0002_NSP_TECHNICAL REPRESENTATIVES.docx

DOCX document 24 KB Posted

Attached to
USNS GRAPPLE Rudder Dry Dock Federal contract opportunity
Solicitation number
N32205-15-R-4008
Issued by
Department of the Navy Military Sealift Command

About this file

WI 2

View the file

Other files for this federal contract opportunity

Other files attached to USNS GRAPPLE Rudder Dry Dock, newest first.
File Type Posted
N32205-15-R-4008-0001.doc DOC document
Attachment J - 13 Past Performance Questionnaire.docx DOCX document
0030_B_CONTINUATION OF SERVICES.docx DOCX document
0001_NSP_INTENT SCOPE GEN REQUIREMENTS DEFINITIONS.docx DOCX document
Attachment J - 4 GFM List.docx DOCX document
0005_NSP_ELECTRICAL SAFETY PROCEDURE REQUIREMENTS.docx DOCX document
0003_NSP_ APPROACH BERTH AND MOORING.docx DOCX document
Attachment J - 9 Disclosure of Lobbying Activities SF-LLL.docx DOCX document
Attachment J - 11 Dry Dock Evaluation Form.docx DOCX document
0024_N_Physical Security at Private Contractor's Facility REV 22 NOV 2013.doc DOC document
902 Additional Days in Dry Dock.doc DOC document
0006_NSP_HEAVY WEATHER PLAN.docx DOCX document
0021_A_Clean Gas Free Tanks.docx DOCX document
0018_A_DELIVERY AND REDELIVERY.docx DOCX document
Attachment J - 12 Past Performance Data.docx DOCX document
0004_NSP_TESTING AND QUALITY ASSURANCE.docx DOCX document
0022_A_DOCK TRIALS AND SEA TRIALS.docx DOCX document
Attachment J - 3 Category B Work Items.xlsx XLSX spreadsheet
N32205-15-R-4008.doc DOC document
Attachment J - 8 Request for Spec Clarification.docx DOCX document
Attachment J - 2 Category A Work Items.xlsx XLSX spreadsheet
Attachment J - 7 MSC Ship Repair Facility Survey.docx DOCX document
Attachment J - 14 Technical Data Non-Disclosure.docx DOCX document
0901_A_DOCKING AND UNDOCKING New.docx DOCX document
0016_A_FIRE PROTECTION AND SHIPS SAFETY PROGRAM.docx DOCX document
Emergent Rudder Repairs Work Item Index.docx DOCX document
Attachment J - 10 Interport Differential.docx DOCX document
0011_A_GENERAL SERVICES FOR SHIP T ARS.docx DOCX document
0404_A_SPEED LOG REPLACEMENT Final.doc DOC document
0020_A_GAS FREE CERTIFICATES.docx DOCX document
908_A_STBD Rudder and Rudder Stock Renewal Rev A.doc DOC document
0010_A_FURNISH OFFICE FOR OMT.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS GRAPPLE

(T-ARS 53)
GENERAL SERVICE & REQUIREMENTSN32205-15-R-4008
ITEM NO. 002CATEGORY “N”4 JUNE 2012
TECHNICAL REPRESENTATIVESMSC/N43D/WTB

1.0 ABSTRACT

1.1 This item sets general requirements for Technical and Manufacturer’s Representatives.

2.0 REFERENCES: None

3.0 ITEM LOCATION/DESCRIPTION:

3.1 As contained within the individual work items.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 None

5.0 NOTES:

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) item 024, to determine applicability to this item. In performance of work items in this package, the contractor and all subcontractors regardless of tier must comply with the requirements of GTR 024, where specified in an individual work item.

5.2 The work item(s) specification(s) contained in the solicitation may indicate or may not indicate that Government Furnished Technical Representative(s) will be on site. Without regard to GFS technical representatives being identified in the work item(s) specification(s) these requirements shall apply.

5.3 For the purpose of this solicitation, the terms “Manufacturer’s Representative”, “Technical Representative”, “Tech Rep”, or any variant thereof shall be construed to be synonymous.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 As contained within the individual work items.

7.0 STATEMENT OF WORK

7.1 The work item(s) specification(s) contained in the solicitation may require the Offeror to furnish Technical Representatives, or may indicate or may not indicate that Government Furnished Technical Representative(s) will be on site. When any such instances are indicated in the work item(s) specification(s) the following shall apply.

7.2 CONTRACTOR FURNISHED TECHNICAL REPRESENTATIVES:

7.2.1 The Contractor shall furnish the services only of an original equipment manufacturer's (OEM.), OEM authorized, or MSC approved qualified independent technical representative(s).

7.2.1.1 The Contractor, in order to obtain MSC approval for an OEM authorized technical representative shall provide a copy of a valid manufacturer's authorization letter with date of issue, name, address, and telephone number for verification.

7.2.2 The Tech Reps are to be on site at all times whenever the following evolutions are performed to specified equipment or systems: disconnection, removal, opening, disassembly inspection, taking of clearance readings, static and dynamic balancing tests and adjustments, reassembly, shop tests, reinstallation, operating tests, dock trials, and sea trials.

7.2.3 The Tech Rep shall witness all of the above identified tasks and shall prepare all reports of design, as found and final reassembly dimensions and clearances, shop test, operational test, dock trial and sea trial results.

7.2.4 The Tech Rep shall witness and sign all reports attesting to his presence and witnessing of the test and concurring with the results for all tests performed by the contractor or other subcontractors.

7.2.5 The Tech Rep shall report his presence on site daily to the MSCREP, at the start of the work day.

7.2.6 One copy of all Tech Rep time sheets, signed by the Contractor's Project Manager, shall be provided to the MSCREP each week as proof of the Tech Reps presence on site.

7.2.7 The Contractor shall be prepared to submit a list of all technical representatives (by manufacturer name), intended to be employed during the contract performance period to MSC as part of the proposal submitted in response to this solicitation.

7.2.8 The MSCREP may reject a Tech Rep for failure to provide an authorization letter or verifiable proof of competence.

7.2.9 The Contractor, in order to obtain approval for an independent Tech Rep shall provide copies of traceable past employment history and certificates of training. The MSCREP may reject an independent Tech Rep for unsatisfactory qualification proof.

7.2.10 No work on any work item requiring a technical representative shall start until the MSCREP approves the Tech Rep for that item and the Tech Rep is on site.

7.3 GOVERNMENT FURNISHED TECHNICAL REPRESENTATIVES:

7.3.1 The Government may furnish the services of a manufacturer's, manufacturer's authorized (or equal) technical representative to be on site at the ship repair facility at required times during repairs to the specified equipment of systems.

7.4 In the event that the contractor indicates either through written correspondence or the contractor’s production schedule that the Government’s technical representative is required to be on-site to support a production element, and subsequently fails to start the subject work item on time, the MSCREP will issue a PSDPN (Production Schedule Delinquent Progress Notice) in accordance with work item 013 of this work package. PSDPNs found to be the result of contractor delinquencies that affect the presence of a Government furnished technical representative will result in actions to recoup the additional costs for the subject Government furnished technical representative.

7.4.1 The Contractor shall coordinate and reiterate the Production Schedule dates for when the Government Tech Rep is to be on site via the MSCREP in writing seven (7) calendar days in advance of the work item's start.

8.0 GENERAL REQUIREMENTS: None Additional