Attachment_P6_Cost_SumSpreadsheet_-_Amend_0001.xls

XLS spreadsheet 52 KB Posted

Attached to
Human Systems Department (AIR-4. 6) Engineering & Technical Support Services Federal contract opportunity
Solicitation number
N00421-18-R-0020
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document contains a cost summary spreadsheet template and details of a related federal contract opportunity. The cost summary spreadsheet template provides instructions for prime contractors and subcontractors to populate labor, other direct costs, and fee information for a three-year IDIQ contract opportunity with the Department of the Navy Naval Air Systems Command. The federal contract opportunity is a follow-on effort to provide engineering and technical support services to the Human Systems Department at the Naval Air Warfare Center in Patuxent River, Maryland. The planned award is a single-source small business set-aside IDIQ with cost-plus-fixed-fee and cost-type contract line items. The period of performance is a three-year ordering period anticipated to begin in September 2018.

Attachemnt P6-Amend 0001

View the file

Other files for this federal contract opportunity

Other files attached to Human Systems Department (AIR-4. 6) Engineering & Technical Support Services, newest first.
File Type Posted
Corrected_Amnedment_0002_.docx DOCX document
Amendment_0002.docx DOCX document
__4_RFP_Questions_&_Answers.docx DOCX document
__3_RFP_Questions_&_Answers.docx DOCX document
N00421-18-R-0020_Q&As_-_04_May.pdf PDF
Attachment_P7_Fully_Burdened_Labor_Rates_-_Amend_0001.xlsx XLSX spreadsheet
N00421-18-R-0020-0001.pdf PDF
N00421-18-R-0020_Q&As_-_01_May_2018.pdf PDF
FINAL_RFP_N0042118R0020.pdf PDF
Attachment_J5_BID_DD254_signed.pdf PDF
Attachment_P4_Past_Performance_Information_Form_Mar_2017.pdf PDF
Attachment_P7_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_J1_OCI_List.doc DOC document
Exhibit_A_-_CDRLs_A001-A003.docx DOCX document
Attachment_P5_CPAQ_May_2016.msg.pdf PDF
Attachment_J3_SAC_19_dec_2017_rev2.docx DOCX document
Attachment_P6_Cost_Summary_Spreadsheet.xls XLS spreadsheet
FINAL_RFP_N0042118R0020.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A13, and A20.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For subcontractor cost summary sheets, delete Rows 22-48.
12When submitting this file, the instructions may be deleted.

Cost Summary Spreadsheet

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Total for All Periods
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 100000
Employee Name 200000
Etc.00000
Total Direct Labor Cost00000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost0000
COM0
Total Prime Contractor Labor Cost0000
0
Subcontractor Labor Cost0
Subcontractor proposed cost and fee0
Subcontractor 10
Subcontractor 20
Etc.0
Total proposed subcontractor labor cost and fee0000
Prime contractor pass through (not including fee)0
Handling0
G&A0
Other (if any)0
Total pass through (not including fee)0
Total Subcontractor Cost including pass through0
0
Total Labor Cost (Prime and Subcontractor Labor)0
0
Fixed Fee0
Prime Contractor Fee for Prime Contractor Labor0
Prime Contractor Fee for Subcontractor Labor *0
Total Fee (for Prime and Subcontractor Labor)0
0
Total Labor Cost Plus Fixed Fee (CPFF)0
0
Other Direct Costs0
Other Direct Costs (ODCs)0
Any adders to ODCs such as G&A (cost only - no fee)0
Total ODCs0
0
Total CPFF all CLINs (Labor and ODCs)0
Grand Total of CPFF all CLINs

&CPage &P&R&F &LKTR: (name)&CSource Selection Information - See: FAR 2.101 and 3.104&RRFP:

Summary

CLIN Summary Sheet
CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
X001
X002
X003
X004
X005
Total

File details come from the government source that posted it. Updated .