About this file

This document contains a federal contract opportunity and related file. The federal contract opportunity is a solicitation for Range Operations Support and Base Operations Support Services at the Pacific Missile Range Facility. Naval Supply Systems Command Fleet Logistics Center Pearl Harbor intends to issue a request for proposal for operations and sustainment services at Pacific Missile Range Facility Barking Sands, Kekaha, Island of Kauai, Hawaii. The services include all aspects of operations and maintenance for radar, optics, safety systems, displays, communications, facilities, and real property. The government will award an indefinite-delivery, indefinite-quantity contract for one 5-year base period and one 5-year option period, consisting of firm fixed price, cost plus incentive fee, and cost reimbursement contract line items. This is a 100% small business set-aside for 8(a) participants under NAICS code 561210 with a size standard of $38.5 million. The related file contains coefficient ceilings and pricing information for the proposal.

J-H12-01(Revised).xlsx

View the file

Other files for this federal contract opportunity

Other files attached to Range Operations Support and Base Operations Support Services at the Pacific Missile Range Facility, newest first.
File Type Posted
J-L06-05_ProposalTeamRoster.xlsx XLSX spreadsheet
0014.pdf PDF
0011.zip ZIP file
0011.zip ZIP file
N0060417R30050012.pdf PDF
J-H13-10_Updates.pdf PDF
N0060417R3005_Conformed-0012.pdf PDF
0013.pdf PDF
N0060417R30050010.pdf PDF
0009.zip ZIP file
0008.zip ZIP file
0007.pdf PDF
0006.zip ZIP file
0005.zip ZIP file
J-FA1-20_dd0254.pdf PDF
N0060417R30050004.pdf PDF
Site_Visit_Script.pdf PDF
PreProposalBrief.pdf PDF
J-L06-01(PPQ).docx DOCX document
N0060417R30050003.pdf PDF
J-4-SPF-03.pdf PDF
J-L02-01.pdf PDF
J-L04-01_Questions-Answers.pdf PDF
N0060417R30050002.pdf PDF
N0060417R30050001.pdf PDF
N0060417R3005_PWS_PMRF(DRAFT).pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-H12-01

J-H12-01 COEFFICIENT CEILINGS

LOCATION-BASED COEFFICIENTS (PART 1)
LOCATIONWORKING HOURSBASE PERIOD COEFFICIENT CEILINGSOPTION PERIOD COEFFICIENT CEILINGS
CONSTRUCTIONSERVICECONSTRUCTIONSERVICE
Barking Sands and Kamokala Special Areas (BS and EA)Standard1.001.001.001.00
Non-standard1.001.001.001.00
Special Area Makaha Ridge (FA)Standard1.001.001.001.00
Non-standard1.001.001.001.00
Special Area Kokee (IA)Standard1.001.001.001.00
Non-standard1.001.001.001.00
Special Area Port Allen (CA)Standard1.001.001.001.00
Non-standard1.001.001.001.00
TIERED PRICING COEFFICIENTS (PART 2)
COEFFICIENT CEILINGS
MAGNITUDE OF PROJECTBASE PERIODOPTION PERIOD
Under $25,000 (no Tiered Factor)1.001.00
$25,000 - $50,0001.001.00
Over $50,000 and not exceeding $100,0001.001.00
Over $100,000 and not exceeding $200,0001.001.00
Over $200,0001.001.00
DEFINITIONS
STANDARD: Daily 8-hour period, starting no earlier than 6:00 AM (HST), ending no later than 6:00 PM (HST)
NON-STANDARD: Hours worked within the day exceeding 8-hours, performed prior to 6:00 AM(HST), or performed after 6:00 PM (HST)
CONSTRUCTION: Services performed by Non-exempt Labor Covered by the Construction Wage Requirements Statute
SERVICE: Services performed by personnel Not Covered by the Construction Wage Requirements Statute

PROPOSAL

Solicitation No. N0060417R3005
PROPOSAL
PERIODL.6 AMOUNTCLINPROPOSED
BASE$ 5,000,0000250$5,000,000
OPTION$ 6,000,0001250$6,000,000
BASE PERIOD, CLIN 0250
LOCATIONWORKING HOURSWEIGHTING FACTORCONSTRUCTIONSERVICE
90%10%
Barking Sands and Kamokala Special Areas (BS and EA)Standard45%$ 2,025,000$ 225,000.0
Non-standard2%90,00010,000
Special Area Makaha Ridge (FA)Standard25%1,125,000125,000
Non-standard3%135,00015,000
Special Area Kokee (IA)Standard15%675,00075,000
Non-standard3%135,00015,000
Special Area Port Allen (CA)Standard5%225,00025,000
Non-standard2%90,00010,000
PART 1 SUB-TOTAL$ 4,500,000$ 500,000.0
PART 1 TOTAL$ 5,000,000.00
MAGNITUDE OF PROJECTWEIGHTING FACTORAMOUNT
Under $25,000 (no Tiered Factor)30%$ 1,500,000
$25,000 - $50,00020%$ 1,000,000
Over $50,000 and not exceeding $100,00020%$ 1,000,000
Over $100,000 and not exceeding $200,00020%$ 1,000,000
Over $200,00010%$ 500,000
TOTAL PROPOSED CLIN 0250$ 5,000,000
OPTION PERIOD, CLIN 1250
LOCATIONWORKING HOURSWEIGHTING FACTORCONSTRUCTIONSERVICE
90%10%
Barking Sands and Kamokala Special Areas (BS and EA)Standard45%$ 2,430,000$ 270,000
Non-standard2%108,00012,000
Special Area Makaha Ridge (FA)Standard25%1,350,000150,000
Non-standard3%162,00018,000
Special Area Kokee (IA)Standard15%810,00090,000
Non-standard3%162,00018,000
Special Area Port Allen (CA)Standard5%270,00030,000
Non-standard2%108,00012,000
PART 1 SUB-TOTAL$ 5,400,000.00$ 600,000.00
PART 1 TOTAL$ 6,000,000.00
MAGNITUDE OF PROJECTWEIGHTING FACTORAMOUNT
Under $25,000 (no Tiered Factor)30%$ 1,800,000
$25,000 - $50,00020%$ 1,200,000
Over $50,000 and not exceeding $100,00020%$ 1,200,000
Over $100,000 and not exceeding $200,00020%$ 1,200,000
Over $200,00010%$ 600,000

TOTAL PROPOSED CLIN 1250 $ 6,000,000

Application Example

APPLICATION EXAMPLEThe coefficients and coefficient ceilings in this example are not representative of the any Government expectation. This example is merely a demonstration of how the coefficients and ceilings may be used.
PROJECT XYZ, REPLACE FENCING

PERIOD BASE PERIOD

PROJECTTOTAL
XYZ$178,600
PERIODBASE
CONSTRUCTIONSERVICES
LOCATIONWORKING HOURSCONSTRUCTION COEFFICIENTSERVICE COEFFICIENTREGULAR WAGESSUB-TOTALREGULAR WAGESSUB-TOTAL
CEILINGPROPOSEDCEILINGPROPOSED
Barking Sands and Kamokala Special Areas (BS and EA)Standard1.501.252.002.00$ 80,000$ 100,000$ 10,000$ 20,000.0
Non-standard2.252.503.00$ 8,00018,000$ 2,000- 0
Special Area Makaha Ridge (FA)Standard1.502.00$ - 0- 0$ - 0- 0
Non-standard2.253.00$ - 0- 0$ - 0- 0
Special Area Kokee (IA)Standard1.502.00$ - 0- 0$ - 0- 0
Non-standard2.253.00$ - 0- 0$ - 0- 0
Special Area Port Allen (CA)Standard1.502.00$ - 0- 0$ - 0- 0
Non-standard2.253.00$ - 0- 0$ - 0- 0
LABOR SUB-TOTALS$ 118,000$ 20,000.0
LABOR TOTAL$ 138,000.00
Other Direct Cost*
NON-LABOR ESTIMATE$ 50,000.00

* FROM SUPPORT SHEET. Overhead and G&A should be included in total.

PART 1 TOTAL$ 188,000.00
COEFFICIENT
MAGNITUDE OF PROJECTPART 1 TOTALCEILINGPROPOSEDAMOUNT
Under $25,000 (no Tiered Factor)$ - 01.00$ - 0
$25,000 - $50,000$ - 01.00$ - 0
$50,001 - $100,000$ - 00.98$ - 0
$100,001 - $200,000$ 188,000.000.950.96$ 178,600
Over $200,000$ - 00.90$ - 0
TOTAL PROPOSED CLIN 0250$ 178,600
NOTES FOR REGULAR WAGE CALCULATIONS FROM SUPPORTING SHEETS (NOT ATTACHED)
1. PER-SITE TOTAL CONSTRUCTION LABOR HOURS PER CONSTRUCTION CLASSIFICATION FROM RS MEANS
2. PER-SITE TOTAL SERVICE LABOR HOURS PER NON-CONSTRUCTION CLASSIFICATION IS BASED ON CONTRACTOR'S ESTIMATE
3. NON-STANDARD HOURS BASED ON CONTRACTOR'S WORKFORCE AND PROJECT SCHEDULE
NON-STANDARD REGULAR WAGES = ∑(CLASSIFICATION RATE) x (NON-STANDARD LABOR HOURS FOR CLASSIFICATION)
4. STANDARD HOURS IS THE DIFFERENCE BETWEEN TOTAL LABOR HOURS AND NON-STANDARD HOURS
STANDARD REGULAR WAGES = ∑(CLASSIFICATION RATE) x (STANDARD LABOR HOURS FOR CLASSIFICATION)

File details come from the government source that posted it. Updated .