N00421-17-R-0054-U0003.pdf
PDF 330 KB Posted
- Solicitation number
- N00421-17-R-0054
About this file
This modification amends a solicitation for engineering services to support the Mission Systems Test and Evaluation Division (MSTED) follow-on effort. The Naval Air Systems Command is seeking engineering support at multiple government sites, including Naval Air Warfare Center locations in Patuxent River, Point Mugu, and China Lake. The modification clarifies labor categories and composite rates, responds to industry questions, and adds an attachment with additional questions and answers. Services will include program management, systems engineering, systems analysis, and engineering technician support. The period of performance is five years from February 2020 to January 2025. Pricing will be determined at the task order level based on estimated hours and composite labor rates by category.
Amendment 03
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See Section A
1. CONTRACT ID CODE PAGE OF PAGES
S 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042117R0054
X 9B. DATED (SEE ITEM 11)
18-Apr-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-May-2019
CODE
NAVAL AIR SYSTEMS COMMAND
AIR-2.3.3.1 SUITE 155 BLDG 2272
47123 BUSE ROAD UNIT IPT
PATUXENT RIVER MD 20670
N00019 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0042117R0054
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been added by full text:
AMENDMENT 03
The purpose of amendment 03 is to respond to three Industry questions:
1. Response to Q5: In Section B, corrected the Composite Rates Table to match Section L 3.5.2 Table
2. Response to Q6: Clarified whether the DD254 should be marked as a follow-on.
3. Response to Q7: Clarified that the Aerospace Engineering Degree is acceptable.
The full Industry questions and Government responses to questions 5 through 7 are attached with this amendment.
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
CLINS
1. While CLINs 0002-0006, 0008-0012 and 0014-0018 are not separately priced (NSP) at the IDIQ level, they will be priced when utilized at the task order level.
2. All labor ceiling, inclusive of cost and fee, for CPFF CLINs 0002-0006 (NSP CLINs) is included in the overall ceiling for CLIN 0001.
3. All travel cost ceiling for COST CLINs 0008-0012 (NSP CLINs) are included in the overall ceiling for
CLIN 0007.
4. All material cost ceiling for COST CLINs 0014-0018 (NSP CLINs) are included in the overall ceiling for
CLIN 0013.
B-1 ESTIMATED RATES
TASK ORDER PLACEMENT PROCEDURES
Offerors are advised that all Task Orders placed under this contract may be issued in accordance with the procedures delineated in NAVAIR Clause 5252.216-9534 ALT I (Proposed)(NAVAIR)(AUG 2018) – TASK ORDERS
PROCEDURES.
ESTIMATED AND NEGOTIATED LABOR RATES
This language is designed for use in conjunction with H-2 Issuance of Orders Using Streamlined Procedures. The below rates consist of composite fully burdened rates for each labor category, exclusive of fee. The below rates are defined as direct labor rates plus all applicable burdens, to include indirect rates, and subcontracting pass-through costs where applicable; fee will be calculated by the Government using the methodology outlined in clause B-2. The rates below will be utilized when developing estimated labor ceilings for task orders by using the estimated hours per labor category multiplied by the composite rate, inclusive of the fee calculated by the Government in accordance with clause B-2. Invoicing will be based on actual costs incurred. Ceiling for Other Direct Costs will be priced in accordance with the Government Estimate. Orders crossing multiple years will be estimated by the Government using the composite rates for each year in proportion to the period of performance of the order.
NON-PERFORMANCE BASED (TERM) GOVERNMENT SITE
Composite Rates, Excluding Fee (Regardless of Clearance)
Labor Category Gov’t Site BLS SOC/SCA
Code
Year 1
02/01/2020 -
01/31/2021
Year 2
02/01/2021 -
01/31/2022
Year 3
02/01/2022 -
01/31/2023
Year 4
02/01/2023 -
01/31/2024
Year 5
02/01/2024 -
01/31/2025
Program
Manager,Sr.,Key
(offsite)
Pax River 11-1021
Engineer, Sr., Key
(onsite)
Pax River 17-2011
Engineer, Sr.
(offsite)
Pax River 17-2011
Engineer, Sr.
(onsite)
China Lake 17-2011
Engineer, Sr.
(onsite)
Pax River 17-2011
Engineer, Journeyman, Key
(onsite)
Pax River 17-2011
Engineer, Journeyman
(onsite)
Pax River 17-2011
Engineer, Journeyman
(offsite)
Pax River 17-2011
Engineer, Jr.
(onsite)
Pax River 17-2011
Engineer, Jr.
(offsite)
Pax River 17-2011
Engineering
Technician, VI, Key
(onsite)
Pax River 17-3029/30086
Engineering
Technician, VI, (onsite)
Pax River 17-3029/30086
Engineering
Technician, VI, (onsite)
Pt. Mugu 17-3029/30086
Engineering
Technician, IV
(onsite)
Pax River 17-3029/30086
Engineering
Technician, IV
(offsite)
Pax River 17-3029/30086
Engineering
Technician, II
(onsite)
Pax River 17-3029/30084
Engineering
Technician, II
(offsite)
Pax River 17-3029/30084
Systems Analyst, Sr., Key
(onsite)
Pax River 13-1111
Systems Analyst, Sr.,(offsite)
Pax River 13-1111
Systems Analyst, Sr. (onsite)
Pax River 13-1111
Systems Analyst, Journeyman
(onsite)
Pax River 13-1111
Systems Analyst, Journeyman
(offsite)
Pax River 13-1111
Systems Analyst, Jr. (onsite)
Pax River 13-1111
Systems Analyst, Jr. (onsite)
Pt. Mugu 13-1111
Systems Analyst, Jr. (onsite)
China Lake 13-1111
Program Analyst, Journeyman
(onsite)
Pax River 13-1111
Program Analyst, Journeyman
(offsite)
Pax River 13-1111
Administrative
Assistant
(onsite)
Pax River 43-6011
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Attachment 9 Wage
Determination Pax River
Attachment 2 Attachment 10 Wage
Determination Pt. Mugu
01-MAY-2019
Attachment 3 Answers to Questions
Recieved from Industry
01-MAY-2019
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Questions & Answers
Part 2
08-MAY-2019
(End of Summary of Changes)
File details come from the government source that posted it. Updated .