Attachment_H_OVERSIGHT_AND_METRICS.pdf

PDF 32 KB Posted

Attached to
Operation & Maintenance of T-AGS Vessels
Solicitation number
N32205-16-R-3100
Issued by

About this file

Attachment H Oversight and Metrics

View the file

Other files

File Type Posted
Forms_A_thru_D-2_TAGS_Rev_4.xlsx XLSX spreadsheet
Amend_7.pdf PDF
RFP_N3220516R3100_Amend_6.pdf PDF
RFP_N3220516R3100_Amend_6_Conformed.pdf PDF
Forms_A_thru_D-2_TAGS_Rev_3.xlsx XLSX spreadsheet
QA7_TAGS_RFP_16R3100.pdf PDF
Attachment_M_-_PP_Questionnaire.doc DOC document
Attachment_K_Past_Performance_Narrative_Rev-1.docx DOCX document
Attach_F-7_WATERS_T-AGS_45_GFP.xlsx XLSX spreadsheet
Attach_F-4_HEEZEN_T-AGS_64_GFP.pdf PDF
Attach_F-2_BOWDITCH_T-AGS_62_GFP.pdf PDF
Attach_F-1_PATHFINDER_T-AGS_60_GFP.pdf PDF
Attach_F-5_MARY_SEARS_T-AGS_65_GFP.pdf PDF
Attach_F-3_HENSON_T-AGS_63_GFP.pdf PDF
Attach_F-6_MAURY_T-AGS_66_GFP.pdf PDF
16R3100_Amend_5.pdf PDF
QA6_TAGS_RFP_16R3100.pdf PDF
16R3100_Amend_5_Conformed.pdf PDF
Forms_A_thru_D-2_TAGS_Rev_2.xlsx XLSX spreadsheet
N32205-16-R-3100_Amend_4_FBO.pdf PDF
QA5_TAGS_RFP_16R3100.pdf PDF
N32205-16-R-3100_Amend_3.doc DOC document
QA4_TAGS_RFP_16R3100.pdf PDF
QA3_TAGS_RFP_16R3100.pdf PDF
Attachment_B-4_WD_CBA-2016-8779_MEBA.pdf PDF
Attachment_B-3_WD_CBA-2016-8778_SIUPD.pdf PDF
16-R-3100_Conformed_thru_Amend_0002.doc DOC document
Attachment_B-2_WD_CBA-2016-8436_TAGS_SIU.pdf PDF
Attachment_B-5_WD_CBA-2016-8780_MMP.pdf PDF
N32205-16-R-3100_Amend_0002.doc DOC document
QA2_TAGS_RFP_16R3100.pdf PDF
N32205-16-R-3100_Amend_1.doc DOC document
QA1_TAGS_RFP_16R3100.pdf PDF
Attachment_J_-_MECSP_Worksheet.doc DOC document
Attachment_K_Past_Performance_Narrative.docx DOCX document
Attachment_L_Award-Fee_Plan_T-AGS_030916.doc DOC document
N32205-16-R-3100.doc DOC document
ATTACHMENT_D_P I_Guidelines.pdf PDF
Attachment_C_DD_254_TAGS.pdf PDF
Attachment_G_-_SF_LLL.pdf PDF
Forms_A_thru_D-2_TAGS.xlsx XLSX spreadsheet
ATTACHMENT_I_Inv_Req.pdf PDF
Attachment_B-1_WD_CBA-2016-8437_FBO.PDF PDF
Attachment_A_TECH_MANUAL.pdf PDF
Attachment_E_HullClauses2009.pdf PDF
Attachment_A_TECH_MANUAL_Draft.pdf PDF
N32205-16-R-3100_TAGS_Draft_RFP_040616.pdf PDF
16-R-3100_Sections_L M_draft.pdf PDF
16-R-3100_Draft_PWS_Rev_1.pdf PDF
Safety_Tradeoff_TAGS.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERSIGHT AND METRICS

In successfully providing these services to the Fleets, there are two basic performance requirements for MSC’s ships: 1) keep the vessel in a readiness state that allows it to perform any mission assigned to it by the Fleet Commander, and 2) perform assigned missions.

Accordingly, in measuring the extent to which a contractor meets the Performance Work Statement, MSC monitors and measures both the condition/readiness of the vessel, and the performance of specific missions/tasks.

MSC will routinely conduct Onboard Condition Inspections (OCI) (normally conducted annually) to monitor performance elements through ship visits and site audits as outlined in the Performance Work Statement.

On an annual basis, the contractor’s performance will be evaluated for its Contractor Performance Assessment Reporting System (CPARS) rating. This evaluation will use, primarily, the metrics below. The results of these metrics will be communicated to the contractor as part of contract administration and any discrepancies or issues will be addressed using the contract remedies available.

Requirements Metric Cost: The metric will be used to manage expenses within established ship operating budgets.

Differences between expected/budgeted and actual costs.

Schedule/Performance: This metric will be used to determine MSC primary output of Ships Ready for Tasking (RFT), the key indicator of MSC readiness. COMSC is responsible to deliver MSC ships Ready for Tasking and to maintain this readiness during operational fleet time.

The RFT metric is a cumulative total of calendar days that a ship is deemed Ready for Tasking (RFT) or Not ready for Tasking (NRFT) in the preceding rolling 12 month period compared to an accepted baseline.

Inspection: This metric will track planned maintenance against performed maintenance, supplemented by periodic inspections of actual vessel condition.

The difference between SAMM System planned maintenance completion levels for ships and actual completion levels. MSC will track findings of annual vessel condition inspections to identify degraded or poor vessel condition and the operating contractor’s corrective action.

Manning & Training: This metric will be used to ensure fully trained mariners are aboard ship in accordance with the Performance Work Statement.

Difference between offered/required mariner shipboard billets versus those that are currently embarked.

File details come from the government source that posted it. Updated .