This document outlines a Contract Surveillance Plan for Mission Systems Test and Evaluation Support Services. The plan details performance standards and acceptance levels for engineering, management, technical support and data tasks. It identifies key government resources such as the Contracting Officer and Contracting Officer's Representative. It describes their roles and responsibilities for monitoring contractor performance. Surveillance methods include the Contractor Performance Assessment Reporting System and monthly performance reviews. Metrics cover quality, schedule, cost control, and other areas. Incentives include exercising option years for satisfactory performance. The related federal contract opportunity is a request for proposal from the Department of the Navy Naval Air Systems Command for follow-on Mission Systems Test and Evaluation Division support services.
Attachment 1 Contractor Surveillance Plan
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT SURVEILLANCE PLAN (CSP)
MISSION SYSTEMS TEST AND EVALUATION SUPPORT SERVICES FOR AIR 5.1.2
MISSION SYSTEMS TEST AND EVALUATION DIVISION
1.
Purpose
The purpose of this Government developed and applied Contract Surveillance Plan (CSP) is to ensure that systematic quality assurance methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the Contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract.
This CSP describes how the Government will observe, evaluate and document the Contractor’s performance in meeting the critical performance standards identified in the contract. Specifically, the CSP will identify the Government resources responsible for monitoring performance and surveillance methods that will be utilized in determining the quality level of services and products delivered under the contract. A properly executed CSP will assist the Government in achieving the objectives of this procurement.
The contract requirement is to provide Engineering and Technical support in the core area of Mission Systems Test and Evaluation to various test teams in the areas of Test Planning, Test Conduct, Data Analysis, Test Reporting, Technical Documentation and Test Project Management.
2.
Authority
Authority for issuance of this CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections, acceptance of the services and documentation called for in the contract, to be executed by the Contracting Officer or a duly authorized representative.
3.
Scope
This CSP provides Government surveillance oversight of the quality of the Contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.
4.
Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer) (PCO) or administer (Administrative Contracting Officer) (ACO) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR 2.5.1.12. The ACO will be designated in the resulting order. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed for the resulting contract. The limitations of authority are contained in a written letter of appointment.
5.
Responsibilities
The following Government resources shall have responsibility for the implementation of this CSP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance
Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. In addition to the continuous monitoring of performance, the COR will also submit an annual assessment in the Navy’s Contractor Performance Assessment Reporting System (CPARS). For CPARS, the COR assesses quality of the product or service, schedule, cost control, business relations, management, small business compliance and other important areas. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
Technical Point of Contact (TPOC) – The TPOC is responsible for technical administration of the contract and the tasks addressed throughout the SOW and CSP. The TPOC is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf 6.
Methods of QA Surveillance a.
Contractor Performance Assessment Report System (CPARS) – The market place for Test and Evaluation (T&E) flight test support is very competitive. As such, the Contractor has a vested interest in the Government generated CPARS rating under this contract. For this procurement the Government will address the quality of product or service, schedule, cost control, business relations, management, small business compliance and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the CSP.
b.
CSP - The below listed methods of surveillance shall be used by the TPOC and/or COR in the technical administration of this CSP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Contract Surveillance Plan (enclosure 5) provided herein.
7. Surveillance
Enclosures (1) and (2) set forth the Technical Support and Data performance standards and surveillance methods; Enclosure (3) provides details on Incentives. Enclosure (4) provides the Surveillance Method and Rating Definitions. Enclosure (5) provides the checklists for monthly and annual surveillance. The COR shall document the monthly surveillance results and then provide that data to the Contracting Officer in a monthly report.
8. Documentation
In addition to providing monthly reports to the Contracting Officer and completing an annual CPARS report, the COR will maintain a complete record of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Contract Surveillance Plans. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) –Engineering, Management and Technical Support Performance Standards
Enclosure (2) – Data Performance Standards
Enclosure (3) - Incentives
Enclosure (4) – Surveillance Method and Rating Definitions
Enclosure (5) – Contract Surveillance Plans
ENGINEERING, MANAGEMENT AND TECHNICAL SUPPORT
Performance STANDARDS (Enclosure 1) SOW Task
Description
| Performance Standard and Acceptable Quality Level (AQL) |
| Surveillance |
Method/Measure Incentives
| Customer billing and work tracking |
| The Contractor shall use a government-approved system to support customer billing and work tracking of not less than 95% accuracy on each individual customer invoice. |
| 100% Inspection by COR and customer feedback. |
| See |
enclosure (3)
| Task status tracking |
| The contractor shall use a government-approved task tracking system to track 100% of task status. |
| 100% Inspection by COR and customer feedback. |
| See |
enclosure (3)
| Management of government owned property |
| The contractor shall maintain, at a 95% operational status, GFE in a manner that is consistent with established preventive maintenance practices and operated in accordance with applicable federal, state and local laws. |
| 100% Inspection by COR and customer feedback. |
| See |
enclosure (3)
| Test Planning & Test Reporting |
| The contractor shall produce test plans and reports that require less than 10% re-work in accordance with applicable instructions. Test plans shall be in accordance with NAVAIRINST 3960.4C (or subsequent) and plans a safe and efficient test program. Test reports shall be in accordance with NAVAIRINST 3905.1 (or subsequent) and completely and accurately describe the results of tests. |
| 100% Inspection by COR and customer feedback. |
| See |
enclosure (3)
| Test instrumentation |
| The contractor shall design and maintain instrumentation related to this task order to maintain a 99% availability rate. The instrumentation shall be capable of recording all required test parameters and provide an avenue to conduct post flight data review. |
| 100% Inspection by COR and customer feedback. |
| See |
enclosure (3)
| Conducting of flight test |
| The contractor shall execute flight test to not exceed the negotiated completion date by 10% and provide the necessary data to write a report. The conduct of test will be in a safe and efficient manner. |
| 100% Inspection by COR and customer feedback. |
| See |
enclosure (3)
Data Performance Standards (Enclosure 2)
| SOW Task Description |
| Performance Standard and Acceptable Quality Level (AQL) |
| Surveillance |
Method/Measure Incentives
| Monthly reports. |
| Submission is in accordance with the DID cited in the CDRL. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR and customer feedback. |
| See enclosure (3) |
| Test Plan |
| Submission is in accordance with the DID cited in the CDRL. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR and customer feedback. |
| See enclosure (3) |
| Laboratory Status Report |
| Submission is in accordance with the DID cited in the CDRL. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR and customer feedback. |
| See enclosure (3) |
| Test and Evaluation Report |
| Submission is in accordance with the DID cited in the CDRL. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR and customer feedback. |
| See enclosure (3) |
| Document Review |
| Submission is in accordance with the DID cited in the CDRL. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR and customer feedback. |
| See enclosure (3) |
| Trip Report |
| Submission is in accordance with the DID cited in the CDRL. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government |
| 100% Inspection by COR and customer feedback. |
| See enclosure (3) |
INCENTIVES (Enclosure 3) The following incentives shall apply to performance under this contract.
| Assessment Period |
| Acceptable Performance Definition |
| How Measured |
Incentives
Base Year:
| No measurement areas rated below “Satisfactory”. |
| CPARS annual evaluations |
| (+) Meet the acceptable performance definition as a condition for exercise of Option 1.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of Option 1.*
Option Year 1
| No measurement areas rated below “Satisfactory”. |
| CPARS annual evaluations |
| (+) Meet the acceptable performance definition as a condition for exercise of Option 2.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of Option 2.*
Option Year 2
| No measurement areas rated below “Satisfactory”. |
| CPARS annual evaluations |
| (+) Meet the acceptable performance definition as a condition for exercise of Option 3.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of Option 3.*
Option Year 3
| No measurement areas rated below “Satisfactory”. |
| CPARS annual evaluations |
| (+) Meet the acceptable performance definition as a condition for exercise of Option 4.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of Option 4.*
SURVEILLANCE METHOD AND RATING DEFINITIONS (Enclosure 4) The Government may not choose to exercise an option unless all regulatory requirements are met and the Contractor meets the acceptable performance definition.
All SOW/CDRL tasks and sub-tasks will be assessed focusing on the following:
Quality of Product or Service – Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule – Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events discuss causes, and assess the effectiveness of Contractor corrective actions.
Cost Control – Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the Contractor experiencing cost growth or underrun? If so, discuss the causes and Contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations – Assess the timelines, completeness, and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, Engineering Change Proposals (ECPs) or other Undefinitized Contract Actions (UCAs), the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management Responsiveness – Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans. Consider the Contractor’s responsiveness to the program as it relates to meeting contract requirements during the period covered by the report. If applicable, identify any other management areas that are unique to the contract.
Other areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the Contractor’s actions appear or were ineffective.
CONTRACT SURVEILLANCE PLAN (Enclosure 5)
Monthly Surveillance:
The COR will perform a Monthly assessment of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure 4.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Mgmt. |
Other
| Monthly reports. |
| Inspection by COR and customer feedback |
| TBD |
| Test Plan |
| Inspection by COR and customer feedback |
| TBD |
| Laboratory Status Report |
| Inspection by COR and customer feedback |
| Test and Evaluation Report |
| Inspection by COR and customer feedback |
| Document Review |
| Inspection by COR and customer feedback |
| Trip Report |
| Inspection by COR and customer feedback |
Monthly Summary of Ratings:
Quality
Schedule
Number of Exceptional
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Cost Control
Business Relations
Management Responsiveness Other Areas
Number of Unsatisfactory
Annual Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure 4 and the monthly summary of ratings. This annual assessment will occur at the midpoint of each period and cover the previous 12 months, except for the base period which will cover only the previous 6 months.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Monthly Ratings. |
| TBD |
| Schedule |
| Review of Monthly Ratings. |
| TBD |
| Cost Control |
| Review of Monthly Ratings |
| TBD |
| Business Relations |
| Review of Monthly Ratings |
| TBD |
| Management |
| Review of Monthly Ratings |
| TBD |
| Other Areas |
| Review of Monthly Ratings |
| TBD |
File details come from the government source that posted it. Updated .