft_RFP_040616.pdf PDF
16-R-3100_Sections_L M_draft.pdf PDF
16-R-3100_Draft_PWS_Rev_1.pdf PDF
Safety_Tradeoff_TAGS.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE QUESTIONNAIRE

TO:

PHONE:

EMAIL:

INFORMATION REQUEST

Military Sealift Command (MSC) is currently in the process of reviewing offers for the TAGS vessel Operation and Maintenance contract. XXXXXXXXX has provided your name and organization as a reference regarding their record of past technical performance under Contract No. XXXXX. Specifically, we are looking for performance information listed in the chart below.

In order for our team to compile its evaluation, we request that you complete the attached questionnaire and email it, and any other pertinent information, as soon as possible to Keishla Valenzuela, email: Keishla.Valenzuela@navy.mil.

Thank you, Richard Lee Anderson

Contracting Officer

Military Sealift Command

CONTRACTOR PERFORMANCE QUESTIONNAIRE

CONTRACTOR NAME:

CONTRACT NUMBER:

EVALUATION PERIOD:

Please provide ratings and comments regarding the Contractor’s performance in each area below using the following ratings: Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory. See page 3 for definition of ratings. For ratings of “Exceptional” or “Unsatisfactory,” please provide a brief explanation on page 3. Additional comments for any of the ratings may be provided on page 3 as well.

EXCEPTIONAL
VERY GOOD
SATISFACTORY
MARGINAL
UNSATISFACTORY
N/A

Operations and Manning

Experience operating and maintaining deep ocean going vessel(s) greater than 1,600 tons.

Successfully crewed the vessel(s).

Managed and maintained a crew retention plan.

Lifecycle Management

Provide Adequate and timely maintenance and repair

Provide Assistance in equipment and system recapitalization efforts

Oversee Vessel alterations and configuration management

Provide Adequate engineering oversight and sparing to ensure vessel readiness.

Planned Maintenance

Effective use of predictive maintenance (PdM), preventive maintenance (PM) and condition monitoring (CM) techniques.

Provide Assistance in long-term planning of vessel maintenance and upgrades

Management of Repairs

Successful solicitation, award, and management of Voyage Repairs, Overhauls and crew capable repairs at US or overseas ports.

Comments:

DEFINITION OF RATINGS FOR PAST PERFORMANCE

Exceptional
Performance meets/met contractual requirements and exceeds/exceeded many to the customer’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
Performance meets/met contractual requirements and exceeds/exceeded some to the Customer’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets/met contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear to be or were satisfactory.
Marginal
Performance does not/did not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet or did not identify corrective actions.
Unsatisfactory
Performance does not/did not meet most contractual requirements and if currently being performed, recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor's corrective actions appear or were ineffective.

File details come from the government source that posted it. Updated .