0901_A_DOCKING AND UNDOCKING New.docx

DOCX document 691 KB Posted

Attached to
USNS GRAPPLE Rudder Dry Dock Federal contract opportunity
Solicitation number
N32205-15-R-4008
Issued by
Department of the Navy Military Sealift Command

About this file

WI 901

View the file

Other files for this federal contract opportunity

Other files attached to USNS GRAPPLE Rudder Dry Dock, newest first.
File Type Posted
N32205-15-R-4008-0001.doc DOC document
Attachment J - 13 Past Performance Questionnaire.docx DOCX document
0030_B_CONTINUATION OF SERVICES.docx DOCX document
0001_NSP_INTENT SCOPE GEN REQUIREMENTS DEFINITIONS.docx DOCX document
Attachment J - 4 GFM List.docx DOCX document
0005_NSP_ELECTRICAL SAFETY PROCEDURE REQUIREMENTS.docx DOCX document
0003_NSP_ APPROACH BERTH AND MOORING.docx DOCX document
Attachment J - 9 Disclosure of Lobbying Activities SF-LLL.docx DOCX document
Emergent Rudder Repairs Work Item Index.docx DOCX document
Attachment J - 10 Interport Differential.docx DOCX document
0011_A_GENERAL SERVICES FOR SHIP T ARS.docx DOCX document
0404_A_SPEED LOG REPLACEMENT Final.doc DOC document
0020_A_GAS FREE CERTIFICATES.docx DOCX document
908_A_STBD Rudder and Rudder Stock Renewal Rev A.doc DOC document
0010_A_FURNISH OFFICE FOR OMT.docx DOCX document
0022_A_DOCK TRIALS AND SEA TRIALS.docx DOCX document
Attachment J - 3 Category B Work Items.xlsx XLSX spreadsheet
0002_NSP_TECHNICAL REPRESENTATIVES.docx DOCX document
N32205-15-R-4008.doc DOC document
Attachment J - 8 Request for Spec Clarification.docx DOCX document
Attachment J - 2 Category A Work Items.xlsx XLSX spreadsheet
Attachment J - 7 MSC Ship Repair Facility Survey.docx DOCX document
Attachment J - 14 Technical Data Non-Disclosure.docx DOCX document
0016_A_FIRE PROTECTION AND SHIPS SAFETY PROGRAM.docx DOCX document
Attachment J - 11 Dry Dock Evaluation Form.docx DOCX document
0024_N_Physical Security at Private Contractor's Facility REV 22 NOV 2013.doc DOC document
902 Additional Days in Dry Dock.doc DOC document
0006_NSP_HEAVY WEATHER PLAN.docx DOCX document
0021_A_Clean Gas Free Tanks.docx DOCX document
0018_A_DELIVERY AND REDELIVERY.docx DOCX document
Attachment J - 12 Past Performance Data.docx DOCX document
0004_NSP_TESTING AND QUALITY ASSURANCE.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS GRAPPLE

(T-ARS 53)

DRYDOCKING AND UNDOCKINGN32205-15-R-4008
ITEM NO. 901CATEGORY “A”16 June 2015
DRY-DOCKING AND UNDOCKINGMSC/WTB
1.0ABSTRACT:
1.1This item describes the requirement to dock/undock the vessel and to accomplish repairs as specified elsewhere in these Specifications. The vessel shall be dry-docked at the Contractor’s facility.
2.0REFERENCES/ENCLOSURES:
2.1References
2.1.1COMSC Instruction 9997.1A, Dry dock Standards for MSC Ship Availabilities
2.1.2Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships, MIL-STD 1625C(SH)
2.1.3MSC Drawing 801-5763331 REV D, ARS-53 Docking Drawing.
2.1.4MSC Drawing 801-5763485, ARS-50 Tank Capacity Curves.
2.1.5MSC Drawing 845-8194008, Trim & Stability Booklet.
2.2Enclosures
2.2.1Docking Report, Forms NAVSEA 9997/1, 2, 3 and 4
2.2.2Definitions
3.0ITEM LOCATION/DESCRIPTION:
3.1Vessel Principal Characteristics:

USNS SAFEGUARD (T-ARS 50)

LENGTH OVERALL
255 FT.
BREADTH MOLDED
51 FT.
DRAFT (Summer Loadline)
17 FT.
FULL LOAD DISPLACEMENT
3,300 LT
4.0GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0NOTES:
5.1The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7 and 29.
5.2The contractor and all subcontractors, regardless of tier, are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3The Contractor shall schedule dry-docking of the vessel during the availability dates such that all dry dock work, plus an additional 15% of emergent dry dock necessary work can be accomplished, and the vessel will be undocked in a timely manner to allow the Ship’s force to light off and stabilize the machinery plant. This will enable the Dock Trials and Sea Trials to be conducted in accordance with Work Item 022, entitled “Dock Trials and Sea Trials,” as outlined in this Specification.
6.0QUALITY ASSURANCE REQUIREMENTS: None additional
7.0STATEMENT OF WORK REQUIRED:
7.1Arrangement/Outfitting
7.1.1The Contractor shall provide a single section steel or concrete floating dock, marine railway or graving dock certified in accordance with Reference 2.1.1. The dry dock must be certified to lift the vessel according to approved stability and docking calculations, as provided by the Contractor per the requirements of paras 7.1.5 through 7.1.7. A copy of the Certificate must be submitted with the Proposal, as well as be available for inspection by the MSCREP during the performance period. The Certificate shall show Issuing Party, Docking facility name (i.e. Shipyard), specific name or number of the dock, issue date, expiration date, maximum lift capacity, maximum allowable keel line loading and any restrictions or exceptions for operation of the dock. If certificate is issued by a third party per Reference 2.1.1, the party shall be specifically identified, the document shall be signed by a Professional Engineer representing the certifying third party and that individual shall stamp or emboss the certificate with their personal stamp or seal.
7.1.1.1Dock length overall is to be greater than the vessel’s LOA, regardless of type of dock used. Exception to this requirement will be considered on a case by case basis by the MSCREP during the bid phase.
7.1.2The Contractor shall provide all labor, material, equipment and services to dock/undock the vessel.
7.1.3Provide the services of a Dockmaster who has been certified in accordance with Reference 2.1.2 and accepted by the MSCREP. Documentation of Dockmaster certification shall be provided as part of the offeror’s submittal. In lieu of Reference 2.1.2 certification, Dockmaster’s training and past dry-docking experience shall be provided.
7.1.4Contractor shall erect, set and align blocks in Position No. One (1) in accordance with Reference 2.1.3.
7.1.4.1Position blocking to ensure that propeller, rudder, and other equipment residing on the surface of or protruding from the hull will not be damaged and will be accessible for removal and repair. Remove and/or shift blocks as required to accomplish work required by other work items and to permit examination of all tank’s drain plugs, transducers and other underwater hull appendages by the ABS Surveyor and MSCREP.
7.1.4.2Provide at least 5 feet of clearance between the vessel’s keel and the dry dock floor. Provide at least 5 feet of clearance on each side of the vessel to allow performance of dry dock work. Exceptions to these clearance requirements will be considered on a case by case basis by the MSCREP during the bid phase.
7.1.4.3Blocking shall be constructed of hardwood or composite concrete/hardwood and softwood caps as specified in Reference 2.1.3 with at least two (2) inches of softwood cap thickness. All softwood caps shall be installed pre-shaped to fit the hull in accordance with Reference 2.1.3.
7.1.4.4Crib and brace blocking as required by Reference 2.1.3.
7.1.5Contractor proposals (or requests) to modify or deviate from the blocking arrangements specified by Reference 2.1.3 shall be submitted to the MSCREP, in writing, no later than fourteen (14) calendar days prior to the scheduled dry-docking. The proposal shall describe all intended modifications or deviations from Reference 2.1.3 and all technical data (i.e. proposed docking plan, table of offsets, block details, etc.) necessary to evaluate the results of the proposed modification. Permission in writing from the MSCREP is required prior to modifying the blocking arrangement specified in Reference 2.1.3.
7.1.5.1All proposed modifications and deviations shall include supporting calculations which substantiate the block loading pressures are within the following maximum values:
Side blocks – 800 psi
Keel blocks – 370 psi
Knuckle block(s) with hardwood caps – 600 psi
NOTE: For narrow skegs or bar keels, or where knuckle load is in excess of 600psi, a minimum 40.8# plate steel cap shall be used.
7.1.5.2All blocks shall land on longitudinal strength members or main transverse bulkheads.
7.1.6The Contractor is responsible for developing a suitable loading condition as well as the preparation of the vessel into this loading condition.
7.1.6.1The Contractor may add, transfer or remove solid and/or liquid loads (i.e. concrete blocks, fuel oil, water ballast) as required to achieve proper trim and stability conditions for dry-docking and undocking.

a) The Contractor shall remove and/or transfer ballast and fuel as required to accomplish other work items, while continuing to meet the requirements of paras 7.1.5 and 7.1.7.

7.1.6.2Clean storage and return of fuel oil removed for dry-docking is the responsibility of the Contractor and shall be accomplished as described in Work Item 0021, para 7.3, 7.4 & 7.5.
7.1.6.3Disposal of any water ballast used in connection with this work item is the responsibility of the Contractor and shall be accomplished at no additional cost to the government.
7.1.6.4The Contractor shall take care not to contaminate clean tanks or interchange tank contents.
7.1.6.5Ship’s Force personnel and Ship’s equipment shall not be used for transferring liquids.
7.1.7For all docking evolutions, submit to MSCREP for approval, fourteen (14) calendar days prior to docking and seven (7) calendar days prior to undocking, to make applicable stability calculations using information from refs 2.1.4 and 2.1.5 as necessary.
7.1.7.1Stability calculations shall determine draft at instability and ensure adequate stability throughout all phases of the docking evolution. If in a floating dock, stability of the combination of vessel and dock shall be analyzed as well.
7.1.7.2Provide maximum trim calculations. If vessel is to be docked in a floating dry dock and the trim will be matched during docking, or if trim is less than any maximum trim listed on Reference 2.1.3, calculations are not required.
7.1.7.3Obtain tank soundings from the Ship’s Master and Chief Engineer. Confirm the soundings obtained. Determine the ballast required to place the vessel in the trim and stability condition specified by paragraph 7.1.7.1.
7.1.7.4Calculations shall be provided showing that vessel loading will not exceed allowable keel line loads as indicated on Dry dock certificate.
7.1.7.5Calculations shall also analyze the effect on the dock of all work to be accomplished while on dock and show that keel line loads on dock will not, at any time, exceed the dock allowables indicated on the Dry dock certificate.
7.1.7.6For a floating dock, a pumping plan in accordance with Reference 2.1.2 shall be submitted to the MSCREP.
7.1.8Provide tugs, and pilots, for the complete transfer, dry-docking and undocking of the ship. The number of tugs is to be as agreed to by the ship's Master at the dry-docking/undocking conferences. At least one tug capable of maneuvering vessel shall remain on standby until vessel is hard on the blocks.
7.1.8.1Mooring lines used in the transfer, drydocking and undocking of the vessel shall be provided by the contractor. Lines shall be in good condition, free of excessive wear, fraying, abrasions, compressions, hockles or bird-caging.
7.1.9The Contractor shall provide the services of qualified divers during the docking operation to inspect and assist in alignment of the vessel for proper placement. Divers shall not be utilized as the primary means to determine vessel position or to monitor vessel position while dewatering.
7.1.10Conduct a docking/undocking conference 24 hours prior to docking/undocking of the vessel. The conference will be attended by Ships Force and MSCREP Project Office personnel. The Contractor’s Dockmaster and supervisory personnel concerned with the docking/undocking evolution shall attend the conference.
7.1.10.1Immediately prior to Dry-docking Conference, the Contractor’s Dockmaster shall furnish to the MSCREPs a written summary of the following conditions/information:

a) Tidal conditions including time high, low and slack tides

b) A minimum clearance of 12 inches of water between vessel’s keel and blocks during the docking evolution shall be maintained until vessel is properly centered and dewatering/deballasting has commenced.

c) Arrangements for Tugs and pilots, criteria for tug release after vessel positioning.

d) Assistance required from Ship’s force

e) Line handling arrangement, methods of centering vessel, use of divers.

f) Electrical grounding arrangement, when to transfer from ship to shore power, use of EDG, etc.

g) Communications arrangement between Dockmaster, Ship’s Master, Ship’s force, Tugs’ pilots and MSCREP during the docking/undocking evolution

h) Weather forecast for time of docking, criteria for postponing/suspending docking evolution due to weather conditions. Include go/no go criteria for postponing the docking evolution.

i) Any other pertinent and/or unusual conditions/factors affecting the docking/undocking evolution

j) Operating practices, safety requirements and shipyard security plans, including but not limited to: fire alarm locations, emergency power, emergency ballast dewatering pumps.

k) Calculated list, trim and drafts of the vessel during docking, including required docking draft, draft at instability, draft at landing and when side blocks are to hauled (if applicable).

l) Any special precautions or actions characteristic to the docking facility, docked vessel, or a combination of the two.

m) Schedule of events, including block inspection and milestones of the docking evolution, i.e. sill crossing, landing, connect shore power, etc.

n) Listing of temporary services/hookups.

7.1.11The Dockmaster and the MSCREP shall conduct a final inspection of blocking prior to flooding the dry dock. Provide inspection documentation showing relationship of blocking locations to sighting marks on dock coping, spacing, offsets, heights and shaping. Inform the MSCREP a minimum of 8 hours before starting the inspection. Contractor shall ensure that the blocks are properly set to clear plugs, openings and protrusions such as the underwater log, fathometer, docking plugs, etc. All measuring devices (tapes, rules, etc) required to conduct this inspection are to be provided by the Contractor. Any delay to docking schedule as a result of a failed block inspection is the responsibility of the Contractor.
7.1.12Contractor shall retain control of the vessel in the centered position during the entire dewatering/deballasting evolution, as well as during flooding/ballasting operations while undocking to prevent damage to the vessel.
7.1.13Once the vessel is on the blocks, but still waterborne, electrically connect the hull to connection points at the bow and stern, using minimum 1,000,000 circular Mils cables and ground connection in dry dock for protection against lightning and other static charges. The static ground leads shall be connected to the vessel before any Shore Power cables are energized.
7.1.14Immediately after the vessel is dry-docked, inspect the fit on all blocks and provide necessary shimming between blocking and hull as a precaution against hull movement that may occur when ballast is removed or when the vessel’s loads are shifted. In the presence of the MSCREP, take soundings and record all readings of ballast, fuel oil, lube oil, oily waste and potable water tanks.
7.1.14.1If the vessel is found to be off the centerline on the keel blocks more than six (6) inches, the Contractor shall re-dock the vessel and place the vessel on centerline position at no additional cost to the government.
7.1.15After the vessel is dry-docked and the hull still wet, the Contractor shall wash down the vessel’s underwater hull, fittings, rudders, propellers and propulsion shafts with clean fresh water at minimum pressure of 2,500 PSI to assure the removal of dirt, slime, marine growth & fouling and other foreign substances.
7.1.15.1Upon completion of the high-pressure water wash, the entire deck/basin of the dry dock shall be water washed or cleaned to remove silt, mud and debris which may have accumulated during docking. Cleaning should be accomplished before any repair work takes place to prevent potential contamination of the river silt, mud and debris.
7.1.15.2Any and all costs to collect, treat and dispose of hull and dock wash waste water and associated debris shall be included in this work item.
7.1.15.3The Contractor shall provide temporary services and equipment; such as lighting, staging and a man lift (with operator), in order to assist the MSCREP, Inspectors/Surveyors and U.S. Government technical consultants in the inspection of the underwater hull and freeboard.
7.1.16Contractor shall perform all required work to properly care for and protect rudder stock bearing gland, propeller root blade flanges, propeller hub, and shaft seals from contamination by grit, paint, dirt and other contaminants.
7.1.17When required, the Contractor is responsible for the removal of underwater hull drain plugs and openings and providing a numbering system to account any temporary plugs inserted into the underwater hull penetrations. All temporary and removed drain plugs openings and hull penetrations shall be replaced and restored to watertight integrity condition prior to undocking. The Contractor shall properly document and identify all drain plugs; openings and hull penetrations removed and submit a complete written report to the MSCREP. This report shall identify each drain plug, opening or hull penetration removed by size, type of service, location, and compartment number and compartment description.
7.1.18Contractor shall assure the vessel is safely maintained while in dry dock. The Contractor shall maintain the vessel’s watertight integrity while the vessel is in dry dock to the maximum extent possible. When an area of shell plating removal makes temporary closure impracticable, the Contractor shall secure each vulnerable compartment in order to minimize potential damage to the extent permitted by the scope and urgency of the work.
7.1.19Undock the vessel at a date and time mutually agreed upon by the MSCREP and the Contractor. Before undocking the vessel, ensure that the dry dock is free of all debris, blasting material and that all sea valves, shaft seals and other hull penetrations below full load draft are proven watertight by high pressure fresh water hose testing or other means acceptable by the MSCREP.
7.1.20Prior to flooding of the dry dock for the undocking evolution, the Contractor and his supervisory personnel, together with the MSCREP and Ship’s Force, shall conduct a final inspection of the vessel to ensure that watertight integrity conditions are satisfied.
7.1.20.1Just prior to flooding dry dock accomplish an inspection with the MSCREP to ensure the dry dock basin is free of all equipment, material, debris, blasting material, all underwater openings are clear, drain plugs installed, strainer gates/guards are installed and all hardware properly secured.
7.1.21After completing all work and receiving approval, re-float the vessel. Flooding of the dry dock shall commence only when approved by the MSCREP and immediately after Paragraphs 7.1.19 and 7.1.20 have been completed and satisfied. Start the flooding; and stop the flooding of the dry dock after the hull penetrations are submerged, but before the vessel lifts off the blocks. Contractor shall visually inspect interior hull and hull penetrations below the water level with MSCREP to ensure the watertight integrity of the vessel. Flooding shall continue once watertight integrity is verified.
7.1.21.1 In the event leaks are found during the watertight integrity tests, the contractor shall be responsible to cease undocking operations and to restore conditions suitable to accomplish permanent repairs. Undocking may not continue until the MSCREP is satisfied that the leak(s) have been corrected.
7.2Structural: None Additional
7.3Mechanical/Fluids: None Additional
7.4Electrical: None Additional
7.5Electronics: None Additional
7.6Preparation of Drawings/Documents
7.6.1For modified blocking arrangements as approved per Para 7.1.5 of this Work Item, the Contractor shall prepare a shipyard specific Blocking Plan reflecting the approved modifications and changes. This drawing is NOT to have a NAVSEA drawing number as it is a one-time variation to the MSC Docking Plan provided as Reference 2.1.2. Drawings shall be prepared using Autocad Version 2004 or later with an electronic copy submitted to the MSCREP. Drawing shall be entitled:

USNS GRAPPLE

Modified Docking Plan for ______________ Shipyard Docking Dates: ______________

7.6.2The Contractor shall prepare and provide the MSCREP with three (3) completed legible copies of Enclosure (1).
7.7Inspection/Test: None Additional
7.8Painting: None Additional
7.9Marking: None Additional
7.10Manufacturer’s Representative: None Additional
8.0GENERAL REQUIREMENTS:
8.1The term “hardwood” for the purpose of this Specification includes the following type of woods: White Oak, California Laurel, Oregon Myrtle, Iron Bark, Blue Gum, American Rock Elm or Preserved Red Oak.

8.2 Blocks showing evidence of excessive crushing, warping, cracking, rotting or damage from dogging and unequal shrinkage or deterioration to an extent of no longer being capable of supporting a prescribed load over full bearing areas are not acceptable and must be replaced.

8.3 The term “softwood” for the purpose of this Specification includes the following type of woods: Douglas Fir, Tamarack, Long Leaf Pine, Yellow Pine or Hemlock.

ENCLOSURES:

ENCLOSURE 2.2.1

ENCLOSURE 2.2.2

901-1 image2.emf

Definitions image1.emf

DOCKING REPORT navsea 9997-1,2,3,&4

Multiple files are bound together in this PDF Package.

Adobe recommends using Adobe Reader or Adobe Acrobat version 8 or later to work with documents contained within a PDF Package. By updating to the latest version, you’ll enjoy the following benefits:

• Efficient, integrated PDF viewing

• Easy printing

• Quick searches

Don’t have the latest version of Adobe Reader?

Click here to download the latest version of Adobe Reader

If you already have Adobe Reader 8, click a file in this PDF Package to view it.

http://www.adobe.com/products/acrobat/readstep2.html

DOCKING REPORT

PROPELLER DETACHABLE BLADE NAVSEA RPT. 9997-2

NAVSEA 9997/3 (11-77)(FRONT) (FORMERLY NAVSHIPS 9070/3) S/N 0116-LF-099-9710

SUPPLEMENTARY SHEET(A). DOCKING REPORT, PROPELLERS, BLADES OF DETACHABLE BLADE PROPELLERS.

NOTES

1. LIST BLADE DATA ON REVERSE SIDE.

2. DETAILED REPORT WHEN NECESSARY ON CONDITION AND REPARIS TO BE ENTERED IN REMARKS COLUMN ON REVERSE SIDE OF THIS

SHEET, SUPPLEMENTED AS NECESSARY WITH SKETCHES AND PHOTOGRAPHS.

BLADE

AS

FOUND

REPLACED

SHAFT

OUTBOARD NO. 1

OUTBOARD NO. 1 INBOARD NO. 2

PORT

INBOARD NO. 3 OUTBOARD NO. 4

CENTER

REPORTING ACTIVITY

U.S.S.

SERIAL NO. 1

TYPE MATERIAL

CONDITION 2

REPAIRS 2

DOCKING REPORT

SHAFTS, BEARINGS, FAIRWATERS

ROPEGUARDS AND STERN TUBE SEALS

DOCKING DATENAVSEA 9997/4 (11-77) (FORMERLY NAVSHIPS 9070/4)

TO BE SUBMITTED BY ALL SHIPYARDS AND STATIONS WHEN REPAIR OR REPLACEMENTS ARE MADE OR WHEN

CORROSION OR WEAR IS EXTENSIVE OR SEVERE.

PROPELLER

NUT & THREAD

SYMBOLS

CONDITION & WORK DONE

C CRACKS

G GOOD CONDITION

L LOOSE

M MISSING

O OTHER - (SPECIFY)

S SCORED

CO CORRODED

RA REPAIRED

RL REPLACED - INDICATE NEW

MATL. UNDER REMARKS

WO WORN

BEARING MATERIAL

O OTHER - (SPECIFY)

W WOOD

PP PHENOLIC PLASTIC

RF RUBBER FACED

PACKING MATERIAL

F FLAX

R RAMIE

SM SEMI-METALLIC

SHAFT COVERING MATERIAL

BC BRUSH COAT RUBBER

CB CONTINUOUS BRONZE LINER

SC SHEET RUBBER (COLD BOND)

SH SHEET RUBBER (HEAT VULC)

USE ONE OF THESE SHEETS FOR

EACH LINE OF SHAFTING.

INDICATE THE LINE OF SHAFTING

TO WHICH THIS SHEET IS

APPLICABLE, I.E.:

No. 1. Stbd. outbd., Stbd., or center.

2. Stbd. inbd., or Port.

3. Port inbd.

4. Port outbd.

C O

U P

LIN

G

F

A

IR

W

T E

R S

IN

PROP TAPER

PROP KEY

BEARING

CEARANCE

B

M

D

N

IT

IO

IA

L

(T . I. R

IC

LE

K

IT

H : F

LE

K

V

IR

SEAL

CLEARANCES

STUFFING

BOX

GLAND

JO

LS

L O L

L A

Y

(S

LY

STUFFING BOX

GLAND

NAME, CLASS AND NUMBER OF VESSEL SIGNATURE

S/N 0102-LF-006-1500

File details come from the government source that posted it. Updated .