ATT_8__Fully_Burdened_Overtime_Labor_Rates.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
RFP for Mission Systems Test and Evaluation Division (MSTED) follow on effort
Solicitation number
N00421-17-R-0054
Issued by

About this file

This document contains a template for proposing fully burdened overtime labor rates for a federal contract opportunity. The template includes columns for proposed labor categories, individual designators, and fully burdened hourly overtime rates for multiple labor categories at the Patuxent River, China Lake, and Point Mugu sites over a five year period.

The related federal contract opportunity is solicitation number N00421-17-R-0054 from the Department of the Navy Naval Air Systems Command Naval Air Warfare Center for the Mission Systems Test and Evaluation Division follow on effort. No further details are provided on the required products or services.

Attachment 8 Fully Burdened Overtime Labor Rate

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

COLUMNCOLUMN HEADINGDESCRIPTION OF DATA UNDER THIS COLUMN HEADING
AProposed Labor Category (Furnished by Government)(TAB 1), Enter the Proposed Labor Category (if it has not already been entered), as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA".
BIndividual Designator*(TAB 1), For each individual Contractor employee proposed; enter a different Identifing title in the form of FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template; rather, provide that information separately in accordance with the requirements of NAVAIR Clause 5252.232-9529. Enter one FTE# for EACH indiviual proposed. (The number of FTE's must coordinate with the submitted P-6 for evaluation purposes.)
C-GProposed Fully-Burdened Labor Rate per Year, per Labor Category(TAB 1), Enter the Fully-Burdened Labor Rate proposed per year for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Fully-Burdened Labor Rates shall include fringe, overhead, G&A, subcontractor pass-through rate, inclusive of fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs.
H-LGovernment Functional Area Labor Rate per Year, per Functional Labor Rate Category(TAB 1), The Fully-Burdened Labor Rate per Year proposed for the applicable Government Functional Labor Rate Category associated with the Proposed Labor Category is a flat Tripwire of $300,000.00.

Fully Burdened Overtime Rates

ATTACHMENT P-8SiteIndividualFully Burdened Hourly Overtime Rate
Proposed Labor CategoryYear 1Year 2Year 3Year 4Year 5
Program Manager, Sr (Key)(Contractort Site)Patuxent River
Engineer, Sr (Key) (Government Site)Patuxent River
Engineer, Sr (Key)(Contractor Site)Patuxent River
Engineer, Sr. (Government Site)China Lake
Engineer, Sr (Government Site)Patuxent River
Engineer, Sr (Contractor Site)Patuxent River
Engineer, Journeyman (Key) (Government Site)Patuxent River
Engineer, Journeyman (Government Site)Patuxent River
Engineer, Journeyman (Contractor Site)Patuxent River
Engineer, Jr.(Government Site)Patuxent River
Engineer, Jr.(Contractor Site)Patuxent River
Engineering Technician, Sr. (Key) (Government Site)Patuxent River
Engineering Technician, Sr. (Key) (Contractor Site)Patuxent River
Engineering Technician, Sr. (Key) (Government Site)Pt. Mugu
Engineering Technician, Sr. (Government Site)Patuxent River
Engineering Technician, Sr. (Contractor Site)Patuxent River
Engineering Technician, Journeyman (Government Site)Patuxent River
Engineering Technician, Journeyman (Contractor Site)Patuxent River
Engineering Technician, Jr. (Government Site)Patuxent River
Engineering Technician, Jr. (Contractor Site)Patuxent River
Systems Analyst, Sr. (Key) (Government Site)Patuxent River
Systems Analyst, Sr. (Key) (Contractor Site)Patuxent River
Systems Analyst, Sr. (Government Site)Patuxent River
Systems Analyst, Journeyman (Government Site)Patuxent River
Systems Analyst, Journeyman (Contractor Site)Patuxent River
Systems Analyst, Jr. (Government Site)Patuxent River
Systems Analyst, Jr. (Contractor Site)Patuxent River
Systems Analyst, Jr. (Government Site)Pt. Mugu
Systems Analyst, Jr. (Government Site)China Lake
Program Analyst, Journeyman (Government Site)Patuxent River
Program Analyst, Journeyman (Contractort Site)Patuxent River
Administrative Assistant, Journeyman (Government Site)Patuxent River

Sheet3

File details come from the government source that posted it. Updated .