ATT_P-6_Prime_and_Sub_Contractor_Cost_Summary.xls

XLS spreadsheet 701 KB Posted

Attached to
RFP for Mission Systems Test and Evaluation Division (MSTED) follow on effort
Solicitation number
N00421-17-R-0054
Issued by

About this file

This document provides instructions for completing a cost proposal template for a federal contract opportunity with the Department of the Navy Naval Air Systems Command Naval Air Warfare Center.

The cost proposal template requests labor rates, hours, and costs for the prime contractor and up to eight subcontractors for various labor categories over multiple contract line item numbers and periods of performance. Instructions provide guidance on populating labor categories and rates, fringe and overhead rates, fee percentages, and other direct costs in the template. Compliance with formatting requirements is emphasized, such as using two decimal places and not modifying colored cells containing formulas. The template is designed to calculate total costs and fees.

Attachment P6 Prime and Subcontractor Cost Summary

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
(Please note that the cells referenced below correspond to the Cost Type sheet.
Government:
AOn Footer Tab for the worksheet, insert the RFP number after the colon.
BInsert the Contract Line Item Numbers (CLINs) at Cells I2, K2, M2, O2, Q2, S2, U2, W2, Y2 and AA2 for the services and at I415, i425, K415, K425, M415, M425, O415,O425, Q415, Q425, S415, S425, U415, U425, W415, W425, Y415, Y425, AA415 and AA425 for ODCs.
CInsert the CLIN description at Cells I4, K4, M4, O4, Q4, S4, U4, W4, Y4 and AA4. It can be color of money such as APN, OM&N, RDT&E, etc; or it may be specific tasks areas or locations, depending on how the Performance Based Statement of Work is written. (Once these cells are filled in, they will automatically populate cells I417, I427,K417, K427, M417, M427, O417, O427, Q417, Q427, S417, S427, U417, U427, W417, W427, Y417, Y427, AA417, and AA427 with the same information.
DIn column A starting at row 5, insert the Government Labor Categories from the Historical Information being provided in the solicitation. List each category only once regardless of the number of estimated support hours. Once A5 through A40 are filled in, they will automatically populate the corresponding cells for the subcontractors 1 through 8.
EIf Capacity Increase CLIN (CIC) is not being utilized in the solicitation, change the "10%" in cells G407, G408, G409 and G436 to "zero" and hide the rows 406-410, 435 and 436. If utilized, CIC is to be used for all Cost Type CLINs for each period.
Contractor:
1On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated.
2On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in.
3A SUMMARY SHEET OF ALL PERIODS NEEDS TO BE COMPLETED AS A SEPARATE TAB. SAMPLE PROVIDED.
4The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
5Within the work sheet any cell colored "blue" contains a formula and should not be edited.
6All dollar figures shall be carried out no further than two decimal places.
7The worksheet is arranged that the workforce being proposed for an entire period of performance is shown together. When the numbers are carried to Section B, they will be the same as shown on the worksheet.
8In Cell B2, enter the period of performance calendar dates. (ex: 1 Jan 09 - 31 Dec 09)
9In column A, starting at row 5 to 40, the Government Labor Categories from the solicitation should have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. However, if it is not comparable, utilize the "not comparable" row. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. The Offeror is not required to utilize the Government's labor categories. However, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. The Offeror does not insert any subcontractor information in this section. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
10In column C, the Offeror should insert a "G" for Government spaces.
11In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the prime contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) For the subcontractors, their fields are in yellow. No input is required by the Offeror in this column. Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
12In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforces, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
13In column F, enter the name of the proposed individual for that position.
14In column G:
(a) for the prime contractor, enter the unburdened labor rate for each individual (e.g. rows 5-44)
(b) In Cell G46 the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell G47 the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank.
(d) In Cell G50, the prime contractor should insert its overhead rate for work performed at the contractor's facility.
(e) In Cell G51, the prime contractor should insert its overhead rate for work performed at the Client/Government's facility.
(f) In Cell G53, the prime contractor should insert its G&A rate being applied.
(g) for the subcontractor enter the fully burden cost including fixed fee associated with individual labor category for CLIN XX00 (e.g., rows 59-98, 101-140, 143-182, 185-224, 227-266, 269-308, 311-350, and 353-392)
(h) In Cell G395 and G808, the prime should insert the subcontractor handling charge, if any.
(i) In Cell G398, the prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
(j) In Cell G399, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
15In column H, and then similarly for Columns J, L, N, P, R, T, V, X and Z:
(a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for CLIN XX00 (e.g., rows 5-44, 59-98, 101-140, 143-182, 185-224, 227-266, 269-308, 311-350, and 353-392). Also make sure you plug in the hours for columns J, L, N and so on.
(b) In Cell H46, the prime contractor should insert the "labor base" its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell H47, the prime contractor should insert the "labor base" its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(d) In Cell H50, the prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the contractor's facility.
(e) In Cell H51, the prime contractor should insert the "labor base" its overhead rate is being applied to for work performed at the Client/Government's facility.
(f) In Cell H53, the prime contractor should insert the base its G&A rate is being applied to.
(g) In Cell H398 and H811, the prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor).
(h) In Cell H399 and H812, the prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any.
(i) Under Other Direct Costs, the prime contractor should insert the Travel, Material by CLIN.
16Column AE automatically calculated the total hours for all the CLINS.
17Column AG is a summation of the costs.
18In cells I832, K832, M832, O832, Q832, S832, U832, W832, Y832, and AA832 enter the amount for travel .
19In cell G834 enter the rate for material handling if it is being applied to Travel and Material. If not applying a material handling, cell should be left blank.
20In cell G835 enter the rate for G&A if it is being applied to Travel and Material. If not applying a G&A rate, cell should be left blank.
21When submitting this file, the instructions may be deleted.
In cell I851, K851, L851, M851, O851, Q851, and AG are all totalled.
Make sure that all categories are totaled for example (I854, K854, L854, M854, O854, Q854, and AG).

Cost Type

DO NOT TYPE IN ANY COLORED AREASYear 1Year 2Year 3Year 4Year 5
Period of Performance:CLIN0001CLIN0001CLIN0001CLIN0001CLIN0001CLINXX06CLINXX07CLINXX08CLINXX09CLINXX10CLINXX11
ServicesContractorhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalHrs
Government Labor CategoryProposed Categorysitesubf/pEmployee NameRateLaborLaborLaborLaborLabor(description)(description)(description)(description)(description)(description)SUMTotal
Program Manager, Sr. (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (China Lake, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Point Mugu)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, offsite) (KEY)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Point Mugu, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (China Lake, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, offsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative Assistant, Journeyman (Pax River, onsite)$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
subtotal0$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
fringe fulltime0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
OverheadBaseBaseBaseBaseBaseBaseBaseBaseBaseBaseBase
Contractor site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Client site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
COM0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor$ - 0
Subcontractors
Sub: 1:
Program Manager, Sr. (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (China Lake, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Point Mugu)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, offsite) (KEY)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Point Mugu, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (China Lake, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, offsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative Assistant, Journeyman (Pax River, onsite)1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 1- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 2:
Program Manager, Sr. (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (China Lake, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Point Mugu)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, offsite) (KEY)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Point Mugu, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (China Lake, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, offsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative Assistant, Journeyman (Pax River, onsite)2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 2- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 3
Program Manager, Sr. (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (China Lake, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Point Mugu)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, offsite) (KEY)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Point Mugu, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (China Lake, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, offsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative Assistant, Journeyman (Pax River, onsite)3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 3- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 4:
Program Manager, Sr. (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (China Lake, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Point Mugu)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, offsite) (KEY)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Point Mugu, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (China Lake, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, offsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative Assistant, Journeyman (Pax River, onsite)4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 4- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 5:
Program Manager, Sr. (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (China Lake, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Point Mugu)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, offsite) (KEY)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (Point Mugu, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Jr. (China Lake, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Program Analyst, Journeyman (Pax River, offsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative Assistant, Journeyman (Pax River, onsite)5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 5- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 6:
Program Manager, Sr. (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr. (China Lake, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Sr.( Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Journeyman (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer, Jr. (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Point Mugu)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Sr. (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Journeyman (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineering Technician, Jr. (Pax River, offsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River, offsite) (KEY)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Sr. (Pax River)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Systems Analyst, Journeyman (Pax River, onsite)6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .