About this file
This document provides an attachment of questions and answers related to solicitation number N00421-18-R-0038 for NAVAIR NAWCAD Range Technical Support Services. The solicitation involves a special notice from the Department of the Navy Naval Air Systems Command Naval Air Warfare Center for range technical support services. Questions posed by potential offerors are answered to provide clarification on requirements. No further details on products or services sought are included in the attachment beyond confirming it relates to the referenced solicitation.
CA-1 Cost Spreadsheet
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
Instructions
| Contractor: | |
| 1 | On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated. |
| 2 | On Footer Tab for the worksheet, insert the firm's name after colon. Insert RFP number after colon |
| 3 | Every worksheet should have items 1 and 2 completed. |
| 4 | The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER. |
| 5 | Within the work sheet any cell colored "blue" contains a formula and should not be edited. In the 'CPFF Total Labor Hours Proposed' tab, formulas in white cells should update automatically if instructions are followed. |
| 6 | All dollar figures shall be carried out no further than two decimal places. |
| 7 | DO NOT add additional worksheets/tabs to this workbook. Any additional tabs will not be evaluated. |
| 8 | All raw rates must be entered per year and may only link to other worksheets as originally provided within this file to show escalation. If links are to worksheets that were not originally provided in the Governments template they will not be considered valid. |
| 9 | Do not change the color shading or add shading to this template. Follow the format and ensure consistency as needed. |
| 10 | In column A, row 5, the contractor shall start inserting the Government labor category it is proposing for and in column C put the Offeror's equivalent labor category, if applicable, and then the rates proposed for each person. For each proposed subcontractor, the Prime shall fill in the subs proposed Government labor category and the proposed subcontractor's equivalent labor category, if applicable, under each proposed subcontractor's section, along with the rates proposed by the subcontractor. Replace "Sub 1", "Sub 2", and so on with the actual Subcontractor's name. DO NOT DELETE UNUSED ROWS OR COLUMNS AS IT WILL IMPACT THE TOTAL COLUMNS AND ROWS. If necessary, you may insert additional rows--but ensure integrity of formulas through all tabs. Labor categories with more than one person providing the service shall be listed individually for each person performing work. For example, if the offeror proposes two people to perform one Senior Analyst position, then the labor category Senior Analyst shall be listed twice along with their applicable rates, hours, and any other information. Same goes for labor categories where there are multiple full-time equivalents. |
| 11 | Labor Categories shall remain in alphabetical order and like categories remain together within each offerors section. For example if the Prime proposes 2 software Engineers, they should be listed in consecutive rows. The same should be followed for subcontractors proposing multiples of the same labor category. |
| 12 | In Column C insert the Contractor's/subcontractor's equivalent labor category title, if applicable. |
| 13 | In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility, a KA for Contractor - Alternate site if the contractor will be using an "off-site" rate for personnel that will not be working at another contractor's facility, or a "G" if it will be performing the work in Government spaces. |
| 14 | In column E, for the prime contractor's own workforce, the field is colored "green" indicating no input needed. (This reflects that the prime contractor is proposing its own employees, contingency hires-, or prospective hires - it does not include any subcontractors.) For the subcontractors, their fields are in yellow. Please note if more subcontractors are needed, the contractor may add additional Sections and rows to accommodate them, but ensure integrity of the formulas. Subcontractor positions should be listed within the individual subcontractor section ONLY. The top portion of the worksheets are for the Prime's workforce. Do not add subcontractor rows in the Prime section. The prime will complete the subcontractors rates within their individual section with the subcontractors fully burdened rate less Prime pass through. |
| 15 | In column F, for both the prime contractor's own workforce and that of the individual subcontractors' workforce, identify for each individual proposed whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 16 | In column G, enter the name of the proposed individual for that position. |
| 17 | In column H: |
| 18 | (a) for the prime contractor, enter the unburdened labor rate for each individual (e.g. rows 5-46) |
| 19 | (b) In Cell H137 the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 20 | (c) In Cell H138 the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank. |
| 21 | (d) In Cell H141, the prime contractor should insert its overhead rate for work performed at the contractor's facility. |
| 22 | (e) In Cells H142 the prime contractor should insert its overhead rate for work performed at the Client/Government's facility. |
| 23 | (f) In Cell H144, the prime contractor should insert its overhead rate for the G&A rate being applied. |
| 24 | (g) For all subcontractors, begining with H149, the Prime shall enter the fully burdened labor rate, including fixed fee, associated with the individual proposed, per labor category, per labor CLIN/Appropriation |
| 25 | (h) In Cell H426, the prime should insert it's subcontractor handling charge, if any. |
| 26 | (i) In Cell H429, the prime should insert the fixed fee rate applied to its cost excluding subcontractor labor. |
| 27 | (j) In Cell H430, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. |
| 28 | In column I, and then similarly for Columns K, M, and O: |
| 29 | (a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for CLIN XX00 (e.g., rows 5-134, 150-182, and so on). Also make sure you plug in the hours for columns K, M and O. |
| 30 | (b) In Cell I137, the prime contractor should insert the "labor base" its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 31 | (c) In Cell I138, the prime contractor should insert the "labor base" its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. |
| 32 | (d) In Cell I141, the prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the contractor's facility. |
| 33 | (e) In Cell I142, the prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the Client/Gov't site rate is being applied to |
| 34 | (f) In CellsI144, the prime contractor should insert the base its G&A rate is being applied to. |
| 35 | (g) In Cell I429, the prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor). |
| 36 | (h) In Cell I430, the prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any. |
| 37 | (i) In H444 and H445 the Prime shall enter its material handling and G&A rate that will be used on the Travel, Material and ODC by CLIN. If not applying a material handling, cell should be left blank. |
| 38 | Do not complete CLIN numbers for the specific period of performance as identified in Section B of the Solicitation in cells J1, L1, N1, P1, the additional sheets for the option periods. |
| 39 | Column "R" automatically calculates the total hours for all the CLINS. |
| 40 | Column"T" is a summation of the costs. |
| 41 | If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the prime is only utilizing two subcontractors, then the rows concerning sub 3 through 8 would be hidden. |
| 42 | When submitting this file, the instructions may be deleted. |
| 43 | The CPFF Total Labor Hours Proposed Tab should calculate automatically. If adding subcontractors or rows, ensure the integrity of ALL formulas on ALL TABS. |
| Fully Burdened CPFF Labor Rates Worksheet: | |
| 1 | In Column A, enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solicitation Labor Category on that row. Spell and format entries the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA". |
| 2 | In Column B, For each individual Contractor employee proposed; enter a different identifying title in the form of FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template. |
| 3 | In Columns C-L, Enter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period. |
Base Year
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||||||||
| Period of Performance: | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | |||||||||
| Services - Prime | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | |||||||
| Government Labor Category | Location | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor - ATR | Labor - ATR OT | Labor - ATMO | Labor - ATMO OT | SUM | Total | ||||
| Captain, Master | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 816 | $ - 0 | 2,736.0 | $ - 0 | |||||
| Chief Engineer/Qualified Member of the Engine Dept. (QMED) | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 780 | $ - 0 | 2,700.0 | $ - 0 | |||||
| Personal Comuter Support Technician | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | |||||
| System Support Specialist | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | |||||
| Computer Programmer I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | |||||
| Computer Programmer II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | |||||
| Computer Programmer III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | |||||
| Computer Scientist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Computer Scientist, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Computer Scientist, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Computer System Analyst I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Computer System Analyst II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Computer System Analyst III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Computer System Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Computer System Analyst, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Configuration Management Specialist | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Configuration Management Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Data Scientist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Electronics Technician I | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Electronics Technician II | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Electronics Technician III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | |||||
| Engineer, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Junior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Engineer, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Journeyman | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Engineer, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Senior | Norfolk, VA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Engineer, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Engineer, Data Quality, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Data Quality, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Data Quality, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineer, Electronics, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Electronics, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,240.0 | $ - 0 | |||||
| Engineer, Electronics, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 360 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,120.0 | $ - 0 | |||||
| Engineer, Software, Junior | Patuxent River, MD | $ - 0 | 2880 | $ - 0 | 180 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,060.0 | $ - 0 | |||||
| Engineer, Software, Junior | Pt. Mugu, CA | $ - 0 | 2880 | $ - 0 | 180 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,060.0 | $ - 0 | |||||
| Engineer, Software, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineer, Software, Journeyman | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineer, Software, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineer, Radar Cross Section, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Engineer, Radar Cross Section, Senior (KEY) | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Engineering Technician Aide | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 960 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 8,640.0 | $ - 0 | |||||
| Engineering Technician I | Patuxent River, MD | $ - 0 | 9600 | $ - 0 | 960 | $ - 0 | 7680 | $ - 0 | 2344 | $ - 0 | 20,584.0 | $ - 0 | |||||
| Engineering Technician I | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician I | Mayport, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician I | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 5760 | $ - 0 | 1416 | $ - 0 | 7,176.0 | $ - 0 | |||||
| Engineering Technician II | Patuxent River, MD | $ - 0 | 11520 | $ - 0 | 960 | $ - 0 | 15360 | $ - 0 | 3968 | $ - 0 | 31,808.0 | $ - 0 | |||||
| Engineering Technician II | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7680 | $ - 0 | 2516 | $ - 0 | 10,196.0 | $ - 0 | |||||
| Engineering Technician II | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician II | Oceana, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | 225 | 2,145.0 | ||||||||
| Engineering Technician III | Patuxent River, MD | $ - 0 | 13440 | $ - 0 | 960 | $ - 0 | 17280 | $ - 0 | 9484 | $ - 0 | 41,164.0 | $ - 0 | |||||
| Engineering Technician III | Mayport, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 9600 | $ - 0 | 500 | $ - 0 | 10,100.0 | $ - 0 | |||||
| Engineering Technician III | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 38400 | $ - 0 | 11616 | $ - 0 | 50,016.0 | $ - 0 | |||||
| Engineering Technician III | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician IV | Patuxent River, MD | $ - 0 | 15360 | $ - 0 | 960 | $ - 0 | 30720 | $ - 0 | 9000 | $ - 0 | 56,040.0 | $ - 0 | |||||
| Engineering Technician IV | Wallops, VA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Engineering Technician IV | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician IV | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 21120 | $ - 0 | 6216 | $ - 0 | 27,336.0 | $ - 0 | |||||
| Engineering Technician IV | Oceana, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 224 | $ - 0 | 2,144.0 | $ - 0 | |||||
| Engineering Technician V | Patuxent River, MD | $ - 0 | 17280 | $ - 0 | 960 | $ - 0 | 15360 | $ - 0 | 9008 | $ - 0 | 42,608.0 | $ - 0 | |||||
| Engineering Technician V | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3840 | $ - 0 | 960 | $ - 0 | 4,800.0 | $ - 0 | |||||
| Engineering Technician VI | Patuxent River, MD | $ - 0 | 19200 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 21,120.0 | $ - 0 | |||||
| Environmental Technical Specialist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Environmental Technical Specialist, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Environmental Technical Specialist, Senior | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | |||||
| Facilities Maintenance Technician I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Facilities Maintenance Technician II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Facilities Maintenance Technician III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Facilities Maintenance Manager | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Field Engineer | Patuxent River, MD | $ - 0 | 24960 | $ - 0 | 1560 | $ - 0 | 9600 | $ - 0 | 2075 | $ - 0 | 38,195.0 | $ - 0 | |||||
| Field Engineer | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Field Engineer, Aerial Targets | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 576 | $ - 0 | 2,496.0 | $ - 0 | |||||
| Field Engineer, Aerial Targets Site Lead | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | |||||
| Field Engineer, Fleet Support | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Field Engineer, Fleet Support | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | |||||
| Field Engineer, Surface Targets | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | |||||
| Field Engineer, Norfolk Surface Targets Site Lead | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 600 | $ - 0 | 2,520.0 | $ - 0 | |||||
| Field Engineer, Radar System | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Field Engineer, Missile Defense Agency | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 61440 | $ - 0 | 6925 | $ - 0 | 68,365.0 | $ - 0 | |||||
| General Clerk I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| General Clerk II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| General Clerk III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| General Operations Manager, Deputy | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| General Operations Manager (KEY) | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Information Security Analyst, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 280 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,120.0 | $ - 0 | |||||
| Information Security Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 280 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,120.0 | $ - 0 | |||||
| Information Security Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 280 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,120.0 | $ - 0 | |||||
| Industrial Security Specialist, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,400.0 | $ - 0 | |||||
| Laborer, Ground Maintenance | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Logistics Analyst | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Management Analyst, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Management Analyst, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 7,920.0 | $ - 0 | |||||
| Management Analyst, Journeyman | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Management Analyst, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Material Coordinator | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 44 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,884.0 | $ - 0 | |||||
| Material Inventory Manager | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Order Clerk I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Order Clerk I | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Order Clerk II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Order Clerk II | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 200 | $ - 0 | 2,120.0 | $ - 0 | |||||
| Program Analyst, Junior | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Program Analyst, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Program Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 5,760.0 | $ - 0 | |||||
| Project Manager, Junior | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Project Manager, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1,920.0 | $ - 0 | |||||
| Project Manager, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Project Support Specialist I | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 9,600.0 | $ - 0 | |||||
| Project Support Specialist I | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | 0 | $ - 0 | 1,920.0 | |||||||
| Project Support Specialist II | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 9,600.0 | $ - 0 | |||||
| Project Support Specialist II | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | 0 | $ - 0 | 1,920.0 | |||||||
| Project Support Specialist III | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 9,600.0 | $ - 0 | |||||
| Project Support Specialist IV | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 9,600.0 | $ - 0 | |||||
| Project Support Specialist IV | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Range Safety Analyst | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Supply Technician | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| System Administrator I | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | |||||
| System Administrator II | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | |||||
| System Administrator III | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | |||||
| Technical Writer I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Technical Writer II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Technical Writer III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Technical Writer Editor, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Weather Forecaster I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Weather Forecaster II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| subtotal | 531840 | $ - 0 | 22664 | $ - 0 | 299520 | $ - 0 | 71749 | $ - 0 | 925,773.0 | $ - 0 | |||||||
| Fringe | Base | Base | Base | Base | |||||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Overhead | Base | Base | Base | Base | |||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| Client site | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| COM | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Total Labor | $ - 0 | ||||||||||||||||
| Subcontractors | |||||||||||||||||
| Sub: 1: Labor Categories | |||||||||||||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 1 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 1 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Sub: 2: Labor Categories | |||||||||||||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 2 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 2 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Sub: 3 Labor Categories | |||||||||||||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 3 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 3 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Sub: 4: Labor Categories | |||||||||||||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 4 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 4 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Sub: 5: Labor Category | |||||||||||||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 5 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 5 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Sub: 6: Labor Category | |||||||||||||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 6 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 6 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Sub: 7: Labor Category | |||||||||||||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 7 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 7 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Sub: 8: Labor Category | |||||||||||||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| 8 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | - 0 | $ - 0 | ||||||
| sub total on Sub 8 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| Total of all Subcontractors | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | - 0 | $ - 0 | |||||||
| subcontractor handling | 0.00% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||
| Base | Base | Base | Base | ||||||||||||||
| Fee/Profit - prime | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total Labor and Subcontractor Cost Plus Fee/Profit | 531,840.0 | $ - 0 | 22,664.0 | $ - 0 | 299,520.0 | $ - 0 | 71,749.0 | $ - 0 | 925,773.0 | $ - 0 |
| Other Direct Costs | CLIN | XXXX - XXXX | CLIN | XXXX - XXXX | ||
| Subtotal | Subtotal | |||||
| ATR | ATMO | Total | ||||
| Travel | $ 1,229,235.00 | $ 1,843,852.00 | $ 3,073,087.00 | |||
| Material | $ 6,434,146.00 | $ 3,669,057.00 | $ 10,103,203.00 | |||
| ODC | $ 5,629,900.00 | $ 10,455,530.00 | $ 16,085,430.00 | |||
| ODC subtotal | $ 13,293,281.00 | $ 15,968,439.00 | $ 29,261,720.00 | |||
| Material handling | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||
| G&A on ODC | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||
| Total ODC | $ 13,293,281.00 | $ 15,968,439.00 | $ 29,261,720.00 |
Grand Total ODCs $ 29,261,720.00
Grand Total Services & ODCs $ 29,261,720.00
Attachment_P6_CLIN_Breakout_Spreadsheet (RFP#) &A
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:
Option Year 1
| DO NOT TYPE IN ANY COLORED AREAS | |||||||||||||||||
| Period of Performance: | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | CLIN | XXXX | |||||||||
| Services - Prime | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | Hrs | |||||||
| Government Labor Category | Location | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor - ATR | Labor - ATR OT | Labor - ATMO | Labor - ATMO OT | SUM | Total | ||||
| Captain, Master | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 755.2 | $ - 0 | 2,675.2 | $ - 0 | |||||
| Chief Engineer/Qualified Member of the Engine Dept. (QMED) | Patuxent River, MD | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 780 | $ - 0 | 2,700.0 | $ - 0 | |||||
| Personal Comuter Support Technician | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| System Support Specialist | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Computer Programmer I | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Computer Programmer II | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Computer Programmer III | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Computer Scientist, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 5,760.0 | $ - 0 | |||||
| Computer Scientist, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Computer Scientist, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Computer System Analyst I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Computer System Analyst II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Computer System Analyst III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Computer System Analyst, Senior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Computer System Analyst, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Configuration Management Specialist | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Configuration Management Analyst, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Data Scientist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Electronics Technician I | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Electronics Technician II | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Electronics Technician III | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 230 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,070.0 | $ - 0 | |||||
| Engineer, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Junior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 30 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,870.0 | $ - 0 | |||||
| Engineer, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Journeyman | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Engineer, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Senior | Norfolk, VA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Engineer, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,960.0 | $ - 0 | |||||
| Engineer, Data Quality, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Data Quality, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Data Quality, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer Electrical, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineer, Electronics, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Electronics, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 480 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,240.0 | $ - 0 | |||||
| Engineer, Electronics, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 360 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,120.0 | $ - 0 | |||||
| Engineer, Software, Junior | Patuxent River, MD | $ - 0 | 2880 | $ - 0 | 180 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,060.0 | $ - 0 | |||||
| Engineer, Software, Junior | Pt. Mugu, CA | $ - 0 | 2880 | $ - 0 | 180 | $ - 0 | 0 | $ - 0 | $ - 0 | 3,060.0 | $ - 0 | ||||||
| Engineer, Software, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineer, Software, Journeyman | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | $ - 0 | 4,080.0 | $ - 0 | ||||||
| Engineer, Software, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Junior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Journeyman | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Senior | Patuxent River, MD | $ - 0 | 5760 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 6,000.0 | $ - 0 | |||||
| Engineer, Systems, Senior | Pt. Mugu, CA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineer, Radar Cross Section, Journeyman | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Engineer, Radar Cross Section, Senior (KEY) | Patuxent River, MD | $ - 0 | 1920 | $ - 0 | 120 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 2,040.0 | $ - 0 | |||||
| Engineering Technician Aide | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 970 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 8,650.0 | $ - 0 | |||||
| Engineering Technician I | Patuxent River, MD | $ - 0 | 9600 | $ - 0 | 970 | $ - 0 | 7680 | $ - 0 | 2344 | $ - 0 | 20,594.0 | $ - 0 | |||||
| Engineering Technician I | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician I | Mayport, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician I | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 5760 | $ - 0 | 1416 | $ - 0 | 7,176.0 | $ - 0 | |||||
| Engineering Technician II | Patuxent River, MD | $ - 0 | 11520 | $ - 0 | 970 | $ - 0 | 15360 | $ - 0 | 3968 | $ - 0 | 31,818.0 | $ - 0 | |||||
| Engineering Technician II | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7680 | $ - 0 | 2516 | $ - 0 | 10,196.0 | $ - 0 | |||||
| Engineering Technician II | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | ||||||
| Engineering Technician II | Oceana, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 102.4 | $ - 0 | 2,022.4 | $ - 0 | |||||
| Engineering Technician III | Patuxent River, MD | $ - 0 | 13440 | $ - 0 | 970 | $ - 0 | 17280 | $ - 0 | 9292 | $ - 0 | 40,982.0 | $ - 0 | |||||
| Engineering Technician III | Mayport, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 9600 | $ - 0 | 500 | $ - 0 | 10,100.0 | $ - 0 | |||||
| Engineering Technician III | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 38400 | $ - 0 | 11616 | $ - 0 | 50,016.0 | $ - 0 | |||||
| Engineering Technician III | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician IV | Patuxent River, MD | $ - 0 | 15360 | $ - 0 | 970 | $ - 0 | 30720 | $ - 0 | 8808 | $ - 0 | 55,858.0 | $ - 0 | |||||
| Engineering Technician IV | Wallops, VA | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Engineering Technician IV | Key West, FL | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 100 | $ - 0 | 2,020.0 | $ - 0 | |||||
| Engineering Technician IV | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 21120 | $ - 0 | 6216 | $ - 0 | 27,336.0 | $ - 0 | |||||
| Engineering Technician IV | Oceana, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 1920 | $ - 0 | 104.4 | $ - 0 | 2,024.4 | $ - 0 | |||||
| Engineering Technician V | Patuxent River, MD | $ - 0 | 17280 | $ - 0 | 970 | $ - 0 | 15360 | $ - 0 | 8816 | $ - 0 | 42,426.0 | $ - 0 | |||||
| Engineering Technician V | Norfolk, VA | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3840 | $ - 0 | 960 | $ - 0 | 4,800.0 | $ - 0 | |||||
| Engineering Technician VI | Patuxent River, MD | $ - 0 | 19200 | $ - 0 | 1920 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 21,120.0 | $ - 0 | |||||
| Environmental Technical Specialist, Junior | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Environmental Technical Specialist, Journeyman | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 3,840.0 | $ - 0 | |||||
| Environmental Technical Specialist, Senior | Patuxent River, MD | $ - 0 | 7680 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 7,680.0 | $ - 0 | |||||
| Facilities Maintenance Technician I | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 | |||||
| Facilities Maintenance Technician II | Patuxent River, MD | $ - 0 | 3840 | $ - 0 | 240 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 4,080.0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .