Attachment_CA-1_Prime_Cost_Spreadsheet_5.21.xlsx
XLSX spreadsheet 742 KB Posted
- Attached to
- NAVAIR NAWCAD Range Technical Support Services Solicitation Federal contract opportunity
- Solicitation number
- N00421-18-R-0038
About this file
This solicitation seeks technical support services for the Atlantic Test Range and Atlantic Targets and Marine Operations Division. The Naval Air Warfare Center - Aircraft Division at Patuxent River, Maryland requires support in the areas of engineering, operations, planning, safety, and quality assurance. The resulting award will be a cost-plus contract with a one-year base period and nine one-year options. The required product and service code is AC14 for research and development of defense systems for aircraft. Questions regarding the solicitation's requirements and instructions are due by May 29, 2019.
Attachment CA-1 Prime Cost Spreadsheet
View the file
Other files for this federal contract opportunity
Show all 50
NAVAIR NAWCAD Range Technical Support Services Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
Instructions
| Contractor: | |
| 1 | On Header Tab the attachment file name should be automatically populated. |
| 2 | On Footer Tab for the worksheet, insert the firm's name after colon. |
| 3 | Every worksheet should have items 1 and 2 completed. |
| 4 | The worksheets of the workbook should all be formatted for printing on legal-size paper, landscpe orientation, without requiring formatting adjustments. |
| 5 | Within the work sheet any cell colored "blue" contains a formula and should not be edited. In the 'CPFF Total Labor Hours Proposed' tab, formulas in white cells should update automatically if instructions are followed. |
| 6 | All dollar figures shall be carried out no further than two decimal places. |
| 7 | DO NOT add additional worksheets/tabs to this workbook. Any additional tabs will not be evaluated. |
| 8 | All Direct rates must be entered per year and may only link to other worksheets as originally provided within this file to show escalation. If links are to worksheets that were not originally provided in the Governments template they will not be considered valid. |
| 9 | Do not change the color shading or add shading to this template. Follow the format and ensure consistency as needed. |
| 10 | In column A, starting at row 5, the Government labor category is provided. The Prime shall begin to enter the rates proposed for each person addressing all labor categories. For each proposed subcontractor, the Prime shall fill in the subs proposed Government labor category under each proposed subcontractor's section, along with the rates proposed by the subcontractor. Replace "Sub 1", "Sub 2", and so on with the actual Subcontractor's name In COLUMN A ONLY. DO NOT DELETE UNUSED ROWS OR COLUMNS AS IT WILL IMPACT THE TOTAL COLUMNS AND ROWS. If necessary, you may insert additional rows to account for multiple rates/personnel in the same category--but ensure integrity of formulas through all tabs. Labor categories with more than one person providing the service shall be listed individually for each person performing work. For example, if the offeror proposes two people to perform one Senior Analyst position, then the labor category Senior Analyst shall be listed twice along with their applicable rates, hours, and any other information. Same goes for labor categories where there are multiple full-time equivalents. |
| 11 | Labor Categories shall remain in alphabetical order and like categories remain together within each offerors section. For example if the Prime proposes 2 software Engineers, they should be listed in consecutive rows. The same should be followed for subcontractors proposing multiples of the same labor category. |
| 12 | In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility, a KA for Contractor - Alternate site if the contractor will be using an "off-site" rate for personnel that will be working at another contractor's facility, or a "G" if it will be performing the work in Government spaces. |
| 13 | In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input needed. (This reflects that the prime contractor is proposing its own employees, contingency hires-, or prospective hires - it does not include any subcontractors.) For the subcontractors, their fields are in yellow. Please note if more subcontractors are needed, the contractor may add additional Sections and rows to accommodate them, but ensure integrity of the formulas. Subcontractor positions should be listed within the individual subcontractor section ONLY. The top portion of the worksheets are for the Prime's workforce. Do not add subcontractor rows in the Prime section. The prime will complete the subcontractors fully burdened rates and hours, as necessary, within the subcontractors individual section with the subcontractors fully burdened rate less Prime pass through. |
| 14 | In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforce, identify for each individual proposed whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 15 | In column F, enter the name of the proposed individual for that position. |
| 16 | In column G: |
| 17 | (a) for the prime contractor, enter the unburdened labor rate for each individual |
| 18 | (b) In Cell G149 the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 19 | (c) In Cell G150 the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank. |
| 20 | (d) In Cell G153, the prime contractor should insert its overhead rate for work performed at the contractor's facility. |
| 21 | (e) In Cell G154 the prime contractor should insert its overhead rate for work performed at the Client/Government's facility. |
| 22 | (f) In Cell G156, the prime contractor should insert its indirect rate for the G&A rate being applied. |
| 23 | (g) For all subcontractors, begining with G162, the Prime shall enter the fully burdened labor rate, including the subcontractors fixed fee, associated with the individual proposed, per labor category, per labor CLIN |
| 24 | (h) In Cell G438, the prime should insert it's subcontractor handling charge, if any. |
| 25 | (i) In Cell G441, the Prime should insert the fixed fee rate applied to its cost excluding subcontractor labor. |
| 26 | (j) In Cell G442, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. |
| 27 | In column H, and then similarly for Columns J, L, and N: |
| 28 | (a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for CLIN XX00 (e.g., rows 5-146, 162-194, and so on). Also make sure you plug in the hours for columns J, L and N. |
| 29 | (b) In Cell H149, the prime contractor should insert the "labor base" its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 30 | (c) In Cell H150, the Prime contractor should insert the "labor base" its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 31 | (d) In Cell H153, the Prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the contractor's facility. |
| 32 | (e) In Cell H151, the Prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the Client/Gov't site rate is being applied to |
| 33 | (f) In Cell H156, the Prime contractor should insert the base its G&A rate is being applied to. |
| 34 | (g) In Cell H441, the Prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor). |
| 35 | (h) In Cell H442, the Prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any. |
| 36 | (i) In G456 and G457 the Prime shall enter its material handling and G&A rate that will be used on the Travel, Material and ODC by CLIN. If not applying a material handling, cell should be left blank. |
| 37 | Proposed Price for Section L, 2.3 Technology/Systems/Process Approach – For each proposed Technology/Systems/Process Approach that results in a cost to the Government, Offerors shall input a Firm Fixed Price (FFP) in all contract years for which costs would be incurred by the Government to implement and utilize the proposed approach. In cell M463, enter any FFP costs associated with the proposed Technology/Systems/Process Approach, as applicable. If more than one Technology/Systems/Process Approach is proposed that results in a cost to the Government, rows may be added to the spreadsheet to ensure the FFP for each Technology/Systems/Process Approach is captured within the spreadsheet. These proposed Firm Fixed Prices will be included by the Government as Option CLINs in the applicable contract years in Section B in the awarded contract. As described in Section L of the solicitation, if there are no costs to the Government for implementation and utilization of the proposed approach, Offerors shall state this in an H clause that will be incorporated into the final contract |
| 38 | Column "Q" automatically calculates the total hours for all the CLINS. |
| 39 | Column"S" is a summation of the costs. |
| 40 | If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the Prime is only utilizing two subcontractors, then the rows concerning sub 3 through 8 would be hidden. |
| 41 | When submitting this file, the instructions tab may be deleted. |
1 The CPFF Total Labor Hours Proposed Tab should calculate automatically. If adding subcontractors or rows, ensure the integrity of ALL formulas on ALL TABS.
| Fully Burdened CPFF Labor Rates Worksheet: | |
| 1 | In Column A, enter the Proposed Government Labor category for each proposed individual. Spell and format entries the same every time it is used on the template. |
| 2 | In Column B, For each individual Contractor employee proposed; enter a different identifying title in the form of FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Rows should be added to account for multiple FTEs at one location and/or FTEs at various locations. Do not enter the individual's name into the template. |
| 3 | In Columns C-L, Enter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator by linking back to the applicable performance period direct and indirect rates. This formula should show the Government how a Prime develops its fully burdened rates in accordance with its disclosure statement so that the Government has a full understanding of how fully burdened rates were developed. The Government should be able to trace this formula back for each labor category for each period of performance. The first orange highlighted row is an EXAMPLE of the type of formula the Government expects to see here in accordance with an Offerors disclosure statement, and SHOULD BE DELETED prior to proposal submission. Offerors are expected to use a similar formula demonstrating how indirect rates are applied to each direct labor rate in order to formulate a fully burdened rate. Numbers should reflect U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period. |
Base Year
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||||||||
| Period of Performance: | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | ||||||||
| Services - Prime | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | |||||||
| Government Labor Category | Location | site | sub | f/p | Employee Name | Rate | Labor - ATR | Labor - ATR OT | Labor - ATMO | Labor - ATMO OT | SUM | Total | ||||
| Captain, Master | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 816 | $ - 0 | 2,736.0 | $ - 0 | ||||
| Chief Engineer/Qualified Member of the Engine Dept. (QMED) | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 780 | $ - 0 | 2,700.0 | $ - 0 | ||||
| Computer Programmer I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | ||||
| Computer Programmer II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | ||||
| Computer Programmer III | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 115 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,035.0 | $ - 0 | ||||
| Computer Programmer IV | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 115 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,035.0 | $ - 0 | ||||
| Computer Scientist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Computer Scientist, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Computer Scientist, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 6,240.0 | $ - 0 | ||||
| Computer System Analyst I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Computer System Analyst II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 6,480.0 | $ - 0 | ||||
| Computer System Analyst III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Computer System Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Computer System Analyst, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Configuration Management Analyst, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Configuration Management Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Data Scientist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Electronics Technician I | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Electronics Technician II | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Electronics Technician III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | ||||
| Engineer, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Junior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Engineer, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Journeyman | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 9600 | $ - 0 | 480 | $ - 0 | 16,080.0 | $ - 0 | ||||
| Engineer, Senior | Norfolk, VA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Data Quality, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Data Quality, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Data Quality, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer Electrical, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer Electrical, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer Electrical, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer Electrical, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Electronics, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Electronics, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,240.0 | $ - 0 | ||||
| Engineer, Electronics, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 360 | $ - 0 | 13440 | $ - 0 | 480 | $ - 0 | 20,040.0 | $ - 0 | ||||
| Engineer, Software, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 360 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,200.0 | $ - 0 | ||||
| Engineer, Software, Junior | Pt. Mugu, CA | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Engineer, Software, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,240.0 | $ - 0 | ||||
| Engineer, Software, Journeyman | Pt. Mugu, CA | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Engineer, Software, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 8,400.0 | $ - 0 | ||||
| Engineer, Systems, Missile Defense Agency, Journeyman | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 11520 | $ - 0 | 6925 | $ - 0 | 18,445.0 | $ - 0 | ||||
| Engineer, Systems, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Systems, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Systems, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Systems, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Radar Cross Section, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Engineer, Radar Cross Section, Senior (KEY) | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Engineer, Radar Cross Section, Senior | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | $ - 0 | $ - 0 | 2,040.0 | $ - 0 | ||||||
| Engineering Aide/Laborer | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 960 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 8,640.0 | $ - 0 | ||||
| Engineering Technician I | Patuxent River, MD | $ - 0 | 9600 | $ - 0 | 960 | $ - 0 | 9600 | $ - 0 | 2344 | $ - 0 | 22,504.0 | $ - 0 | ||||
| Engineering Technician I | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | ||||
| Engineering Technician I | Mayport, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | ||||
| Engineering Technician I | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 5760 | $ - 0 | 1416 | $ - 0 | 7,176.0 | $ - 0 | ||||
| Engineering Technician II | Patuxent River, MD | $ - 0 | 11520 | $ - 0 | 960 | $ - 0 | 15360 | $ - 0 | 3968 | $ - 0 | 31,808.0 | $ - 0 | ||||
| Engineering Technician II | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7680 | $ - 0 | 2516 | $ - 0 | 10,196.0 | $ - 0 | ||||
| Engineering Technician II | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | ||||
| Engineering Technician II | Oceana, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | 225 | 2,145.0 | $ - 0 | ||||||
| Engineering Technician III | Patuxent River, MD | $ - 0 | 13440 | $ - 0 | 960 | $ - 0 | 17280 | $ - 0 | 9484 | $ - 0 | 41,164.0 | $ - 0 | ||||
| Engineering Technician III | Mayport, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 9600 | $ - 0 | 500 | $ - 0 | 10,100.0 | $ - 0 | ||||
| Engineering Technician III | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 38400 | $ - 0 | 11616 | $ - 0 | 50,016.0 | $ - 0 | ||||
| Engineering Technician III | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | ||||
| Engineering Technician IV | Patuxent River, MD | $ - 0 | 15360 | $ - 0 | 960 | $ - 0 | 30720 | $ - 0 | 9000 | $ - 0 | 56,040.0 | $ - 0 | ||||
| Engineering Technician IV | Wallops, VA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineering Technician IV | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | ||||
| Engineering Technician IV | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 21120 | $ - 0 | 6216 | $ - 0 | 27,336.0 | $ - 0 | ||||
| Engineering Technician IV | Oceana, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 224 | $ - 0 | 2,144.0 | $ - 0 | ||||
| Engineering Technician V | Patuxent River, MD | $ - 0 | 15360 | $ - 0 | 960 | $ - 0 | 15360 | $ - 0 | 9008 | $ - 0 | 40,688.0 | $ - 0 | ||||
| Engineering Technician V | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3840 | $ - 0 | 960 | $ - 0 | 4,800.0 | $ - 0 | ||||
| Engineering Technician VI | Patuxent River, MD | $ - 0 | 17280 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 19,200.0 | $ - 0 | ||||
| Environmental Technical Specialist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Environmental Technical Specialist, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Environmental Technical Specialist, Senior | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | ||||
| Facilities Maintenance Technician II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Facilities Maintenance Technician III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Facilities Maintenance Manager | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| General Clerk I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| General Clerk II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| General Clerk III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| General Operations Manager, Deputy, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| General Operations Manager, Senior (KEY) | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Information Security Analyst, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 280 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,120.0 | $ - 0 | ||||
| Information Security Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 280 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,120.0 | $ - 0 | ||||
| Information Security Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 280 | $ - 0 | 7680 | $ - 0 | 480 | $ - 0 | 12,280.0 | $ - 0 | ||||
| Industrial Security Specialist, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,400.0 | $ - 0 | ||||
| Laborer | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Laborer, Ground Maintenance | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Logistics Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Management Analyst, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Management Analyst, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 7,920.0 | $ - 0 | ||||
| Management Analyst, Journeyman | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Management Analyst, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Material Coordinator | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 22 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,942.0 | $ - 0 | ||||
| Material Coordinator | Norfolk, VA | $ - 0 | 1920 | $ - 0 | 22 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,942.0 | $ - 0 | ||||
| Material Inventory Manager, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Network and Computer System Administrator, Junior | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | ||||
| Network and Computer System Administrator, Journeyman | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | ||||
| Network and Computer System Administrator, Senior | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | ||||
| Operations Manager, Journeyman | Patuxent River, MD | $ - 0 | 24960 | $ - 0 | 1560 | $ - 0 | 9600 | $ - 0 | 2075 | $ - 0 | 38,195.0 | $ - 0 | ||||
| Operations Manager, Journeyman | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Operations Manager, Journeyman, Aerial Targets | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 576 | $ - 0 | 2,496.0 | $ - 0 | ||||
| Operations Manager, Journeyman, Aerial Targets Site Lead (KEY) | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | ||||
| Operations Manager, Journeyman, Fleet Support | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Operations Manager, Journeyman, Fleet Support | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | ||||
| Operations Manager, Journeyman, Norfolk Surface Targets Site Lead | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | ||||
| Operations Manager, Journeyman, Radar System | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Operations Manager, Journeyman, Surface Targets | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | ||||
| Order Clerk I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Order Clerk I | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Order Clerk II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Order Clerk II | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 200 | $ - 0 | 2,120.0 | $ - 0 | ||||
| Personal Computer Support Technician | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | ||||
| Program Analyst, Junior | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Program Analyst, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Program Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 3840 | $ - 0 | 480 | $ - 0 | 8,160.0 | $ - 0 | ||||
| Project Manager, Junior | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Project Manager, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Project Manager, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Project Support Specialist I | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 9,600.0 | $ - 0 | ||||
| Project Support Specialist I | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Project Support Specialist II | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 9,600.0 | $ - 0 | ||||
| Project Support Specialist II | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Project Support Specialist III | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 9,600.0 | $ - 0 | ||||
| Project Support Specialist III | Norfolk, VA | $ - 0 | 0 | 0 | 1920 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||||
| Project Support Specialist IV | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 5760 | $ - 0 | 480 | $ - 0 | 13,920.0 | $ - 0 | ||||
| Project Support Specialist IV | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Range Safety Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Subject Matter Expert, Radar Radio Frequency | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Subject Matter Expert, Aircraft Dynamic Avionics Measurements | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Subject Matter Expert, Range RCS Data Reduction | Patuxent River, MD | $ - 0 | 960 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 960.0 | $ - 0 | ||||
| Subject Matter Expert, Range Electronic Warfare Threat | Patuxent River, MD | $ - 0 | 960 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 960.0 | $ - 0 | ||||
| Subject Matter Expert, Range GPS Data Analysis | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Subject Matter Expert, Range GPS Applications and Integration | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Supply Technician | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| System Support Specialist | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | ||||
| Technical Writer I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Technical Writer II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Technical Writer, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Technical Writer Editor, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Weather Forecaster I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Weather Forecaster II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| subtotal | 531840 | $ - 0 | 22664 | $ - 0 | 295680 | $ - 0 | 75589 | $ - 0 | 925,773.0 | $ - 0 | ||||||
| Fringe | Base | Base | Base | Base | ||||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Overhead | Base | Base | Base | Base | ||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Total Labor | $ - 0 | |||||||||||||||
| Subcontractors | ||||||||||||||||
| Sub: 1: Labor Categories | ||||||||||||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 2: Labor Categories | ||||||||||||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 3 Labor Categories | ||||||||||||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 4: Labor Categories | ||||||||||||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 5: Labor Category | ||||||||||||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 5 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 6: Labor Category | ||||||||||||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 6 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 7: Labor Category | ||||||||||||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 7 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Sub: 8: Labor Category | ||||||||||||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | |||||
| sub total on Sub 8 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| Total of all Subcontractors | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | ||||||
| subcontractor handling | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Base | Base | Base | Base | |||||||||||||
| Fee/Profit - prime | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total Labor and Subcontractor Cost Plus Fee/Profit | 531,840.0 | $ - 0 | 22,664.0 | $ - 0 | 295,680.0 | $ - 0 | 75,589.0 | $ - 0 | 925,773.0 | $ - 0 |
| Other Direct Costs | CLIN | XXXX - XXXX | CLIN | XXXX - XXXX | ||
| Subtotal | Subtotal | |||||
| ATR | ATMO | Total | ||||
| Travel | $ 1,229,235.00 | $ 1,843,852.00 | $ 3,073,087.00 | |||
| Material | $ 6,434,146.00 | $ 3,669,057.00 | $ 10,103,203.00 | |||
| ODC | $ 5,629,900.00 | $ 10,455,530.00 | $ 16,085,430.00 | |||
| ODC subtotal | $ 13,293,281.00 | $ 15,968,439.00 | $ 29,261,720.00 | |||
| Material handling | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||
| G&A on ODC | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||
| Total ODC | $ 13,293,281.00 | $ 15,968,439.00 | $ 29,261,720.00 |
Grand Total ODCs $ 29,261,720.00
| 2.3 Technology/Systems/Process Approach (FFP CLIN) | $ - 0 | |
| Total 2.3 Technology/Systems/Process Approach (FFP CLIN) | $ - 0 | $ - 0 |
Grand Total Services & ODCs & 2.3 Technology/Systems/Processes Approach $ 29,261,720.00
Attachment_CA-1_CLIN_Breakout_Spreadsheet (RFP# N00421-18-R-0038) &A
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104
Option Year 1
| DO NOT TYPE IN ANY COLORED AREAS | ||||||||||||||||
| Period of Performance: | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | ||||||||
| Services - Prime | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | |||||||
| Government Labor Category | Location | site | sub | f/p | Employee Name | Rate | Labor - ATR | Labor - ATR OT | Labor - ATMO | Labor - ATMO OT | SUM | Total | ||||
| Captain, Master | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 755.2 | $ - 0 | 2,675.2 | $ - 0 | ||||
| Chief Engineer/Qualified Member of the Engine Dept. (QMED) | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 780 | $ - 0 | 2,700.0 | $ - 0 | ||||
| Computer Programmer I | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Computer Programmer II | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Computer Programmer III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 125 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,965.0 | $ - 0 | ||||
| Computer Programmer IV | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 115 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,035.0 | $ - 0 | ||||
| Computer Scientist, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 5,760.0 | $ - 0 | ||||
| Computer Scientist, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Computer Scientist, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 6,240.0 | $ - 0 | ||||
| Computer System Analyst I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Computer System Analyst II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 6,480.0 | $ - 0 | ||||
| Computer System Analyst III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Computer System Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Computer System Analyst, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Configuration Management Analyst, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | ||||
| Configuration Management Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Data Scientist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Electronics Technician I | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Electronics Technician II | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Electronics Technician III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | ||||
| Engineer, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Junior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 30 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,870.0 | $ - 0 | ||||
| Engineer, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Journeyman | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 9600 | $ - 0 | 480 | $ - 0 | 16,080.0 | $ - 0 | ||||
| Engineer, Senior | Norfolk, VA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Data Quality, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Data Quality, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Data Quality, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer Electrical, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer Electrical, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer Electrical, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer Electrical, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Electronics, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Electronics, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,240.0 | $ - 0 | ||||
| Engineer, Electronics, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 360 | $ - 0 | 13440 | $ - 0 | 480 | $ - 0 | 20,040.0 | $ - 0 | ||||
| Engineer, Software, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 360 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,200.0 | $ - 0 | ||||
| Engineer, Software, Junior | Pt. Mugu, CA | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Engineer, Software, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,240.0 | $ - 0 | ||||
| Engineer, Software, Journeyman | Pt. Mugu, CA | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | ||||
| Engineer, Software, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 8,400.0 | $ - 0 | ||||
| Engineer, Systems,Missile Defense Agency, Journeyman | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 11520 | $ - 0 | 6925 | $ - 0 | 18,445.0 | $ - 0 | ||||
| Engineer, Systems, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Systems, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | ||||
| Engineer, Systems, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | ||||
| Engineer, Systems, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | ||||
| Engineer, Radar Cross Section, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Engineer, Radar Cross Section, Senior (KEY) | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Engineer, Radar Cross Section, Senior | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | ||||
| Engineering Aide/Laborer | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 970 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 8,650.0 | $ - 0 | ||||
| Engineering Technician I | Patuxent River, MD | $ - 0 | 9600 | $ - 0 | 970 | $ - 0 | 9600 | $ - 0 | 2344 | $ - 0 | 22,514.0 | $ - 0 | ||||
| Engineering Technician I | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .